Loading...
HomeMy WebLinkAboutKnorr Systems Inc; 2017-05-16; PKRC624Tracking#: EXHIBIT B Knorr Systems, Inc. shall install a new mechanical ro.om control system at the Monroe Street Pool. All work shall be performed in accordance with the attached Contractor's proposal and data sheet. JOB QUOTATION ITEM DESCRIPTION PRICE NO. 1 Mechanical Room Control System $13,612.00 2 Installation Materials $350.00 3 Installation Labor $4,664.00 4 Sales Tax (7.75%) $1,082.06 5 Freight $236.82 TOTAL $19,944.88 Agreement shall not exceed $19,944.88 MECHANICAL ROOM CONTROL SYSTEM INSTALLATION; CONT. NO. PKRC624 Page 6 of 6 City Attorney Approved 9/27/2016 Payment: Interest: Returns: Restock: Freight: Sales Tax: Notes: Commissioning: 2 Terms and Conditions Net 30 days from date of invoice Quoted equipment will not be subject to project retention and invoices must be paid in full 18% APR is charged on all past due invoices Returns MUST be pre-approved, shipped prepaid and accompany written return authorization A MINIMUM 20% restock fee applies to all returns; % is based on actual manufacturer restock fee F.O.B. individual ship points; refer to estimated freight costs above Subject to sales tax rate as noted above Pricing valid through June 30, 2017 Pricing excludes Health Department plan check fees, Payment I Performance I Bid Bond fees and Insurance Certificates. All labor rated quoted meets current california DIR and Prevailing Wage requirements. Mechanical equipment commissioning is provided at no charge by KSI's Service Department On-site equipment commissioning is determined by size/type equipment provided. City of Carlsbad -BECSys7