HomeMy WebLinkAboutKnorr Systems Inc; 2017-05-16; PKRC624Tracking#:
EXHIBIT B
Knorr Systems, Inc. shall install a new mechanical ro.om control system at the Monroe Street Pool. All
work shall be performed in accordance with the attached Contractor's proposal and data sheet.
JOB QUOTATION
ITEM DESCRIPTION PRICE
NO.
1 Mechanical Room Control System $13,612.00
2 Installation Materials $350.00
3 Installation Labor $4,664.00
4 Sales Tax (7.75%) $1,082.06
5 Freight $236.82
TOTAL $19,944.88
Agreement shall not exceed $19,944.88
MECHANICAL ROOM CONTROL SYSTEM
INSTALLATION; CONT. NO. PKRC624 Page 6 of 6 City Attorney Approved 9/27/2016
Payment:
Interest:
Returns:
Restock:
Freight:
Sales Tax:
Notes:
Commissioning:
2
Terms and Conditions
Net 30 days from date of invoice
Quoted equipment will not be subject to project retention and invoices must be paid in full
18% APR is charged on all past due invoices
Returns MUST be pre-approved, shipped prepaid and accompany written return authorization
A MINIMUM 20% restock fee applies to all returns; % is based on actual manufacturer restock fee
F.O.B. individual ship points; refer to estimated freight costs above
Subject to sales tax rate as noted above
Pricing valid through June 30, 2017
Pricing excludes Health Department plan check fees, Payment I Performance I Bid Bond fees and
Insurance Certificates.
All labor rated quoted meets current california DIR and Prevailing Wage requirements.
Mechanical equipment commissioning is provided at no charge by KSI's Service Department
On-site equipment commissioning is determined by size/type equipment provided.
City of Carlsbad -BECSys7