HomeMy WebLinkAboutPalm Engineering Construction Company Inc; 2015-12-17; PWM16-35TRANRECORDED REQUESTED BY
CITY OF CARLSBAD
AND WHEN RECORDED PLEASE
MAIL TO:
City Clerk
City of Carlsbad
1200 Carlsbad Village Drive
Carlsbad, California 92008
DOC# 2016-0209568
I llllll lllll lllll lllll l/1111111111111111111111111111111111111111111111
May 03, 2016 04:30 PM
OFFICIAL RECORDS
Ernest J. Dronenburg, Jr.,
SAN DIEGO COUNTY RECORDER
FEES: $0.00
PAGES: 1
Space above this line for Recorder's use.
PARCEL NO: n/a
NOTICE OF COMPLETION
Notice is hereby given that:
1. The undersigned is owner of the interest or estate stated below in the property hereinafter described.
2. The full name of the undersigned is City of Carlsbad, a municipal corporation.
3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008.
4. The nature of the title of the undersigned is: In fee.
5. A work or improvement on the property hereinafter described was completed on March 14, 2016.
6. The name of the contractor for such work or improvement is Palm Engineering Construction
Company, Inc.
7. The property on which said work or improvement was completed is in the City of Carlsbad, County of
San Diego, State of California, and is described as follows: Project No. 6322 (PWM16-35TRAN),
Grand Avenue Pedestrian Enhancement (Carlsbad by the Sea).
8. The street address of said property is on Grand Avenue in the City of Carlsbad.
City Engi9ee~:,,/ 1
[.,,"'
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California,
92008; the City Manager of said City on A:f)Bi\ 1:k , 2o___llz_, accepted the above
described work as completed and ordered that a Notice of Completion be filed.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on 6lr1 ) ;2 f , 20 /~ , at Carlsbad, California.
CITY. OF CARLSBAD ~ c~ 'I '"'1'.a 1_,,hi.A,,P~c;7 ~ (,~
L~ARBARA ENGLESO .,_,,
City Clerk
Word\Masters\Forms\Notice of Completion (City) 3/9/98
CITY OF CARLSBAD
ACCEPTANCE OF PUBLIC IMPROVEMENTS
COMPLETION OF PUBLIC IMPROVEMENTS
The contractor has constructed the improvements required for Project No. 6322
(PWM16-35TRAN), Grand Avenue Pedestrian Enhancement (Carlsbad by the Sea), and has
requested that the City of Carlsbad accept the public improvements. City forces have inspected
the public improvements and found them to be satisfactory. The public improvements consist
of:
IMPROVEMENTS VALUE
Street Striping $10,758
PUBLIC WORKS DIRECTOR CERTIFICATION OF COMPLETION OF IMPROVEMENTS
&)'' 'i ) ,,/' .,,'"-""-l
< Mi,/~/~----«Jf.:b4L1t.~)tb
Js:1i;1.,-Public wc::Jrector Date '/ / .
CITY MANAGER'S ACCEPTANCE OF PUBLIC IMPROVEMENTS
The construction of the above described public improvements is deemed complete and hereby
accepted. The City Clerk is hereby authorized to record the Notice of Completion and release
the bonds in accordance with State Law and City Ordinances.
The City of Carlsbad is hereby directed to commence maintaining the above described
improvements.
APPROVED AS TO FORM:
CELIA BREWER, City Attorney
By:~
Assistant City Attorney };qut:J
Word\Masters\Forms\Acceptance of Public Improvements (City) 3/9/98
PWM16-35TRAN
CITY OF CARLSBAD
MINOR PUBLIC WORKS CONTRACT
GRAND AVENUE PEDESTRIAN ENHANCEMENT (CARLSBAD BY THE SEA); CONT. NO. 6322
This agreement is made on the l1:~ day of v eceW\ b er' , 2015, by the City
of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and Palm Engineering
Construction Company, Inc., a California corporation whose principal place of business is 7330 Opportunity
Road, Suite J, San Diego, CA 92111 (hereinafter called "Contractor").
City and Contractor agree as follows:
DESCRIPTION OF WORK. Contractor shall perform all work specified in the Contract documents for the
project described by these Contract Documents (hereinafter called "Project").
PROVISIONS OF LABOR AND MATERIALS. Contractor shall provide all labor, materials, tools,
equipment, and personnel to perform the work specified by the Contract Documents unless excepted
elsewhere in this Contract.
CONTRACT DOCUMENTS. The Contract Documents consist of this Contract, exhibits to this Contract,
Contractor's Proposal, the Plans and Specifications, the General Provisions, addendum(s) to said Plans
and Specifications, and all proper amendments and changes made thereto in accordance with this Contract
or the Plans and Specifications, all of which are incorporated herein by this reference. When in conflict,
this Contract will supersede terms and conditions in the Contractor's proposal.
LABOR. Contractor will employ only skilled workers and abide by all State laws and City of Carlsbad
Ordinances governing labor.
GUARANTEE. Contractor guarantees all labor and materials furnished and agrees to complete the Project
in accordance with directions and subject to inspection approval and acceptance by: John Kim (City Project
Manager)
WAGE RATES. The general prevailing rate of wages for each craft or type of worker needed to execute
the contract shall be those as determined by the Dire,ctor of Industrial Relations pursuant to Sections 1770,
1773 and 1773.1 of the Labor Code. Pursuant to Section 1773.2 of the Labor Code, a current copy of the
applicable wage rates is on file in the Office of the City Engineer. The contractor to whom the contract is
awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him
or her in execution of the contract.
The Prime Contractor shall be responsible for insuring compliance with provisions of section 1777.5 of the
Labor Code and section 4100 et seq. of the Public Contracts Code, "Subletting and Subcontracting Fair
Practices Act." The City Engineer is the City's "duly authorized officer" for the purposes of section 4107 and
4107.5.
The provisions of Part 7, Chapter 1, of the Labor Code commencing with section 1720 shall apply to the
Contract for work.
A contractor or subcontractor shall not be qualified to bid on, be listed in a bid proposal, subject to the
requirements of Section 4104 of the Public Contract Code, or engage in the performance of any contract
for public work, unless currently registered and qualified to perform public work pursuant to Section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
FALSE CLAIMS. Contractor hereby agrees that any contract claim submitted to the City must be asserted
as part of the contract process as set forth in this agreement and not in anticipation of litigation or in
conjunction with litigation.
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 1 of 6 City Attorney Approved 10/6/15
PWM16-35TRAN
Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act,
provides for civil penalties where a person knowingly submits a false claim to a public entity. These
provisions include false claims made with deliberate ignorance of the false information or in reckless
disregard of the truth or falsity of the information.
The provisions of Carlsbad Municipal Code sections 3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining
to false claims are incorporated herein by reference.
Contractor hereby acknowledges that the filing of a false claim may subject the Contractor to an
administrative debarment proceeding wherein the contractor may be prevented from further bidding on
public contracts for a period of up to five years and that debarment by another jurisdiction is grounds for
the City of Carlsbad to disqualify the Contractor or subcontract~flrogi participatii::i{l in contract bidding.
/i'~.'("~/~ {,.,..~~
Signature: i/
Print Name: \<asouJ S'noJ, laa z_j
REQUIRED INSURANCE. The successful contractor shall provide to the City of Carlsbad, a Certification
of Commercial General Liability and Property Damage Insurance and a Certificate of Workers'
Compensation Insurance indicating coverage in a form approved by the California Insurance Commission.
The certificates shall indicate coverage during the period of the contract and must be furnished to the City
prior to the start of work. The minimum limits of liability insurance are to be placed with California admitted
insurers that have a current Best's Key Rating of not less than "A-:VII"; OR with a surplus line insurer on
the State of California's List of Approved Surplus Line Insurers (LASLI) with a rating in the latest Best's Key
Rating Guide of at least "A:X"; OR an alien non-admitted insurer listed by the National Association of
Insurance Commissioners (NAIC) latest quarterly listings report.
Commercial General Liability Insurance of Injuries including accidental death, to any one person in an
amount not less than ........ $'1 ,000,000
Subject to the same limit for each person on account of one accident in an amount not less than
....... $1,000,000
Property damage insurance in an amount of not less than ........ $1,000,000
Automobile Liability Insurance in the amount of $1,000,000 combined single limit per accident for bodily
injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of
the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-
scheduled. The automobile insurance certificate must state the coverage is for "any auto" and cannot be
limited in any manner.
The above policies shall have non-cancellation clauses providing that thirty (30) days written notice shall
be given to the City prior to such cancellation.
The policies shall name the City of Carlsbad as an additional insured. The full limits available to the named
insured shall also be available and applicable to the City as an additional insured.
WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY. Workers' Compensation limits as
required by the California Labor Code. Workers' Compensation will not be required if Contractor has no
employees and provides, to City's satisfaction, a declaration stating this.
INDEMNITY. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and
hold harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability of
every kind, nature and description, directly or indirectly arising from or in connection with the performance
of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable
law, rules or regulations including those related to safety and health; and from any and all claims, loss,
damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 2 of 6 City Attorney Approved 10/6/15
PWM16-35TRAN
nature of the work covered by the Contract, except for loss or damage caused by the sole or active
negligence or willful misconduct of the City. The expenses of defense include all costs and expenses
including attorneys' fees for litigation, arbitration, or other dispute resolution method.
JURISDICTION. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego County,
California.
Start Work: Contractor agrees to start within ten (10) working days after receipt of Notice to Proceed.
Completion: Contractor agrees to complete work within ten (10) working days after receipt of Notice to
Proceed.
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
/II
Ill
Ill
Ill
Ill
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 3 of 6 City Attorney Approved 10/6/15
CONTRACTOR'S INFORMATION.
PALM ENGINEERING CONSTRUCTION
COMPANY, INC.
(name of Contractor)
853930
(Contractor's license number)
A,B,C27,C10 -Exp. 2/28/2017
(license class. and exp. date)
(DIR registration number)
(DIR registration exp. date)
PWM16-35TRAN
7330 OPPORTUNITY ROAD, STE J
(street address)
SAN DIEGO, CA 92111
(city/state/zip)
619-291-1495
(telephone no.)
(fax no.)
stan@palmengineeringco.com
(e-mail address)
AUTHORITY. The individuals executing this Agreement and the instruments referenced ln it on behalf of
Contractor each represent and warrant that they have the legal power, right and actual authority to bind
Contractor to the terms and conditions of this Agreement.
CONTRACTOR
PALM ENGINEERING CONSTRUCTION
COMPANY, a Califo/r\ia crporation
By: i.J~I . i i /!;',.-
CITY OF CARLSBAD, a municipal corporation
of the State of California
By:
..-(.sign hyre) . c· f) . .l \ Ra ~ouJ 8 bO\-b b c. 2-1rcf.6i&.i.Jt.V
(print ~me/title)
Patrick A. Thoma ub c Works Director
as authorized by the City Manager
By: .. / }
'(sign here)
Sb.Cl,~ belzi -$ eef·e-ta. \I'll
{print name/t~e} ;...,I
If required by City, proper notarial acknowledgment of execution by Contractor must be attached . .!tJ!
corporation, Agreement must be signed by one corporate officer from each of the following two groups:
Group A
Chairman,
President, or
Vice-President
Group B
Secretary,
Assistant Secretary,
CFO or Assistant Treasurer
Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under
corporate seal empowering the officer(s) signing to bind the corporation.
APPROVED AS TO FORM:
CELIA A. BREWER, City Attorney
'/~---· BY: ~ ~~~./A~'
¥ettiftt-City Attorney
#::pidJ
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 4 of 6 City Attorney Approved 10/6/15
PWM16-35TRAN
EXHIBIT A
LISTING OF SUBCONTRACTORS BY GENERAL CONTRACTOR
Set forth below is the full name and location of the place of business of each sub-contractor whom the
Contractor proposes to subcontract portions of the Project in excess of one-half of one percent of the total
bid, and the portion of the Project which will be done by each sub-contractor for each subcontract.
NOTE: The Contractor understands that if it fails to specify a sub-contractor for any portion of the Project
to be performed under the contract in excess of one-half of one percent of the bid, the contractor
shall be deemed to have agreed to perform such portion, and that the Contractor shall not be
permitted to sublet or subcontract that portion of the work, except in cases of public emergency or
necessity, and then only after a finding, reduced in writing as a public record of the Awarding
Authority, setting forth the facts constituting the emergency or necessity in accordance with the
provisions of the Subletting and Subcontracting Fair Practices Act (Section 4100 et seq. of the
California Public Contract Code).
If no subcontractors are to be employed on the project, enter the word "NONE."
SUBCONTRACTORS
Portion of Project to Business Name and Address DIR Registration License No., %of
be Subcontracted No. Classification & Total
Expiration Date Contract
/
l)v
Total% Subcontracted: ______ _
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 5 of 6 City Attorney Approved 10/6/15
PWM16-35TRAN
EXHIBIT B
(ENTER SCOPE OF WORK, SPECIFICATIONS, CONTRACTOR'S PROPOSAL, ETC.)
JOB QUOTATION
ITEM UNIT QTY DESCRIPTION PRICE
NO.
1 LS 1 Labor, equipment and materials required to provide the $10,758.00
concrete, brick and striping improvements on Grand
Avenue adjacent to the Carlsbad By The Sea retirement
community as shown on the attached exhibit.
TOTAL* $10,758.00
*Includes taxes, fee's, expenses and all other costs.
GRAND AVE PEDESTRIAN ENHANCEMENT;
CONT. NO. 6322 Page 6 of 6 City Attorney Approved 10/6/15
PALM ENGINEERING CONSTRUCTION COMPANY, INC.
7330 Opportunity Road, Suite 1, San Diego, CA 92111
(619) 291-1495, fax (619) 291-0482
Proposal 1501-A
September 22, 2015
JAY JORDAN
City of Carlsbad
5950 El Camino Real
Carlsbad, CA 92008-8802
(760) 602-2780 x7306
Email: Jay.Jordan@carlsbadca.gov
Re: NW Storm Drain , Misc. Water Valve Replacement, Pavement Management
Proposal for Provide & Install Two (2) Pedestrian Ramps per attached
Drawing
1. Demolition & Removal 1,800.00
2. Concrete 1,728.00
3. Brick Pavers 1,920.00
4. Truncated Domes 3,600.00
5. Striping 1,500.00
6.
Subtotal 10,548.00
7. Bond 210.00
Total Lump Sum Proposal $10,758.00
Exhibit "C"
Thank you for your consideration of the above proposal. If you have any questions, please
call me at (619) 438-8202.
Upon acceptance of this proposal, please provide a signed Change Order and Purchase
Order enabling us to proceed. No work can proceed without these executed documents.
Respectfully Submitted,
Stan Smith
Project Manager
SS/hmd
GRAND AVENUE
--------TO GARFIELD STREET
EXISTING SIGN,
PROPOSED RRFB LOCATION (BY OTHERS)
EXIS-m,G SIGN
EXISTING SIGN
TO REMAIN
PROPOSED RRFB LOCATION (BY OTHERS) \ TO CARLSBAD BOULEVARD------
NOT TO SCALE
GRAND AVENUE CROSSWALK
CARLSBAD BY THE SEA
0
0
0
0
CONSTRUCTION NOTES:
REMOVE EXISTING AC PAVEMENT. INSTALL NEW
4" PCC CONCRETE SIDEWALK. MATCH EXISTING
GRADE.
REMOVE EXISTING AC PAVEMENT. INSTALL NEW 2'
WIDE STRIP OF BRICK PAYERS TO MATCH EXISTING.
MATCH EXISTING GRADE.
REMOVE EXISTING TRUNCATED DOMES. REPAIR
AREA WITH NEW 4" PCC CONCRETE SIDEWALK-
INSTALL NEW 11'X3' TRUNCATED DOMES PER
SAN DIEGO REGIONAL STANDARD DRAWING
G-30.
PAINT NEW 4" BLUE STRIPE AS SHOWN.
SHEET1 OF 1
APPROVED:
TRAFFIC DIVISION DATE