Loading...
HomeMy WebLinkAboutWestern A/V Inc; 2017-03-07; PKRC612CITY OF CARLSBAD CONTRACT CHANGE ORDER TRANSMITTAL -C/O # 1 Project: PKRC612, Alga Norte Park Community Room AV Systems Upgrade Date Routed: Reasons for changes: Project Manager Parks & Recreation Director Finance Director~ 1--10 City Manager Item 1: The city provided an existing source code for the audio visual systems upgrade at Alga Norte Community Park. Despite programming efforts, the existing control processor did not respond to the code. To complete the upgrade, a new control processor with source code is needed. COST ACCOUNTING SUMMARY: Original contract amount $27,725.30 Total amount this C/O $8,285.37 Total amount of previous C/O's $0.00 Total C/O's to date $8,285.37 New Contract Amount $36,010.67 Total C/O's as% of original contract 29.88% Contingency amount encumbered $0.00 Contingency increase/ decrease $0.00 Contingency Subtotal $0.00 Total C/O's to date $8,285.37 Contingency balance -$8,285.37 Note: this CCO will be encumbered to the PO once fully executed. Project: PKRC612, Alga Norte Park Community Room AV Systems Upgrade Change Order No. 1 CITY OF CARLSBAD CONTRACT CHANGE ORDER NO. 1 PROJECT: PKRC612, Alga Norte Park Community Room AV Systems Upgrade CONTRACT NO. PKRC612 ACCOUNT NO. 0014510-7550 CONTRACTOR: Western Audio Visual ADDRESS: 6353 Corte Del Abeto, Suite 106 Carlsbad, CA 92011 P.O. NO. P133639 The Contractor is directed to make the following changes as described herein. Changes shall include all labor, materials, equipment, contract time extension, and all other goods and services required to implement this change. Payment stated on this change order includes all charges, direct or indirect, arising out of this additional work including charges for field overhead, extended home office overhead, delays, disruptions, cumulative impacts, loss of efficiency, extended equipment costs and overtime premium costs and is expressly agreed between the City and the Contractor to be the complete and final costs hereof. The requirements of the specifications, where pertinent and not in conflict with this change order, shall apply to these changes. Pursuant to the Standard Specifications for Public Works Construction, perform the following: Item 1: Increase to contract cost. ........................................................... $8,285.37 TOTAL INCREASE TO CONTRACT COST .............................................. $8,285.37 TIME FOR COMPLETION OF ALL WORK UNDER THIS CONTRACT SHALL BE INCREASED BY THREE (3) WORKING DAYS AS A RESULT OF THIS CHANGE ORDER. Project: PKRC612, Alga Norte Park Community Room AV Systems Upgrade Change Order No. 1 RECOMMENDED BY: ~~ 7/JD/17 FINANCE DIRECTOR (DATE) APPROVED BY: , -//~ ~,{a?~ CONTATR -~/2~1; 7 (DAT ) --== -~,Uestern '-'-.__!audio Visual Hailey Schellin OranOjl County Offlc•: 6353 Corte Del Abeto, Suite 106 1692 N. Batavia St., Suite #2 Carlsbad, CA 92011 Orange, CA 92867 ?hone: (760) 431-89-48 Phone: {714) 637-7272 Fax: (760) 438-0086 Fax: (714) 637-7330 Prepared tor: Alga Norte Park Meeting Room AV Systems Upgrade Proposal COMPANY: City of Carlsbad -Alga Norte Switcher/Processc A TT!:NTION: Kelly Murphy ADDRESS: 6565 Alicante Rd 0 Carlsbad, CA, 92009 TELEPHONE: (760) 434-2982 FAX PHONE:· E~MAIL: Ke!!y Murphy@car1sbadca go\/ EQUIPMENT !Item !Qty Manufacturer Model Crestron DMPS3-200-C WESTERN AV EQUIPMENT SUB-TOTAL SHIPPING AND HANDLING TAX NON-EQUIPMENT MISC Engineering, Drafting & D SP Control Programming Project Management Staging & Assembly Installation & Testing Training Service/Preventative Maintenance (90 Days) Labor & Materials Bond G&A Electronic Waste Recycling Fee NON-EQUIPMENT TOTALS PROPOSAL TOTAL Description Interface and Switching System 3-Series® DigitalMediaâ„¢ Presentation System 200 and Processor Miscellaneous Components Miscellaneous lnstalialion Materials, Cables and Comectors $ $ DATE: TERMS: FOB: SALES TAX: DELNERY: QUOTEVAUD: REVISION: WAV PROJECT#: PRICE 3,240.00 30.00 CeU:(949) 5114-7028 hai!eys@wav 1 com wwwwav1 com $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ June 12, 2017 NET30 Destinallon 7.7500% TBD 30Days A TBD EXTENSION 3,240.00 30.00 3,270.00 89.93 260.39 13600 3,072.00 88.00 1,320.00 49.05 4,665.05 8,285.37 Basic Warranty: The AV System is warranted against all defects of material and workmanship, as a system, as well as individual componenls. for a period of 90 Days after date of acceptance or first used. If individual manufadurers warranty their equipment for a longer period, the manufacturer's warranty wilt apply, unless Extended Warranl:y is purchased. Notes: This proposal includes prevailing wage rates. AUTHORIZED SIGNATURE DATE Cl~nt Proposal Confldentlal Pagel