Loading...
HomeMy WebLinkAboutBOSWELL PAINTING; 2011-02-24; PEM530PUBLIC WORKS LETTER OF AGREEMENT Boswell Painting PEM 530 This letter will serve as an agreement between Boswell Painting, a Sole Ownership (Contractor) and the City of Carlsbad (City). The Contractor will provide all equipment, material and labor necessary to prepare and paint the interior walls and doors at Stagecoach Community Center Gym, per the Contractor's proposal dated February 8. 2011 and City specifications, for a sum not to exceed Four-Thousand. Five Hundred and Eighty dollars (3)4.580.00. This work is to be completed within thirty (30) working days after issuance of a Purchase Order. ADDITIONAL REQUIREMENTS 1. City of Carlsbad Business License 2. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City, and its agents, officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of this Contract or work; or from any failure or alleged failure of the contractor to comply with any applicable law, rules or regulations including those relating to safety and health; except for loss or damage which was caused solely by the active negligence of the City; and from any and all claims, loss, damage, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by this Contract, unless the loss or damage was caused solely by the active negligence of the City. The expenses of defense include all costs and expenses, including attorney's fees for litigation, arbitration, or other dispute resolution method. 3. Contractor shall furnish policies of general liability insurance, automobile liability insurance and a combined policy of workers compensation and employers liability in an insurable amount of not less than five hundred thousand dollars ($500,000) each, unless a lower amount is approved by the City Attorney or the City Manager. Said policies shall name the City of Carlsbad as a co-insured or additional insured. Insurance is to be placed with insurers that have (1) a rating in the most recent Best's Key Rating guide of at least A-:V, and (2) are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner. Proof of all such insurance shall be given by filing certificates of insurance with contracting department prior to the signing of the contract by the City. 4. The Contractor shall be aware of and comply with all Federal, State, County and City Statues, Ordinances and Regulations, including Workers Compensation laws (Division 4, California Labor Code) and the "Immigration Reform and Control Act of 1986" (8USC, Sections 1101 through 1525), to include but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors and consultants that are included in this Contract. 5. The Contractor may be subject to civil penalties for the filing of false claims as set forth in the California False Claims Act, Government Code^jsections 12£>5(1 et seq.. and Carlsbad Municipal Code Sections 3.32.025, et sea. fl*1&?—-JBtt £--&•*' init 6. The Contractor hereby acknowledges that debarment by another jurisdiction is groundsr the City of Carlsbad to disqualify the Contractor from participating in contract bidding. init Revised 9/28/00 7. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California. 8. The general prevailing rate of wages, for each craft or type of worker needed to execute the contract, shall be those as determined by the Director of Industrial Relations pursuant to the Section 1770, 1773 and 1773.1 of the California Labor Code. Pursuant to Section 1773.2 of the California Labor code, a current copy of applicable wage rates is on file in the office of the City Engineer. The contractor to whom the contract is awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him or her in the execution of the contract. TO INDICATE ACCEPTANCE OF THIS AGREEMENT, PLEASE SIGN IN THE SPACE BELOW AND RETURN TO: Kelly Brooks PEM 405 Oak Ave Carlsbad. CA 92008 (Project Mgr) (Department) (Address) Boswell Painting _ {) By; (Name of Contractor) (Contractor's License Number) ' -- -- "/ _ (Sign Here) (Print Name and Title) (E-mail Address) By: _ (Sign Here; (Print Name and Title) /-^(E-mail Addrea£)jLLy;?-— Department Head Date (Proper notarial acknowledgment of execution by Contractor must be attached. Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant treasurer must sign for corporations. Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL, City Attorney BY: Deputy City Attorney - 2 - Revised 9/28/00 2.- Boswell Pflti/itti/t (IA,C. 300 Carlsbad Village Dr. Ste. 108a #205 Carlsbad, CA 92008 (760)519-1291 Lie. # 878250 Proposal for Stagecoach Gymnasium 3420 Canting de ios Coches Interior Painting Preparation Masking! We will cover carpet, tile, windows, and furniture as needed using tape, paper, plastic and drop cloths. This will protect from paint spills and splatters, Clean Up: Work will be completed in a clean and professional manner. Garbage is removed and clean up is preformed daily and at completion of the job. Touch-up paint will be left in labeled cans for your future convenience. Caulking and Spackling: We will remove all nails and screws and spackle holes as needed. We will caulk all cracks in the drywall, and in the door jambs as needed. Dry Wall Patching- We will remove peeling paint and drywall from the storage area ceiling. We will float the area where we removed peeling paint and drywall using 2 coats of drywall mud. We will texture the area to match the existing texture. Sanding- We will sand 15 doors and 30 door jambs to create a light bond, and too smooth down rough surfaces. Switch Plates, Outlet Covers, Blinds, & Door Knobs- We will remove the switch plates, outlet covers, blinds, and door knobs to prepare for painting. We will reinstall the switch plates, outlet covers, blinds, & door knobs after painting is completed. Prittier- We will prime 4 bathrooms using 1 coat of Kilz Premium interior stain blocking primer and bond coat. Boswell 300 Carlsbad Village Dr. Ste. 108a #205 Carlsbad, CA 92008 (760)519-1291 Lie. # 878250 Interior Painting Walls- We will paint the walls in 2 hallways and the storage area using 2 coats of Frazee's Lo-Glo interior eggshell enamel. Ceilings- We will paint the ceiling in the storage area using 2 coats of Frazee's Lo- Glo interior eggshell enamel. Bathrooms- We will paint 4 bathrooms using 2 coats of Frazee's Mirro-Glide 100% acrylic semi-gloss enamel. DoOfS & Door Janibs- We will paint 30 door jambs and 15 doors using 2 coats of Frazee's Aeroplate oil-base semi-gloss enamel. This proposal includes: labor and materials. Price: $ 4,580.00