HomeMy WebLinkAboutCity of Vista; 2011-10-13;AGREEMENT FOR PLANNING AND DESIGN PHASE SERVICES
FOR THE AGUA HEDIONDA SEWER LIFT STATION AND
VISTA/CARLSBAD INTERCEPTOR SEWER, REACHES VC11B - VC15
THIS AGREEMENT for the Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer, Reaches VC11B - VC15 ("Agreement") is made and entered into as of the
"" day of Cl&J-<)fjje^^f , 20 _ , by and between the City of Vista, a charter city
("Vista"), and the City of Carlsbad, a charter city ("Carlsbad"), collectively, ("the Parties").
RECITALS
WHEREAS, on February 26, 2002, the Parties entered into an agreement for the
ownership, operation and maintenance of the Vista/Carlsbad Interceptor Sewer ("Ownership
Agreement"), the terms of which are incorporated herein by this reference; and
WHEREAS, the existing Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer was built in the early 1960's and does not have adequate capacity to convey
the sewage flows projected for this basin; and
WHEREAS, the Sewer Master Plans for the Parties include a recommendation that
pipeline reaches VC11B - VC15 of the Vista/Carlsbad Interceptor Sewer and Agua Hedionda
Sewer Lift Station be replaced with larger pipelines and pumps, respectively, to increase the
capacity necessary to convey future sewer flows; and
WHEREAS, Carlsbad has completed a Preliminary Design Report dated September
2008, a copy of which has been provided to Vista, and has selected a consultant to prepare the
final design for the replacement of the Agua Hedionda Sewer Lift Station and pipeline reaches
VC1 IB - VC15 of the Vista/Carlsbad Interceptor Sewer; and
WHEREAS, Carlsbad is in the process of obtaining environmental clearance through the
California Environmental Quality Act (CEQA) process and plans, specifications and cost
estimates for the Project have been prepared and are approximately 90% complete; and
WHEREAS, the Parties are entering into this Agreement in order to establish the roles
and responsibilities of each Party during the planning and design phase of the Project and to
define the cost share, accounting procedures and payment schedule for the Parties. The phrase
"Planning and Design Phase", as used throughout this Agreement, shall be considered to include
all Project activities occurring prior to the Award of the construction contract; and
WHEREAS, the Parties intend to execute a subsequent project agreement prior to
soliciting bids for construction to address responsibilities and cost sharing for construction of the
Project .
8/15/2011 ^
NOW THEREFORE, THE PARTIES HERETO AGREE TO THE FOLLOWING:
SECTION!. PROJECT DESCRIPTION
The Agua Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches
VC1 IB - VC15 (the "Project") is a sewer project that will replace existing facilities to increase
the capacity and improve the reliability within the lower portion of the Vista/Carlsbad
Interceptor Sewer System. The Project begins at the north shore of the Agua Hedionda Lagoon
and extends southerly a distance of approximately 2.3-miles to the Encina Water Pollution
Control Facility, as shown on Exhibit "A". The major elements of the Project are defined in the
September 2008 Preliminary Design Report and are summarized as follows:
A. Replace the existing wood trestle sewer bridge across Agua Hedionda Lagoon
with a new steel support bridge that will clear span the existing channel, being approximately
140-feet in length. The new sewer support bridge will be designed to allow lightweight
maintenance vehicles to pass over the bridge to allow for access to the interceptor sewer north of
the lagoon, which will allow for improved inspection and maintenance capabilities as well as
improved emergency response. In addition, the Project will replace approximately 1400 linear
feet of existing 42-inch diameter sewer pipe with a 54-inch diameter pipe. The Project will
relocate a portion of an existing 12-inch diameter high pressure gas line that conflicts with the
proposed northerly abutment of the new bridge. The existing wood trestle sewer support
structure will be removed as part of the project.
B. Construct a new sewer lift station at a location adjacent to the existing lift station
on the south shore of Agua Hedionda Lagoon. The lift station will be capable of pumping the
ultimate peak wet weather sewage flows for the basin, estimated at 33 million gallons per day
(mgd) in the current master plans. In addition to the structure containing the pumps and motors,
the lift station will also have standby pumps, an emergency generator, a grinder installed in a
vault, an electrical control building and odor control facilities. The facility will be designed to
comply with local and resource agency permit requirements, including the California Coastal
Commission. The existing lift station facility will be removed at the completion of the project.
C. Construct a new force main and gravity sewer that will operate in parallel to the
existing 42-inch diameter gravity flow sewer, providing increased system reliability. The new
force main will be approximately 4000 linear feet of 30-inch diameter pipe and will be
manufactured from High Density Polyethylene (HOPE). The force main will discharge into a
new 54-inch diameter gravity sewer that will be constructed in Avenida Encinas, being
approximately 7000-feet in length, extending from Cannon Road to the Encina Water Pollution
Control Facility. These pipelines will be installed using several different methods of
construction, including open-trench excavation with shoring, horizontal directional drilling
(HDD) and microtunneling. The existing interceptor has been inspected and found to be in good
condition; however, the manholes were determined to need rehabilitation, and the rehabilitation
work was performed separate from this project in 2009.
-2- 8/15/2011
10
SECTION 2. RESPONSIBILITIES OF CARLSBAD
Carlsbad shall be the Lead Agency for the Planning and Design Phase of the Project and
will be responsible for studies, design, permitting, property acquisition, environmental
compliance, bidding and administration of the project. As Lead Agency, Carlsbad shall have
authority to approve contracts and agreements in accordance with this agreement, Carlsbad's
policies and applicable law. Carlsbad's purchasing policies shall apply to implementation and
performance of construction contracts, professional services agreements and any other activity
under this agreement. Carlsbad shall provide Vista the opportunity to review and comment on
any proposal for services that exceeds $30,000.
Carlsbad shall have authority to acquire all necessary easements and permits required to
construct and maintain the facility. At a minimum, easements for Project facilities will be
acquired from the North County Transit District, Cabrillo Power (a.k.a., NRG Energy) and San
Diego Gas & Electric. The City of Carlsbad and the City of Vista shall be named as Grantee on
all easements acquired for the project.
Carlsbad staff shall notify Vista of milestone design review meetings and submittals and
shall keep Vista staff informed about any significant project developments, particularly those
that may lead to amendments.
SECTION 3. RESPONSIBILITIES OF VISTA
Vista shall provide an engineering representative to attend milestone design review
meetings and shall provide written comments to Carlsbad within 10-days of the meeting. Vista
agrees to make payment to Carlsbad for completed work, as agreed to in Section 4 herein, within
30 days of the invoice date.
Vista agrees to perform additional services, if any, at Vista's expense as necessary to
comply with funding requirements as a result of Vista's selected method of financing the Project.
Anticipated costs may be, but are not limited to, site investigations, permitting, environmental
review and additional project administration / reporting.
SECTION 4. ALLOCATION OF COSTS
Allocation of Project costs between the Parties varies by reach as defined in the
Ownership Agreement. Furthermore, an estimate of all Project costs is shown in Table 1 of
Exhibit "B", which has been developed from plans that are considered to be approximately 90%
complete.
Vista acknowledges that Carlsbad has incurred significant expenses to-date during the
preparation of studies, design and environmental compliance for the Project as shown in Table 2
of Exhibit "B". Additionally, the allocation of these expenditures between the Parties is shown
in Table 3 of Exhibit "B" and identifies Vista's share of Project costs incurred through the end of
calendar year 2010 as $2,366,060. Upon execution of this agreement by the Parties, Vista agrees
to pay to Carlsbad this amount in full within 30-days of the invoice date. Subsequent to the first
invoice, Carlsbad shall invoice Vista for all work performed during the first half of calendar year
2011 and shall then submit invoices to Vista quarterly thereafter for ongoing Project activities
performed until work is deemed complete in accordance with Section 5 herein.
-3- 8/15/201
Vista shall pay Carlsbad within 30-days of the date of the invoice on all amounts not in
dispute. All invoices shall include backup documentation to support each line item on the
invoice.
It is understood that Carlsbad's cost for project management and administration shall be
included in the overall cost of the Project and shall be paid by each Party as defined in Section 5
herein. Allowable costs shall be actual costs for work performed by Carlsbad Engineering
Department staff and reasonable expenses. Carlsbad staff costs will be billed at their hourly fully
burdened rate.
SECTIONS. COST ACCOUNTING
Carlsbad shall be responsible for the administration and accounting of all expenditures
related to the Project. The Parties agree that Vista will pay to Carlsbad its allocated portion of
actual and estimated costs as shown in Tables 1, 2 and 3 of Exhibit "B" and stated in Section 4
herein. Final accounting of Planning and Design Phase costs will be made after the Award of the
construction contract by the Carlsbad City Council. Carlsbad will issue a final invoice for
Planning and Design Phase work to Vista within 30-days of Award.
The Parties acknowledge that the Planning and Design Phase work activities and related
costs are typically spread throughout multiple reaches at any given time, making it difficult to
allocate costs to specific reaches with different ownership percentages. Therefore, the Parties
agree to distribute the total of all Planning and Design Phase costs for the Project to each
respective ownership reach by utilizing the ratio of the estimated total project costs for each
reach divided by the overall total Project cost. These cost percentages are calculated and shown
in Table 1 of Exhibit "B" and result in 65% of the Planning and Design Phase costs being
distributed to Reaches VC1 IB through VC13 and the remaining 35% of the costs being allocated
to Reaches VC14 and VC15. The costs shall then be shared by each Party in accordance with the
terms of Section 4 herein.
SECTION 6. COUNTERPARTS
This Agreement may be executed in any number of counterparts, each of which shall be
deemed an original, but all of which, taken together, shall constitute one and the same
instrument.
(Continued on Next Page)
-4- 8/15/201:
SECTION 7. ENTIRE AGREEMENT
This Agreement, together with any other written document referred to, embody the entire
agreement and understanding between the Parties relating to the subject matter hereof. In case of
conflict between this Agreement and the Ownership Agreement, the terms of the Ownership
Agreement shall prevail.
IN WITNESS WHEREOF, each Party hereto has pursuant to resolution duly passed and
adopted by its respective governing body this AGREEMENT and caused it to be executed and be
effective on the date first above written.
CITY OF VISTA, a chartered municipal
corporation.
By:
ER, Mayor
_
JUDYJtt
ATTEST:
MARCI KILIAN, City Clerk
By:
APPROVED AS TO FORM:
DAROLD PIEPER, City Attorney
BY:
CITY OF CARLSBAD, a
municipal corporation
chartered
ATTEST'
LORRAINE M. WOOD, City Clerk
APPROVED AS TO FORM: 0, f//
RONALD R. BALL, City Attome/'V^.?40'''',,
^o,-->- '- ' '• £/ .*-> • _ .—wf^pvrv. * %-• .
pO^
^
BY:
-5-8/15/2011
EXHIBIT A
BEGIN
PROJECT
LAGOON BRIDG,
VC11B
AGUA HEDIONDA
LIFT STATION
LEGEND:
VC11B-VC15
VC1-VC11A
END PROJECT AT
ENCINA WATER
POLLUTION
CONTROL FACILITY.
PROJECT NAME
AGUA HEDIONDA LIFT STATION & VISTA/CARLSBAD
INTECEPTOR SEWER REACHES VC11B THROUGH VC15
PROJECT
NUMBER
CP3492,
3886 & 3949
EXHIBIT
A
DRf>m BY: SCOTT EVANS: CARLSBAD UTILITIES DEPT, 1/13/11 C: \UTILITIES DEPARTUENT\DESIGN D/WS/ON\SM/7H\VC//-/5 LOCATION UAP.DWG
EXHIBIT "B11
TABLE 1
AGUA HEDIONDA LIFT STATION AND V/C INTERCEPTOR REPLACEMENT PROJECT, REACHES VC11B - VC15
ESTIMATED PROJECT COSTS
Phase
Reach 1 1 B
AHLS& Reach 12-1 3
Reaches 14-15
Reach 1 1 B
AHLS & Reach 12-1 3
Reaches 14-15
Pre-Construction Construction
Phase Costs Management
$700,000 $600,000
$1,900,000 $1,500,000
$1,400,000 $1,300,000
$4,000,000 $3,400,000
Percentage of
Total Est. Cost Overall Project
$6,128,500 13%
$23,699,9201 " 52%
$16,092,000 35%
Total! $45,920,420 100.0%
(1) Outside Costs:
Vista's
Sub-Total of Construction Change Order Outside Ownership Vista's Cost Carlsbad's
Soft Costs Cost Budget Costs (1) Total Percentage Share Cost Share
$1,300,000 $3,935,000; $393,500 $500,000 $6,128,500; 69.1% $4,234,794! $1,893,707
$3,400,000 $17,824,000 $1,425,920; $1,050,000 $23,699,920! 69.1%: $16,376,645! $7,323,275
$2,700,000 $12,400,000 $992,000;
$7,400,000 $34,159,000 $2,811,420! $1,
% of Project
Cost by Vista's Carlsbad's
Ownership Ownership Ownership
Reach Percentage Percentage
65.0% 69.1%; 30.9%
35.0% 56.1% 43.9%
100.0%
r
SDGE Gas Line Relocation Costs $300,000
Electrica Feed to Lift Station $200,000
NRG Property Acquisition: $750,000
SDGE Property Acquisition : $1 00,000
NCTD Flagging Costs; $200,000
TOTAL; $1,550,000
Reach 1 1 B
AHLS
AHLS
AHLS j
Reach 1 1 B j
$0 $16,092,000! 56.1% $9,027,612; $7,064,388
550,000 $45,920,420! $29,639,050 $16,281,370
j I
j
'• ' \
\
\
'•
.
'
I
' '
/.A May 31, 2011
EXHIBIT "Bf
TABLE 2
AGUA HEDIONDA LIFT STATION & V/C INTERCEPTOR
REPLACEMENT PROJECT, REACHES VC11B - VC15
EXISTING PROJECT EXPENDITURES THRU DEC. 31, 2010
Description |
A DESIGN CONSULTANTS
Krieger and Stewart Study - March 2000
Dokken Engineering - Bridge Alignment Support
Brown & Caldwell Alignment & Site Study - June 2006
Brown & Caldwell Preliminary Design Report - Sept. 2008
Brown & Caldwell Preliminary Design Amendment No. 1
Brown & Caldwell Preliminary Design Amendment No. 2
Brown & Caldwell Final Design (PS&E and Environmental)
Brown & Caldwell Final Design Amendment No. 1
Brown & Caldwell Final Design Amendment No. 2 (time extention)
Subtotal
B MANHOLE REHAB CONSTRUCTION CONTRACT
Socal Pacific Contractors
Construction Inspection
Misc. Costs
Subtotal
C CARLSBAD PROJECT MGMT. STAFF (2005 - 12/31/10)
D MISC. EXPENDITURES
TOTAL
TOTAL COST
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
83,000
2,984
99,960
294,641
36,058
37,600
2,382,281
98,230
-
3,034,754
290,465
25,704
28,730
344,899
269,707
16,108
3,665,468
May 31, 2011
EXHIBIT "B1
TABLE 3
AGUA HEDIONDA LIFT STATION AND V/C INTERCEPTOR REPLACEMENT PROJECT, REACHES VC11B -VC15
DISTRIBUTION OF PROJECT COSTS
(Inception through 12/31/2010)
Project No.Project Phase
Actual Percentage of j Corrected Vista Carlsbad
Expenditures Overall Expenditure Ownership Ownership
Reported Project * Amount Percentage Percentage
Vista Cost
Share
Carlsbad Cost
Share
3886 Reach VC11B
3492 AHLS and Reach VC12&VC13
3949 Reach VC14 & VC15
TOTAL
$735,687
$1,920,583
13%$476,511 69.1%30.9%$329,269 $147,242
52%$1,906,043 69.1%30.9% $1,317,076 $588,967
$1,009,198 35%$1,282,914 56.1%43.9%
$3,665,468 100%$3,665,468
$719,715 $563,199
$2,366,060 $1,299,408
* Percentage Developed from Table 1
May 31, 2011