HomeMy WebLinkAboutDAN VAUGHN MASONRY AND CONCRETE; 2010-11-16; PKRC498PUBLIC WORKS
LETTER OF AGREEMENT
Cannon Park Concrete Mow Strip (PKRC498)
This letter will serve as an agreement between Dan Vaughn Masonry and Concrete, a masonry
and concrete company (Contractor) and the City of Carlsbad (City). The Contractor will provide
all equipment, material and labor necessary to set and pave 6"x6" mow concrete strip with #3
rebar located at Cannon Park, per the Contractor's proposal dated October 6, 2010 and City
specifications, for a sum not to exceed Four Thousand One Hundred Sixteen dollars ($4,116).
This work is to be completed within 21 calendar days after issuance of a Purchase Order.
ADDITIONAL REQUIREMENTS
1. City of Carlsbad Business License.
2. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and
hold harmless the City, and its agents, officers and employees, from all claims, loss, damage,
injury and liability of every kind, nature and description, directly or indirectly arising from or in
connection with the performance of this Contract or work; or from any failure or alleged failure
of the contractor to comply with any applicable law, rules or regulations including those
relating to safety and health; except for loss or damage which was caused solely by the
active negligence of the City; and from any and all claims, loss, damage, injury and liability,
howsoever the same may be caused, resulting directly or indirectly from the nature of the
work covered by this Contract, unless the loss or damage was caused solely by the active
negligence of the City. The expenses of defense include all costs and expenses, including
attorney's fees for litigation, arbitration, or other dispute resolution method.
3. Contractor shall furnish policies of general liability insurance, automobile liability insurance
and a combined policy of workers compensation and employer's liability in an insurable
amount of not less than five hundred thousand dollars ($500,000) each, unless a lower
amount is approved by the City Attorney or the City Manager. Said policies shall name the
City of Carlsbad as a co-insured or additional insured. Insurance is to be placed with insurers
that have (1) a rating in the most recent Best's Key Rating guide of at least A-:V, and (2) are
admitted and authorized to transact the business of insurance in the State of California by the
Insurance Commissioner. Proof of all such insurance shall be given by filing certificates of
insurance with contracting department prior to the signing of the contract by the City.
4. The Contractor shall be aware of and comply with all Federal, State, County and City
Statues, Ordinances and Regulations, including Workers Compensation laws (Division 4,
California Labor Code) and the "Immigration Reform and Control Act of 1986" (8USC,
Sections 1101 through 1525), to include but not limited to, verifying the eligibility for
employment of all agents, employees, subcontractors and consultants that are included in
this Contract.
5. The Contractor shall be aware of and comply with California Regional Water Quality Control
Board, San Diego Region requirements.
A. Contractor shall not allow any discharges from the construction site, which may have an
adverse effect on receiving waters of the United States.
Contractor shall not allow any groundwater extraction water to be discharged from
construction site except in full compliance with the General Waste Discharge
Requirements for Ground Water Extraction and Similar Discharges from Construction
and Remediation Projects (Order No. 96-41) adopted by the Regional Board. Prior to
Revised 9/28/00
submitting Bid, Contractor shall obtain a copy of said Order No. 96-41 and review all
compliance requirements therein, including monitoring, testing, and reporting.
B. In the event of conflict between the Contract and Permit requirements, the most stringent
shall prevail. All permit requirements shall be satisfied by Contractor and accepted by all
issuing agencies, and the Owner before project will be accepted and a Notice of
Completion filed.
C. Contractor shall, at his own expense, procure any additional permits, certificates, and
licenses required of him by law for the execution of the work. He shall comply with all
Federal, State and local laws, ordinances or rules and regulations relating to the
performance of said work.
E. The Contractor shall incorporate and comply with all applicable Best Management
Practices (BMPs) during the completion of this agreement. All work must be in
compliance with the most current San Diego Regional Water Quality Control Board
(RWQCB) permit, Carlsbad Municipal code and the City of Carlsbad Jurisdictional Urban
Runoff Management Plan (JURMP) incorporated herein by reference.
F. The Contractor shall indicate in his submittals methods of compliance, equipment
utilized to insure compliance, training of staff and experience in compliance with
environmental regulations. If in the opinion of the project manager, the Contractor is not
in compliance with this provision CITY reserves the right to implement BMP's to the
maximum extent practical, and deduct payment due or back charge the Contractor for
implementation with a 15% markup for administration and overhead.
6. The Contractor may be subject to civil penalties for the filing of false claims as set forth in the
California False Claims Act, Government Code sections t£650, e/ sea., and Carlsbad
Municipal Code Sections 3.32.025, et seq. init L/n {/ init
7. The Contractor hereby acknowledges that debarment by another jurisdiction is grounds for
Cthe City of ,Carlsbad to disqualify the Contractor from participating in contract bidding.
init T>r init
8. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego
County, California.
9. The City of Carlsbad is a Charter City. Carlsbad Municipal Code Section 3.28.130
supersedes the provisions of the California Labor Code when the public work is not a
statewide concern. Payment of prevailing wages is at contractor's discretion.
-- 2 -- Revised 9/28/00
TO INDICATE ACCEPTANCE OF THIS AGREEMENT, PLEASE SIGN IN THE SPACE
BELOW AND RETURN TO:
Paul Harrison
(Project Mgr)
Parks & Recreation 1166 Carlsbad Village Dr. Carlsbad. CA 92008
(Department) (Address)
Dan Vaughn Masonry and Concrete
(Name of Contractor)
(Sign Here)
450969
(Contractor's License Number)
(Print Name and Tftte>
(E-mail Address)
By:
(Print Name and Title)
Date
(Proper notarial acknowledgment of execution by Contractor must be attached.
Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant
treasurer must sign for corporations. Otherwise, the corporation must attach a resolution
certified by the secretary or assistant secretary under corporate seal empowering the officer(s)
signing to bind the corporation.)
APPROVED AS TO FORM:
RONALD Br^tferCity Attorney
BY:
- 3 -Revised 9/28/00
Oct 06 10 O2:08p Vaughn Masonry 760*7249677 p. I
FROM W
Proposal
t COPY
Proposal No.
Sheet No.
Proposal Submitted To Work To Be Performed At
\We hereby propose to furnish oil the materials and perform all the labor necessary for tl/e completion
ST****^ fooe LpyfiT iA*^^te.p A3 p-<.e f^o^^v>V/£sD r^ ~>»gn ' 7
i C\
All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications
submitted for above work and completed in a substantial workmanlike ~fffinefl6ftiWTvm of «<f
QU^i^ihSiP/MJy ^*fjit.V_ Dollar, (J
with payments lo be mode as follows:
Any alteration or deviation from above specifications involving extra costs, will be executed only upon written ordtrs, and will
become art extra charge over and above the estimate. All agreements contingent upon strike), accidents or delays beyond our
control. Owner to carry fire, tornado and other necessary Insurance upon above work. Workmen's Compensation and Public
Liability Insurance on above work to be taken out by
"NOTICE TO OWNEfT
(Section 7019—Contractors license Uw)
Undo the Mtelufiici' Lien Uw. iny conlrKtof. subcontractor,
iabcrii, nituiilmtn 0( othtr pirson who helps to Improve your
property and is nol paid for his labor, services « material, has a
right la enforce Ms claira agatnsl jroffi property.
Under the la*, »ou may protect y«umH acai/nt such claims oy
filint. before uruntnclna such work or improvenut. an orifinalcontract far tbe onik ol IntuwmwM « i imdltiottn thereof, inthe oliiet of Uie county wonkr of the coonV where tha piopertyii sctuatetf «ntf iee.afftii( that > contractor's pajrmest bond be racoidtdIn nidi otltea. Said boad shall be in an amount net lisa ttun tittypercent (50%) of tin caittract prlte and shall, in addition to inyconditions fcr ttt perfotmaiicj ol the contract, be conditioned tof
the payment lo (all of the claims of all ptfsons furnbliiTiJ labor, serv-
ices, egiiipneM or materials for trie work Ascribed In said cantraci.
Respectfully submitte
Per
State License No.
Note — This proposal may be withdrawn by us if not accepted within days
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and ore heraby accepted. You are authorized to do the work as
specified. Payment will be made as outlined above.
Accepted.
Date
.Signature.
.Signature.
Contractors are) required by low to be licensed and regulated by the Contractor's State license
Board. Any questions concerning a contractor may be referred to the Registrar, Contractors State
License Board, (3132 Bradshaw Road,] Sacramento, California. [Mailing Address: P.O. Box
26000, Sotramtnte, California 95626.)
TOPS FORM }*5O • CAL.LIT HO IN U. *. A.