HomeMy WebLinkAboutDAN VAUGHN MASONRY AND CONCRETE; 2011-12-19; PKRC511PUBLIC WORKS
LETTER OF AGREEMENT
Carlsbad Skate Park Concrete Pad (PKRC511)
This letter will serve as an agreement between Dan Vaughn Masonry and Concrete, a masonry
and concrete company (Contractor) and the City of Carlsbad (City). The Contractor will provide
all equipment, material and labor necessary to pour 4" thick 520-0-2500 psi concrete pad on
existing dirt area located at Skate Park per supplied aerial photo, which is attached to and
incorporated in by this reference as Exhibit "A"; with #4 dowels installed at step area only. Prior
to the concrete installation, scarify native soil to a depth of four (4) inches, grade and re-
compact native soil to a minimum of 95% compaction. Contractor will remove and replace
broken 4' x 6' panel of existing sidewalk adjacent to new concrete pad. All new concrete
surfaces shall have a medium broom finish. All work to be performed per the Contractor's
proposal dated November 23, 2011 and City specifications, for a sum not to exceed Three
Thousand Four Hundred Forty dollars ($3,440). This work is to be completed within 21 calendar
days after issuance of a Purchase Order.
ADDITIONAL REQUIREMENTS
1. City of Carlsbad Business License.
2. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and
hold harmless the City, and its agents, officers and employees, from all claims, loss, damage,
injury and liability of every kind, nature and description, directly or indirectly arising from or in
connection with the performance of this Contract or work; or from any failure or alleged failure
of the contractor to comply with any applicable law, rules or regulations including those
relating to safety and health; except for loss or damage which was caused solely by the
active negligence of the City; and from any and all claims, loss, damage, injury and liability,
howsoever the same may be caused, resulting directly or indirectly from the nature of the
work covered by this Contract, unless the loss or damage was caused solely by the active
negligence of the City. The expenses of defense include all costs and expenses, including
attorney's fees for litigation, arbitration, or other dispute resolution method.
3. Contractor shall furnish policies of general liability insurance, automobile liability insurance
and a combined policy of workers compensation and employer's liability in an insurable
amount of not less than five hundred thousand dollars ($500,000) each, unless a lower
amount is approved by the City Attorney or the City Manager. Said policies shall name the
City of Carlsbad as a co-insured or additional insured. Insurance is to be placed with insurers
that have (1) a rating in the most recent Best's Key Rating guide of at least A-:V, and (2) are
admitted and authorized to transact the business of insurance in the State of California by the
Insurance Commissioner. Proof of all such insurance shall be given by filing certificates of
insurance with contracting department prior to the signing of the contract by the City.
4. The Contractor shall be aware of and comply with all Federal, State, County and City
Statues, Ordinances and Regulations, including Workers Compensation laws (Division 4,
California Labor Code) and the "Immigration Reform and Control Act of 1986" (8USC,
Sections 1101 through 1525), to include but not limited to, verifying the eligibility for
employment of all agents, employees, subcontractors and consultants that are included in
this Contract.
5. The Contractor shall be aware of and comply with California Regional Water Quality Control
Board, San Diego Region requirements.
1 -- Revised 9/28/00
A. Contractor shall not allow any discharges from the construction site, which may have an
adverse effect on receiving waters of the United States.
Contractor shall not allow any groundwater extraction water to be discharged from
construction site except in full compliance with the General Waste Discharge
Requirements for Ground Water Extraction and Similar Discharges from Construction
and Remediation Projects (Order No. 96-41) adopted by the Regional Board. Prior to
submitting Bid, Contractor shall obtain a copy of said Order No. 96-41 and review all
compliance requirements therein, including monitoring, testing, and reporting.
B. In the event of conflict between the Contract and Permit requirements, the most stringent
shall prevail. All permit requirements shall be satisfied by Contractor and accepted by all
issuing agencies, and the Owner before project will be accepted and a Notice of
Completion filed.
C. Contractor shall, at his own expense, procure any additional permits, certificates, and
licenses required of him by law for the execution of the work. He shall comply with all
Federal, State and local laws, ordinances or rules and regulations relating to the
performance of said work.
E. The Contractor shall incorporate and comply with all applicable Best Management
Practices (BMPs) during the completion of this agreement. All work must be in
compliance with the most current San Diego Regional Water Quality Control Board
(RWQCB) permit, Carlsbad Municipal code and the City of Carlsbad Juhsdictional Urban
Runoff Management Plan (JURMP) incorporated herein by reference.
F. The Contractor shall indicate in his submittals methods of compliance, equipment
utilized to insure compliance, training of staff and experience in compliance with
environmental regulations. If in the opinion of the project manager, the Contractor is not
in compliance with this provision CITY reserves the right to implement BMP's to the
maximum extent practical, and deduct payment due or back charge the Contractor for
implementation with a 15% markup for administration and overhead.
6. The Contractor may be subject to civil penalties for the filing of false claims as set forth in the
California False Claims Act, Government Code Sections 1265o/et sea., and Carlsbad
Municipal Code Sections 3.32.025, et sec. [)^J init {yV init
7. The Contractor hereby acknowledges that debarment by another jurisdiction is grounds for
tfa^^ty of ^jl^ad to disqualify the Contractor from participating in contract bidding.
8. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for
resolution of any disputes between the parties arising out of this agreement is San Diego
County, California.
9. The City of Carlsbad is a Charter City. Carlsbad Municipal Code Section 3.28.130
supersedes the provisions of the California Labor Code when the public work is not a
statewide concern. Payment of prevailing wages is at contractor's discretion.
//
//
//
//
//
-- 2 - Revised 9/28/00
TO INDICATE ACCEPTANCE OF THIS AGREEMENT, PLEASE SIGN IN THE SPACE
BELOW AND RETURN TO:
Paul Harrison
(Project Mgr)
Parks & Recreation 1166 Carlsbad Village Dr. Carlsbad. CA 92008
(Department)
Dan Vaughn Masonry and Concrete
(Nam^DkContractor)
"(Sign Here)
(E-mail Ai
(Address)
450969
(Contractor's License Number)
(Frin Vint Name and Title)
Ci Htr^^^l^ fork v/z'/ W^Kil r^yNT-
(Print Name and Title)
(E-mail Address)
Department Head Date
(Proper notarial acknowledgment of execution by Contractor must be attached.
Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant
treasurer must sign for corporations. Otherwise, the corporation must attach a resolution
certified by the secretary or assistant secretary under corporate seal empowering the officer(s)
signing to bind the corporation.)
APPROVED AS TO FORM:
RONALD R. BAkl/S^tAttorney
BY:
~ 3 Revised 9/28/00
Mov 23 11 ai:43p Vaughn Masonra 760«7249677 p. 1
FROM
Proposal No.
Sheet No.
Proposal Submitted To
Work To Be Performed At
Nam
Stre
City
State
State.
Street
City.
Dote of Plan*.
Architect. ' ^ Architect—^5a»^ ' j '—
with payments to be made as follows!
"SOTICS TO OWNER"
{Section 7019—CoBtrattofs Uceos* Lwrt
iind« the !«w »u m« prot«ct younteif »»in*t sua eUlms !iy
S« W work onmp;o«m«>t or »
n Vtt" otfiM. Sid tK-nd sh«Ii b. in 'Sftln Jlan to m »...^.nt /Mats of th« MirtMct price »Bff sfilli, in »Ban>a" '<».
Respectfully submitteq
P«r-
Stote Ucense No i. cJ*-—t-
The obcve prices, specificotlons and .ortdltions ore sotlsfocto^ ond ore Hereby occepted. You ore outhorUed to do the work os
specified. Payment will ba mode os outlined above.
Accepted. Stgnoture.
Dote-
_Sisnoture.
26000, Sacramento, Calif Prnio 95826.1 LITHO IN U, S. A.