Loading...
HomeMy WebLinkAboutDAN VAUGHN MASONRY AND CONCRETE; 2011-12-19; PKRC511PUBLIC WORKS LETTER OF AGREEMENT Carlsbad Skate Park Concrete Pad (PKRC511) This letter will serve as an agreement between Dan Vaughn Masonry and Concrete, a masonry and concrete company (Contractor) and the City of Carlsbad (City). The Contractor will provide all equipment, material and labor necessary to pour 4" thick 520-0-2500 psi concrete pad on existing dirt area located at Skate Park per supplied aerial photo, which is attached to and incorporated in by this reference as Exhibit "A"; with #4 dowels installed at step area only. Prior to the concrete installation, scarify native soil to a depth of four (4) inches, grade and re- compact native soil to a minimum of 95% compaction. Contractor will remove and replace broken 4' x 6' panel of existing sidewalk adjacent to new concrete pad. All new concrete surfaces shall have a medium broom finish. All work to be performed per the Contractor's proposal dated November 23, 2011 and City specifications, for a sum not to exceed Three Thousand Four Hundred Forty dollars ($3,440). This work is to be completed within 21 calendar days after issuance of a Purchase Order. ADDITIONAL REQUIREMENTS 1. City of Carlsbad Business License. 2. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City, and its agents, officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of this Contract or work; or from any failure or alleged failure of the contractor to comply with any applicable law, rules or regulations including those relating to safety and health; except for loss or damage which was caused solely by the active negligence of the City; and from any and all claims, loss, damage, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by this Contract, unless the loss or damage was caused solely by the active negligence of the City. The expenses of defense include all costs and expenses, including attorney's fees for litigation, arbitration, or other dispute resolution method. 3. Contractor shall furnish policies of general liability insurance, automobile liability insurance and a combined policy of workers compensation and employer's liability in an insurable amount of not less than five hundred thousand dollars ($500,000) each, unless a lower amount is approved by the City Attorney or the City Manager. Said policies shall name the City of Carlsbad as a co-insured or additional insured. Insurance is to be placed with insurers that have (1) a rating in the most recent Best's Key Rating guide of at least A-:V, and (2) are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner. Proof of all such insurance shall be given by filing certificates of insurance with contracting department prior to the signing of the contract by the City. 4. The Contractor shall be aware of and comply with all Federal, State, County and City Statues, Ordinances and Regulations, including Workers Compensation laws (Division 4, California Labor Code) and the "Immigration Reform and Control Act of 1986" (8USC, Sections 1101 through 1525), to include but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors and consultants that are included in this Contract. 5. The Contractor shall be aware of and comply with California Regional Water Quality Control Board, San Diego Region requirements. 1 -- Revised 9/28/00 A. Contractor shall not allow any discharges from the construction site, which may have an adverse effect on receiving waters of the United States. Contractor shall not allow any groundwater extraction water to be discharged from construction site except in full compliance with the General Waste Discharge Requirements for Ground Water Extraction and Similar Discharges from Construction and Remediation Projects (Order No. 96-41) adopted by the Regional Board. Prior to submitting Bid, Contractor shall obtain a copy of said Order No. 96-41 and review all compliance requirements therein, including monitoring, testing, and reporting. B. In the event of conflict between the Contract and Permit requirements, the most stringent shall prevail. All permit requirements shall be satisfied by Contractor and accepted by all issuing agencies, and the Owner before project will be accepted and a Notice of Completion filed. C. Contractor shall, at his own expense, procure any additional permits, certificates, and licenses required of him by law for the execution of the work. He shall comply with all Federal, State and local laws, ordinances or rules and regulations relating to the performance of said work. E. The Contractor shall incorporate and comply with all applicable Best Management Practices (BMPs) during the completion of this agreement. All work must be in compliance with the most current San Diego Regional Water Quality Control Board (RWQCB) permit, Carlsbad Municipal code and the City of Carlsbad Juhsdictional Urban Runoff Management Plan (JURMP) incorporated herein by reference. F. The Contractor shall indicate in his submittals methods of compliance, equipment utilized to insure compliance, training of staff and experience in compliance with environmental regulations. If in the opinion of the project manager, the Contractor is not in compliance with this provision CITY reserves the right to implement BMP's to the maximum extent practical, and deduct payment due or back charge the Contractor for implementation with a 15% markup for administration and overhead. 6. The Contractor may be subject to civil penalties for the filing of false claims as set forth in the California False Claims Act, Government Code Sections 1265o/et sea., and Carlsbad Municipal Code Sections 3.32.025, et sec. [)^J init {yV init 7. The Contractor hereby acknowledges that debarment by another jurisdiction is grounds for tfa^^ty of ^jl^ad to disqualify the Contractor from participating in contract bidding. 8. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California. 9. The City of Carlsbad is a Charter City. Carlsbad Municipal Code Section 3.28.130 supersedes the provisions of the California Labor Code when the public work is not a statewide concern. Payment of prevailing wages is at contractor's discretion. // // // // // -- 2 - Revised 9/28/00 TO INDICATE ACCEPTANCE OF THIS AGREEMENT, PLEASE SIGN IN THE SPACE BELOW AND RETURN TO: Paul Harrison (Project Mgr) Parks & Recreation 1166 Carlsbad Village Dr. Carlsbad. CA 92008 (Department) Dan Vaughn Masonry and Concrete (Nam^DkContractor) "(Sign Here) (E-mail Ai (Address) 450969 (Contractor's License Number) (Frin Vint Name and Title) Ci Htr^^^l^ fork v/z'/ W^Kil r^yNT- (Print Name and Title) (E-mail Address) Department Head Date (Proper notarial acknowledgment of execution by Contractor must be attached. Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant treasurer must sign for corporations. Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.) APPROVED AS TO FORM: RONALD R. BAkl/S^tAttorney BY: ~ 3 Revised 9/28/00 Mov 23 11 ai:43p Vaughn Masonra 760«7249677 p. 1 FROM Proposal No. Sheet No. Proposal Submitted To Work To Be Performed At Nam Stre City State State. Street City. Dote of Plan*. Architect. ' ^ Architect—^5a»^ ' j '— with payments to be made as follows! "SOTICS TO OWNER" {Section 7019—CoBtrattofs Uceos* Lwrt iind« the !«w »u m« prot«ct younteif »»in*t sua eUlms !iy S« W work onmp;o«m«>t or » n Vtt" otfiM. Sid tK-nd sh«Ii b. in 'Sftln Jlan to m »...^.nt /Mats of th« MirtMct price »Bff sfilli, in »Ban>a" '<». Respectfully submitteq P«r- Stote Ucense No i. cJ*-—t- The obcve prices, specificotlons and .ortdltions ore sotlsfocto^ ond ore Hereby occepted. You ore outhorUed to do the work os specified. Payment will ba mode os outlined above. Accepted. Stgnoture. Dote- _Sisnoture. 26000, Sacramento, Calif Prnio 95826.1 LITHO IN U, S. A.