Loading...
HomeMy WebLinkAboutHELTON CONSTRUCTION COMPANY; 1976-08-23; 1034CITY OF CARLSBAD SAN DIEGO COUNTY CALIFORNIA CONTRACT DOCUMENTS & SPECIFICATIONS FOR RESTORATION OF THE MAGEE HOUSE LOCATED AT BEECH AVE. & GARFIELD ST. CONTRACT NO. 1034 MARCH 1976 TABLE OF CONTENTS 1 3 6 7 8 9 11 13 15 DIVISION 1 DIVISION 2 DIVISION 3 DIVISION 4 DIVISION 6 DIVISION 7 DIVISION 8 DIVISION 9 DIVISION 10 DIVISION 15 DIVISION 16 NOTICE INVITING SEALED PROPOSALS PROPOSAL BID BOND DESIGNATION OF SUBCONTRACTORS STATEMENT OF FINANCES AGREEMENT AND CONTRACT BOND FOR LABOR AND MATERIALS BOND FOR FAITHFUL PERFORMANCE SPECIAL PROVISIONS GENERAL REQUIREMENTS SITE WORK CONCRETE MASONRY CARPENTRY MOISTURE PROTECTION DOORS/WINDOWS & GLASS FINISHES SPECIALTIES MECHANICAL ELECTRICAL PAGE NO. 19 20 ' 21 22 * 24 25 26 27 32 • 33 37 Page 1 CITY OF CARLSBAD, CALIFORNIA NOTICE INVITING BIDS SEALED BIDS will be received at the Office of the City Clerk, City Hall, 1200 Elm Avenue, Carlsbad, California, until 10:00 a.m. on the T 6-i-b day of ,Tnnp , ^T_^_r at which time they will be opened and read, for performing the work as follows: Restoration of the Magee House located at Beech Avenue and Garfield Street. . Contract No. 1034 Said work shall be performed in strict conformity with the speci- fications therefor as approved by the City Council of the City of , Carlsbad by Resolution No. 3904 , adopted on May 18 _/ 19^6^, and on file in the Engineering Department. Reference is hereby made to said specifications for full particulars and descrip- tion of said work. No bid will be received unless it is made on a proposal form fur- nished by the Engineering Department. Each bid must be accompanied by cash, certified check or bidder's bond made payable to the City of Carlsbad for an amount equal to at least 10 percent of the amount bid. Such guaranty to be forfeited should the bidder to whom the contract is awarded fail to furnish the required bonds and to enter into a contract with the City within the period of time provided by f****"" the bid requirements.w* The documents included within the sealed bids which require comple- tion and execution are the following: 1. Proposal - Page 3. 2. Designation of Subcontractors - Page 7. 3. Bidder's Bond - Page 6. 4. Contractor's Financial Status - Page 8. Said documents shall be affixed with the appropriate notaried sig- natures and titles of the persons signing on behalf of the bidder. For corporations, the signatures of the President or Vice-President and Secretary or Assistant Secretary are required and the corporate seal shall be affixed to all documents requiring signatures. In the case of a partnership, the signature of at least one general partner is required. All bids are to be compared on the basis of the Engineer's estimate. The estimated quantities are approximate only, being given solely as a bisis for the comparison of bids. No bid will be accepted from a contractor who has not been licensed in accordance with the provisions of Chapter 9, Division 3 of the Business and Professions Code. The contractor shall state his f~~ License number and classification in the proposal. The estimated *"**' cost of the work is $60,000-. 05 . Page 2 Plans, Special Provisions and Contract Documents may be obtained at the Engineering Department, City Hall, Carlsbad, California, at no cost to licensed contractors. A nonref undable charge of $5 . 00 _ will be required for each set of plans, special provisions and con- tract documents for other than licensed contractors. It is requested that the plans and special provisions be returned within two weeks after the bid opening. The City of Carlsbad reserves the right to reject any or all bids and to waive any minor irregularity or informality in such bids. A project tour will be conducted by the City of Carlsbad Engineering Department at 10:00 a.m. on the day requested _ _____• In accordance with the provisions of Sections 1770 to 1780 of the Labor Code of the State of California, the City Council of the City of Carlsbad has ascertained that the general prevailing rate of wages in the locality in which the work is to be performed for each craft or type of workman needed to execute the contract are as set forth in Resolution No. 3875, adopted by said Council and published in a newspaper of general circulation within said City on May 26 _ , 1976_. A copy of said Resolution is on file in the Office of the City Clerk of the City of Carlsbad and is incorporated by reference herein. It shall be mandatory upon the Contractor to whom the contract is awarded to pay not less than the said specified prevailing rates of wages to all workmen employed by him in the execution of the contract. Also, the prime contractor shall be responsible to insure compliance with provisions of Section 1777.5 of the Labor Code of the State of California for all occupations with apprenticeships as required on public works projects above thirty thousand dollars ($30,000) or twenty working days. The amount of the bond to be given for the faithful performance of the contract for the said work, shall be one hundred percent of the contract price therefor, and an additional bond in the amount equal to fifty * percent of the contract price for said work shall be given to secure the payment of the claims for any material or supplies furnished for the performance of the work contracted to be done by the contractor or any work or labor of any kind done thereon. Approved by the City Council of the City -of - Carlsbad, -California, by Resolution No. 3904 adopted on May 18 _ , 1976- / ''ttsjj £&•?? C~- C/ 1 sL. DATED : May 21 , 1 976 _ MARpARf E. ADAMS, City Clerk /*"•- Page 3 CITY OF CARLSBAD RESTORATION OF THE MAGEE HOUSE LOCATED AT BEECH AVE. & GARFIELD ST. *> Contract No. 1034 PROPOSAL To the City Council City of Carlsbad 1200 Elm Avenue Carlsbad, CA 92003 Gentlemen: The undersigned declares that he has carefully examined the location of the work, read the Notice Inviting Bids, examined the plans and specifications, and hereby proposes to furnish all labor, materials, equipment, transportation and services required to do all the work to complete Contract 1034 in accordance with the plans, the specifi- cations of the City of Carlsbad, and the special provisions, and that he will take in full payment therefor the following unit prices for each item complete to wit: Approx. Items with Unit Prices or Unit Prices Total Item Nc. Quantity Lump Sum Written in Words In Figures Amount 1. L.S. plumbing system complete at rr.^g^ dollars and _ °/L-c' _ cents 2. L.S. forced air heating unit complete at fi/;? dollars and f!<J,--<> cents 3. L.S. electrical system complete /jrA,£-7dollars and _ cents 4. L.S. all other work shown on plans and included in specifications at Total Amount Total Amount ,_ and in Figures %( J in Words "S&^n,} dollars cents '? 3i-&'^i l~f TT&Z&cr T7-faiJ$A>'<t /) Yr* ' £*$& /bj*i)£&? •>& ./ ' Page 4 All bids are to be computed on the basis of the given estimated quantities of work, as indicated in this proposal, times the unit f" price as submitted by the bidder. In case of a discrepancy between words and figures, the words shall prevail. In case of an error in the extension of a unit price, the corrected extension shall be calculated and the bids will be computed as indicated above and compared on the basis of the corrected totals. The estimated quantities of work indicated in this proposal are approximate only, being given solely as a basis for comparison of bids. The undersigned has checked carefully all.of the above figures and understands that the City will not be responsible for any errors or omissions on the part of the undersigned in .making up this bid. The undersigned agrees that in case of default in executing the required contract with necessary bonds and insurance policies within twenty (20) days from the date of award of contract by the City Council of the City of Carlsbad, the proceeds ol check or bond accompanying this bid shall become the property of.the City of Carlsbad. Licensed-in accordance with the Statutes of the State of California providing for the registration of contractors, License No.°3804 / 211449 Identification B-l . C The undersigned bidder hereby represents as fcllcv.'s: (a) That no Councilman, officer, agent or employee of the 'City of Carlsbad-is personally interested, directly or indirectly, in this contract, or the compensation to be paid hereunder; that no representation, oral or in writing, of the City Council, its officers, agents or employees, has induced him to enter into this Contract, excepting only those contained in this form of Contract and the papers made a part hereof by its terms, and (b) That this bid is made without connection with any person, firm or corporation making a bid for the same work, and is in all respects fair and without collusion or fraud. Accompanying this proposal is Bid Bond (cash, certified check, cashier's check or bond) in an amount not less than 10 per cent of the total bid price. The undersigned is aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workmen's compensation or to'undertake self-insurance in accordance with the provisions of that code, and agrees to comply with such provisions before commencing the performance of the work of this contract. Page 5 C 729 2034 Phone Number June 16, 1976 Date Helton Construction Co. Bidder-1 s Name (SEAL) "^uthorized Signature/ Authorized Signature 2829 State Street, Carlsbad Ca. 9200.8 Bidder's Address Individual Type of Organization (Individual, Corporation, Co- partnership) List below names of President, Secretary, Treasurer and Manager if a corporation, and names of all co-partners if a co-partnership: Page 6 BIDDER'S BOND TO ACCOMPANY PROPOSAL KNOW ALL MEN BY THESE PRESENTS, jf~*. W That we, Helton Construction Company / as Principal, and Pacific Employers Insurance Company / as Surety, are held and firmly bound unto the City of Carlsbad, California, in the sum of 10$ of amount bid Dollars ($ ) , lawful money of the United States for the payment of which sum well and truly to be made, we bind ourselves, jointly and severally, firmly by these presents THE CONDITION OF THE FOREGOING OBLIGATION IS SUCH: That if the proposal of the above-bounden principal for: Restoration of the Magee House located at Beech Ave. & Garfield St. Contract No. 1034 in the City of Carlsbad, is accepted by the City Council of said City, and if the above-bounden Principal shall duly enter into and execute a contract including required bonds and insurance policies within (20) twenty days from the date of award of contract by the City Council of the City of Carlsbad, being duly notified of said award, then this obligation shall become null and void; otherwise it shall be and f^ remain in full force and effect, and the amount specified herein shall be forfeited to the said City. In the event that any Principal above named executed this bond 1 as an individual, it is agreed that the death of any such Principal shall not exonerate the surety from its obligations under this bond. IN WITNESS WHEREOF, we hereunto set our hands and seals this 15th day of June _, 1976 . Corporate Seal (if corporation) Helton Construction Company by Principal (Attach Acknowledgement of Attorney in Fact) Pacific Employers Insurance Co. Surety By r"*•* Title Attorney-in-f act (Notarial acknowledgement -of execution by all PRINCIPALS and SURETY must be attached.) STATE OF CALIFORNIA, COUNTY nr- San Diego OFFICIAL SEAL Su.c;:ii;e A. /VkCanhy :n MOTARY PUBLIC - CALIFORNIA '/ SAN: DIEGO COUrxiTY My CDmrn. expiies WAY 12. 1S33 ss. ON June l6 , 19 ?6 , before me, the undersigned, a Notary Public in and for said State, personally appeared Gerald C. McClellan , , ., known to me, to be the person whose name is subscribed to the within Instrument, and acknowledged to me that _ he _ executed the same. WITNESS my hand and official/seal. / Notary Public in arftTfbr said State. jj ACKNOWLEDGMENT-General-Wolcotts Form 233-Rev. 3-64 STATE OF CALIFORNIA, COUNTY nr Ran Diego OFFICIAL SEAL Susanne A. McCarthy NOTARY PUBLIC - CALIFORNIA SAN DIEGO COUNTY My comm. expires MAY 12, 1980 June 16 before me, the undersigned, a Notary Public in and for said State, personally appeared . Gary D. Helton .., known to me, s subscribed to the within Instrument,to be the person whose name__ and acknowledged to me that he executed the same. WITNESS my hand and official s/ral. ^^' ^'^.(fttiZbg.' ' Vv frNotary Public in and for said State. ACKNOWLEDGMENT—General—Wolcotts Form 233—Rev. 3-64 Page 7 DESIGNATION OF SUBCONTRACTOR c The undersigned certifies that he has used the subbids of the following listed contractors in making "Up his bid and that the subcontractors listed will be used for the work for-which they bid, subject to the approval of the City Engineer, and in accordance with the applicable provisions of the specifications No change may be made in these subcontractors except upon the prior approval of the City Council of the City of Carlsbad. ITEM OF WORK 1. Plumbing 2. Heating SUBCONTRACTOR ADDRESS O c.^^.^i, 0 a' 3. Electrical 4. Drywall !>7 5. Painting //(' 6. Floorcovering C Helton Construction Co Bidder/1 s Name -Authorized Signature Individual Type of Organization (Individual, Co-Partnership or Corporation) 2829 State Street Carlsbad, Cal. 92008 Address Page 8 BIDDER'S STATEMENT OF FINANCIAL RESPONSIBILITY TECHNICAL ABILITY AND EXPERIENCE •• ~ (The Bidder is required to state what work of a similar character to that included in the proposed contract he has successfully performed and give reference which will enable the City Council to judge his responsibility, experience, skill and business standing.) The undersigned submits herewith a statement of his financial respon- sibility. Cs The undersigned submits below a statement of the work of similar character to that included in the proposed contract which he has successfully performed. Business started in 1946- have worked the the north county all of that time. much work at the Carlsbad Army Navy Academy both new and old work project in the city of Oceanside including the remodeling of the Oceanside Library. Currently completing a Medical Center in Downtown Del Mar _ STgn&d INSTANCE COMPANY OF NORTH AME. CA CONTRACT BOND STATUS QUERY •3.1-13-70-kitt BOND NO. MNR 14 13 05 YOUR NO.OUR BOND ON BEHALF OF Helton Construction Co COVERS A CONTRACT FOR Performance labor and material restoration of the Magee House located at Beech St. & Gartieid St. Contract No./1034 Without prejudicing your rights or affecting our liability under our bond(s) referred to above, please furnish the information requested below. Please return both copies in the ATTACHED ADDRESSED ENVELOPE. "1r L City of Carlsbad City Clerk, Engineer 1200 Bin Street Carlsbad, CA J Signed.James ALlieon Surety Depcrtmeat 1. HAS CONTRACT BEEN COMPLETED? .............................. 2. IF COMPLETED, PLEASE STATE a. Date of acceptance ............................................ b. Total amount of completed contract? ............... . ......... . .$ 3. IF NOT COMPLETED, PLEASE STATE a. Probable completion date ....................................... b. Amount paid contractor to date .................... ............ $ c. Amount withheld as retained percentage ........................ $ f 4. HAS WORK PROGRESSED SATISFACTORILY? ...................... 5. ARE THERE ANY UNSATISFIED CLAIMS OR LIENS ON FILE? REMARKS: Signed- Dated.Title (ftS<3 BS-9458 PTD. IN U.S.A. SERVICE OFFICE COPY Page 9 CONTRA£T THIS AGREEMENT, made and entered into this day of , 19 , by and between the City of Carlsbad, California, hereinafter designated as the City, party of the first part, and Helton Construction Company , hereinafter designated as.the Contractor, party of the second part. WITNESSETH: that the parties hereto do mutually agree as follows: 1. For and in consideration of the -payments and agreements hereinafter mentioned to he made and performed by the City, the Con- tractor agrees with the City to furnish all materials and labor for: Restoration of the Magee House located at Beech Ave. & Garfield St. Contract No. 1034 and to perform and complete in a good and workmanlike manner all the work pertaining thereto shown on the plans and specifications therefor; to furnish at his own proper cost and expense all tools, equipment, labor and materials necessary therefor, (except such materials, if any, as in the said specifications are stipulated to be furnished by the City), and to do everything required by this agreement and the said ^,, plans and specifications. '%«»»'2. For "furnishing all said materials and labor, tools and equip- ment, and doing all the work contemplated and embraced in this agreement also for all loss and damage arising out of the nature of the work aforesaid, or from the action of the elements, or from any unforeseen difficulties which may arise or be encountered in the prosecution of the work until its acceptance by the City, and for all risks of every description connected with the work; also, for all expenses incurred by or in consequence of the suspension or discontinuance of work, except such as in said specifications are expressly stipulated to be borne by the City; and for well and faithfully completing the work and the whole thereof, in the manner shown and described in the said plans and specifications, the City will pay and the Contractor shall rec'eive in full compensation therefor the lump sum price, or if the bid is on the unit price basis, the < total price for the several items furnished pursuant to the specifications, named in the bidding sheet of the proposal, as the case may be. 3. The City hereby promises and agrees with the said Contractor to employ, and does hereby employ the said Contractor to provide the materials and to do the work according to the terms and conditions herein contained and referred to for the price aforesaid and hereby conditions set forth in the specifications; and the said parties for themselves, their heirs, executors, administrators, successors and ^ assigns, do hereby agree to the full performance of the covenants ^ herein contained. 4. The Notice to Bidders, Instructions to Bidders, Contractor's Proposal, and the plans and specifications, and all amendments thereof Page 10 when approved by the parties hereto, or when required by the City in accordance with the provisions of the plans and specifications, are • hereby incorporated in and made part of-this agreement.- 5. Pursuant to the Labor Code of the State of California, the City Council has ascertained the general prevailing rates of per diem wages for each craft or type of workman needed to execute the contract and a schedule containing such information is included in the Notice Inviting Bids and is incorporated by reference herein. 6. The Contractor shall assume the defense of and indemnify and save harmless the City, the City Engineer, and their officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from the performance of the contract or work, regardless of responsi- bility for negligence; and from any and all claims, loss, damage, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the contract, regardless of responsibility for negligence. IN WITNESS WHEREOF, the parties hereto have caused this contract to be executed the day and year first above written. s?. -Tro Contractor . ..(seal) Title by Title ,RLSBAD, CALIFORNIA c layor Approved as te-, form: . ATTEST:-^n •» (Notarial acknowledgement of execution by all PRINCIPALS must be * attached.) TO 1945 CA (8-74) (Corporation) STATE OF CALIFORNIA COUNTY OF San Diego ss. TITLE INSURANCEANDTRUST ATICOR COMPANY •< STAPLE HERE >•On AugUSt 23, 1976 before me, t State, personally appeared Robert C, F T 3 Z f he undersigned, a Notary Public in and for said »e^ known to me to he the Mayor Bfe&sMeYit and Maroaret E. Adams known to me to he City Clerk Secretary of the corporation that executed the within Instrument, known to me to be the persons who executed the within Instrument on behalf of the corporation therein named, and acknowledged to me that such corporation executed the within instrument pursuant to its by-laws or a resolution of its board of directors. WITNESS my hand and official seal. "T* f jfc/ J ' ) Signature / LQ~\nL^f /' • >P*S^iJt CPtt^C^Axs ~~ X5^X OFFICIAL SEAL /j?^fj§\ NORA K. GARDINER (s^^i-j NOTAR> »UBL»C- CALIF- WgpP/ PRINCIPAL OFFICE IN | MY COMMISSION EXPIRES JAN. 29, 1980 (This area for official notarial seal) *> SJ f STATE OF CALIFORNIA, COUNTY OP Q^ ™-e%° before me, the undersigned, a Notary Public in and for said State', personally appeared Gary D. Helton . is OFFICIAL SEAL AUDREY B. CURLEY NOTARY PUBLIC • CALK PRINCIPAL OFFICE IN SAN OiEGO COUNfY My Commission Expires July 11. 1977 to be the person whose name_ and acknowledged to me that he executed the same. WITNESS my hand and official seal. , known to me, .subscribed to the within Instrument, Notary Pimlic in and for said State. .X&KNOWLEDGMENT—General—Wolcotts Form 233—Rev. 3-64 LABOR AND MATERIAL BOND jj iln-305 ' Premiums Included KNOW ALL MEN BY THESE PRESENTS, THAT WHEREAS, the City Council of the City of Carlsbad, State of California, by Res. No. 3951 adopted July 6, 1976 has awarded to Helton Construction Company hereinafter designated as the "Principal", a contract for: Restoration of the Magee House located at Beech Ave. & Garfield St. Contract No. 1034 in the City of Carlsbad, in strict conformity with the drawings and specifications and other contract documents on file in the Office of the City Clerk. WHEREAS, said Principal has executed or is about to execute said contract and the terms thereof require the furnishing of a bond with said contract, providing that if said Principal or any of his or its subcontractors shall fail to pay for any materials, provisions, pro- vender or other supplies or teams used in, upon, for or about the performance of the work agreed to be done, or for any work or labor done thereon of any kind, the Surety on this bond will pay the same to the extent hereinafter set forth: NOW, THEREFORE, WE Helton Construction ^Qompany • as Principal, hereinafter designated as Contractor and Pacific Employers Insurance Company as Surety, are held firmly bound unto Thirty-six Thousand-i 'the City of Carlsbad, in the sum of Six Hundred Seventy-eight Dollars ($36,678.00 ) , said sum being 50 per cent of the estimated amount payable by the City of Carlsbad under the terms of the contract, for which payment well and truly to be made we bind ourselves, our heirs, executors and administrators, successors, or assigns, jointly and severally, firmly by these presents.' THE CONDITION OF THIS OBLIGATION IS SUCH, that if the person or his subcontractors fail to pay for any materials, provisions, provender or other supplies, or teams used in, upon, for or about the performance of the work contracted to be done, or for any other work or labor thereo of any kind, or for amounts due under the Unemployment Insurance Code with respect to such work or labor, that the Surety or Sureties will pay for the same, in an amount not exceeding the sum specified in the bond, and also, in case suit is brought upon the bond, a reasonable attorney's fee, to be fixed by the court, as required by the provisions of Section 4204 of the Government Code of the State of California. C. This bond shall inure to the benefit of any and all persons, companies and corporations entitled to file claims under Section 1192.1 of the Code of Civil Procedure so as to give a right of action to them or their assigns in any suit brought upon this bond, as required by the provisions of Section 4205 of the Government Code of the State of California. And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alterations or additions to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any such change, extension of time, alterations or additions to the .terms of the Contract or to the work or to the specifications. In the event that any principal above named executed .this bond as an individual, it is agreed that the death,of any such Principal shall not exonerate the Surety from its obligations under this bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the liit.h day of j»iy ' __, 1.9 76 . • Helton Consitructiop- Conmajay (Seal) _ (Seal) (Seal) Contractor Pacific Employers Insurance Company (Seal) By: s^*-c/* ^- ^-g-^*.^. _ (Seal) Gerald C. McClellan Attorney-in-fact _ . _ (Seal) Surety STATE OF CALIFORNIA, COUNTY OF San Diego OFFICIAL SEAL AUDREY B. CURLEY HUBllo CMlttGivriiA PRINCIPAL OFFICE IN SAN DIEGO COUNTY My Commission Expires July 11, 1977 SS. ON_ July lA, , IQ 76 ; before me, the undersigned, a Notary Public in and for said State, personally appeared Gary D. Helton isto be the person whose name and acknowledged to me that he executed the same. WITNESS my hand and official seal. , known to me, .subscribed to the within Instrument, Notary Putmc in and for said State tCKNOWLEDGMENT-General-Wolcotts Form 233-Rev. 3-64 STATE OF CALIFORNIA, COUNTY nr- San Diego AUDREY B. CURISY UiLIC • CALIrOKNlA PiV.iiCli'AL OFFlCt IN _ SAN DIEGO COUNTY My Commission Expires July 11. * _ - _ - - __j-j._-jj^ SS. ON July lA 19 T6 , before me, the undersigned, a Notary Public in and for said State, personally appeared Gerald C. McClellan to be the person whose name is and acknowledged to me that he executed the same. WITNESS my hand and official seal. , known to me, .subscribed to the within Instrument, Notary niblic in and for said State. ACKNOWLEDGMENT—General—Wolcotts Form 233—Rev. 3-64 Page 13 C PERFORMANCE.-BOND M 1^1-.305 Premium: $73^.00 KNOW ALL MEN BY THESE PRESENTS, that WHEREAS, the City Council of the City of Carlsbad, State of California, by Res. No. 3951 adopted July 6, 1976 has awarded to Helton-Construction Company , hereinafter designated as the "Principal", a contract for: Restoration of the Magee House located at Beech Ave. & Garfield St. Contract No. 1034 in the City of Carlsbad, in strict conformity with the drawings and specifications and other contract documents now on file in the Office of the City Clerk of the City of Carlsbad. WHEREAS, said Principal has executed or is about to execute said contract and the terms thereof require the furnishing of a bond for the Faithful Performance of said contract; NOW, THEREFORE, WE, Helton Construction Company as Principal, hereinafter designated as the "Contractor", and 'Pacific Employers Insurance Company f as Surety, are held and firmly bound Seventy-three Thousand unto the City of Carlsbad, in the sum of Three Hundred Fifty-six Dollars ($ 73,356.00 ) / said sum being equal to 100 per cent of the estimated amount of the contract, to be paid to the said City or its certain attorney, its successors and assigns; for which payment, well and truly to be made, we bind ourselves, our heirs, executors .and administrators, successors or assigns, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH, "that if the above-bounden Principal, his or its heirs, executors, administrators, successors or assigns, shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions and agreements in the said contract and any alteration thereof made as therein provided on- his or their part, to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the City of Carlsbad, its officers and agents, as therein stipulated, then this obligation shall become null and void; otherwise it shall remain in full force and virtue. And said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of t" OT +~'": *-*1'"- vTork +~'~" foe ^ Page 14 cations accompanying the same shall in any wise affect its obligations on this bond, and it does hereby waive notice of any change, extension of time, alterations or addition to the terms of the contract or to the work or to the specifications. • In the event that any Principal above named executed this bond as an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under thi's bond. IN WITNESS WHEREOF, this instrument has been duly executed by the Principal and Surety above named, on the . i^th daY of July / 19 76 • Helton Construction Company By: (Seal) (Seal) (Seal) Contractor Pacific Employers Insurance Company (Seal) ^ (Seal) (Seal) Bv:Gerald C. McClellan Attorney-in-fact Surety STATE OF CALIFORNIA, COUNTY OF San Diego OFFICIAL SEAL AUDREY B. CURLEY i NGlAKi' PUBLIC • CALIFORNIA ! PRINCIPAL OFFICE IN SAN DitGO COUNTY My Commission Expires July 11, 1977 ss. before me, the undersigned, a Notary Public in and for said State, personally appeared Gary D. Helton ., known to me, to be the person whose name !§ subscribed to the within Instrument, and acknowledged to me that he executed the same. WITNESS my hand and official seal. Notary Pubftc in and for said State. . (/ CKNOWLEDGMENT-General-Wolcotts Form 233-Rev. 3-64 STATE OF CALIFORNIA, COUNTY DP San Diego Ol:FUJAL uiAl- REY B. CUIU.EY p,iiN£IHAL Orritt IN SAN DitGO COUNU ss. before me, the undersigned, a Notary Rubric1'in and for said State, personally appeared Gerald C. McClellan to be the person whose name and acknowledged to me that he executed the same. WITNESS my hand and official seal. _, known to me, is subscribed to the within Instrument, Notary Public in and for said State. ACKNOWLEDGMENT—General—WolcotU Form 233—Rev. 3-64 PAGE 15 * CITY OF CARLSBAD RESTORATION OF THE MAGEE HOUSE CONTRACT NO. 1034 SPECIAL PROVISIONS 1.0 GENERAL CONDITIONS 1.1 SCOPE a. UNLESS SPECIFICALLY STATED OR NOTED OTHERWISE IN THE CONTRACT DOCUMENTS, THE WORK OF THIS CONTRACT INCLUDES THE FURNISHING OF ALL LABOR, MATERIAL, EQUIPMENT, SERVICES AND APPURTENANCES REQUIRED TO COMPLETELY, PROPERLY AND FAITHFULLY PERFORM ALL THE WORK OF RESTORING THE MAGEE HOUSE, AS HEREIN SPECIFIED AND SHOWN ON THE DRAWINGS. WORK UNDER THIS CONTRACT IS LOCATED AT BEECH AVENUE, CARLSBAD, CALIFORNIA 92008. 1.2 DRAWINGS AND SPECIFICATIONS a. DRAWINGS WHICH FORM A PART OF THE CONTRACT DOCUMENTS AND WHICH ACCOMPANY THESE SPECIFICATIONS ARE COMPOSED OF ELEVEN SHEETS AS FOLLOWS: Al, A2, A3, A4, A5, A6, A7, A8, A9, A10,.A11. b. SPECIFICATIONS WHICH FORM A PART OF CONTRACT DOCUMENTS CONSIST OF SECTIONS AS LISTED.IN THE TABLE OF CONTENTS IN THE FOREPART OF THESE SPECIFICATIONS. c. DIVISION OF THE SPECIFICATIONS; FOR CONVENIENCE, THESE SPECIFICATIONS ARE ARRANGED IN SEVERAL TRADE SECTIONS, BUT SUCH SEPARATION DOES NOT ESTABLISH LIMITS OF WORK REQUIRED BY ANY SUBCONTRACT OR TRADE. TERMS AND CONDITIONS OF SUCH LIMITATIONS ARE WHOLLY BETWEEN CONTRACTOR AND SUBCONTRACTORS. 1.3 ADDITIONAL DEFINITIONS a. OWNER: CITY OF CARLSBAD, 1200 ELM AVENUE, CARLSBAD, CALIFORNIA b. DRAWINGS; EDPAG - (ENVIRONMENTAL DESIGN, PLANNING & GRAPHICS) 2551 STATE STREET, SUITE 107, CARLSBAD, CALIFORNIA 92008 c. WORK; ALL WORK AS DEFINED BY ANY OR ALL PORTIONS OF THESE SPECIFICATIONS AND ACCOMPANYING DRAWINGS. d. REFERENCE TO DRAWINGS; WHERE THE WORDS "SHOWN", "INDICATED", "DETAILED", "NOTED", "SCHEDULED", OR WORDS OF SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD THAT REFERENCE IS MADE TO THE DRAWINGS ACCOMPANYING THESE SPECIFICATIONS, UNLESS STATED OTHERWISE. e. DIRECTIONS: WHERE THE WORDS "DIRECTED", "DESIGNATED", "SELECTED", OR WORDS OF SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD THAT THE DIRECTION, DESIGNATION, SELECTION, OR SIMILAR IMPORT, OF EDPAG IS INTENDED, UNLESS STATED OTHERWISE. THE WORD "REQUIRED" AND WORDS OF SIMITAR IMPORT SHALL BE UNDERSTOOD TO MEAN "AS REQURED TO PROPERLY COMPLETE THE WORK AND AS REQUIRED AND APPROVED BY EDPAG, ULESS STATED OTHERWISE. PAGE 16 f. EQUALS AND APPROVALS: WHERE THE WORDS "EQUAL", "APPROVED EQUAL", "EQUIVALENT" AND SUCH WORDS OF SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD SUCH WORDS ARE FOLLOWED BY THE EXPRESSION "IN THE OPINION OF EDPAG", UNLESS STATED OTHERWISE. WHERE THE WORDS "APPROVED", "APPROVAL", "ACCEPTABLE", "ACCEPTANCE", OR WORDS OF SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD THAT THE APPROVAL, ACCEPTANCE, OR SIMILAR IMPORT, OF EDPAG IS INTENDED. g. PERFORM AND PROVIDE: THE WORD "PERFORM" SHALL BE UNDERSTOOD TO MEAN THAT THE CONTRACTOR, AT HIS EXPENSE, SHALL PERFORM ALL OPERATIONS, LABOR, TOOLS, AND EQUIPMENT, AND FURTHER INCLUDING THE FURNISHING AND INSTALLING OF MATERIALS THAT ARE INDICATED, SPECIFIED, OR REQUIRED TO COMPLETE SUCH PERFORMANCE. THE WORD "PROVIDE" SHALL BE UNDERSTOOD TO MEAN THAT THE CONTRACTOR, AT HIS EXPENSE, SHALL FURNISH AND INSTALL THE WORK, COMPLETE IN PLACE AND READY FOR USE, INCLUDING FURNISHING OF NECESSARY LABOR, MATERIALS, TOOLS, EQUIPMENT AND TRANSPORTATION. h. LANGUAGE AND INTENT: THE SPECIFICATION SECTIONS ARE WRITTEN IN A MODIFIED BRIEF STYLE CONSISTENT WITH CLARITY. IN GENERAL, THE WORDS "THE","SHALL", "WILL" AND "ALL" ARE NOT USED. WHERE SUCH WORDS AS "PERFORM", "INSTALL", "ERECT", "TEST", OR WORDS OF SIMILAR IMPORT ARE USED, IT SHALL BE UNDERSTOOD THAT SUCH WORDS INCLUDE THE MEANING OF THE PHRASE "THE CONTRACTOR SHALL". THE REQUIREMENTS INDICATED AND SPECIFIED APPLY TO WORK OF THE SAME KIND, CLASS AND TYPE, EVEN THOUGH THE WORD "ALL" IS NOT STATED. 1.4 LOCAL CONDITIONS AND PLANS a. BEFORE SUBMITTING A PROPOSAL THE BIDDER SHALL CAREFULLY EXAMINE THE PLUMBING ELECTRICAL, MECHANICAL, ARCHITECTURAL DRAWINGS AND SPECIFICATIONS. HE SHALL VISIT THE SITE AND FULLY INFORM HIMSELF OF ALL EXISTING CONDITIONS AND LIMITATIONS APPLYING TO THE WORK. BY THE ACT OF SUBMITTING A PROPOSAL, EACH BIDDER SHALL BE DEEMED TO HAVE MADE SUCH EXAMINATIONS OF THE DRAWINGS AND SPECIFICATIONS AND PREMISES AND IT WILL BE ASSUMED THAT HE IS THEREFORE FAMILIAR WITH AND ACCEPTS AND HAS BASED HIS PROPOSAL UPON ALL OF SUCH EXISTING CONDITIONS AND LIMITATIONS APPLYING TO THIS WORK. 1.5 CODES AND STANDARDS a. REFERENCE TO CODES, ORDINANCES, REGULATIONS AND STANDARD SPECIFICATIONS REFER TO EDITIONS IN EFFECT AS TO DATE OF PROPOSALS. ABBREVIATIONS ARE USED FOR AGENCIES ISSUING STANDARD SPECIFICATIONS AS FOLLOWS: AGENCY ABBREVIATION AMERICAN SOCIETY FOR TESTING MATERIALS ASTM U.S. GOVERNMENT FED. SPEC. NATIONAL BOARD OF FIRE UNDERWRITERS NBFU AMERICAN INSTITUTE OF STEEL CONSTRUCTION . AISC AMERICAN STANDARDS ASSOCIATION ASA UNDERWRITERS LABORATORIES, INC. UL AMERICAN CONCRETE INSTITUTE ACI DEPARTMENT OF COMMERCE STANDARDS CS PAGE 17 * b. STANDARD SPECIFICATIONS INCORPORATED IN THE REQUIREMENTS OF THE SPECIFICATIOI BY REFERENCE SHALL BE THOSE OF LATEST EDITION AT TIME OF RECEIVING BIDS. IT SHALL BE UNDERSTOOD THAT THE MANUFACTURER'S OR PRODUCERS OF MATERIALS SO REQUIRED EITHER HAVE SUCH SPECIFICATIONS VAILABLE FOR REFERENCE OR ARE FULLY FAMILIAR WITH THEIR REQUIREMENTS AS PERTAINING TO THEIR PRODUCT OR MATERIAL. 1.6 MANUFACTURERS INSTRUCTIONS a. WHERE INSTALLATION OF WORK IS REQUIRED IN ACCORDANCE WITH THE PRODUCT MANUFACTURER'S DIRECTIONS, THE CONTRACTOR SHALL OBTAIN AND DISTRIBUTE THE NECESSARY COPIES OF SUCH INSTRUCTIONS, INCLUDING TWO COPIES TO EDPAG. 1.7 INTERNAL COMBUSTION ENGINES a. ALL INTERNAL COMBUSTION ENGINES USED IN THE CONSTRUCTION SHALL BE EQUIPPED WITH MUFFLERS IN GOOD REPAIR WHEN IN USE ON THE PROJECT (WITH SPECIAL ATTENTION TO CITY NOISE CONTROL ORDINANCES). 1.8 OCCUPANCY a. OWNER RESERVES THE RIGHT TO OCCUPY BUILDINGS AT ANY TIME BEFORE COMPLETION, AND SUCH OCCUPANCY SHALL NOT CONSTITUTE FINAL ACCEPTANCE OF ANY PART OF WORK COVERED BY THIS CONTRACT. 1.9 OWNER'S INSPECTOR a. AN INSPECTOR MAY BE EMPLOYED BY THE OWNER. b. ALL WORK SHALL BE UNDER OBSERVATION OF SAID INSPECTOR. HE SHALL HAVE FREE ACCESS TO ANY OR ALL PARTS OF WORK AT ANY TIME. CONTRACTOR SHALL FURNISH INSPECTOR REASONABLE FACILITIES FOR OBTAINING SUCH INFORMATION AS MAY BE NECESSARY TO KEEP HIM FULLY INFORMED REGARDING PROGRESS AND MANNER OF WORK AND CHARACTER OF MATERIALS. INSPECTION OF WORK SHALL NOT RELIEVE CONTRACTOR FROM ANY OBLIGATION TO FULFILL THIS CONTRACT. 1.10 PROVISIONS REQUIRED BY LAW DEEMED INSERTED a. EACH AND EVERY PROVISION OF LAW AND CLAUSE REQUIRED BY LAW TO BE INSERTED IN THIS CONTRACT SHALL BE DEEMED TO BE INSERTED HEREIN AND THE CONTRACT SHALL BE READ AND ENFORCED AS THOUGH IT WERE INCLUDED HEREIN, AND IF THROUGH MISTAKE OR OTHERWISE ANY SUCH PROVISION IS NOT INSERTED, OR IS NOT CORRECTLY INSERTED, THEN UPON APPLICATION OF EITHER PARTY THE CONTRACT SHALL FORTHWITH BE PHYSICALLY AMENDED TO MAKE SUCH INSERTION OR CORRECTION. 1.11 INTENT OF CONTRACT DOCUMENTS a. THE CONTRACTOR, HIS SUBCONTRACTORS AND MATERIAL SUPPLIERS SHALL PROVIDE AND INSTALL THE WORK AS INDICATED, SPECIFIED AND IMPLIED BY THE CONTRACT DOCUMENTS. ANY ITEMS OF WORK NOT INDICATED OR SPECIFIED BUT WHICH ARE ESSENTIAL TO THE COMPLETION OF THE WORK SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE TO FULFILL THE INTENT OF SAID DOCUMENTS. IN.ALL INSTANCES THROUGHOUT THE LIFE OF THE CONTRACT, EDPAG WILL BE THE INTERPRETER OF THE INTENT OF THE CONTRACT DOCUMENTS AND HIS DECISION RELATIVE TO SAID INTENT WILL BE • FINAL AND BINDING. FAILURE OF THE CONTRACTOR TO APPRISE HIS SUBCONTRACTORS AND MATERIAL SUPPLIERS OF THIS CONDITION OF THE CONTRACT WILL NOT RELIEVE HIM OF THE RESPONSIBILITY OF COMPLIANCE. •PAGE 18 1:12 SUBSTITUTION OF MATERIALS a. THE PROPOSAL OF THE BIDDER SHALL BE IN STRICT CONFORMITY WITH THE DRAWINGS AND SPECIFICATION AND BASED UPON THE ITEMS INDICATED OR SPECIFIED. b. WITHIN A REASONABLE TIME AFTER BIDDING, THE CONTRACTOR MAY OFFER TO EDPAG A SUBSTITUTION FOR ANY MATERIAL, APPARATUS, EQUIPMENT OR PROCESS INDICATED OR SPECIFIED BY PATENT OR PROPRIETARY NAMES OR BY NAMES OF MANUFACTURER, WHICH HE CONSIDERS EQUAL IN EVERY RESPECT TO THOSE INDICATED OR SPECIFIED. THE OFFER MADE IN WRITING SHALL INCLUDE PROOF OF THE STATE FIRE MARSHAL'S APPROVAL, IF REQUIRED, ALL NECESSARY INFORMATION, SPECIFICATIONS, DATA AND THE DIFFERENCE IN COST. c. IF REQUESTED BY EDPAG THE CONTRACTOR AT HIS OWN EXPENSE SHALL HAVE THE PROPOSED SUBSTITUTE MATERIAL, APPARATUS, EQUIPMENT OR PROCESS, TESTED UNDER THE DIRECTION OF EDPAG,AS TO ITS QUALITY AND STRENGTH, ITS PHYSICAL, CHEMICA3 OR OTHER CHARACTERISTICS, ITS DURABILITY, FINISH, OR EFFICIENCY, BY A TESTING LABORATORY AS SELECTED BY EDPAG. d. IF THE SUBSTITUTE OFFERED IS NOT DEEMED BY EDPAG TO BE EQUAL TO THAT SO INDICATED OR SPECIFIED, THEN THE CONTRACTOR SHALL FURNISH, ERECT, OR INSTALL THE MATERIAL, APPARATUS, EQUIPMENT OR .PROCESS INDICATED OR SPECIFIED. 1.13 RECORD DRAWINGS a. PROVIDE AND MAINTAIN AT THE PROJECT ONE COMPLETE SET OF WHITE BACKGROUND PRINTS OF ALL MECHANICAL AND ELECTRICAL DRAWINGS, WHICH FORM A PART OF THE CONTRACT. IMMEDIATELY AFTER THE WORK IS INSTALLED, CAREFULLY DRAW QM THESE PRINTS IN RECORD RED OR BLACK INK, ALL WORK WHICH IS INSTALLED, AT VARIANCE WITH THE WORK AS INDICATED ON THE DRAWINGS; AND INDICATED BY MEASURED DIMENSIONS TO BUILDING CORNERS OR OTHER PERMANENT MONUMENTS, THE LOCATION AND DEPTH OF ALL UNDERGROUND UTILITY DISTRIBUTION. b. UPON COMPLETION OF THE WORK DELIVER THE SET OF CORRECT PRINTS AND RECORD DRAWINGS TO THE CITY OF CARLSBAD ENGINEERING DEPARTMENT IN GOOD CONDITION WITH EVERY CHANGE IN THE WORK INDICATED THEREON. 1.14 PERMITS THE GENERAL CONSTRUCTION, ELECTRICAL AND PLUMBING PERMITS WILL BE ISSUED BY THE CITY OF CARLSBAD AT NO CHARGE TO THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER REQUIRED LICENSES AND FEES. 1.15 ALLOWED CONSTRUCTION TIME THE AMOUNT OF TIME ALLOWED FOR THE COMPLETION OF CONSTRUCTION OF THIS WORK IS 120 CALENDAR DAYS. NO EXTENSION OF TIME WILL BE ALLOWED. PAGE 19 DIVISION 1 GENERAL REQUIREMENTS PRELIMINARY 1. WORK AREA: A. CONTRACTOR SHALL CONFINE HIS ACTIVITY TO AN AREA/IN ADDITION TO THE "BUILDING" AS SHOWN ON THE SITE PLAN AND AS APPROVED BY THE OWNER / ALL MATERIAL STOCKPILE, AND TEMPORARY STRUCTURES, SHALL BE MAINTAINED THEREIN. A TEMPORARY FENCE, IF REQUIRED, SHALL BE PROVIDED BY THE CONTRACTOR. THE CONTRACTOR SHALL PROVIDE BARRICADES AND TAKE ANY OTHER SAFETY OR PROTECTIVE MEASURES REQUIRED BY THESE SPECIFICATIONS OR BY GOVERNING REGULATIONS. 2. JOB OFFICE; A. FURNISH AND MAINTAIN A SUITABLE JOB OFFICE WHEREIN SHALL BE PROVIDED A REFERENCE TABLE ADEQUATE FOR A SET OF THE PLANS AND SPECIFICATIONS. 3. TELEPHONE: A. PROVIDE AND PAY FOR A CONTRACTOR'S JOB TELEPHONE LOCATED IN THE JOB OFFICE. 4. UTILITIES: A. THE CONTRACTOR WILL MAKE ALL CONNECTIONS AND PAY FOR WATER, ELECTRICAL ENERGY AND GAS USED DURING PROGRESS OF THE WORK. 5. LAYOUT OF WORK: A. CONTRACTOR SHALL LAY OUT AND CORRECTLY ESTABLISH ALL LINES, LEVELS, GRADES AND POSITIONS OF ALL PARTS OF THE WORK AND BE RESPONSIBLE FOR THEIR ACCURACY. B. CONTRACTOR SHALL ESTABLISH THE EXACT LOCATION OF ALL PARTITIONS AS A GUIDE TO ALL TRADES. 6. SCAFFOLDING: A. THE CONTRACTOR WILL PROVIDE, INSTALL, MAINTAIN, AND REMOVE ALL FIXED SCAFFOLDING, FOR THE PROPER EXECUTION OF HIS WORK, AND THAT OF HIS SUBCONTRACTORS, AND SHALL CONSULT AND COOPERATE WITH OTHER CONTRACTORS REGARDING THE INSTALLATION OF SAME. ALL MOVABLE SCAFFOLDING AND PLANKING OF ALL SCAFFOLDING SHALL BE PROVIDED AND MAINTAINED BY EACH CONTRACTOR FOR HIS WORK. 7. TOILETS: A. PROVIDE TEMPORARY TOILETS FOR THE USE OF WORKMEN IN ACCORDANCE WITH HEALTH DEPARTMENT REQUIREMENTS. C PAGE 20 x DIVISION 2 SITE WORK SITE PREPAEATION 1. SITE PREPARATION; A. IF IT IS NECESSARY TO REMOVE VEGETATION, CONTACT THE CITY OF CARLSBAD PARKS AND RECREATION DEPARTMENT FOR APPROVAL. 2. EXCAVATION; A. CONFORM WITH GRADES ESTABLISHED ON DRAWINGS. NO FILL PERMITTED UNDER FOOTINGS. IF, BY ERROR, EXCAVATIONS ARE DUG DEEPER THAN REQUIRED, FILL THE ADDITIONAL DEPTH WITH CONCRETE OF THE SAME MIX AS THE FOUNDATION CONCRETE AT THE CONTRACTOR'S EXPENSE. BOTTOM OF ALL EXCAVATIONS SHALL BE SOLID, CLEAN AND LEVEL. WHERE EARTH WILL HOLD ITS POSITION FOR CLEAN-CUT EARTH FORMS, WOOD FORMS MAY BE OMITTED BELOW GRADE, BUT INCREASE FOOTING WIDTHS BY 2". WHERE SOIL CONDITIONS INDICATE THAT FOOTINGS MUST BE CARRIED DEEPER, THE REQUIRED CHANGES IN THE FOUNDATION MUST BE APPROVED. 3. SUB-GRADING, FILL AND BACKFILL UNDER SLABS; A. REMOVE ALL VEGETATION, ROOTS, AND OTHER FOREIGN MATTER FROM AREA TO WHICH FILL IS TO BE APPLIED. FILL OR BACK FILL WITH CLEAN SELECTED MATERIAL, ALL VEGETATION, ROOTS AND OTHER FOREIGN MATTER REMOVED, WITH PROPER MOISTURE CONTENT FOR OPTIMAL COMPACTION. AT ALL AREAS TO RECEIVE SOIL / THOROUGHLY COMPACT EXISTING BASE BY ROLLING OR TAMPING / THEN WET DOWN, AND DEPOSIT THE SUBGRADE FILL OR BACKFILL IN 6" LAYERS, DAMPEN EACH LAYER AS REQUIRED WHILE ROLLING UNTIL SURFACE HAS RECEIVED MAXIMUM COMPACTION. 4. TERMITE CONTROL; A. TREAT . ENTIRE SOIL AREA WITHIN BUILDING WALLS AND TEN FEET OUT FROM OUTSIDE WALLS UNDER ANY FINISHED CONCRETE OR PAVING ABUTTING BUILDING WITH 1% CHLORDANE IN A WATER SOLUTION. - APPLY AT NO LESS THAN 10 LBS PRESSURE AT THE NOZZLE AND AT RATE OF ONE GALLON OF SOLUTION TO EACH 10 SQ. FT. AS AN OVERALL TREATMENT / ALONG FOOTINGS AND FOUNDATION WALLS AT RATE OF TOO GALLONS PER 5 LIN. FT. TREATING DONE BY A LICENSED TERMITE OPERATOR. A FOUNDATION SKETCH OF AREAS TO BE TREATED SHALL BE KEPT IN DUPLICATE SHOWING THE DATE EACH AREA IS TREATED. 5. COMPACTION; A. COMPACTION UNDER PAVED AREAS AND SLABS 90% MODIFIED A.A.S.H.O. COMPACTION TESTS MADE IF REQUIRED. COST BORNE BY OWNER. RECOMPACT AREAS TESTED AS REQUIRED. 6. SETTLEMENT: A. FILL TO REQUIRED LEVELS ALL SUBGRADES WHICH SETTLE, REGARDLESS OF WHETHER OR NOT ANY PREVIOUS FILL OR BACK FILL HAS BEEN MADE. 7. EXCESS MATERIAL; A. REMOVE FROM THE SITE ALL EXCESS EARTH OR OTHER MATERIAL RESULTING FROM THIS OPERATION, OR PLACE WHERE DIRECTED ON THE SITE. 8. CLEAN-UP; A. UPON COMPLETION OF THE WORK OF THIS SECTION REMOVE FROM SITE ALL RUBBISH/ TRASH, AND DEBRIS RESULTING FROM THE OPERATIONS. REMOVE ALL EQUIPMENT AND IMPLEMENTS OF SERVICE AND LEAVE ENTIRE AREA IN A NEAT, CLEAN, ACCEPTABLE CONDITION. PAGE 21 DIVISION 3 CONCRETE CONCRETE WORK 1. MATERIALS; A. FOUNDATION CONCRETE: 2,000 P.S.I. /3"-6" SLUMP / 1%" MAX. COARSE AGGREGATE. B. SLAB CONCRETE: 2,000 P.S.I. /l"-3" SLUMP / 1" MAX. COARSE AGGREG. C. PORTLAND CEMENT: TYPE I / ASTM C-150. D. SAND: CLEAN / PROCESSED NATURAL SAND PER ASTM C-33. E. REINFORCING: NEW BILLET INTERMEDIATE GRADE ASTM A-15 / DEFORMED PER ASTM A-305. WELDED STEEL WIRE MESH ASTM A-185 / TIE WIRE #18 GA OR LARGER. F. COLOR: INTERGRAL READY MIX ADMIXTURES. 2. FORMS: A. CONSTRUCT FORMS OF 2" D.F. OR FORM PLYWOOD AS REQURED / TO SLOPE, LINE AND DIMENSIONS SHOWN / PLUMB, STRAIGHT, AND SUFFICIENTLY BRACED TO PREVENT MOVEMENT DURING THE POUR. REMOVE FORM WITHOUT DAMAGE TO CONCRETE. 3. REINFORCING; A. INSTALL STEEL AS INDICATED ON PLANS AND AS REQUIRED BY LOCAL AND STATE BUILDING ORDINANCES. LAP ALL STEEL 20 BAR DIAMETERS UNLESS OTHERWISE NOTED. SUPPORT ABOVE SUBGRADE ON PRE-CAST, CONCRETE BLOCKS / ABOVE FORMS ON STEEL CHAIRS AND .SPACERS. A. PREPARATION; A. CHECK WITH OTHER TRADES, BE SURE ALL UNDER SURFACE WORK IS COMPLETE, PROPERLY . LOCATE ALL INSERTS, HANGERS, TIES, ANCHORS BOLTS, DOWELS, CHASES, BLOCKING. GROUNDS, VENTS, ETC., BEFORE CONCRETE IS POURED. PROPERLY WET DOWN ALL FOSI-1S / PUDDLE AND TAMP FILL. SET SCREED BOARD FOR ACCURATE GRD.SUPPORT. ALL VERTICAL STEEL AND BOLTS IN PLACE WITH RIGID SPACER FORMS. 5. WORKMANSHIP; . A. PLACE AND VIBRATE ALL CONCRETE AS REQUIRED TO ELIMINATE ALL VOIDS, POCKETS, ETC., AROUND FORM, REINFORCING OR FASTENING DEVICES. FILL.EXCESS CUTS AND ROUGH PLACES WITH FINES. REMOVE ALL LOOSE CONCRETE AND FILL HONEYCOMBED SURFACES, STONE POCKETS AND OTHER IRREGULARITIES WITH CEMENT MORTAR. FLATWORK FREE OF PUDDLES. PROTECT ADJACENT SURFACES. 6. FINISHES; ..... . . , •• > ••• -., .''••;,'.'". \ ;';.-.-':.;' •••'•'.'• A. EXTERIOR CONCRETE-SEE PLANS FOR FINISHES. 7. CURING; A. PROTECT AND CURE ALL CONCRETE. TAKE CARE NOT TO STAIN OR DISCOLOR FINISHED CONCRETE SURFACES. FOOTINGS / DAMP CURE 2 DAYS. SLABS / DAMP CURE 5 DAYS. 8. DEFECTIVE CONCRETE; A. REMOVE AND REPLACE ANY DEFECTIVE CONCRETE WORK. PAGE 22 DIVISION 4 MASONRY CONCRETE BLOCK 1. STANDARD: A. CONCRETE MASONRY DESIGN MANUAL BY CONCRETE MASONRY ASSOCIATION OF CALIFORNIA. 2. MATERIALS: A. CONCRETE BLOCK: ASTM C-90 / PATTERN, SIZE, COLOR ON PLAN. B. PORTLAND CEMENT: ASTM C-150 TYPE I. C. GROUT AGGREGATE: ASTM C-144 D. GROUT AGGREGATE: ASTM C-404 E. LIME HYDRATED: ASTM C-207 F. REINFORCING STEEL: ASTM A-15 / ASTM A-305 / DEFORKZ1) BARS / INTERMEDIATE GRADE G. WIRE REINFORCEMENT: ASTM A-82. H. WATER: 'CLEAN, DRINKABLE. 3. MORTAR: A. 1 PART PORTLAND CEMENT k TO h PART 1 HYDRATED LIME 3% PARTS SAND. 4. GROUT: A. 1 PART PORTLAND CEMENT 3 PARTS SAND 2 PARTS PEA GRAVEL. 5. CONSTRUCTION; A. WORKMANSHIP / BEST TRADE PRACTICE OF INDUSTRY. B. ALL MASONRY UNITS SOUND, DRY CLEAN, AND FREE FROM CRACKS WHEN PLACED IN STRUCTURE. C. ALL MASONRY UNITS LAID TRUE, LEVEL, PLUMB AND NEAT. D. MAKE ALL MASONRY CUTS NEAT, TRUE AND ACCURATE. CUT TO FIT ALL PLUMBING DUCTS, OPENINGS AND ELECTRICAL WORK / ALL HOLES PATECHED NEATLY. E. MIXING OF MORTAR AND GROUT / MORTAR RETEMPERED WITH WATER AS REQUIRED TO MAINTAIN HIGH PLASTICITY. RETEMPERING ON MORTAR BOARDS DONE ONLY BY ADDING WATER WITHIN A BASIN FORMED WITH MORTAR AND MORTAR REWORKED INTO WATER. USE NO MORTAR WHICH IS UNUSED AFTER ONE AND ONE-HALF HOURS FROM MIXING TIME. F. FOR BONDING MASONRY TO FOUNDATION / CLEAN TOP SURFACE OF CONCRETE FOUNDATION WITH LAITANCE REMOVED AND AGGREGATE EXPOSED BEFORE STARTING MASONRY CONSTRUCTION. , G. HORIZONTAL J.OINTS AND VERTICAL JOINTS DENSE WELL BONDED TO BLOCK AT EDGES. TOOLI1 DONE WHEN MORTAR IS PARTIALLY SET BUT STILL SUFFICIENTLY PLASTIC TO BOND. ALL TOOLING DONE WITH TOOL WHICH COMPACTS MORTAR, PRESSING EXCESS MORTAR OUT OF JOINT RATHER THAN DRAGGING IT OUT. H. VERTICAL HEAD JOINTS BUTTERED WELL FOR THICKNESS EQUAL TO FACE SHELL OF UNIT AND THESE JOINTS SHOVED TIGHTLY SO THAT MORTAR BONDS WELL TO BOTH UNITS. JOINTS SOLIDLY FILLED FROM FACE OF BLOCK TO AT LEAST DEPTH OF FACE SHELL. I. IF IT IS NECESSARY TO MOVE A UNIT AFTER PLACING, REMOVE UNIT FROM WALL / CLEAN AN: SET IN FRESH MORTAR. J. REINFORCING / WHEN FOUNDATION DOWEL DOES NOT LINE UP WITH VERTICAL CORE, IT SHALL NOT BE SLOPED MORE THAN 7 HORIZONTAL IN 6 VERTICAL. DOWELS GROUTED INTO A CORE IN VERTICAL ALIGNMENT EVEN THOUGH IT IS IN AN ADJACENT CELL TO VERTICAL WALL REINFORCING. K. REINFORCING STEEL SECURED IN PLACE AND INSPECTED BEFORE GROUTING STARTS. L. MORTAR DROPPINGS KEPT OUT OF GROUT SPACE. M. ALL GROUT FULLY RODDED IN PLACE TO INSURE COMPLETE FILL OF ALL VOIDS AND CREVICES 0. SOLIDLY GROUT ALL BOLTS, ANCHORS, ETC., INSERTED IN WALL IN PLACE. PAGE 23 DIVISION 4 MASONRY CONCRETE BLOCK - CONTINUED 6. CLEANING AND PROTECTION; A. REMOVE ALL DEBRIS, REFUSE, AND SURPLUS MASONRY MATERIAL FROM PREMISES. PAGE 24 DIVISION 6 • CARPENTRY FINISH CARPENTRY & MILLWORK 1. STANDARD A. WOODWORK INSTITUTE OF CALIFORNIA "MANUAL OF MILLWORK", 1969, "CUSTOM" GRADE. B. WCLB GRADING RULES #16. 2. MATERIALS A. INTERIOR FINISH: 1) TRIM, MOULDINGS, FRAMES, ETC.: CLEAR PONDEROSA PINE EXCEPT AS OTHERWISE NOTED. 2) SHELVING: PONDEROSA PINE, C-SELECT OR D.F. PLYWOOD, A-B, BANDED EDGES. B. EXTERIOR FINISH; 1) SIDING - DOUGLAS FIR (DROP PATTERN) SHIPLAP NO. 2 COMMON. 2) TRIM & FASCIA - DOUGLAS FIR #2 COMMON. 3. INSTALLATION A. ALL INTERIOR MILLWORK ITEMS TO BE STORED AND INSTALLED IN COMPLETELY ENCLOSED, FINISHED, DRY AREAS, WELL PROTECTED. B. SET ALL WORK PLUMB, TRUE, LEVEL AND SECURELY FASTENED. VERIFY DIMENSIONS AND ADVISE EDPAG OF ANY DISCREPENCIES. C. WOODWORK SHALL BE FREE FROM DEFECTS, MARKS, BROKEN EDGES, OR MARRED SURFACES. 4. GUARANTEE GUARANTEE ALL WORK FOR PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. .PAGE 25 DIVISION 7 MOISTURE PROTECTION ROOFING 1. BUILT-UP ROOFING: A. MATERIALS: MATERIALS AND METHODS DESCRIBED ARE BASED ON FIBERGLAS SPECIFICATIONS AND ARE GIVEN TO DESIGNATE THE QUALITY OF MATERIALS AND WORKMANSHIP REQUIRED. EQUIVALENT MATERIALS AND METHODS WILL BE CONSIDERED FOR ACCEPTANCE PRIOR TO THE AWARD OF CONTRACT. B. CONDENSED SPECIFICATION: FIBERGLAS BUILT-UP ROOFING SPEC. 315 - WG (OR 315 WGD APPLIED IN ACCORDANCE WITH THE FIBERGLAS BUILT-UP ROOFING SPECIFICATIONS OF ,;l THAT NUMBER OR LATEST REVISION). C. MATERIALS: MINIMUM PER 100 SQ. FEET OF ROOF: FIBERGLAS COMBINATION SHEET, 1 PLY 15 LBS. FIBERGLAS PERMA PLY, 2 PLIES 16 LBS. ROOFING ASPHALT 120 LBS. D. CRUSHED RIVER ROCK 400 LBS. 2. SHINGLE ROOFING; A. MATERIALS: MINIMUM PER 100 SQ. FEET OF ROOF: SINGLE FELT UNDERLAYMENT 15 LBS. ASPHALT SHINGLES 345 LBS . B. CONDENSED SPECIFICATION: BIRD ARCHITECT 70 SHINGLE WITH THE FOLLOWING CHARACTERISTICS: A) U/L type. CLASS "C" B) EXPOSURE: 5", HEADLAP 2" C) APPROX. DIMENSIONS: LENGTII=36", WIDTH=12" D) MINIMUM SLOPE: 4" PER, FOOT E) SHINGLES PER SQUARE: 80 F) NAILS PER SHINGLE: 4 3. INSPECTION: • A. THE MANUFACTURERS REPRESENTATIVE SHALL BE NOTIFIED PRIOR TO COMMENCEMENT OF ANY ROOFING WITH AMPLE TIME -GIVEN FOR INSPECTION OF DECK TO BE ROOFED AND SHALL CERTIFY IN WRITING THAT ROOFING WAS APPLIED PER THESE SPECIFICATIONS. 4. CUT-OUT; A. ONE 18" X 18" SECTION MAY BE CUT OUT FROM ANY PART OF THE ROOFING FOR INSPECTION AND ANALYSIS. THE CUT-OUT WILL BE MADE BEFORE THE FLOOD COAT AND ROCK ARE APPLIED, SAID CUTS ARE TO BE MADE AND REPAIRED AT THE ROOFER'S EXPENSE. 5. GUARANTEE: A. GUARANTEE THAT ALL DEFECTS DUE TO FAULTY MATERIALS OR INSTALLATION WHICH BECOME APPARENT WITHIN TWO YEARS FROM THE DATE OF ACCEPTANCE SHALL BE REMEDIED TO MEET THIS SPECIFICATION AT NO EXPENSE TO THE OWNER. PAGE 26 DIVISION 8 DOORS / WINDOWS AND GLASS GLASS AND GLAZING 1. GENERAL; A. ALL SASH OR OTHER OPENINGS / GLAZED ON SI.TE BY SKILLED GLAZIERS / USING BEST STANDARDS OF TRADE PRACTICE. 2. CLEANING AND POLISHING; A. ' UPON COMPLETION THOROUGHLY WASH AND POLISH ALL GLASS SURFACES INCLUDING MIRRORS AND THEIR FRAMES. REPLACE ALL BROKEN, SCRATCHED, CHIPPED OR OTHERWISE DEFECTIVE GLASS OR MIRRORS. 3. GLASS MATERIALS; A. 1/8" FLOAT GLASS 4. GLAZING; SURFACES SHALL BE DRY AND FREE FROM DUST OR RUST BEFORE GLAZING. PUTTY SHALL NOT BE APPLIED IN TEMPERATURE BELOW 40°F OR DURING DAMP AND RAINY WEATHER. A. BED GLASS COMPLETELY IN PUTTY OR GLAZING COMPOUND. FACE SHALL BE FULLY SMOOTH AND WITH ACCURATELY FORMED BEVELS HAVING CLEAN CUT MITERS. B. CLEAR GLASS ON BOTH SIDES AFTER PAINTING IS COMPLETE AND DRY. DO NOT USE ACID .SOLUTIONS OR WATER CONTAINING CAUSTIC SOAPS. BROKEN GLASS, GRACED GLASS AND GLASS NOT COMPLYING WITH THESE SPECIFICATIONS SHALL BE REPLACED. AT COMPLETION OF WORK, GLASS, PUTTY, AND OTHER GLAZING MATERIALS SHALL BE CLEAN, WHOLE AND IN PERFECT CONDITION. 5. MIRRORS; - - A. MIRRORS SHALL BE V POLISHED PLATE WITH COPPER BACK ELECTROLITICALLY APPLIED, COMPLETE WITH ALUMINUM FRAMES. INSTALL ONE IN EACH TOILET ROOM AS SHOWN ON THE DRAWINGS. •PAGE 27 DIVISION 9 FINISHES ' • PAINTING • 1. GENERAL: A. THE TERM "PAINT" INCLUDES EMULSIONS, ENAMELS, SEALERS, STAINS, VARNISHES, AND SIMILAR COATINGS. 2. STANDARDS: A. PAINTINGS AND DECORATING CONTRACTORS OF AMERICA - 1970 B. TITLE 19, PUBLIC SAFETY STATE OF CALIFORNIA Cv C. AMERICAN SOCIETY OF TESTING MATERIALS 3. SAMPLES; A. SAMPLES OF COLOR AND FINISH MUST BE APPROVED BEFORE PROCEEDING WITH WORK. B. TINT ALL UNDERCOATS TO APPROXIMATE THE FINISH COLOR. 4. PREPARATION; A. WORKMANSHIP: VERY BEST TRADE PRACTICE / EMPLOY ONLY SKILLED CRAFTSMAN. B. DURING INTERIOR PAINTING AND DRYING OF VARNISH OR ENAMEL, MAINTAIN A MINIMUM ROOM TEMPERATURE OF 70° F / A MINIMUM ROOM TEMPERATURE OF 50° F FOR OTHER INTERIOR PAINTING. PROVIDE ADEQUATE VENTILATION. PERFORM EXTERIOR PAINTING WHEN AIR TEMPERATURE IS 50° F OR MORE AND IN DRY WEATHER. C. STORE AND MIX MATERIALS ONLY IN ROOMS DESIGNATED FOR THAT PURPOSE. KEEP ROOM NEAT AND CLEAN. REMOVE OILY RAGS AND WASTE FROM BUILDING EVERY NIGHT. TAKE PRECAUTIONS TO AVOID DANGER OF FIRE. ALL MATERIALS STORED AT JOB SITE. D. THINNING AND APPLICATION OF PAINT IN ACCORDANCE WITH PRINTED INSTRUCTION OF MANUFACTURER. E. ANY ALTERATION OF PAINTING MATERIAL NECESSARY DUE TO EXTREME CLIMATIC OR JOB CONDITIONS TO BE DONE ONLY IN ACCORDANCE WITH THE WRITTEN RECOMMENDATION OF THE MANUFACTURER. F. REMOVE EXISTING PAINT, DIRT, SMOKE STAINS AND SCALE BY SANDING, SANDBLASTING, OR WIRE-BRUSHING AND RE-PRIME. 5. APPLICATION; A. SPREAD OR FLOW ON ALL MATERIALS SMOOTHLY WITH PROPER FILM THICKNESS AND WITHOUT RUNS, SAGS, SKIPS OR OTHER DEFECTS. EDGES OF PAINT ADJOINING OTHER MATERIALS OR COLOR / SHARP AND CLEAN WITHOUT OVERLAPPING. SHOULD WORKMANSHIP OF FINISH BE DEFECTIVE PROPER PREPARATORY WORK DONE AND ADDITIONAL COATS APPLIED AS NECESSARY TO GIVE FINISH IN ACCORDANCE WITH SPECIFICATIONS AND COLOR SAMPLES. B. SURFACES TO BE PAINTED CLEAN / DRY AND FREE FROM DIRT AND MOISTURE. C. TOUCH UP KNOTS, PITCH STREAKS, SAPPY SPOTS WITH ORANGE SHELLAC OR RESIN SEALER. D. REMOVE RUST / GREASE / SCALE AND DIRT FROM STEEL AND IRON / CLEAN SHOP COATS OF PAINT THAT BECAME MARRED AND TOUCH UP WITH SPECIFIED PRIMER. E. CLEAN GALVANIZED METAL AND ZINC-COPPER ALLOY TO BE PAINTED THOROUGHLY WITH MINERAL SPIRITS AND WIPED DRY. F. DO NECESSARY PUTTYING OF NAIL HOLES / CRACKS AND MINOR IMPERFECTIONS BETWEEN FIRST AND SECOND COAT WITH PUTTY TO MATCH THAT OF FINISH. BRING PUTTY FLUSH WITH ADJOINING SURFACE IN NEAT / WORKMANLIKE MANNER. G. ALLOW PAINT TO DRY HARD BETWEEN COATS / 2 to 7 DAYS. H. PROTECT ALL WORK FROM DAMAGE BY USE OF DROP CLOTHS. I. PAINT TOPS / BOTTOMS AND EDGES OF WOOD DOORS WITH SAME.MATERIAL AND NUMBER OF COATS AS SPECIFIED FOR DOORS AND AFTER DOORS HAVE BEEN FITTED. J. REMOVE OR PROTECT HARDWARE / ACCESSORIES / FIXTURES AND SIMILAR ITEMS DURING PAINTING AND REPLACE ON COMPLETION OF PAINTING. K. PAINT EXTERIOR DOORS ONE COAT OF EXTERIOR PRIMER BEFORE APPLYING THE REQUIRED 2 •PAGE 28 DIVISION 9 ' FINISHES Painting-CONTINUED ADDITIONAL COATS OF PAINT. L. BACK PRIME EXTERIOR TRIM AND SIDING BEFORE INSTALLATION. 6. FINISHES: A. SEE PLAN FOR FINISH SCHEDULE. 7. CLEAN UP: ' A. AT COMPLETION OF WORK REMOVE FROM THE PREMISES ALL SURPLUS PAINTING MATERIALS AND ALL DEBRIS / REMOVE ALL SPLATTERINGS AND LEAVE WORK IN CLEAN AND FINSIHED CONDITION. PAGE 29 DIVISION 9 FINISHES DRYWALL 1. GENERAL A. BEFORE COMMENCING INSTALLATION EXAMINE WORK OF OTHER TRADES AS IT AFFECTS THIS/ REPORT IN WRITING ANY DEFECTS FOUND. COMMENCING OF INSTALLATION IS CONSTRUED AS ACCEPTANCE OF SUCH WORK PERFORMED BY OTHERS. B. PROVIDE DRYWALL SURFACES READY FOR PAINTING CONTRACTOR / CLEAN, EVEN AND NEAT. 2. STANDARDS A. DRYWALL CONSTRUCTION BY DRYWALL CONTRACT ADMIN. TRUST. ASTM C36-55 / %" THK. OR 5/8" THK. / 48" WIDE / LENGTH AS LONG AS POSSIBLE TO MINIMIZE JOINTS / THICKNESS ON PLANS. 1 3/8" x 14 CF & 1 DRI-TITLE DRYWALL NAILS. PERF -A-TAPE JOINT SYSTEM. DURABEAD NO. 200 SERIES EDGE TRIM. MACHINE SPRAYED OR FINE SPIT TEXTURE. 3. MATERIALS A. GYPSUM BOARD: B. FASTENINGS: C. JOINT REINFORCING: D. TRIM: E. TEXTURE FINISH: 4. INSTALLATION A. APPLY WALLBOARD WITH LONG DIMENSION ACROSS FRAMING MEMBERS ABUTTING ENDS AND EDGES OVER FRAMING MEMBER. STAGGER JOINTS ON OPPOSITE SIDES OF PARTITION. NAILS NOT CLOSER THAN 3/8" FROM EDGES / 7" O.C. ON CEILINGS / 8" O.C. ON WALLS STAGGERED ALONG THE ABUTTING EDGES 12" O.C. IN THE FIELD. SET NAIL HEADS SLIGHTLY / SHALL NOT DAMAGE GYPSUM BOARD. B. JOINT WORK: APPLY BEDDING COMPOUND OR JOINT SYSTEM CEMENT TO THE TAPERED EDGE JOINTS / END JOINTS AND NAIL HEADS. SHEAR OFF SURPLUS LEAVING "NO MATERIAL ON" ' HIGH EDGES. EMBED TAPE LEAVING A UNIFORM THICKNESS OF MATERIAL UNDER THE TAPE. MACHINE TAPING MAY BE USED. WHEN BEDDING COMPOUND OR JOINT SYSTEM CEMENT HAS DRYED COVER JOINT WITH TOPPING COMPOUND OR JOINT SYSTEM CEMENT. SHEAR OFF SURPLUS LEAVING A UNIFORM COVERAGE OVER TAPE WITH EDGES WELL FEATHERED WHEN TAPING COMPOUN1 AND TOPPING COMPOUND ARE THOROUGHLY DRY. COVER JOINTS A SECOND TIME WITH TOPPING COMPOUND OR JOINT SYSTEM CEMENT. SHEAR OFF SUPLUS LEAVING A SMOOTH WELL^FEATHERED JOINT. APPLY SKIM COAT OF JOINT SYSTEM CEMENT OVER ENTIRE SURFACE. SHEAR OFF TIGHT IN LIEU OF A 3RD APPL. TO JOINTS ONLY. 5. CLEANING A. FILL AND POINT UP ALL SPACES AND CREVICES AT JUNCTURE WITH OTHER WORK AS DIRECTED. MAKE GOOD DAMAGED OR DEFECTIVE WORK. PROTECT WORK OF OTHERS AND CLEAR AWAY ALL DEBRIS CAUSED BY THIS WORK. LEAVE FLOORS, TRIM AND OTHER WORK CLEAN. PAGE 30 DIVISION 9 FINISHES CERAMIC TILE 1. STANDARD A. FEDERAL SPECIFICATION SS-T-00308C AND ANSI A137.1-1967. HANDBOOK FOR CERAMIC TILE INSTALLATION BY THE TILE COUNCIL OF AMERICA. 2. MATERIALS A.. RESTROOM TILE: 'INTERFACE' OR-SANETTE Q-012-46 LOS ANGELES B. KITCHEN TILE: 'POMONA STONE', 6" x 6" CHESTNUT PARCHMENT. 3. INSTALLATION A. WALLS: "THIN SET" TYPE PER ANSI A108.4-1968 FOR INSTALLATION OVER DRYWALL. B. FLOORS: ANSI A118.1-1967 FOR DRY-SET MORTAR. 4. PROTECTION AND CLEANING REQUIRED FOR THIS WORK. AT COMPLETION OF THE BUILDING ALL WORK MUST BE LEFT UNBROKEN AND CLEAN. 5. SERVICE SERVICE TILE SIX MONTHS AFTER INSTALLATION BY GROUTING, POINTING AND REPLACING DEFECTIVE WORK OR MATERIALS. PAGE 31 DIVISION 9 FINISHES CARPET MATERIALS A. CARPET: AS MANUFACTURED BY ARMSTRONG. TYPE TO BE "PASSPORT #714". COLOR TO BE SELECTED BY OWNER. B. PREPARATION; FLOORS-SHALL BE CLEAN, DRY, AND SMOOTH, FREE OF OIL, GREASE, LOOSE PAINT, OR VARNISH. WHEN BONDING WITH ADHESIVE, WAX SHOULD BE REMOVED, AND PAINTED OR VARISHED FLOORS SHOULD BE LIGHTLY SANDED. ROUGH SPOTS SHALL BE SMOOTHED OFF WHERE NECESSARY. ALL JOINTS OR CRACKS SHALL BE FILLED WITH A GOOD-QUALITY PATCHIN COMPOUND. OLD RESILIENT FLOORING MUST BE SECURELY BONDED AND IN GOOD CONDITION WITH NO HOLES, ETC. WAX SHOULD BE REMOVED WHEN CARPET IS TO BE BONDED WITH ADHESIVE. C. INSTALLATION: OPTIMUM TEMPERATURE FOR INSTALLATION IS 70 F. CARPET SHOULD NOT BE INSTALLED BELOW 55 F. INSTALLATION SHALL BE WITH GOOD WORKMANSHIP IN ACCORDANC WITH THE PRACTICES OF THE TRADE. NO. 714 WITH HIGH-DENSITY LATEX FOAM-RUBBER BACK CAN BE CEMENTED IN PLACE WITH ARMSTRONG CARPET ADHESIVE NO. 3. COMPLETE INSTALLATION INSTRUCTIONS ARE AVAILABLE FROM THE NEAREST ARMSTRONG REGIONAL OFFICE OR ARMSTRONG CARPET DISTRIBUTOR. D. GUARANTEE THE CARPET CONTRACTOR WILL GUARANTEE THAT ALL WORK SHALL BE FREE FROM DEFECT IN MATERIAL OR WORKMANSHIP, PROVIDING ANY SUCH DEFECT IS BROUGHT TO HIS ATTENTION IN WRITING WITHIN ONE YEAR AFTER COMPLETION OF HIS WORK. UPON SUCH NOTICE, THE CARPET CONTRACTOR WILL, AT HIS EXPENSE, MAKE THE NECESSARY REPAIRS AND/OR •PAGE 32 DIVISION 10 SPECIALTIES TOILET ACCESSORIES AND COMPARTMENTS/KITCHEN ACCESSORIES 1. GENERAL SEE DRAWINGS FOR THE LOCATION OF ITEMS HEREIN SPECIFIED. 2. MATERIALS A. TOILET ACCESSORIES: SHALL BE STAINLESS STEEL AS MANUFACTURED BY BOBRICK CORPORATIO 1) TOILET TISSUE DISPENSER MODEL 13-288 (ONE EACH TOILET COMPARTMENT) 2) PAPER TOWEL DISPENSER AND WASTE RECEPTACLE MODEL B-3944 - 3) SOAP DISPENSER MODEL B-12 (ONE EACH ' FOR OF LAVATORIES) B. TOILET PARTITIONS AND SCREEN; AS MANUFACTURED BY GLOBAL STEEL PRODUCTS CORP. "REGAL" TYPE, OR SANYMETAL PRODUCTS "NORMANDIE" TYPE, FLOOR SUPPORTED, GALVANIZED BONDERIZED STEEL WITH SYNTHETIC BAKED ENAMEL FINISHED IN COLORS SELECTED BY ARCHITECT FROM MANUFACTURERS STANDARD COLORS. PARTITIONS SHALL BE COMPLETE WITH ALL HARDWARE, INCLUDING COAT HOOKS AND BUMPERS. C. TOILET AND LAVATORY; TOILET TO BE AMERICAN. STANDARD ELONGATED CADET (WITH BOLT CAPS AND SEAT). FLUSH VALVES TO BE SLOAN ROYAL 115 OR DELANEY FLUSHBOY 414 VB. LAVATORY TO BE AMERICAN STANDARD ROXALYN LAVATORY (24 X 20-4" CENTERS) WITH CONCEALED ARMS. LAVATORY FIXTURE TO BE AMERICAN STANDARD "AQUARIAN" CENTERSET LAVATORY FAUCET (HI SPOUT) WITH DRAIN. D. HANDICAP ACCESSORIES: GRAB BARS SHALL BE HALL MACK 350 SERIES, SOLID BRASS TUBING, CHROME PLATED, 1 V" O.D., .049 INCH WALL THICKNESS. FORGED BRAZED FLANGES BRIGHT NICKEL-CHROME PLATED. E. KITCHEN SINK; AMERICAN STANDARD 'FESTIVAL' 20 GA. DOUBLE SINK WITH 'AQUARIAN' FITTING/OR EQUAL. F. RANGE AND OVEN; JENN. AIR MODEL 4775 EGR. G. FOOD WASTE DISPOSAL; WHIRLPOOL SYD-60, OR EQUAL. H. RESTROOM FAN: NUTONE QT-80 I. FLOOR DRAIN; WADE - 1100, 5" NICKEL BRONZE TOP, OR EQUAL PAGE 33 DIVISION 15 MECHANICAL PLUHBING 1. GENERAL A. PLUMBING CONTRACTOR TO DO ALL PLUMBING COMPLETE IN EVERY DETAIL TO MAKE READY FOR USE, INCLUDING ALL EQUIPMENT/PIPING/EXCAVATING/BACKFILLING/ETC. B. PLUMBING CONTRACTOR TO VERIFY GAS METER LOCATION WITH UTILITY COMPANY. C. GAS MAIN AND METER TO BE BY UTILITY COMPANY AND CONNECTION TO METER BY PLUMBER. D. PLUMBING CONTRACTOR TO MARK GAS STUB UP LINES AT GAS METERS FOR RESPECTIVE UNITS. METERS TO BE SO MARKED TO MATCH. 2. CODE RULES AND REGULATIONS: A. ALL WORK AND MATERIALS SHALL CONFORM STRICTLY TO ALL REQUIREMENTS OF ALL PUBLIC AUTHORITIES HAVING JURISDICTION INCLUDING PLUMBING/HEALTH BUILDING ORDINANCES/ SAFETY ORDER OF STATE INDUSTRIAL ACCIDENT COMMISSION/STRICT CONFORMANCE TO THE UNIFORM PLUMBING CODE OF THE WESTERN PLUMBING OFFICIALS. 3. PERMITS, INSPECTION, TESTS: A. PLUMBING CONTRACTOR TO TAKE OUT AND PAY FOR ALL PERMITS AND INSPECTION FEES AS REQUIRED FOR HIS WORK. B. PLUMBING CONTRACTOR SHALL MAKE ALL TESTS REQUIRED BY LOCAL BUILDING AND PLUMBING •ORDINANCES. ALL TESTS SHALL BE CARRIED OUT IN THE PRESENCE OF A PLUMBING INSPECT01 WHO SHALL BE NOTIFIED IN ADVANCE. ALL DOMESTIC WATER LINES SHALL BE TESTED TO A WATER PRESSURE OF ONE HUNDRED (100) POUNDS PER SQ. INCH FOR 6 HOURS. ALL SOIL, WASTE AND VENT LINES SHALL BE TESTED TO AN AIR PRESSURE OF 15 POUNDS PER SQUARE INCH FOR 6 HOURS. USE HYDROSTATIC TEST FOR WATER TESTING. 4. LAYOUT SPECIAL CARE MUST BE USED IN LOCATING LINES FOR ALL FIXTURES TO BE SURE THEY WILL BE IN CORRECT POSITION WHEN INTERIOR WALLS ARE COMPLETE. 5. EXCAVATING AND BACKFILL: A. DO ALL EXCAVATING AND SHORING TO INSTALL THE WORK. PLUMBING LINES OUTSIDE OF BUILDING SHALL BE BURIED TO A DEPTH OF NOT LESS THAN 18" BELOW FINISHED GRADE. AFTER PIPES HAVE BEEN TESTED AND APPROVED TRENCHES WILL BE BACKFILLED AND COMPACTS] B. PLUMBING EXCAVATIONS ARE NOT TO BE MADE PARALLEL TO FOOTING BELOW ANGLE OF REPOSE OF CONCRETE FOOTING (I.E., BELOW A LINE DRAW 45 DEGREE DOWN FROM EACH CORNER OF THE BOTTOM OF FOOTING.) 6. OPENING AND CUTTING: HOLES CUT IN STRUCTURAL MEMBERS FOR PLUMBING PIPES SHALL BE NEATLY NOTCHED OR DRILLED .AND REINFORCED AS REQUIRED. 7. WATER LINES, WASTE LINES, FITTINGS; A. WATER SUPPLY LINES SHALL BE COPPER OF SIZE INDICATED WITH A MINIMUM DEPTH BELOW GROUND LEVEL OF 16". INDIVIDUAL SHUT-OFF VALVES SHALL BE INSTALLED FOR ALL FIXTUR B. ALL PIPING RUN FREE OF TRAPS AND UNNECESSARY BENDS AND ARRANGED TO CONFORM TO THE BUILDING REQUIREMENTS AND TO SUIT THE NECESSITIES OF CLEARANCE FOR OTHER MECHANICA WORK SUCH AS FLUES, CONDUITS, ETC. NO PIPING INSTALLED SO AS TO CAUSE ANY UNUSUAL NOISE FROM THE FLOW OF WATER UNDER NORMAL CONDITIONS. C. ALL HORIZONTAL SANITARY PIPING INSIDE OR UNDER BUILDING SHALL BE RUN ON A UNIFORM GRADE OF NOT LESS THAN V PER FOOT, EXCEPT WHERE NOTED OTHERWISE. GRADE VENT PIPING SO AS TO FREE ITSELF QUICKLY OF WATER OR CONDENSATION. •PAGE 34 DIVISION 15 MECHANICAL PLUMBING - CONTINUED 8. GAS LINES; PROPERLY SIZE ALL GAS LINES AND CONNECT TO EACH FIXTURE REQUIRING GAS. ALL PIPING SHALL BE FIRST GRADE SCHEDULE 30 BLACK STEEL PIPE/MALLEABLE FITTINGS/THREADED JOINTS MADE UP WITH RED LEAD AND BOILED LINSEED OIL... ALL UNDERGROUND LINES SHALL BE WRAPPED OR GALVANIZED IN ACCORDANCE WITH UTILITY COMPANY STANDARDS. 9. FLASHINGy-HANGERS; FLASH ALL PIPES INCLUDING WATER HEATER VENT THROUGH ROOF WITH PRE-FORMED GALVANIZED ' IRON FLASHINGS. INSTALL HANGERS AND SUPPORTS FOR ALL PIPING. HANGERS SHALL BE SEPARATED FROM THE PIPE BY LONG-HAIR FELT PADS. 10. COVER, PROTECT; COVER AND PROTECT ALL FIXTURES AND FITTINGS UNTIL COMPLETION OF THE JOB, CLEAN ALL FIXTURES AND FITTINGS. EXPOSED PARTS WHICH ARE TO BE PAINTED SHALL BE THOROUGHLY CLEANED OF CEMENT, PLASTER, AND OTHER MATERIALS. IN THE EVENT THE FIXTURES AND FITTINGS ARE NOT CLEANED TO SATISFY THE OWNER THE PLUMBING CONTRACTOR SHALL STAND THE COST OF PROFESSIONAL CLEANING SERVICE. 11. FIXTURES; SEE SCHEDULE. PAGE 35 DIVISION 15 ' MECHANICAL HEATING AND VENTILATING 1. GENERAL: A. FURNISH AND INSTALL COMPLETE AND OPERATING ALL HEATING/VENTILATING AND EXHAUST SYSTEMS. 2. WORK BY OTHERS: A. ELECTRICAL CONTRACTOR SHALL PROVIDE ALL LOW END LINE VOLTAGE CONDUIT/DISCONNECTS/ MANUAL STARTERS AND CONNECT UP ALL MOTORS COMPLETE. MECHANICAL CONTRACTOR TO PROVIDE WRING DIAGRAM AS REQUESTED. INSTALL AND CONNECT THERMOSTAT PROVIDED BY MECHANICAL CONTRACTOR. USE CONDUIT ONLY WHERE CODE REQURED. B. PLUMBING CONTRACTOR SHALL CONNECT GAS (IF ANY) TO ALL UNITS AND INSTALL WATER PIPING AND CONDENSATE PIPING. C. GENERAL CONTRACTOR SHALL PROVIDE CUTTING, PATCHING, FRAMING, FURRING, PAINTING AND CONCRETE WORK. 3. CODE RULES AND REGULATIONS: ALL WORK AND MATERIAL SHALL BE PERFORMED AND INSTALLED IN COMPLIANCE WITH THE FOLLOWINi CODES AND ADOPTED AND AMENDED BY THE INSPECTION AUTHORITY. NOTHING IN THESE PLANS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. IL) 'UNIFORM BUILDING CODE. 1973 2) UNIFORM PLUMBING CODE. 1973 3) UNIFORM HEATING AND COMFORT COOLING CODE. 1973 4) CALIFORNIA ADMINISTRATIVE CODE, TITLE 19. 5) STATE FIRE MARSHAL. 6) SAFETY ORDERS, STATE DIVISION OF INDUSTRIAL SAFETY. 7) NATIONAL ELECTRIC CODE. 1971. 4. PERMITS AND INSPECTIONS; OBTAIN ALL PERMITS AND ALL LICENSES REQURED FOR PERFORMANCE OF WORK BY ALL LAWS/ • ORDINANCES/RULES/REGULATIONS/AND PAY ALL FEES RELATING THERETO. CALL FOR ALL INSPECT!' 5. SUBSTITUTIONS: EACH ITEM REFERRED TO ON THE DRAWINGS AND IN THE SPECIFICATIONS IS INTENDED TO REPRESE; THE STANDARD MERIT OF THE MATERIALS OR METHODS WHICH WILL BE REQUIRED. SHOULD THE - CONTRACTOR WISH TO SUGGEST ANY SUBSTITUTIONS CONSIDERED EQUIVALENT IN MERIT TO THE ONE SPECIFIED/THERE SHALL BE NOTED IN THE BID WHAT THE ITEM SUGGESTED IS/ANY ALSO THE DIFFERENCE IN COST AS APPLIED TO THE BID (IE ANY). 6. WORKMANSHIP AND LABOR: SHALL BE 1ST CLASS IN ALL RESPECTS. ALL LABOR TO BE CAREFULLY SKILLED FOR THIS KIND OF WORK, UNDER DIRECTION OF FOREMAN. 7. TESTS AND ADJUSTMENTS; ALL HEATING/VENTILATING AND EXHAUST SYSTEMS SHALL BE TESTED/ADJUSTED/AND BALANCED. ALL HEATING SYSTEMS SHALL BE TESTED UNDER SEASONAL WEATHER LOAD CONDITIONS REGARDLESS OF THE COMPLETION DATE OF THE WORK. 8. GUARANTEES: ALL MATERIALS, APPARATUS AND EQUIPMENT FURNISHED AND INSTALLED SHALL BE NEW AND FREE FROM ALL DEFECTS. SHOULD ANY TROUBLE DEVELOP WITHIN ONE YEAR FROM DATE OF ACCEPTANCE OF WORK DUE TO INFERIOR OR FAULTY MATERIAL AND/OR WORKMANSHIP, THE TROUBLE SHALL BE CORRECTED BY THE HEATING CONTRACTOR WITHOUT EXPENSE TO OWNER. •PAGE 36 DIVISION 15 ' . MECHANICAL HEATING AND VENTILATING CONTINUED • 9. MATERIALS AND EQUIPMENT; ALL MATERIALS AND EQUIPMENT FOR THE HEATING AND WORK SHALL BE OF NEW STOCK AND THE BEST GRADE OF ITS SEVERAL KINDS. ALL MATERIALS,. EQUIPMENT AND APPARATUS SHALL BE INSTALLED AS RECOMMENDED BY THE MANUFACTURERS OF THE MATERIAL, EQUIPMENT AND/or APPARATUS. a) US STD GA. MAX. SIDE IN. MAX. DIA. IN. , 26 UP TO 12" UP TO 12" C 24 13" TO 30" OVER 12" X-BRACED . b) SHEET METAL DEFLECTORS AND DAMPERS SHALL BE NOT LEbS THAN #20 GA. IRON PAGE 37 DIVISION 16 ELECTRICAL GENERAL CONDITIONS: A. ELECTRICAL CONTRACTOR SHALL DO ALL CUTTING NECESSARY FOR THE PROPER INSTALLATION OF HIS WORK AND SHALL REPAIR ANY DAMAGE DONE BY HIMSELF OR HIS WORKMEN. HE SHALL COORDINATE HIS WORK WITH THAT OF OTHERS. B. ALL EXPOSED WORK SHALL BE THOROUGHLY CLEANED UPON COMPLETION OF WORK, PANELBOARD ENCLOSURES, FIXTURES AND EQUIPMENT WHERE FINISH HAS BEEN MARRED IN SHIPMENT OR INSTALLATION SHALL BE COMPLETELY REFINISHED. C. THE ELECTRICAL CONTRACTOR SHALL MAINTAIN "AS-BUILTS" RECORDS AT ALL TIMES, SHOWING THE EXACT LOCATIONS OF WORK INSTALLED UNDER THIS CONTRACT. D. ELECTRICAL SYSTEM LAYOUTS ARE GENERALLY DIAGRAMMATIC AND LOCATION OF OUTLETS AND EQUIPMENT IS APPROXIMATE. EXACT ROUTING OF WIRING AND LOCATIONS OF OUTLETS IS TO BE GOVERNED BY STRUCTURAL CONDITIONS AND OBSTRUCTIONS. WIRING FOR EQUIPMENT REQUIRING MAINTENANCE AND INSPECTION TO BE READILY ACCESSIBLE. E. THE CONTRACTOR AGREES TO REPLACE OR REPAIR TO THE SATISFACTION OF THE OWNER ANY PART OF THE INSTALLATION WHICH MAY FAIL DUE TO DEFECTIVE MATERIAL AND/OR WORKMAN- SHIP OR FAILURE TO FOLLOW PLANS AND SPECIFICATIONS FOR A PERIOD OF ONE YEAR AFTER FINAL ACCEPTANCE. HE SHALL FURTHER SECURE FROM THE MANUFACTURERS OF SPECIAL EQUIPMENT SUCH AS SIGNAL SYSTEMS THEIR RESPECTIVE GUARANTEES AND SERVICE MANUALS •AND DELIVER SAME TO OWNER. F. THE ELECTRICAL CONTRACTOR SHALL DO ALL BACKFILLING AND EXCAVATING IN CONNECTION WITH ELECTRICAL WORK. BACKFILLING SHALL BE IN LAYERS OF APPROXIMATELY 6" WATER TAMPED FOR EACH LAYER. ALL DISTURBED SURFACES SHALL BE RESTORED TO ORIGINAL CONDITION, PROPERLY TAMPED TO ELIMINATE ANY SETTLEMENT. G> CONTRACTOR SHALL COOPERATE WITH THE OTHER TRADES IN THE INTEREST OF OBTAINING THE MOST PRACTICAL OVERALL ARRANGEMENT OF EQUIPMENT, PIPING, CONDUIT, AND DUCTS AND .TO MAINTAIN MAXIMUM HEADROOM AND ACCESSIBILITY. H. ALL EQUIPMENT OF ALL KINDS INSTALLED BY THIS CONTRACTOR SHALL BE TESTED TO DETERMINE WHETHER IT FULFILLS THE REQUIREMENTS OF THESE SPECIFICATIONS. THE CONTRACTOR SHALL FURNISH ALL LABOR NECESSARY TO ADJUST THE OPERATION OF THE APPARATUS AND MAKE THE CONNECTION FOR THE TESTS. HE SHALL REPLACE ALL CONNECTIONS OR FUSES BLOWN DURING THE TESTS. AFTER THE TESTS HAVE BEEN COMPLETED THE CONTRACT SHALL RESTORE ALL CONNECTIONS, APPARATUS, ETC. SHOULD ANY PIECE OF APPARATUS OR ANY MATERIAL OR WORK FAIL IN ANY OF THESE TESTS, IT SHALL BE IMMEDIATELY REMOVED AND BE REPLACED BY PERFECT MATERIAL BY THIS CONTRACTOR AT HIS EXPENSE AND THE PORTION OF THE WORK REPLACED BE TESTED BY THE CONTRACTOR SHALL RESTORE ALL CONNECTIONS, APPARTUS, ETC. I. MANUFACTURER'S DIRECTIONS SHALL BE FOLLOWED IN ALL CASES WHERE MANUFACTURERS OF ARTICLES USED IN THIS CONTRACT FURNISH DIRECTIONS COVERING POINTS NOT SHOW ON THE DRAWINGS AND SPECIFICATIONS. PAGE 38 DIVISION 16 ELECTRICAL- CONTINUED V~- 2. PERMITS, FEES, INSPECTIONS, AND TESTS; A. NOTHING IN THESE PLANS AND SPECIFICATIONS IS TO BE CONSTRUED TO PERMIT WORK NOT CONFORMING TO THESE CODES. ELECTRICAL CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMW 3. RULES AND REGULATIONS; A. ALL WORK AND MATERIALS SHALL BE IN FULL ACCORDANCE WITH THE LATEST RULES AND REGULATIONS OF: 1) NFPA NATIONAL FIRE AND ELECTRICAL CODES. 2) UNIFORM BUILDING CODES. . '. 3) UNIFORM MECHANICAL CODES. 4) UNIFORM PLUMBING CODES. 5) CALIFORNIA ADMINISTRATIVE CODE, TITLES 1 THRU 26. 6) THE STATE AND LOCAL FIRE MARSHALS. 7) SAFETY ORDERS OF THE INDUSTRIAL ACCIDENT COMMISSION, STATE OF CALIFORNIA. 8) OTHER APPLICABLE LOCAL REGULATIONS. 4. MATERIALS AND SUBSTITUTIONS; A. ALL EQUIPMENT AND MATERIALS SHALL BE NEW, UL APPROVED AND OF THE BEST QUALITY. WHEN SPECIFIC TRADE NAMES ARE USED IN CONNECTION WITH MATERIALS, THEY ARE MENTIONED AS STANDARDS, BUT THIS IMPLIES NO RIGHT UPON THE PART OF THE CONTRACTOR TO SUB- STITUTE OTHER MATERIALS OR METHODS WITHOUT APPROVAL. B. THIS CONTRACTOR SHALL ORDER ALL EQUIPMENT IN TIME TO PREVENT ANY DELAY IN CONSTRUCTION SCHEDULE OR COMPLETION -OF PROJECT. HE SHALL BEAR ANY PENALITY BY MANUFACTURERS TO MEET CONSTRUCTION SCHEDULE WITH ANY SPECIAL HANDLING CHARGES. » C. ABOVE GRADE WIRING TO BE 'ROMEX'. 5. MECHANICAL AND OTHER SPECIAL EQUIPMENT; A. MECHANICAL COORDINATION: PRIOR TO COMMENCING CONSTRUCTION THE ELECTRICAL CONTRACTO SHALL ARRANGE A CONFERENCE WITH THE MECHANICAL AND PLUMBING CONTRACTOS AND SUB- CONTRACTOS AS WELL AS EQUIPMENT SUPPLIERS AND SHALL VERIFY TYPES, SIZES, LOCATIONS, REQUIREMENTS, CONTROLS, AND DIAGRAMS OF ALL EQUIPMENT FURNISHED BY THEM. HE SHALL, IN WRITING, INFORM THE ELECTRICAL ENGINEER THAT ALL PHASES OF COORDINATION OF THIS EQUIPMENT HAVE BEEN COVERED AND IF THERE ARE ANY UNUSUAL CONDITIONS OR PROBLEMS THEY SHALL BE ENUMERATED AT THIS TIME. B. MECHANICAL WIRING: ALL ELECTRICAL LINE AND LOW VOLTAGE WIRING, RELAYS, STARTERS, DISCONNECTS, AND CONDUIT SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICAL CON- TRACTOR UNLESS OTHERWISE SHOWN. THE MECHANICAL CONTRACTOR WILL FURNISH THERMOSTATS REQUIRED FOR THE OPERATION OF THE SYSTEMS TO THE ELECTRICAL CONTRACTOR FOR WIRING AND INSTALLATION. IT SHALL BE THE MECHANICAL CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL NECESSARY CONTROL WIRING DIAGRAMS TO THE ELECTRICAL CONTRACTOR. C. MISCELLANEOUS EQUIPMENT: CONTRACTOR SHALL BE RESPONSIBLE FOR ELECTRICAL HOOK-UP AND CONNECTION TO ALL ELECTRICAL EQUIPMENT WHETHER FURNISHED BY THIS CONTRACTOR OR OTHERS. THIS SHALL INCLUDE ALL SPECIAL MECHANICAL EQUIPMENT AS WELL AS EQUIPMENr WHICH IS FURNISHED BY THE MECHANICAL CONTRACTOR. 6. OUTLETS: A. IN GENERAL, THE LOCATIONS OF ELECTRICAL OUTLETS SHALL BE AS SHOWN ON THE DRAWINGS, HOWEVER, THE CONTRACTOR SHALL MAKE ANY CHANGES NECESSARY TO SUIT CONDITIONS ON THE JOB OR RE-ARRANGEMENTS OF BUILT-IN FIXTURES AND EQUIPMENT. B. IT SHALL BE INCUMBANT UPON THE CONTRACTOR TO STUDY THE GENERAL BUILDING PLANS WITH RELATION TO SPACES SURROUNDING EACH OUTLET IN ORDER THAT HIS WORK MAY FIT THE WORK OF OTHERS AND THAT WHEN FIXTURES OR OTHER EQUIPMENT ARE INSTALLED THEY WILL BE SYMMETRICALLY LOCATED ACCORDING TO ROOM LAYOUT. •PAGE 39 * DIVISION 16 ELECTRICAL - CONTINUED 7. WIRING DEVICES: A. SHALL BE AS FOLLOWS, UNLESS OTHERWISE SHOWN ON THE PLANS: 1) TUMBLER SWITCHES SHALL BE ARROW-HART 1891-1 SERIES OR EQUAL. 2) CONVENIENCE RECEPTACLES SHALL BE HUBBELL #5242-1, 3 WIRE GROUNDING TYPE. 3) ALL WALL SWITCH, CONVENIENCE, TELEPHONE AND SPEICAL PLATES, ALSO BLANK COVERS FOR THE VARIOUS BOXES REQUIRED TO BE SO EQUIPPED, SHALL BE PLASTIC, SIERRA OR EQUAL. COVER PLATES THAT ARE POSITIONED OVER WOOD TRIM TO BE DARK BROWN, ALL OTHERS TO BE IVORY. '•-> 4) GANG TYPE PLATES SHALL BE USED FOR MULTIPLE UNITS. 8. LIGHTING FIXTURES: A. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL LIGHTING FIXTURES AS INDICATED ON THE ELECTRICAL DRAWINGS AND IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS. B. THIS CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE COMPLETE EQUIPMENT OF ALL FIXTUR OUTLETS WITH FIXTURES OF THE PROPER DESIGN AS SHOWN. C. ALL SURFACE AND STEM SUSPENSION FIXTURES SHALL BE SECURELY ANCHORED TO THE OUTLET BOXES OR CEILING FURRING CHANNELS TO PREVENT ANY POSSIBLE CHANCE OF THEIR FALLING. D. RECESSED FIXTURES SHALL BE COMPLETE WITH PLASTER FRAMES, SUPPORTING BRACKETS AND GROUNDS, COMPLETE WITH SUITABLE FELT GASKET TO PREVENT LIGHT LEAKAGE. 1.SPOTLIGHT- TO BE PROGRESS P 3946-31 W/ 150 W. LAMP 2.RESTROOM AND CLOSET FIXTURE- TO BS PROGRESS P3529 AND P3525, RESPECTIVELY, 9. SECURITY STSTSM;A. MOTION DETECTION SHALL BE PROVIDED THROUGH THE USE OF AN ULTRA-SONIC SYSTEM AS MANUFACTURED BY UNISSC.MASTER PANEL MODEL USD-21TRANSDUCER MODEL CWPTRANSDUCER LOCATIONS PER PLAN (14 TOTAL)(7 TRANSMITTERS/7 RECEIVERS)B. SYSTEM SHALL BE PROVIDED WITH A MINIMUM OF EIGHT (8) HOUR AUTO-MATIC STANDBY POWER. C. MAIN ENTRY DOOR TO BE PROVIDED WITH CONCEALED MAGNETIC CONTACT PROTECTION. 10. FIRE DETECTION SYSTEM; A. A HEAT DETECTION SYSTEM SHALL BE INSTALLED IN A MANNER WHICH WILL MEET THE REQUIREMENTS OF THE INSURANCE SERVICES OFFICE (ISO) FORFULL INSURANCE CREDITS.B. HEAT DETECTORS SHALL BE SERIES #500 RATE OF RISE FIXED TEMPERATURE \TYPE AS MANUFACTURED BY NOTIFIER COMPANY, OR EQUAL.C. IONIZATION TYPE SMOKE DETECTORS SHALL BE LOCATED PER PLAN (10 TOTAL).DETECTORS SHALL BS NOFIFIER COMPANY MODEL NK-24 WITH NKF FLUSHMOUNT HARDWARE, OR EQUAL.D. FIRE BELL SHALL BS TYPE N-CO-6 DIAMETER AS MANUFACTURED BE NOTIFIERCOMPANY OR EQUAL.E. MANUAL FIRE STATION SHALL BE MODEL BNG-1 AS MANUFACTURED BYNOTIFIER COMPANY, OR EQUAL.F. INTRUSION AND FIRE ALARM SIGNALS SHALL BE TRANSMITTED BIA LEASED TEL-EPHONE LINE TO A CENTRAL STATION. INSURANCE COMPANY OF NORTH AMERICA AND PACIFIC EMPLOYERS GROUP OF INSURANCE COMPANIES CERTIFICATE OF INSURANCE (This Certiftcote of Insurance neither affirmatively nor negatively amends, extends or alters the coverage, limits, terms or conditions of the policies it certificates.) is in Crrlifjj to |CITY OF CARLSBAD 1200 Elm Avenue Carlsbad, CA 92008 ~1 COMPANY CODES QD ALLIED INSURANCE CO. IS PACIFIC EMPLOYERS INDEMNITY CO. 5] PACIFIC EMPLOYERS INSURANCE CO. I I rsi INSURANCE COMPANY —' m OF NORTH AMERICA that the following described policy or policies, issued by The Company as coded below, providing insurance only for hazards checked by "X" below, have been issued to-. Name and Address Helton Construction Company of Insured— 2829 State Street, Carlsbad, CA 92008 covering in accordance with the terms thereof, at the following location(s): Restoration Of the Magee HOUSB located at Beecl Avenue and Garfield Street, Contract No.103^ TYPE OF POLICY (a) Standard Workmen's Compensation & Employers' Liability ' (b) General Liability •. / Premises — Operations (including "In- cidental Contracts" as defined below) > 3 Elevatorsc x Independent Contractors 1> Completed Operations'/Productsffl Contractual, (Specific type as de- scribed in footnote below) Premises - Operations, (Including "Incidental Contracts" as defined ? below) g Elevators ~ Independent Contractors £ o Completed Operations/Products a. Contractual, (Specific type as de- scribed in footnote below) (c) Automobile Liability Owned Automobiles _>> '•53 Hired AutomobilesO f-tn- Non-owned Automobiles >u Owned Automobiles•c t» ££ Hired Automobiles 0 Non-owned Automobiles (d)The City of Carlsbad 1 All Subs must furnish C and name them as addita HAZARDS D n H s n [x] n fx] s nan ertifi onal CO. CODE D D 0 Qn 0 Q o ed as cates insure POLICY NUMBER CCD 3^2428 an additional of Insurance t ds. POLICY PERIOD 4-1-76 to 4-1-77 insured as res o Helton Const LIMITS OF LIABILITY Statutory W. C. $ One Accident and Aggregate Disease $ 300, 000. Each Person OAA AAA ;'— ' Accident$ 300, 000. Each jrjn „ f ( 1— I Occurrence f $ 300, 000 .Aggregate— Completed / Operations/Products * CA Ann c L 3 Accident% 50,OOO .Each ,r-i( KJ Occurrence $ 250 000 A99re9ate — Prem./Oper. $ Aggregate — Protective $ Aggregate — Completed Operations/Products $ Aggregate — ContractuaJ ) $ 100,000 .Each Person ( 1 I/ 3! — 1 Accident J * 300,OOO.Each Jg Qccurrence ( $ 25,000^ach S2 ^ccident ( l== Occurrence Dects this job only, ruction Co. with same limits Contractual Footnote: Subject to all tfie policy terms applicable, specific contractual liability coverage is provided as respects D a contract / D purchase order agreements / d all contracts (check applicable blocks) between the Insured and: Name of Other Party:. . . Dated (if applicable): Contract No. (if any): Description (or Job): , . , . ,— . Definitions: "Incidental contract" means any written (1) lease of premises (2) easement agreement, except in connection with construction or demolitn,n operations on or adjacent to a railroad, (3) undertaking to indemnify a municipality required by municipal ordinance, except in connection with work for the municipality, (4) sidetrack agreement, or (5) elevator maintenance agreement. McClellan Insurance It is the intention of the company that in the event of cancelation of the policy or policies by the company, ten (10) days' written notice of such cancelation will be given to you at the address stated above. LC-1389a (150M 4/73) PTD. IN U.S.A.1. ORIGINAL Authorized Representative TATI COMPENSATION INSURANCE P.O. BOX 807, SAN FRANCISCO, CALIFORNIA 94101 CERTIFICATE OF WORKERS' COMPENSATION INSURANCE July 20, 1976 City of Carlsbad 1200 Elm Ave. Carlsbad, CA 92008 This is to certify that we have issued a valid Workers' Compensation insurance policy in a form approved by the California Insurance Commissioner to the employer named below for the policy period indicated. This policy is not subject to cancellation by the Fund except upon ten days' advance written notice to the employer. '. / We will also give you TEN days' advance notice should this policy be cancelled prior to its normal expiration 200384-76 1-1-76/1-1-77 THE CITY OF CARLSBAD IS NAMED AS ADDITIONAL INSURED EMPLOYER BUT ONLY AS RESPECTS EMPLOYEES OF HELTON CONST. CO. WHOSE NAMES APPEAR ON ITS PAYROLL RECORDS. EMPLOYER Helton Construction Co. P. 0. Box 356 Carlsbad, CA 92008 PRESIDENT Job: #1034 Restoration of the Magee House SCIF FORM 262A (REV. 2-76)