Loading...
HomeMy WebLinkAboutHeritage Creations Inc; 2007-01-09;The Crossings @ Carlsbad * * * * Manufacturing, Finish and Installation Agreement ***** THIS AGREEMENT is dated January 9,2007 between Procraft Heritage Creations Inc. d.b.a. Heritage Creations 61573 American Loop Bend, OR 97702 And Carlsbad Financing Authority (hereafter Client), located at 1635 Faraday Avenue Carlsbad, CA 92008 Heritage Creations proposes to manufacturing, finish, and install the cabinets and fixtures for the The Crossings @ Carlsbad Golf Shop, located at 5800 Hidden Valley Road Carlsbad, CA 92008, San Diego County, as follows: 1.0 MANUFACTURING SPECIFICATIONS Heritage Creations will construct all cabinets and fixtures per the attached Exhibit 'A' as follows: 1.1 Wood Species: All fixtures shall be constructed of Cherry hardwoods and veneers. 1.2 Milling Profiles: To be Standard Profiles. 1.3 Fixture Tops: To be Wood. 1.4 Counters: 1.4.1 Front counter top to be constructed of Granite. An allowance of $4,060.00 has been included for this material in the Agreement sum. 1.4.2 Recessed point-of-sale areas to be overlaid with laminate with wood self edge. Laminate to be selected from Nevamar, Formica, or Wilsonart brands. 1.5 Fabric: Fabric to be selected from Momentum Textiles. 1.6 Leather: House leather will be provided. 1.7 Hardware: Hardware to be Oil Rubbed Bronze. 1.8 Finish: All cabinets and fixtures to be finished in SSL to match stain sample on desired wood species provided by client. Upon receipt of client's stain sample, Heritage Creations will provide two (2) sets of stain samples. Any additional sets will be provided at $75.00 per set. Finish processes other than that specified may result in an adjustment to the Agreement sum. Carlsbad Financing Authority Manufacturing Agreement Project: The Crossings @ Carlsbad Page 2 2.0 FIELD MEASUREMENTS One field measurement trip is included in this Agreement. If all required dimensions and details are not available at that time Client agrees to provide additional measurements at their expense. Client assumes responsibility for the accuracy of any field measurements provided. Field Measurements must be completed at least 6-weeks prior to load date. No changes are to be made to the structure of the golf shop after the final field measurements are taken. If any changes occur Client agrees to inform Heritage Creations immediately. Client accepts full responsibility for those structural changes made to the golf shop and their communication to Heritage Creations and acknowledges that additional costs may be incurred if rebuilding or reworking of the fixtures is required. 3.0 INSTALLATION Installation is projected to begin on April 11,2007, with a completion allowance of 4 days, travel time included. The load date would be April 08, 2007. Heritage Creations, or an approved subcontractor, will install all cabinets and fixtures for the golf shop and assist with coordination of any junction where cabinets and casework will interface. Heritage Creations agrees to provide a completed installation by the agreed upon date. (Exceptions to this include shipping problems due to inclement weather, extended dates as agreed to by client or other causes beyond our control.) In order to maintain this installation date ail job specifications and design issues must be completed 8 weeks prior to the load date. Client will have the golf shop ready for installation as follows: 3.01 All painting to be completed prior to install date. 3.02 No carpet and base are to be installed prior to completion of installation, unless agreed upon by Heritage Creations in writing. 3.03 Any and all building permits are the responsibility of the Client. 3.04 Any union labor necessary for the installation shall be provided by and paid for by the Client. 3.05 Golf shop must be clean and clear of all debris and ready for installation. Heritage Creations will need full and complete access to the golf shop space without interference of other subcontractors. 3.06 A clear road to the clubhouse and golf shop in a condition to receive a semi truck and trailer are required. If the road is not paved it needs to be hard packed to bear heavy truck weight. This is extremely important to avoid incurring additional freight costs. 3.07 Client to provide a contact name and phone number to enable the truck or install team access to the shop after hours. 3.08 Client shall provide and pay for an electrician to assist with any electrical hookups that may be required. Electrical hook-ups including wiring, telephone and computers, are not included in this scope of work. 3.09 Client shall provide lighting and electricity adequate for the installation. 3.10 Client is responsible for communicating all installation requirements to General Contractor or Owner's Representative. Carlsbad Financing Authority Manufacturing Agreement Project: The Crossings @ Carlsbad Page 3 3.11 Building must be properly climatized to receive wood fixtures. Heritage Creations will incur no cost for repair or rework of fixtures stored in a facility that is not properly climatized; all warranties will be voided. Transfer of the fixtures to a climatized storage facility and rescheduling of the installation may be the best course of action and would be at Client's expense. 3.12 Installation expenses are included in this Agreement. 3.13 In the event the shop is not ready for installation, or installation is delayed or extended due to Client or Client's agents, Client will reimburse Heritage Creations for all rej but not limited to, additional installation, storage, and/or additional freigJ Please initial here that you have read and understand Section: 4.0 SHIPPING Heritage Creations will handle all details regarding the loading and shipping of all cabinets and fixtures. Freight charges will be estimated and subject to change due to actual carrier charges at time of shipment. 5.0 AGREEMENT SUM Heritage Creations will perform the above services for the Total Agreement Sum of One Hundred Forty Three Thousand Five Hundred Thirty Five Dollars & 91/100 ($143,535.91) including $8,869.41 for sales tax at the rate of 7.75%. Interest will be charged on all past due balances at the rate of 18%; Client agrees to pay all interest charges incurred due to delay in payment. If Client can not provide documentation of tax exempt status taxes will be additional. All fixtures will remain property of Heritage Creations until Agreement is paid in full. Heritage Creations retains the right to take back, at Client's expense, golf shop fixtures equal to the amount of any unpaid debt. Client will pay any property taxes. The laws of the State of Oregon shall govern this Agreement. 6.0 CHANGES TO AGREEMENT SUM Heritage Creations will deliver your new golf shop on the installation date indicated, except as noted above. This is a project that requires teamwork to ensure success; together we are the team. The following items are actions, or lack of actions, by the Client, or their Agents, that may result in additional charges to the Client. 6.1 This Agreement sum will remain fixed (exclusive of additional changes in price) for a period of fifteen (15) days from the date that Heritage Creations signs this Agreement, with the stipulation that the actual manufacturing of the fixtures is commenced 8 weeks prior to load date. If manufacturing is started less than 8 weeks prior to load date, due to delays by the Client, including returning the authorized Agreement and deposits past the required date of February 15, 2007, Heritage Creations reserves the right to revise the Agreement sum to compensate for increases in labor costs, including overtime. 6.2 All manufacturing specifications and design issues must be completed 8 weeks prior to the load date. In addition, field measurements must be completed at least 6-weeks prior to the load date. Any delays to these decisions, or the obtaining of field measurements, as caused by Client or Client's agents, may result in delays to the manufacturing schedule and may incur additional costs. Heritage Creations reserves the right to move the project to the next available opening on the manufacturing schedule. / 6.3 Changes to the specifications for this project, as shown in Section 1, may result in additional costs. Carlsbad Financing A uthority Manufacturing Agreement Project: The Crossings @ Carlsbad Page 4 6.4 Client agrees to assume any costs resulting from fixture redesign, rework or rebuilding costs due to structural changes made to the golf shop after final field measurements have been taken/provided. 6.5 This agreement is drawn and priced based on a projected install date of April 11,2007. Should you request to modify the Install Date by more than five (5) days the request should be made at least 45-days in advance to avoid additional charges. If any request to change the date is made less than 30-days in advance then you will be responsible for additional charges incurred by Heritage Creations including, but not limited to, freight, storage fees and costs for^the rescheduling of the installation. In addition, a new installation date approval based on our current installation schedule. Please initial here that you have read and understand Section 6. 7.0 EXPENSE REIMBURSEMENT Client will be responsible for reimbursement to Heritage Creations the cost of UPS and Federal Express type delivery charges in accumulative excess of $100.00. These delivery charges include those for the shipment of floor plans, project documents, stain samples, etc., sent to you or your agents. These and all other expenses, including travel, lodging and additional consultation services, incurred per your request, will be billed upon completion of the project. 8.0 PAYMENT TERMS 50% of Agreement Sum $71,767.96 The 50% Payment is due and payable upon signing and return of this Agreement no later than February 15,2007. 40% of Agreement Sum $57,414.36 The 40% payment is due and payable and must be received two weeks prior to shipping. 10% Balance of Agreement Sum $ 14,353.59 The balance is due and payable upon delivery and completion of the installation. TOTAL AGREEMENT PRICE $ 143,535.91 PAYMENT SHALL BE MADE TO: Heritage Creations 61573 American Loop Bend, OR 97702 *** HERITAGE CREATIONS MUST BE CONTACTED PRIOR TO MAKING ANY CHANGES TO THIS AGREEMENT ***/ cr\ EXECUTED BY: f\(F$l&lLj, (Juljf^l DATE: I VfrHerit&CySStioyl/ / EXECUTED BY: \Mll/t !/„ WAS* DATE: APPROVED AS TO FORM: . Jaile/Mobaldi, Assistant City Attorney Carlsbad Financing Authority Project: The Crossings @ Carlsbad Exhibit 'A' Plan Date June 6, 2006, Revision Date October 5, 2006 ITEM# 1 1.01 1.02 1.03 2 2.1 2.2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 DESCRIPTION Front Counter Counter Top Material - Granite Allowance Logo Ball Display Sundries Display Gate Back Counter Tiered Ball Display Tiered Glove Display Wrapping Station Office Desk Back Counter 8' Hat and Cap Display 10' Wall Plaque 10' Wall Plaque 4' Wall Plaque 4' Wall Plaque 8' Open Wall Display with Platform Base 8' Wall Display with Storage / Doors 8' Open Wall Display with Platform Base Shoe Display with Pullout Storage TV Display Shoe Display with Pullout Storage Handicap Station 8' Wall Plaque Wall Mirror Nesting Table Set of Two Display Table Four Way Display T-Display Umbrella Display QUANTITY 1 EA 2 EA 2 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA EA EA EA EA EA EA 1 EA 1 EA 2 EA 1 EA 2 EA 1 EA 1 EA 2 EA 2 EA 1 EA 5 EA 3 EA 1 EA Page 1 EA = Each LF - Linear Feet Carlsbad Financing Authority Project: The Crossings @ Carlsbad Exhibit 'A' Plan Date June 6, 2006, Revision Date October 5, 2006 25 26 27 28 29 30 31 32 33 34 35 36 37,38 Large Nesting Table Set of Two Belt Display Side Table Utility Club Display Jewelry Display 60" Round Table with Pedestal Base Dressing Room Shelf with Hooks Dressing Room Bench Restocking Cart Work Table with Laminate Top Desk Upper Cabinets LPL Storage Cabinets 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 22 EA ITEM # ACCESSORIES A B C D E F I J K L Waterfall Arms Straight-out Arms 12" x 14" Shelves 42" x 14" Shelves 42" Rod and Corbel Set Shoe Display Pad with Shelf 3 Pin Sock Plaque 7 Pin Belt Plaque Bag Display Hoops Drawer and Door Pull Allowance QUANTITY 25 20 10 8 4 12 8 2 14 1 EA EA EA EA EA EA EA EA PR EA Page 2 EA = Each LF - Linear Feet Carlsbad Financing Authority Project: The Crossings @ Carlsbad Exhibit 'A' Plan Date June 6, 2006, Revision Date October 5, 2006 SUMMARY: CABINETS, FIXTURES & FINISH FIELD MEASUREMENTS INSTALLATION STOCK ROOM PROJECT SUBTOTAL FREIGHT FOB BEND OREGON VIA UNITED VAN LINES PROJECT TOTAL TAXABLE AMOUNT $114,444.00 SALES TAX AT 7.75% TOTAL AGREEMENT SUM $ $ $ $ $ $ $ $ $ 104,494.00 1,362.50 13,110.00 9,950.00 128,916.50 5,750.00 134,666.50 8,869.41 143,535.91 COMMENTS: Page3 EA = Each LF - Linear Feet