Loading...
HomeMy WebLinkAboutRobertson Industries; 2013-12-13; PKRC528Tracking #: CITY OF CARLSBAD MINOR PUBLIC WORKS CONTRACT TOT LOT RESURFACING: AVIARA, PINE AVE., HIDDEN CANYON & CADENCIA PARKS; PKRC528 This agreement is made on the _ day of by the City of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and Robertson Industries, Inc. whose principal place of business is 4401 E. Baseline Rd., Suite 105 Phoenix, AZ 85042 (hereinafter called 'Contractor"). City and Contractor agree as follows: DESCRIPTION OF WORK. Contractor shall perform all work specified in the Contract documents for the project described by these Contract Documents (hereinafter called "Project"). PROVISIONS OF LABOR AND MATERIALS. Contractor shall provide all labor, materials, tools, equipment, and personnel to perform the work specified by the Contract Documents unless excepted elsewhere in this Contract. CONTRACT DOCUMENTS. The Contract Documents consist of this Contract, exhibits to this Contract, Contractor's Proposal, the Plans and Specifications in Attachments A & B, the Generai Provisions, addendum(s) to said Plans and Specifications, and all proper amendments and changes made thereto in accordance with this Contract or the Plans and Specifications, all of which are incorporated herein by this reference. When in conflict, this Contract will supersede terms and conditions in the Contractor's proposal. LABOR. Contractor will employ only skilled workers and abide by all State laws and City of Carlsbad Ordinances governing labor. GUARANTEE. Contractor guarantees all labor and materials furnished and agrees to complete the Project in accordance with directions and subject to inspection approval and acceptance by: Kyle Lancaster (City Project Manager) PREVAILING WAGES NOT REQUIRED. The City of Carlsbad is a Charter City. Carlsbad Municipal Code Section 3.28.130 supersedes the provisions of the California Labor Code when the public work is not a statewide concern. Payment of prevailing wages is at Contractor's discretion. FALSE CLAIMS. Contractor hereby agrees that any contract claim submitted to the City must be asserted as part of the contract process as set forth in this agreement and not in anticipation of litigation or in conjunction with litigation. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. the provisions of Cartsbad Municipal Code sectipns 3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference. NAME OF PROJECT; CONT. NO. NNNN Page 1 of 6 City Attorney Approved 2/7/13 Tracking #: Contractor hereby acknowledges that the filing of a false claim may subject the Contractor to an administrative debarment proceeding wherein the contractor may be prevented from further bidding on public contracts for a period of up to five years and that debarment by another jurisdiction is grouj^ the City of Cartsbad to disqualify the Contractor or sutxBontractor from participating in contractj Signature: r or subBontra^oi Print Name: f^\(MS[V7\ ft^A/' REQUIRED INSURANCE. The successful contractor shall provide to tl%i City q^^tgoad, a Ceiftification of Commercial General Liability and Property Damage Insurance a^^s^'Xertificate of Workers' Compensation Insurance indicating coverage in a form approved ^ly the California Insurance Commission. The certificates shall indicate coverage dunng the penod of the contract and must be furnished to the City prior to the start of work. The minimum limits of liability insurance are to be placed with insurers that have: (1) a rating in the most recent Best's Key Rating Guide of at least A-:V and (2) are admitted and authorized to transact the business of insurance in the State of California by the Insurance Commissioner. Commercial General Liability Insurance of Injuries including accidental death, to any one person in an amount not less than $500,000 Subject to the same limit for each person on account of one accident in an amount not less than $500,000 Property damage insurance in an amount of not less than $100,000 Automobile Liability Insurance in the amount of $100,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. The automobile insurance certificate must state the coverage is for "any auto" and cannot be limited in any manner. The above policies shall have non-cancellation clauses providing that thirty (30) days wntten notice shall be given to the City prior to such cancellation. The policies shall name the City of Cartsbad as an additional insured. INDEMNITY. The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly ansing from or in connection with the performance of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable law, rules or regulations including those related to safety and health; and from any and all claims, loss, damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, except for loss br damage caused by the sole or active negligence or willful misconduct of the City. The expenses of defense include all costs and expenses including attorneys' fees for litigation, arbitration, or other dispute resolution method. CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, SAN DIEGO REGION. A. Contractor shall not allow any discharges from the construction site, which may have an adverse effect on receiving waters of the United States. B. Contractor shall not allow any groundwater extraction water to be discharged from construction site except in full compliance with the General Waste Discharge Requirements for Ground Water Extraction and Similar Discharges from Construction and Remediation Projects (Order No. 96-41) adopted by the Regional Board. Pnor to submitting Bid, Contractor shall obtain a copy of said Order NAME OF PROJECT; CONT. NO. NNNN Page 2 of 6 City Attomey Approved 2/7/13 Tracking #: No. 96-41 and review all compliance requirements therein, including monitoring, testing, and reporting. C. In the event of conflict between the Contract and Permit requirements, the most stringent shall prevail. All permit requirements shall be satisfied by Contractor and accepted by all issuing agencies, and the Owner before project will be accepted and a Notice of Completion filed. D. Contractor shall, at his own expense, procure any additional permits, certificates, and licenses required of him by law for the execution of the work. He shall comply with all Federal, State and local laws, ordinances or rules and regulations relating to the performance of said work. E. The Contractor shall incorporate and comply with all applicable Best Management Practices (BMPs) during the completion of this agreement. All work must be in compliance with the most current San Diego Regional Water Quality Control Board (RWQCB) permit, Carlsbad Municipal code and the City of Carlsbad Junsdictional Urban Runoff Management Plan (JURMP) incorporated herein by reference. F. The Contractor shall indicate in his submittals methods of compliance, equipment utilized to insure compliance, training of staff and experience in compliance with environmental regulations. If in the opinion of the project manager, the Contractor is not in compliance with this provision CITY reserves the right to implement BMP's to the maximum extent practical, and deduct payment due or back charge the Contractor for implementation with a 15% markup for administration and overhead. JURISDICTION. The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties ansing out of this agreement is San Diego County, California. Start Work: Contractor agrees to start within 10 working days after receipt of Notice to Proceed. Completion: Contractor agrees to complete work within 25 working days after receipt of Notice to Proceed. // // // // II II II II II II II II II NAME OF PROJECT; CONT. NO. NNNN Page 3 of 6 City Attorney Approved 2/7/13 Tracking #: CONTRACTOR'S INFORMATION. Robertson Industries, Inc. (name of Contractor) CA: 667261, CLASS C/64 D/64 & C/61 D/12 (Contractor's license number) 4401 E. Baseline Rd., Suite 105 (street address) Phoenix / AZ / 85042 ise r.las.q land exn ri (city/state/zip) (800)858-0519 (license class.'and exp. date) (telephone no.) (858)274.3125 (fax no.) dpurcell@totturf.com (e-mail address) AUTHORITY. The individuals executing this Agreement and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authonty to bind Contractor to the terms and conditions of this Agreement. CONTRACTOR By: O i CITY OF CARLSBAD, a municipal corporation of the State of QJalifornia ^—^ (pnnt nan^e/title) as authorized by the City Managir>- '••\ By: ATTEST: (sign here) (print name/title) If required by City, proper notanal acknowledgment of execution by Contractor must be attached. If a corporation. Agreement must be signed by one corporate officer from each of the following two groups: Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. ^^istant City Attorney NAME OF PROJECT; CONT. NO. NNNN Page 4 of 6 City Attomey Approved 2/7/13 Tracking #: EXHIBIT A LISTING OF SUBCONTRACTORS BY GENERAL CONTRACTOR Set forth below is the full name and location of the place of business of each sub-contractor whom the Contractor proposes to subcontract portions of the Project in excess of one-half of one percent of the total bid, and the portion of the Project which will be done by each sub-contractor for each subcontract. NOTE: The Contractor understands that if it fails to specify a sub-contractor for any portion of the Project to be performed under the contract in excess of one-half of one percent of the bid, the contractor shall be deemed to have agreed to perform such portion,/and that the Contractor shall not be permitted to sublet or subcontract that portion of the work, except in cases of public emergency or necessity, and then only after a finding, reduced in wnting as a public record of the Awarding Authonty, setting forth the facts constituting the emergency or necessity in accordance with the provisions of the Subletting and Subcontracting Fair Practices Act (Section 4100 et seq. of the California Public Contract Code). If no subcontractors are to be employed on the project, enter the word "NONE." SUBCONTRACTORS Portion of Project to be Subcontracted Business Name and Address License No., Classification & Expiration Date %of Total Contract Total % Subcontracted: NAME OF PROJECT; CONT. NO. NNNN Page 5 of 6 City Attorney Approved 2/7/13 EXHIBIT B JOB QUOTATION Tracking #: ITEM NO. UNIT QTY , DESCRIPTION PRICE 1 LS 1 PINE AVE PARK ~ Ig pad in 100% colors flowing thru plygrnd; seam sep. beginning; pad in ok shape overall, tho thin wear course in spots * 60 SF patches: make patch repairs on 100% blue (at swings, N of structure, S of structure, at spring nders) * approx. 5,000 SF of aliphatic roll coat to slow granulation & help w/ seam sep. $6,881.60 2 LS . 1 HIDDEN CANYON PARK ~ 2plygrds needing patches, 1/2" Retop on one section, and roil'coat; 100% colors flow thru plygrnd; great deal of wear wl holes and thin wear course * 173 SF patches: make patch repairs both plygrnds mainly in 100% blue areas * 900 SF of 1/2" Retop in 100% blue aliphatic in section with many holes and thinnest wear course on large play pad '' approx. 7,260 SF of aliphatic roll coat to slow granulation & help w/ thinning wear course $17,776.56 3 LS 1 AVIARA COMM PK ~ Ig plygrnd w/ two large oval patches at swings and roll coat throughout; 100% colors flow thru playground * 108 SF patches: make patch repairs as 9'x6' wear pads under belt swings in 100% green * approx. 8,300 SF of aliphatic roll coat to slow granulation & prolong life of pad $11,014.48 4 LS 1 CADENCIA PK ~ Remove & Replace * Demo existing rubber & touch up subbase as needed * Furnish and Install 530 SF (410 SF + 80 LF of turn down) of New 3.5" TotTurf Aromatic with 50/50 std color/black mix with aromatic urethane $7,941.60 TOTAL* $43,614.24 *lncludes taxes, fees, expenses and all other costs. NAME OF PROJECT; CONT. NO. NNNN Page 6 of 6 City Attorney Approved 2/7/13 PROPOSAL # 13-11921 P • V • 'J • w AV CORE* Company Date Issued: 11/13/2013 Project Name: Carlsbaci - four park repairs Address: Carlsbad, CA 92008 Site Contact: Rodney Nishirnoto Contact Ph#: (760) 324-2952 Fax#: Contact Email: Robertson Industries, Inc 4401 E. Baseline Rd., Suite 105 Phoenix, AZ 85042 (800) 858-0519 FX: (602) 340-0402 www.totturf.com TotTurf Sales Representative Name: David Purcell Phone: (760) 809-1875 Fax: (858) 274-3125 Email: dpurcell@totturf.com Scope: See page 2 and 3 for detailed scope information Product Name Line Description Quantity | Sales Price Total Price | Maintenance AVIARA COMM PK repairs per Scope 1.00| $11,014.48 $11,014.48| Maintenance PINE AVE PK patches & reseal per Scope i.oo| $6,881.60 $6,881.60| Maintenance HIDDEN CANYON PK repairs per Scope i.oo| $17,776.56 $17,776.56| Maintenance CADENCIA PK repairs per Scop 1.00| $7,941.60 $7,941.60| Grand Total 1 $43,614.24{ PRICE EXPIRES: 1/21/2014 CONTRACTOR'S LICENSE NUMBERS: AZ: ROC091920, CLASS L-05 ~ CA: 667261, CLASS C/64 D/64 and C/61 D/12 FL: CGC 038554 ~ NV: 42331, CLASS C25 C40 Page 1 of 5 PROJECT SCOPE PROPOSAL # 13-11921 PROJECT NAME: Cartsbad - four park repairs PROJECT ADDRESS: Carisbad. CA 92008 PROJECT CONTACT: Rodnev Nishirnoto EMAIL ADDRESS: Requested Install: PHONE: (760) 324-2952 FAX:. 1. PRODUCT: Maintenance Additional Products: 2. URETHANE: Aliphatic 3. TOTAL SQUARE FOOTAGE: 15,071 Total # of Pads: Pad #1 SF: Pad #2 SF: Pad #3 SF: Pad #4 SF: 4. TURNDOWN: No if YES, LF: 0.00 5. DEPTH OF SYSTEM: Various Pad #1 Depth: Pad #2 Depth: Pad #3 Depth: Pad #4 Depth: 8. SITE ACCESSIBILITY: 0-25'. No Stairs 9. SUB BASE TYPE: ??? 6. WEAR COURSE COLORS: 100% blue 10. DEMOLITION: N/A 11. EXCAVATION: No 12. SAWCUTTING: No 13. WASTE DISPOSAL: N/A 14. SECURITY: No 15. FALL HEIGHT/ATTENUATION TESTING: N/A 16. WAGE TYPE: Non-Prevailing 17. UNION CONTRACT: Pad #1 Color: Pad #2 Color: Pad #3 Color: Pad #4 Color: 18. BONDING REQUIRED: N/A Bond Type(s): 7. LAYOUT/DESIGN: N/A / N/A 19. WARRANTY: None PROJECT SCOPE NOTES: SEE NEXT PAGE FOR DETAILED NOTES Page 2 of 5 PROJECT SCOPE, continued PROPOSAL # 13-11921 PROJECT NAME: Carisbad - four park repairs PROJECT ADDRESS: Carisbad. CA 92008 PROJECT CONTACT: Rodney Nishirnoto EMAIL ADDRESS: Requested Install: PHONE: (760) 324-2952 FAX:. PROJECT SCOPE NOTES: PINE AVE PARK - Ig pad in 100% colors flowing thru plygrnd; seam sep. beginning; pad in ok shape overall, tho thin wear course in spots * 60 SF patches: make patch repairs on 100% blue (at swings, N of structure, S of structure, at spring riders) * approx. 5,000 SF of aliphatic roll coat to slow granulation & help w/ seam sep. HIDDEN CANYON PARK - 2plygrds needing patches, 1/2" Retop on one section, and roll coat; 100% colors flow thru plygrnd; great deal of wear w/ holes and thin wear course * 173 SF patches: make patch repairs both plygrnds mainly in 100% blue areas * 900 SF of 1/2" Retop in 100% blue aliphatic in section with many holes and thinnest wear course on large play pad * approx. 7,260 SF of aliphatic roll coat to slow granulation & help w/ thinning wear course AVIARA COMM PK - lg plygrnd w/ two large oval patches at swings and roll coat throughout; 100% colors flow thru playground * 108 SF patches: make patch repairs as 9'x6' wear pads under belt swings in 100% green * approx. 8,300 SF of aliphatic roll coat to slow granulation & prolong life of pad CADENCIA PK - Remove & Replace * Demo existing rubber & touch up subbase as needed * Furnish and Install 530 SF (410 SF + 80 LF of turn down) of New 3.5" TotTurf Aromatic with 50/50 std color/black mix with aromatic urethane * Good Access, Regular Wages (Carlsbad is charter city) EXCLUSIONS: temporary constr. fencing and 24-hour security TOTAL PRICE: $43,614.24 Customer Signature/Title: (Payor) Date: Upon full acceptance of all items contained herein, your TOTTURF SCHEDULING AND INSTALLATION CONTACT is: NAME: PHONE: EMAIL: FAX: Page 3 of 5 TERIVIS & CONDITIONS PROPOSAL # 13-11921 Robertson Industries, Inc. is an IPEMA (International Play Equipment Manufacturers Association) certified manufacturer. Our Products meet or exceed all ASTM F-1292 and ASTM F-1951 standards, as well as all CDC and ADA standards, as they apply to safety surfacing and playgrounds. Robertson Industries' installers have been drug-screened, background checked and E-Verified. Installers have successfully undergone safety and OSHA training. Records available upon request. See product specifications for specific detailed product and installation information. Product specifications are available from your Sales Contact. Material samples will be provided upon request. 1. Quote is based on the information provided here within and is subject to change based on final installation unless otherwise indicated in writing. Any changes or additions to this proposal will affect pricing. 2. in the event that a change in color, color percentage, thickness, or square footage is requested, a revised proposal and/or purchase order will be required before installation can begin. 3. Changes to the proposed scope not agreed to here within or separately in writing may result in additional charges (change order). Work cannot commence until the Change Order(s) are fully executed . 4. ANY additional site work not included here within, including sub base, is the responsibility ofthe owner. 5. Job site access must be at a maximum of 25' for trucks and mixer, with no stairs. Irrigation, sprinkler, and/or water systems must be shut off 24 hours before install and remain off until 24 hours after the installation has completed. 6. Additional charges for dov\/ntime/stand-by may be assessed, in the event that installation is delayed due to the site not being ready as scheduled or if installation is interrupted for reasons other than those related to weather or general public emergencies. 7. Security during install and upon completion is the responsibility ofthe owner, unless specified otherwise in Project Scope. 8. Any excess material at the job site upon completion is property of Robertson Industries, Inc., unless otherwise noted here within. 9. Installations scheduled after 90 days of proposal acceptance may be subject to price adjustments. 10. Scheduling and crew deployment is subject to local weather conditions. 11. Warranty wiii NOT be issued unless "Completion Sheet" is signed. 12. All projects over $2,500.00 will be issued a preliminary lien. Installation Exclusions, unless otherwise noted in Project Scope (page 3). Permits/Licensing Builders Risk Insurance/ Additionally Insured OCIP Waivers of Subrogation Bonding State or Federal (Davis Bacon) Wages Union Fees (PLA/PSA Contracts) Engineering Fall Height/Attenuation Testing Fencing/Security Excavation and Site Work/Preparation Demolition Drainage Waste/Dumpsters Rooftop Installations Extended Warranty Third-Party Playground Inspections INITIALS Page 4 of 5 PROPOSAL ACCEPTANCE PROPOSAL # )3-ri921 Robertson Industries, Inc. 4401 E. Baseline Rd., Suite 105, Phoenix, AZ 85042 j (800) 858-0519, FX: (602) 340-0402, www.totturf.com i ACCEPTANCE: I agree to the scope and details as provided for the abovementioned proposal as well as the terms outlined in this agreement. I am duly authorized by to approve and accept this proposal as stated. SIGNATURE: DATE: PRINTED NAME: TITLE: COMPANY NAME: BILLING CONTACT: ADDRESS: PHONEj FAX: EMAIL: n CONTRACT • PURCHASE ORDER • OTHER will follow this signed proposal. PAYMENT TERMS: Payment may be made via Check, Cash, or Credit Card. Contractors and private agencies requesting a line of credit must apply and be approved by Robertson Industries prior to proposal acceptance (credit applications may be obtained from your sales rep). A 50% deposit is required on private residence projects with the balance due upon completion. The company reserves the right to require a 50% deposit on any other project. Please attach a copy of your TAX EXEMPT CERTIFICATE if you or your company is claiming tax exemption. TOTAL PURCHASE AMOUNT: $43.614.24 CREDIT CARD INFORM A TION: Type: \~~\ Visa f] MasterCard Card#: Exp Date: Name (as it appears on card): Authorized Amount and Date for Charge: Signature: Date: Issue all PCs, Contracts, and payments to ROBERTSON INDUSTRIES. INC. Send ALL completed forms back to your TotTurf Sales Representative: David Purcell Fax:(858)274-3125 dpurcell(^totturf.com Page 5 of 5 r ' ^. - • f '"1 " TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 TotTurf® Aromatic PART 1 - General 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf® Aromatic poured in place playground surfacing shall consist of a polyurethane binder mixed with 100% recycled, shredded tire material which will make up the Cushion Layer. The Cushion Layer is capped with EPDM, TPV or Treated SBR rubber granules mixed with a polyurethane binder creating the Wear Course. TotTurf® surfaces comply with ADA and CPSC guidelines as well as ASTM Standards. TotTurf® is certified by IPEMA, a third party testing organization for playground surfaces and equipment. 1.02 PERFORMANCE REQUIREMENTS A. Area Safety: Poured in place within playground equipment use zones shall meet or exceed the performance requirements of the CPSC, ADA and Fall Height Test ASTM F 1292-09. The surface must yield both a peak deceleration of no more than 200 G-max and a Head Injury Criteria (HIC) value of no more than 1,000 for a head-first fall from the highest accessible portion of play equipment being installed as shown on drawings. IPEMA certification is required.{ASTM F1292 section 4.3.3: The laboratory test used to determine critical fall height shall have been conducted on surfacing material samples identical in design, materials, components, thickness and manufactured as the installed playground surface) B. Accessibility: NOTE: Children's outdoor play areas shall be in compliance with the Uniform Federal Accessibility Standards (UFAS) FED-STD-795 and the Architectural and Engineer Instructions (9AEI) Design Criteria. The requirements of the Americans with Disabilities Act Accessibility Guidelines (ADAAG) 28 CFR Part 36 that provide equal or greater accessibility than the requirements of UFAS must also be met in children's outdoor play areas. C. Poured in place surfaces intended to serve as accessible paths of travel for persons with ; disabilities shall be firm, stable and slip resistant, and shall meet the requirements of ASTM F 1951 - 08 and ASTM F 1292-09. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 1 ' ^^^^ .>]'' '' f. ;•' V i J - ,•— -v !::> £3 n y TotTurf® Aroinatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 D. APPLICABLE STANDARDS ASTM Intemational: • ASTM C1028 Standard Test Method for Determining ttie Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pull Meter Method - This standard replaces ASTM D2047 • ASTM D412 Standard Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers- Tension • ASTM D624 Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers • ASTM D2859 Standard Test Method for Flammability of Finished Textile Floor Covering Materials • ASTM E303 Standard Test Method for Measuring Surface Frictional Properties Using the British Pendulum Tester • ASTM F1292 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment • ASTM F1951 Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground Equipment E. Poured in place surfaces shall be manufactured and installed by trained, experienced company employees or certified installers who have successfully completed the "Certified Installers Training Program" required by TotTurf®. F. Submittals: The following shall be submitted: 1. One original hard copy of the submittal package will be provided. Additional hard copies available by request. All specifications/ details/ testing data can be obtained from your sales representative or found on the TotTurf® website www.totturf.com. 2. Products submitted as equal must include hard copies of manufactures written specifications and warranty. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 2 TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 3. Manufacturer's descriptive data and installation instructions. 4. Manufacturer's details showing depths of Wear Course and sub-base materials, anchoring systems and edge details. 5. Upon request, a listing of at least five installations where products similar to those proposed for use have been installed and have been in service for a minimum period of 3 years. This list shall include owner or purchaser, address of installation, date of installation, contact person, and phone number. 6. A signed statement by an authorized official certifying that the surfacing system meets the requirements of ASTM-F1292-09 for a head-first fall from the highest accessible portion of the specified playground equipment. 7. A signed statement from the manufacturer of the poured in place surfacing attesting that all materials under this section shall be installed only by the Manufacturer's Trained Installers. 8. A certificate of Insurance shall be provided by TotTurf® for poured in place surfacing for use as playground safety surfacing, covering general and product liability, of not less than $1,000,000 for each occurrence, $2,000,000 general aggregate, with an excess/ umbrella liability of $25,000,000. The issuing underwrite shall be AA rated. 9. Upon request, samples of the proposed material for this project. 10. IPEMA certification mandatory. G. Delivery, Storage and Handling: Materials and equipment shall be delivered and stored in accordance with the manufacturer's recommendations. H. Project Site Conditions: Poured in Place surfacing must be installed on a dry sub-surface, with no prospect of rain within the initial drying period, and within the recommended temperature range of the manufacturer. Installation in weather condition of extreme heat, cold (less than 55 degrees F), and/or high humidity may affect cure time, and the structural integrity of the final product. Immediate surrounding sites must be reasonably free of dust conditions or this could affect the final surface look. The manufacturer's Service Center Manager reserves the right to control the installation based on such factors without penalty to TotTurf®. I. Sequencing and Scheduling: Poured in place surfacing shall be installed after all playground equipment, shade structures, signs and any other items that will be within the surfacing area. Surface installation coordinated by a TotTurf® representative. J. Warranty: Poured in place surface shall maintain required impact attenuation characteristics and be guaranteed against defects in workmanship AND material for a limited five (5) year period or as specified and agreed upon per alternate contract. Warranty will be specific to maintenance requirements and performance standards of completed product. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 3 mSMtr ^^^^^^^^^ V y . » . ,1* / V \ ^^^^ ^^^P^ ^P^^^K TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 PART 2 - PRODUCTS Safety surfacing shall consist of synthetic materials meeting the requirements of this specification. The type of safety surfacing shall be TotTurf® Aromatic, manufactured and installed by TotTurf® a PLAYCORE company, Telephone: 800-858-0519. 2.01 Product Scope A. Poured in Place Surface: The poured in place surface shall consist of 100 percent recycled shredded tire material mixed with a polyurethane binder, then capped with either an EPDM, TPV or Treated SBR granule also mixed with a polyurethane binder. B. It shall consist of a uniform material manufactured in such a way that the top portion meets the requirements specified herein for wear surface. C. The type of safety surfacing shall be a poured-in-place system and shall be indicated on the drawings. 2.02 Cushion Layer Section A. Impact Attenuating Cushion Layer: Cushion Layer consists of shredded styrene butadiene rubber (SBR) adhered with a 100 percent solids polyurethane binder to form a resilient porous material. B. Strands of SBR may vary from 0.5 mm - 2.0 mm in thickness by 3.0 mm - 20 mm in length. Cushion material may have 10% SBR Ambient Crumb Rubber and a fiber content of .1% or less mixed in. C. Foam or standard rubber granules are not to be permitted in Cushion Layer D. Binder shall be between 8-12 percent of the total weight of the material, and shall provide 100 percent coating of the particles. E. The Cushion Layer shall be compatible with the Wear Course and must meet requirements herein for impact attenuation. 2.03 Wear Course Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 4 TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 A. The following are TotTurf® Custom Colors available: Cancun, Arizona Gold, Shenwood Forest, Blue Moon and California Dream'n. (See Totturf.com) B. Wear Course shall consists of Ethylene Propylene Diene Monomer(EPDM), Thermal Plastic Vulcanized (TPV) or Treated SBR (Styrene Butadiene Rubber) granules with polyurethane binder formulated to produce an even, uniform, seamless surface up to 2000 square feet. C. EPDM shall be peroxide cured with an EPDM content of 26 percent and shall include a Processing aid to prevent hardness with 26% poly content to maintain dynamic testing characteristics, weatherization and UV stability. D. ASTM D 2240 (Shore A) hardness of 55-65, not less than 26 percent rubber hydrocarbons. E. Size of EPDM granules shall be 2-4 mm across. Binder shall be not less than 20 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. F. TPV shall be angular granules with a (Shore A) hardness of 65 °A ±5 and particle size between 1 - 4mm. Binder shall be not less than 20 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. G. Size of Treated SBR Granules shall be 1 -3 mm across. Binder shall be not less than 20 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. H. Thickness of Wear Course shall be a minimum Vz inch (12.7 mm). I. The Wear Course shall be porous. 2.04 BINDER A. No Toluene Diphenel Isocyanate (TDI) shall be used. B. No filler materials shall be used in urethane such as plasticizers and the catalyzing agent shall contain no heavy metals. C. Weight of polyurethane shall be no less than 8.5 lbs/gal (1.02 Kg/1) and no more than 9.5 lbs/gal (1.14 Kg/1) Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 5 'i< (v. . />: • 0 ('"1 "1 ' /"""^ '< ' ^m- yJBBr ^^^m^ ^^^^ TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 D. Manufacturer is permitted to modify the type of urethane required to match extreme weather conditions. Substitutions must be equal to or exceed original quality. MATERIALS A. Wear Course - EPDM Granules: Manufacturer: RTH Processing, Inc. As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area B. Wear Course- TPV Granules: Manufacturer: Rosehill Polymers As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area C. Wear Course- TotTurf Treated SBR Granules: As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area D. Cushion Layer - TotTurf Shredded SBR As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area E. Binder - VORAMER MR Products Manufacturer: Dow Chemical As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area E. Binder- Stockmeier Products Manufacturer: Stockmeier Urethanes As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Are F. Binder- Aliphatic Manufacturer: Marchem Pacific, Inc. As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 6 TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 PART 3 - EXECUTION 3.01 SITE PREPARATION (OWNER OR OWNERS REPRESENTATIVE SHALL) A. Finished Grade/Slope: Verify that finished elevations of adjacent areas are as indicated on the architectural or site plans, that the appropriate sub-grade elevation has been established for the particular safety surface to be installed, and that the subsurface has been installed per architectural, site or equipment plans while meeting accessibility and use zones requirements. B. Sub base: Tolerance of concrete or bituminous sub base shall be within 1/8 inch (3.0 mm) in 10 feet (3050 mm). Tolerance of aggregate sub base shall be within 3/8 inch (10mm) in 10 ft (3050 mm). Verify that aggregate sub base has been fully compacted in 2" watered lifts to 95 percent or greater. C. Curing of Asphalt and Concrete: If poured in place surfacing is installed, verify that concrete Sub base has cured (All areas appear white in color usually between 3-7 days) and that all concrete curing compounds and other deleterious substances that might adversely affect adhesion have been removed. Surface shall be clean and dry. Asphalt cure time requires fourteen (14) days. Once the new asphalt has cured, it must be pressured washed prior to the surfacing being installed. The contractor shall be responsible for flooding the pad to insure proper slope and tolerance. Any areas holding enough water to cover a flat nickel shall be patched prior to arrival of our installation crews. D. Drainage: Verify that sub-surfacing drainage, if required, has been installed to provide positive drainage per architectural plans. 3.02 INSTALLATION A. Poured in Place Surfacing: Components of the poured in place surfacing shall be mixed on site in a rotating tumbler to ensure components are thoroughly mixed and are in accordance with manufactures recommendations. Installation of surfacing shall be seamless up to 2,000 square feet per day and completely bonded to concrete of sub base. Material shall cover all foundations and fill around all elements penetrating the surface. B. Cushion Layer: Whenever practical, cushion layer of surfacing material shall be installed in one continuous pour on the same day of up to 2,000 square feet. When a second pour is required, Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 7 3 I ^^^^^^^^^ "^B ^^^^s TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 step the seam (see detail) and fully coat the step of the previous work with polyurethane binder to ensure 100 percent bond with new work. Apply adhesive in small quantities so that new cushion layer can be placed before the adhesive dries. C. Wear Course: Wear Course must be either high quality peroxide cured EPDM, TPV or Treated SBR granules. Wear surface shall be bonded to Cushion Layer. If necessary, additional primer will be used between the cushion layer and Wear Course. Apply adhesive to Cushion Layer in small quantities allowing the Wear Course to be applied before adhesive dries. Surface shall be hand troweled to a smooth, even finish. Except where the Wear Course is composed of differing color patterns, pour shall be continuous and seamless up to 2,000 square feet per day. (Contact sales representative for seamless installations in excess of 2000 square feet) Where seams are required due to color change, size or adverse weather, a step configuration will be constructed to maintain Wear Course integrity. The edge of initial pour shall be coated with adhesive and wearing surface mixture shall be immediately applied. Pads with multiple seams are encouraged to include a top coat of urethane before being placed into use. Butt joint seams are not acceptable except for repairs. Under special conditions and with owners written approval seams may be permitted in same color pad. Consult with manufacturer for specific applications. D. Perimeter: For installations over existing concrete, the perimeter must be saw cut to provide a keyway 1" deep x 1" wide, or formed during the pour, with surfacing rolled down inside void. Primer adhesive must be applied to all sides of the void. When connecting to a concrete curb or boarder the inside vertical edge shall be primed with adhesive and the final 2" of the cushion layer shall be tapered to allow the wear surface material to be 1.5"- 2" thick where it joins the concrete edge. E. When installing over new or existing asphalt, a curb or other type of border must be installed around the entire pad. Primer adhesive must be applied to the inside vertical edge of the border before PIP surface installation. F. Thickness: Construction methods, such as the use of measured screeds or guides shall be employed to ensure that full depth of specified surfacing material is installed. Surfacing system thickness throughout the playground equipment use zone shall be as required to meet the impact attenuation requirements specified herein. G. Clean Up: Manufacturer's installers shall work to minimize excessive adhesive on adjacent surfaces or play equipment. Spills of excess adhesive shall be promptly cleaned. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 8 ^^^^^^^ ^^^^^^^^^^^^^^^^ TotTurf® Aromatic TotTurf® Aromatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company April 2011 H. Protection: The safety surface shall be allowed to fully cure in accordance with Manufacturer's instructions. The surface shall be protected bv the owner from all traffic during the curing period of 48 hours or as instructed bv the manufacturer. I. Manufacturer's Services: For poured in place safety surfacing, a manufacturer's representative who is experienced in the installation of playground safety surfacing shall be provided. The representative shall supervise the installation to ensure that the system meets the impact attenuation requirements as specified herein. All specifications/details/testing data can be found at: www.totturf.com Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 9 ^^^^ '^K^ » TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 TotTurf® Aliphatic PART 1 - General 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf® Aliphatic poured in place playground surfacing shall consist of a polyurethane binder mixed with 100% recycled, shredded tire material which will make up the Cushion Layer. The Cushion Layer is capped with EPDM, TPV or Treated SBR rubber granules mixed with a polyurethane binder creating the Wear Course. TotTurf® surfaces comply with ADA and CPSC guidelines as well as ASTM Standards. TotTurf® is certified by IPEMA, a third party testing organization for playground surfaces and equipment. 1.02 PERFORMANCE REQUIREMENTS A. Area Safety: Poured in place within playground equipment use zones shall meet or exceed the performance requirements of the CPSC, ADA and Fall Height Test ASTM F 1292-09. The surface must yield both a peak deceleration of no more than 200 G-max and a Head Injury Criteria (HIC) value of no more than 1,000 for a head-first fall from the highest accessible portion of play equipment being installed as shown on drawings. IPEMA certification is required.{ASTM F1292 section 4.3.3: The laboratory test used to determine critical fall height shall have been conducted on surfacing material samples identical in design, materials, components, thickness and manufactured as the installed playground surface) B. Accessibility: NOTE: Children's outdoor play areas shall be in compliance with the Uniform Federal Accessibility Standards (UFAS) FED-STD-795 and the Architectural and Engineer Instructions (9AEI) Design Criteria. The requirements of the Americans with Disabilities Act Accessibility Guidelines (ADAAG) 28 CFR Part 36 that provide equal or greater accessibility than the requirements of UFAS must also be met in children's outdoor play areas. C. Poured in place surfaces intended to serve as accessible paths of travel for persons with disabilities shall be firm, stable and slip resistant, and shall meet the requirements of ASTM F 1951-08 and ASTM F 1292-09. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 1 .V om |3s ny TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 D. APPLICABLE STANDARDS ASTM Intemational: • ASTM C1028 Standard Test Method for Determining the Static Coefficient of Friction of Ceramic Tile and Other Like Surfaces by the Horizontal Dynamometer Pull Meter Method - This standard replaces ASTM D2047 • ASTM D412 Standard Test Methods for Vulcanized Rubber and Thermoplastic Rubbers and Thermoplastic Elastomers- Tension • ASTM D624 Standard Test Method for Tear Strength of Conventional Vulcanized Rubber and Thermoplastic Elastomers • ASTM D2859 Standard Test Method for Flammability of Finished Textile Floor Covering Materials • ASTM E303 Standard Test Method for Measuring Surface Frictional Properties Using the British Pendulum Tester • ASTM F1292 Standard Specification for Impact Attenuation of Surface Systems Under and Around Playground Equipment • ASTM F1951 Standard Specification for Determination of Accessibility of Surface Systems Under and Around Playground Equipment E. Poured in place surfaces shall be manufactured and installed by trained, experienced company employees or certified installers who have successfully completed the "Certified Installers Training Program" required by TotTurf®. F. Submittals: The following shall be submitted: 1. One original hard copy of the submittal package will be provided. Additional hard copies available by request. All specifications/ details/ testing data can be obtained from your sales representative or found on the TotTurf® website www.totturf.com. 2. Products submitted as equal must include hard copies of manufactures written specifications and warranty. Safely Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 2 7^ TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 3. Manufacturer's descriptive data and installation instructions. 4. Manufacturer's details showing depths of Wear Course and sub-base materials, anchoring systems and edge details. 5. Upon request, a listing of at least five installations where products similar to those proposed for use have been installed and have been in service for a minimum period of 3 years. This list shall include owner or purchaser, address of installation, date of installation, contact person, and phone number. 6. A signed statement by an authorized official certifying that the surfacing system meets the requirements of ASTM-F1292-09 for a head-first fall from the highest accessible portion of the specified playground equipment. 7. A signed statement from the manufacturer of the poured in place surfacing attesting that all materials under this section shall be installed only by the Manufacturer's Trained Installers. 8. A certificate of Insurance shall be provided by TotTurf® for poured in place surfacing for use as playground safety surfacing, covering general and product liability, of not less than $1,000,000 for each occurrence, $2,000,000 general aggregate, with an excess/ umbrella liability of $25,000,000. The issuing underwrite shall be AA rated. 9. Upon request, samples of the proposed material for this project. 10. IPEMA certification mandatory. G. Delivery, Storage and Handling: Materials and equipment shall be delivered and stored in accordance with the manufacturer's recommendations. H. Project Site Conditions: Poured in Place surfacing must be installed on a dry sub-surface, with no prospect of rain within the initial drying period, and within the recommended temperature range of the manufacturer. Installation in weather condition of extreme heat, cold (less than 55 degrees F), and/or high humidity may affect cure time, and the structural integrity of the final product. Immediate surrounding sites must be reasonably free of dust conditions or this could affect the final surface look. The manufacturer's Service Center Manager reserves the right to control the installation based on such factors without penalty to TotTurf®. I. Sequencing and Scheduling: Poured in place surfacing shall be installed after all playground equipment, shade structures, signs and any other items that will be within the surfacing area. Surface installation coordinated by a TotTurf® representative. J. Warranty: Poured in place surface shall maintain required impact attenuation characteristics and be guaranteed against defects in workmanship AND material for a limited five (5) year period or as specified and agreed upon per alternate contract. Warranty will be specific to maintenance requirements and performance standards of completed product. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 3 "V <Z:o m |=>a r-iy TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 PART 2 - PRODUCTS Safety surfacing shall consist of both recycled and synthetic materials meeting the requirements of this specification. The type of safety surfacing shall be TotTurf® Supreme, manufactured and installed by TotTurf®, or it's Certified Installers. Telephone: 800-858-0519. Contact: 2.01 Product Scope A. Poured in Place Surface: The poured in place surface shall consist of 100 percent recycled shredded tire material mixed with a polyurethane binder, then capped with either an EPDM, TPV or Treated SBR granule mixed with a aliphatic binder. B. It shall consist of a uniform material manufactured in such a way that the top portion meets the requirements specified herein for wear surface. C. The type of safety surfacing shall be a poured-in-place system and shall be indicated on the drawings. 2.02 Cushion Layer Section A. Impact Attenuating Cushion Layer: Cushion Layer consists of recycled styrene butadiene rubber (SBR) adhered with a 100 percent solids polyurethane binder to form a resilient porous material. B. Strands of SBR may vary from 0.5 mm - 2.0 mm in thickness by 3.0 mm - 20 mm in length. Cushion material will have at least 10% SBR Ambient Crumb Rubber (5-9 Mesh) using sieve analysis ASTM D 5644 and a Fiber Content of .1% or less mixed in. C. Foam or standard rubber granules are not to be permitted in Cushion Layer D. Binder shall be between 10-14 percent of the total weight of the material, and shall provide 100 . percent coating of the particles. E. The Cushion Layer shall be compatible with the Wear Course and must meet requirements herein for impact attenuation. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 4 I ^^^^^^ ^^^^^^ •C::OF^E[=" <= omioany TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 2.03 Wear Course A. The following are TotTurf® Custom Colors available: Cancun, Arizona Gold, Sherwood Forest, Blue Moon and California Dream'n. (See Totturf.com) B. Wear Course shall consists of Ethylene Propylene Diene Monomer(EPDM), Thermal Plastic Vulcanized (TPV) or Treated SBR (Styrene Butadiene Rubber) granules with polyurethane binder formulated to produce an even, uniform, seamless surface up to 2000 square feet. (Contact sales representative for seamless pads over 2000 square feet) C. EPDM shall be peroxide cured with an EPDM content of 26 percent and shall include a Processing aid to prevent hardness with 26% poly content to maintain dynamic testing characteristics, weatherization and UV stability. D. ASTM D 2240 (Shore A) hardness of 55-65, not less than 26 percent rubber hydrocarbons. E. Size of EPDM granules shall be 2-4 mm across. Binder shall be not less than 18 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. F. TPV shall be angular granules with a (Shore A) hardness of 65°A ±5 and particle size between 1 - 4mm. Binder shall be not less than 20 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. G. Size of Treated SBR Granules shall be between 1 -4 mm across. Binder shall be not less than 18 percent of total weight of rubber used in the wear surface, and shall provide 100 percent coating of the particles. H. Thickness of Wear Course shall be a minimum V2 inch (12.7 mm). I. The Wear Course shall be porous. 2.04 BINDER A. No Toluene Diphenel Isocyanate (TDI) shall be used. B. No filler materials shall be used in urethane such as plasticizers and the catalyzing agent shall contain no heavy metals. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 5 -•--•'i i?- Vl.-—:i ., • >^ "... ^^^^^^ "^K^ ^^^-w^^w A f=>L;;C.-^^ C::<I>F^li=* C:orT-i|=.at-iy TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 C. Weight of polyurethane shall be no less than 8.5 lbs/gal (1.02 Kg/1) and no more than 9.5 lbs/gal (1.14 Kg/1) D. Manufacturer is permitted to modify the type of urethane required to match extreme weather conditions. Substitutions must be equal to or exceed original quality. MATERIALS A. Wear Course - EPDM Granules: Manufacturer: RTH Processing, Inc. As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area B. Wear Course- TPV Granules: Manufacturer: Rosehill Polymers As distributed by:^ TotTurf® - (800) 858-0519 Location Used: Playground Area 0. Wear Course- TotTurf Treated SBR Granules: As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area D. Cushion Layer - TotTurf Shredded SBR As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area E. Binder - VORAMER MR Products Manufacturer: Dow Chemical As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area E. Binder- Stockmeier Products Manufacturer: Stockmeier Urethanes As distributed by: TotTurf® - (800) 858-0519 Location Used: Playground Area Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 6 v.. o m r-iy TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 F. Binder- Aliphatic Manufacturer: Marchem Pacific, Inc. As distnbuted by: TotTurf® - (800) 858-0519 Location Used: Playground Area PART 3 - EXECUTION 3.01 SITE PREPARATION (OWNER OR OWNERS REPRESENTATIVE SHALL) A. Finished Grade/Slope: Verify that finished elevations of adjacent areas are as indicated on the architectural or site plans, that the appropriate sub-grade elevation has been established for the particular safety surface to be installed, and that the subsurface has been installed per architectural, site or equipment plans while meeting accessibility and use zones requirements. B. Sub base: Tolerance of concrete or bituminous sub base shall be within 1/8 inch (3.0 mm) in 10 feet (3050 mm). Tolerance of aggregate sub base shall be within 3/8 inch (10mm) in 10 ft (3050 mm). Verify that aggregate sub base has been fully compacted in 2" watered lifts to 95 percent or greater. C. Curing of Asphalt and Concrete: If poured in place surfacing is installed, verify that concrete Sub base has cured (All areas appear white in color usually between 3-7 days. May be shorter in some areas) and that all concrete curing compounds and other deleterious substances that might adversely affect adhesion have been removed. Surface shall be clean and dry. Asphalt cure time requires fourteen (14) days. Once the new asphalt has cured, it must be pressured washed prior to the surfacing being installed. The contractor shall be responsible for flooding the pad to insure proper slope and tolerance. Any areas holding enough water to cover a flat nickel shall be patched prior to arrival of our installation crews. D. Drainage: Verify that sub-surfacing drainage, if required, has been installed to provide positive drainage per architectural plans. 3.02 INSTALLATION A. Poured in Place Surfacing: Components of the poured in place surfacing shall be mixed on site in a rotating tumbler to ensure components are thoroughly mixed and are in accordance with manufactures recommendations. Installation of surfacing shall be seamless up to 2,000 square Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 7 TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 feerper day and completely bonded to concrete of sub base. Material shall cover all foundations and fill around all elements penetrating the surface. B. Cushion Layer: Whenever practical, cushion layer of surfacing material shall be installed in one continuous pour on the same day of up to 2,000 square feet. When a second pour is required, step the seam (see detail) and fully coat the step of the previous work with polyurethane binder to ensure 100 percent bond with new work. Apply adhesive in small quantities so that new cushion layer can be placed before the adhesive dries. C. Wear Course: Wear Course must be either high quality peroxide cured EPDM, TPV or Treated SBR granules. Wear surface shall be bonded to Cushion Layer. If necessary, additional primer will be used between the cushion layer and Wear Course. Apply adhesive to Cushion Layer in small quantities allowing the Wear Course to be applied before adhesive dries. Surface shall be hand troweled to a smooth, even finish. Except where the Wear Course is composed of differing color patterns, pour shall be continuous and seamless up to 2,000 square feet per day. (Contact sales representative for seamless installations in excess of 2000 square feet) Where seams are required due to color change, size or adverse weather, a step configuration will be constructed to maintain Wear Course integrity. The edge of initial pour shall be coated with adhesive and wearing surface mixture shall be immediately applied. Pads with multiple seams are encouraged to include a top coat of urethane before being placed into use. Butt joint seams are not acceptable except for repairs. Under special conditions and with owners written approval seams may be permitted in same color pad. Consult with manufacturer for specific applications. D. Perimeter: For installations over existing concrete, the perimeter must be saw cut to provide a keyway 1" deep x 1" wide, or formed during the pour, with surfacing rolled down inside void. Primer adhesive must be applied to all sides of the void. When connecting to a concrete curb or boarder the inside vertical edge shall be primed with adhesive and the final 2" of the cushion layer shall be tapered to allow the wear surface material to be 1.5"- 2" thick where it joins the concrete edge. E. When installing over new or existing asphalt, a curb or other type of border must be installed around the entire pad. Primer adhesive must be applied to the inside vertical edge of the border before PIP surface installation. F. Thickness: Construction methods, such as the use of measured screeds or guides shall be employed to ensure that full depth of specified surfacing material is installed. Surfacing system thickness throughout the playground equipment use zone shall be as required to meet the impact attenuation requirements specified herein. Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 8 zi' > do m iz>^» ny TotTurf® Aliphatic TotTurf® Aliphatic Poured in Place Product Specifications TOTTURF® a PLAYCORE company July 2011 G. Clean Up: Manufacturer's installers shall work to minimize excessive adhesive on adjacent surfaces or play equipment. Spills of excess adhesive shall be promptly cleaned. H. Protection: The safety surface shall be allowed to fully cure in accordance with Manufacturer's instructions. The surface shall be protected bv the owner from all traffic during the curing period of 48 hours or as instructed bv the manufacturer. I. Manufacturer's Services: For poured in place safety surfacing, a manufacturer's representative who is experienced in the installation of playground safety surfacing shall be provided. The representative shall supervise the installation to ensure that the system meets the impact attenuation requirements as specified herein. All specifications/details/testing data can be found at: www.totturf.com Safety Surfacing For Playgrounds TotTurf® a PLAYCORE company Copyright © 2011, TotTurf® a PLAYCORE company. All rights reserved. All information contained within subject to change without notice. 9