Loading...
HomeMy WebLinkAboutSan Diego, County of; 1944-12-11; (13)SAN DIEGO COUNTY SAN OIEGO, CALIFORNIA ENCROACHMENT APPLICATION AND PERMIT TO THE COUNTY ROAD COMMISSIONER SAN DIEGO COUNTY, CALIFORNIA GENTLEMEN; THE UNDERslG^^:o HEREBY APPLIES FOR PERMISSION fo ENTER UPON, EXCAVATE AND OR OTHERWISE ENCROACH UPON THE RIGHT QF WAY OF THE FOLLOWING DESCRIBED COUNTV ROAO: Pine Avenue between First Street and Third Street, in Carlsbad, Callfbrhia, To PERFORM THE FOLLOWING WORK. (DESCRIBE FULLV WORK TO BE DONE) Install 600 feet of 6 inch 1© ga. electric weld steel pipe on Pine Avenue. AND AS SHOWN ON SKETCH ATTACHED; (SHOW DISTANCE FROM CENTER LINE OF STREET To WORK TO BE DONE) CARLSBAD MUTUAL VATHR COLIFAMY (signed By S. D. Fraaer SIGNATURE OF APPLICANT Asst. 3ec 'y. Ca I'l g PAd, Cal if ornla. ADDRESS REMARKS AND RECOMMENDATIONS BY COUNTY ROAD COMMISSIONER WE WOULD RECOMMEND THAT PERMISSION BE GRANTED UNDER THE FOLLOWING PROVISIONS: THIS PERMIT SHALL BE KEPT AT THE SITE OF THE WORK AND MUST BE SHOWN TO ANY AUTHORIZED REPRESENTATIVE OF SAN DIEGO COUNTY. ADEQUATE PROVISIONS SHALL BE MAINTAINED TO PROTECT THE TRAVELING PUBLIC BAR- RICADES, RED LIGHTS AND WARNING SIGNS SHALL BE MAINTAINED, TOGETHER WITM FLAG- MEN WHERE NECESSARY. ALL APPROACHES TO PRIVATE DRIVEWAYS ANO INTERSECTING STREETS SHALL BE KEPT OPEN TO TRAFFIC AT ALL TIMES. ALL EXCAVATED MATERIAL SHALL BE CAST AWAY FROM THE IMPROVED PORTION OF THE HIGH- WAY ANO ALL EXCESS MATERIAL INCLUDING EXCESS EXCAVATION SMALL BE REMOVED FROM THE RIGHT OF WAY ANO THE ROAO WAY LEFT IN A NEAT ANO ORDERLY CONDITION. ALL ROAOSIDE'ORAINAGE DITCHES SHALL BE RESTORED TO A TRUE GRADE *ND THE INTAKE AND OUTLET ENDS OF ALL CULVERTS SHALL BE LEFT FREE FROM ALL EXCESS MATERIAL. CLAY AND EARTH WHICH ADHERES TO THE PAVED SURFACE OF THE ROADWAY SHALL BE RE- MOVED BY HAND SCRAPING, WASHING, AND SWEEPING, OR BY ANY OTHER METHOD THAT WILL NOT DESTROY OR LOOSEN THE SURFACE, BUT WILL LEAVE A CLEAN NON-SKID SURFACE. ALL TRENCH EXCAVATIONS SHALL BE KEPT AT LEAST 5 ''EET FROM THE EDGE OF THE IM- PROVED ROADWAY OR PAVEMENT AND ALL PIPES OR CONDUITS SHALL HAVE A MINIMUM COVER ING OF TWO (2) FEET TO TME TOP OF TME PIPE. TRENCHING FOR INSTALLATION ACROSS ANY INTERSECTING ROADWAY OPEN TO TRAFFIC SMALL BE PROGRESSIVE, NOT MORE THAN I/2 WIDTH OF TRAVELED WAY TO BE DISTURBED AT ONE TIME, THE REMAINING WIDTH SHALL BE K^PT OPEN TO TRAFFIC BY BRIDGING OR BACKFILL- ING. IN BACKFILLING, FLOODING THE TRENCH WILL NOT BE ALLOWED WITHIN THE UPPER TWENTY-FOUR (2^+) INCHES- ALL LOOSE BACKFILL SHALL BE DAMPENED ANO TAMPED WITH A PNEUMATIC TAMPER TO REDUCE ALL SETTLEMENT TO A MINIMUM. SHORING WILL BE REQUIRED WHERE NECESSARY. IT IS EXPRESSLY UNDERSTOOD IN THE GRANTING OF THIS PERMIT THAT IN CASE OF RE- CON STRVUCVTJ;)N OR MAINTENANCE OF THE ROAD BY THE COUNTV, AND IT BECOMES NECES- SARY TO LOWER OP REMOVE THE INSTALLATION THAT, UPON REQUEST OF THE (JOUNTY ROAD COMMISSIONER, THE SAME SHALL BE LOWERED, MOVED, OR REMOVED AT THE EXPENSE OF THe pr-KMITTEE. IR ANY HARD SURFACING OR OILED SURFACING HAS BEEN REMOVED, DAMAGED, OR DESTROYED BY THE INSTALLATION PROVIDED HEREIN, THE SAME SHALL BE REPLACED AT THE EXPENSE CF THE PERMITTEE AND AS HEREINFATER SPECIFIED. IF THE GRANTOR SMALL SO ELECT, REPAIRS TO THE PAVING WHICH HAS BEEN DISTURBED SHALL BE MADE BY THE EMPLOYEES OF THE GRANTOR, AND TME EXPENSE THEREFOR SMALL BE BORNE BY THE PERMITTEE, WHO SHALL PURCHASE AND DELIVER ON THE ROAD ALL MATERIAL NECESSARY FOR SAIO WORK AS SPECIFIED BY THE ROAD COMMISSIONER. ALL PAYMENTS FOR LABOR, EQUIPMENT, ETC.EMPLOYED BY THE LARANTOR FOR OR ON ACCOUNT OF THE WORK REQUIRED SHALL BE MADE BY SAIO PERMITTEE FORTHWITH ON RECEIPT OF WRITTEN ORDERS, PAYROLLS, OR VOUCHERS APPROVED BY TWE GRANTOR. THE GRANTOR WILL GIVE REASONABLE NOTICE OF ITS ELECTION TO MAKE SUCH REPAIRS. IF THE GRANTOR DOES NOT SO ELECT, THE GRANTEE SHALL MAKE SUCH REPAIRS PROMPTLY, EXCEPT WHERE THE GRANTOR ELECTS TO MAKE REPAIRS TO PAVING AS ABOVE PROVIDED IN THIS PARAGRAPH AND EXCEPT WHERE PROVISION TO THE CONTRARY IS MADE BV SPEC- IAL WRITTEN AGREEMENT. THE PERMITTEE SHALL INDEMNIFY ANO SAVE THE CoUNTY OP SAN DlEGO HARMLESS FROM ANY DAMAGE, COST OR EXPENSE OR CLAIM FOP DAMAGE, COST OR EXPENSE ARISING EITHER DIRECTLY, INDIRECTLY, OR CONSEQUENTIALLY FROM THE INSTALLATION ABOVE REQUESTED. THIS PERMIT IS ONLY GRANTED AS TO ANY PORTION OF SAID STREETS OVER WHICH THE COUNTY OF SAN DIEGO MAS JURISDICTION, AND ALL WORK SMALL BE DONE TO THE COM- PLETE SATISFACTION OF THE COUNTY ROAD COMMISSIONER. COUNTY ROAO COMMISSIONER B. P. MOORE, ASSISTANT COUNTY SURVEYOR PERMISSION TO DO THE ABO^'E WORK GRANTED BY RESOLUTION OF THE BOARD OF SUPER- VISORS peoeaber 11 .19 44 CONDITIONS HSiEINABOTE STATED , „ , ^ AW ACG^T^+T^ LEES, COUNT^ CLERK AND EX OFFICIO CLERK OF THE BOARD ;^SU^RVISORS -2-