Loading...
HomeMy WebLinkAboutSan Diego, County of; 1962-11-07;1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 AGREEMENT THIS AGREEMENT made and entered into this 7th day of November, 196: by and between CARLSBAD MUNICIPAL WATER DISTRICT, a municipal water district organized under the Municipal Water District Act of 1911 of State of California, as amended, hereinafter referred to as "District", and COUNTY OF SAN DIEGO, State of California, hereinafter referred to as "County". WITNESSETH WHEREAS, County has constructed a certain water pipeline extension for the use and delivery of water within the boundaries of District; and WHEREAS, County has requested that District accept ownership of said water pipeline and County has complied or hereby agrees to comply with all conditions required by said District; and WHEREAS, the Board of Directors of the District has approved the con- struction of said water pipeline and the District Engineer's recommendations, and has determined that said pipeline will constitute a portion of the Districts primary or basic distribution system; and WHEREAS the parties hereto desire to enter into an agreement for re- imbursement to County for cost of said pipeline or a portion thereof, as provided by the ordinances, rules and regulations of the District. NOW THEREFORE, it is agreed between the parties hereto as follows: 1. The said pipeline and all improvements and appurtenances connected therewith, hereinafter called "pipeline", are described in detail on the plans and specifications for said pipeline on file with the District and entitled "Palomar Airport Water Pipeline", said plans and specifications incorporated herein by reference. 2. The ownership of said pipeline and all improvements and appurten- ances connected therewith is hereby vested in the District. 3. County states that all the costs connected with the installation of said pipeline are fully paid and County hereby agrees to hold District free and harm- less from any claims, demands, or costs arising out of or in connection with the construction of said pipeline. w 1 4. County states that it has supplied to the District or herein agrees to 2 supply to the District the following: 3 1. Three copies of the "as built" drawings of the said pipeline endorsed by a registered civil engineer of the State of California. 4 2. Three copies of the legal description of the center line of said 5 pipeline as constructed. 5 3. Valid easements for pipeline purposes in favor of the District over and across the land that said pipeline is constructed. 7 4. Certified copies of action takem by ihe Board of Supervisors of 8 County of San Diego authorizing the execution of this agreement and granting of necessary easements required by this agreement. 9 5. In consideration of the acceptance of the pipeline by the District and 10 the agreement of the District to reimburse the County for costs of the pipeline 11 as hereinafter set forth County agrees to do the following: 12 1. County shall remove the existing meter on the pipeline located 13 at El Camino Real and replace with a suitable section of pipe. The removed meter shall be the property of the County. 14 2. County agrees to install, at County expense, on the pipeline a 15 standard blow-off (according to specifications of the District) approximately 1100 feet west of El Camino Real. 16 3. County agrees to install a one-inch meter at the end of the pipe- 17 line to service the Airport Building. 18 4. County agrees to maintain the existing fire hydrant on the pipeline and to pay an annual service charge of $50. 00 to the District for 19 any water which may be used from said fire hydrant. 20 6. District hereby agrees to pay to County fifty per cent (50%) of the ac- 21 tual water consumption charges received by the District from the sale and 22 delivery of water through said pipeline, between the end of this particular pipe- 23 line installation, as shown in the plans and specifications thereof and on file in 24 the office of the District and the connection of said line with the District's main 25 transmission line, subject to the following terms and conditions: 26 a- The sum to be paid to the County in any one year shall not exceed twenty per cent (20%) of the total amount to be reimbursed under 27 this agreement. 28 b. The District shall continue to make said payments to the County, for a period of ten (10) years from/completion of the installation 29 of the pipelin^or until the actual aniount to be reimbursed under #*\^L._ this agreement has been paid, whichever event occurs first. *§ 30 c. There shall be no obligation on the part of the District to pay any 31 sum of money to the County except from the sale of water sold and delivered through meters connected to the line as hereinbefore 32 described. BEST ORIGINAL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 d. No interest on any sum or any other charge shall be payable by the District. Said payments shall be made by the District annually on July 20th of each year until termination of the obligation of the District to pay as hereinbefore set forth; except that the first payment covering the period from the completion of the installation of the pipeline to the first day of the month in which this contract is executed shall be paid by the District upon execution of the agreement and submission and acceptance by the District of all the items required to be suppliec or performed by the County as hereinbefore set forth. 7. The agreed amount to be reimbursed to the County in accordance with the terms and conditions of this agreement and the ordinances, rules and regula- tions of the District is the sum of Twelve Thousand One Hundred Sixty Six and no/100 Dollars ($12, 166. 00). IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the day and year first above written. CARLSBAD MUNICIPAL WATER DE3TRIC ALLAN O. KEtyLY President of the Carlsbad Municipal Water District and of the Board of Directors thereof. ATTEST: RICHARD R. COE Secretary of Carlsbad Municipal Water District and of the Board of Directors thereof. COUNTY OF SAN DIEGO By ATTEST: Clerk of the Board of Supervisors of County of San Diego -3-