HomeMy WebLinkAboutTanner, Marquardt, Melvin & Associates; 1966-06-08;STIPULATION, RELEASE AND DISMISSAL
This Agreement, entered into this ) Slif day of J0/VAT: 1966by
TANNER, MARQUARDT, MELVIN & ASSOCIATES, a California corporation and
ROBERT E. MELVIN, hereinafter referred to as plaintiffs, and the CITY OF
CARLSBAD, a Municipal Corporation, hereinafter referred to as defendant.
WHEREAS, the parties hereto are plaintiffs and defendant, respectively,
in an action in the Superior Court of the State of California, No. 290324, and
WHEREAS, the parties thereto desire to settle their differences and to
dismiss said action,
NOW, THEREFORE, it is agreed as follows:
1. The City of Carlsbad agrees to pay to Tanner, Marquardt, Melvin &
Associates, a California corporation, the sum of $17, 719.00 in full satisfaction
of any and all claims arising out of any agreement or agreements for the
Carlsbad Library construction, specifically including the agreement dated
August 7, 1962, and between the City of Carlsbad and Robert E. Melvin, A.I.A.,
and Associates.
2. Robert E. Melvin hereby specifically releases and admits full
satisfaction of any and all obligation due him from the City of Carlsbad under
the aforesaid contract and for work performed under said contract on the
library job prior to the date of this release agreement, except for work
involved in re -siting the building. It is further agreed by Robert E. Melvin
that work involved in re -siting the building or that any further work performed
on the library job shall be performed pursuant to a new contract by and between
Robert E. Melvin, A.I.A., and the City of Carlsbad.
3. The City of Carlsbad agrees to release Tanner, Marquardt, Melvin &
Associates, a California corporation, from any and all obligations which they
may have pursuant to the aforesaid contract and hereby releases Tanner,
Marquardt, Melvin & Associates, a California corporation, from any and all
further obligations whatsoever in the construction, planning, engineering or
work on the Carlsbad library job.
-1-
4. The parties hereto agree that the payment of the aforesaid
sum by the City of Carlsbad releases all of the parties inter se,
from any obligation, duty or liability known or unknown, in respect
to that certain Carlsbad library project.
5. Attached hereto and made a part hereof and duly executed by
the plaintiffs in the aforesaid action, is a Dismissal with Prejudice
as to action No. 290324 in the Superior Court of the State of California.
6. The City of Carlsbad, for purposes of this settlement agree-
ment and for the sole purpose of providing consideration for this
settlement agreement, hereby ratifies that certain contract entered into
by and between Robert E. Melvin, A.I.A., & Associates, and the City
of Carlsbad, State of California, on August 7, 1962, and executed by
John D. Slater, City Manager, and the signature of the Mayor of the
City of Carlsbad on this settlement release agreement shall be con-
strued as such ratification.
Dated: 121E 4g) A
IZSLA-Ir
Robert E. Melvin
TANNER, MARQUARDT, MELVIN & ASSOCIATES
By 4)( l �
CITY OF CARLSBAD
BY CV(/ .i
Mayor
September 15, 1966
City of Carlsbad
Carlsbad, California
For professional services rendered in changing plans for the Carlsbad
City Library to re -site the building to the corner of Elm and Elmwood.
Robert E. Melvin
Stanley Ring
Dan Switzer
Paul Thoryk
Leeds -Hill Assoc.
Al Murray & Assoc.
Whitman Atkinson & Assoc.
'Z..i-- E.. ..�..
Robert E. Melvin
471 Carolina Road
Del Mar, California
42.5 hrs.
44.5 hrs.
6.5 hrs.
19.0 hrs.
34.0 hrs.
-113.5 hrs.
15.0 hrs.
275.0 hrs. at $22.50/hr. = $6, 187.50
+ printing 326.68
Total Charges $6,514.18
Less Received on Account -1, 500.00
Balance Due 15,014.18
"RANGE ORDER WY--
,
r
;.'! obert' E Melvin,
,12Z',JAv'enida de la Playa
F''A`1.1, t-1,,. Cal=fern ier 92037
' Dear;Mr. Melvin;
•
November 21, 1=, , i
My' '
V
1':The initiation of this. change order, 1s by: the _City of' Carl shad 1
4 Buili'd.ing 'Inspector, Clerk of•,,the •Work,s., • Some•,o,f the items'•ha4e been
I 'accomplished and.,are, comp•1•e'tec';,'• Thi-s was to' .expe`dite•the completion, ' •
of -the L••br.-ary arid t,hey•would'have, been required; by the 'Unifurm Build-.
e
•ing• Code for other requirements.. .
--� --- "r�l'T""1t•r•e o- `��'f. t brit i;'e• �'ITif `rt r� fi "e";'l alpe:r,,g7 s= eT3 _ > ...�___
• :• griders ard tilt :U,fi ni l i,,te i 1•i rr i n the ;chi ldrenl s. read -
•1,ig room. (gee attached'•-s;ta•te,r,ent), •,.'> a 2, 86.83
Instal 1 3,e1ectri. 1inhf .ni.tlet- anrt „ ., ♦le i j
inn the f ltur,e storage room:' �L °f~;rar'y =i3oa•rd''req;:?:st;..th'is-be I
ar{City i=tem:�)', ;r '''' K, •4„
Irn•s.(t(,,ya l l : the ;Time clocks on, ;e arate';power ;c�i'r�cui ts., nor, on
'! ti,g i 1, C i r c.0 1 ••t.'S . 's�•7 ,'� % ./ .. <,.y ..••v i• '••,y ^ii'C ,„^y. , -
:;Tn,stal•11-wir•iing.t)o com•press,or•^,unit•�u;sed.•i,n air •conditi.oninq
tit -stem• . 1 .,,
- .
'I•ns -tal l check valve (ba+ k f,•low• de'vi'ce) •-ahead• o
' cpnden,ser unit,.
pump:. at
locate elect 1 Pam;fl'o,o uo•der:``ser.:v'ice count r
at"Hes,t'en•try
itstall-• `conveniencje ou,t•,1
•reciard.•room. •
•
Cever plastic' condenser, `line
lr'es,awn and painted,
'(C'ohstruction planters in uarki•n9 lot •t,o-..correspond.,to, angle,
'parking, as per submitted rplan: Power pole', to.undergr/+And.
•
edlete; -one type desk, and cred.i t $ , 1'20 00, as per `1•e;t ter
.184} from .Lusardi C'onstructi
%-s.tail l,•1,ouvered• screeds: behind, the'' ai.r ve.,nts';.gri 11 • wohk.
or•`:Eas.t 'and West mechan:i•ca 1 '•r, ooms .' •
er, r
n South" side, of building,
y 'r
es...prtfu.1; su!49mi; ted,
'TCHARD S;' OSBURN
r1nr1. gfthA 1.It•;i.'4��•e
r
d
•
t. di Con;.. tru'.' ic1:1 :Company___, • � -
.
*.�•�`, = Tru• t eet
t k MA ILI f!•t•
57.50 •
r,
;1.0,0
Total: ',$4,465:41
T'