City of Carlsbad
Carlsbad Recycling Facility
h4F EQUIF'MENT PROCUREMENT
SECTION 11306
MEMCOR CMFS SYSTEM
PART 1 - GENERAL
1.01 DESCRIPTION
A. Description of Work
1. This Detailed Specification Section covers the submerged continuous membrane
filtration (CMFS) equipment as supplied by US. FilterlMemcor.
2. The MF system shall consist of two (2) CMFS units (independent cells mounted
on a common skid), compressed air system, membrane cleaning (CIP) system,
backwash system, piping, valves, controls and instrumentation.
B. Coordination
1. The MFEM shall fumish the majority of equipment items associated with the MF
system and shall participate in the commissioning, startup, testing, and training of
District's personnel in operation of the MF system as a whole.
2. The Installation Contractor will unpack, assemble, and install equipment items
furnished by the MFEM as shown on the Drawings and as specified herein. In
addition, the Installation. Contractor will also furnish and install additional
equipment items, interconnecting piping, valves, instruments, power and control
wiring, and other appurtenances not furnished by the MFEM.
3. The Installation Contractor in association with the MFEM will be responsible for
acceptance testing of individual items of equipment as defined in the individual
equipment specifications. The Installation Contractor will also participate in the
startup of the MF system as described in Section 01670.
PART 2 - PRODUCTS
2.01 PROCESS SYSTEM DESIGN AND PERFORMANCE
A. Service Conditions
1. See Section 11300 for requirements.
B. Process Design Requirements
1. See Section 11300 for requirements.
11306.MEMCOR CMFS SYSTDrl.DOC 11306-1 APRIL 27.2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
2.02 EQUIPMENT DESIGN AND FABRICATION
A. General
1. The following subsystems and components are included in the MF membrane
system:
a. Two CMFS membrane units, equipment numbers M-0912-(2) consisting of
the following:
1) 84 MlOT microfiltration modules;
2) Membrane process tank;
3) Filtrate extraction pump;
4) Skid mounted piping, valves, and instrumentation;
b. All required components for installation, including but not necessarily
limited to, appropriate anchor bolts, skid-mounted piping supports,
hardware, surface preparation, and shop painting.
B. Membrane System Requirements
1.
2.
3.
4.
5.
6.
The MF units shall be a product of the Memcor division of U.S. Filter
Corporation.
Each unit shall contain 84 hollow fiber membrane modules. Each module shall
contain a sufficient number of fibers to provide a nominal surface area of 320
square feet based on the outside fiber diameter.
The hollow fiber membrane modules shall be polypropylene with a 0.2 micron
nominal pore size.
The membrane modules and supporting pipe work shall be designed for a direct
flow.
The units shall incorporate an aidwater backwash system to maintain filter flow
performance.
Equipment furnished under this section shall be fabricated in full conformity with
the drawings, specifications, engineering data, instructions, and recommendations of the MFEM except as modified herein.
C. Membrane Process Tanks
11306-2 APRIL 27,2001
City of cdsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
1.
2.
3.
4.
5.
6.
7.
8.
9.
Membrane process tanks shall be constructed of all Type 31613161, stainless steel
in a welded configuration for installation above grade. Components shall
conform to the following:
a. Plate: Stainless steel, Type 316L; ASTM A240 - Standard Specification for
Heat-Resisting Chromium and Chromium-Nickel Stainless Steel .Plate,
Sheet and Strip for Pressure Vessels, passivated.
b. Squares, Channels, and Angles: Stainless steel, Type 316L; ASTM A479 -
Standard Specification for Stainless Steel Bars and Shapes for Use in
Boilers and Other Pressure Vessels, passivated.
c. Pipe: Stainless steel, welded process, Grade TP316L, Schedule 10s; ASTM
A312 - Standard Specification for Seamless and Welded Austenitic
Stainless Steel Pipes, passivated.
d. Flanges: Forged stainless steel; ASTM A182 - Standard Specification for
Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and
Parts for High-Temperature Service, Grade F316, lap joint flange with
stainless steel stub end, ASTM A240 - Standard Specification for Heat-
Resisting Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and
Strip for Pressure Vessels, Type 316L, welded grade conforming to MSS
SP-43 - Wrought Stainless Steel Butt-welding Fittings; schedule to match
pipe.
Plate shall be a minimum 3/16-inch thick.
All welding shall be conducted in accordance with AWS D.6 - Structural
Welding Code-Stainless Steel. All welding operators shall be qualified in
accordance with current AWS requirements.
The direct current, straight polarity, gas tungsten-arc (GTAW) process shall be
used for all welding.
The method of fabrication shall be continuous fillet and bevel welds. Stitch or
spot welding is not permitted.
Passivate all finished welds following fabrication.
The strength of the welds shall meet or exceed the strength of the structural shape
or tubing material.
All interior and external welds shall be ground smooth.
The tanks shall include all necessary support assemblies and components for the
membrane module cassettes and related piping and appurtenant equipment.
11306.MEMCOR CMFS SYSTEM.DOC 11306-3 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
10. The tanks shall be designed for anchorage to a concrete equipment pad. The tank
shall be designed to resist the gravitational and seismic forces of the module
assemblies, piping, and other related equipment supported from the structure
when full. The tank and all anchorages shall be designed to be in conformance
with the latest edition of the Uniform Building Code for Seismic Zone 4, with a
seismic importance factor of 1.0. The MFEM shall submit calculations
documenting compliance with these requirements.
D. MF Module Assemblies
1. The membrane modules shall be designed for direct flow operation. Feed shall
enter through the membrane exterior face and filtrate shall exit through the upper
end cap.
2. The modules shall be Memcor MlOT. Modules shall be arranged in manifolded
assemblies of 4 modules each.
3. Each assembly shall be supported by a stainless steel framework in a vertical
orientation for submersion-In the membrane process tank. All seals shall be
EPDM.
4. Eighty-four (84) modules shall be incorporated in each unit. The modules shall
be connected in manifolded racks of 28 modules each and supported from the
membrane process tank framework.
5. Each module shall be tested at the factory. A certified test report organized by
module serial number shall be forwarded to the District a minimum 30 days prior
to shipment of the modules to the site. The District reserves the right to have a
representative present to witness the testing.
E. Membrane Backwash System
1. The membrane units shall incorporate provisions for a combined aidwater
backwashlflush sequence.
2. Filtrate produced by the membrane units shall be pumped in a reverse flow
configuration through the hollow fibers while course air is introduced to the base
of the modules to agitate the membrane surface. The concentrated backwash
solution shall be drained from the membrane process tank to waste and the basin
refilled.
3. The backwash cycle for each unit shall be sequenced and controlled automatically
through the PLC.
4. The compressed air system supplying compressed air for the aeration portion of
the cycle and for pneumatic actuated valves on the MF unit will be provided by
the MFEM. See Article 2.03-B, Compressed Air System.
11306.MEMCOR CMFS SYSTFhl.Doc 11306-4 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
5. The compressed air system within the MF units shall include the following:
a. A control air manifold which supplies compressed air to solenoid valves for
control of automatic process valves;
b. A stainless steel pipework connection to supply process air to the modules.
6. All pneumatic tubing to on-skid valves shall be Type 316 stainless steel. The use
of plastic tubing will not be allowed.
F. Filtrate Extraction System
1. Filtrate shall be extracted through the membrane modules by a vacuum induced
on the filtrate side of the hollow fibers by the unit extraction pump. The
extraction pump shall also be used to circulate membrane backwash and cleaning
solutions.
2. The system shall include an air separation system incorporating an eductor unit.
3. Design and operating requirements for components of the filtrate extraction
system are included in Supplement 4.01-A, Process Equipment Schedules.
4. Requirements for the extraction pumps are specified in Section 11214.
G. Instrumentation and Controls
1. Each MF unit shall be equipped with the following:
a.
b.
C.
d.
e.
f.
g.
h.
Membrane process tank level indicating transmitter.
Membrane process tank discrete level switches (two)
Filtrate differential pressure indicating transmitter.
Extraction pump discharge pressure gauge.
Extraction pump discharge pressure switch.
Extraction pump discharge flow meter.
Filtrate pH analyzer.
Filtrate conductivity analyzer.
2. AI1 control, power, and instrument wiring external to unit electrical panels shall
be run in PVC coated rigid galvanized steel conduit and fittings, flexible PVC
coated, steel core liquid tight conduit, or cable tray with wiring secured by nylon
ties. See Section 16100 for requirements.
IIM6.MEMCORCMFSSYSTEM.WC 11306-5 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
H. Access Provisions
1. The shd assembly shall be furnished complete with all required provisions to
access the membrane cells, including ladders, walkways, module removal gantry
and associated appurtenances.
I. Piping
1. The membrane units and ancillary system equipment shall be arranged on a
hydraulic skid assembly incorporating the membrane process tanks, extraction
pumps, backwash supply tank, cleaning tank and cleaning chemical dosing
systems. Cleaning chemical dosing tanks may be located adjacent to the skid at
the option of the MFEM.
2. The MFEM shall provide all piping integral to the skid assembly to terminations
at the envelope of the skid. The Installation Contractor will supply all
interconnecting pipe work to terminal flanges outside the skid envelope.
3. All termination points shall be flanged ANSI Class 150 in sizes 2-inches and
larger; or NPT pipe threaded in sizes less than 2-inches.
4. Terminations shall be provided for the services listed below. Pipe sizes at the
points of connection shall be per the MFEM” design.
a. MF feed inlet.
b. RO permeate fill inlet.
c. MF filtrate outlet.
d. MF filter-to-waste outlet.
e. Membrane process tank concentrate drain outlet.
f. Cyclic process air inlet.
g. MF control air inlet.
5. Piping materials for each service shall be per the MFEMs design. See
requirements for candidate piping systems in Division 15.
J. Valves
1. For a list of automatic flow valves to be furnished on each unit, see Supplement
4.01-B, Valve Schedules.
11306.MEMCOR CMFS SYSTEM.DoC 11306-6 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMEW
2. In addition to the valves listed in Supplement 4.01-B, the MFEM shall provide the
following manual MF unit mounted valves (typical for each unit):
TAG NUMBER TYPE SIZE [INCHES]
V-0912-4
BFV3 6 V-0912-9
scv3 6 V-0912-8
BV2 112 V-09 12-6
BV2 112 V-0912-5
BV2 112
V-0912-10 BV2 112
3. For valve requirements, see Section 15100.
2.03 EQUIPMENT AND COMPONENTS
A. Feed Delivery System
1. The feed delivery system includes the MF feed pump station; automatic strainers;
interconnecting piping, valves, instrumentation and controls.
2. Design and operating requirements for components of the feed delivery system
are included in Supplement 4.01-A, Process Equipment Schedules.
3. Requirements for the MF feed pumps are specified in Section 11213.
4. Requirements for the automatic strainers are specified in Section 11340.
B. Compressed Air System
1. The compressed air system shall consist of two separate subsystems: a process air
blower system and control air compressor system.
2. The process air blower system shall consist of the following: two aeration blowers
with inlet filter assemblies; interconnecting piping, valves, instrumentation and
controls.
3. The control air system shall consist of the following: two air compressors with
integral dryers and outlet filters; two supply air filter assemblies; one air receiver
with accessories; one control air regulator assembly; one process air regulator
assembly; interconnecting piping, valves, instrumentation and controls.
4. The process air blower system shall be suitable for supply to the membrane
process aeration system.
5. The compressed air system shall be suitable for supply of control air used for the
pneumatically operated valves furnished with the MF system.
11306.MEMCOR CMFS SYSTEM.Doc 11306-7 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMEh'T
Carlsbad Recycling Facility
6. Design and operating requirements for components of the compressed air system
are included in Supplement 4.01-A, Process Equipment Schedules.
7. Components of the control air compressed air system are specified in Section
11370.
8. Components of the process air blower system are specified in Section 11375.
C. Membrane Cleaning System
1. The cleaning system shall include a CIP solution tank and accessories, citric acid
dose system, Memclean C dose system, sodium hydroxide dose system;
interconnecting piping, valves, instrumentation and controls.
2. Design and operating requirements for components of the membrane cleaning
system are included in Supplement 4.01-A, Process Equipment Schedules.
3. The CIP tank is specified will be integral to the system hydraulic skid and share a
common wall with the backwash supply tank. Tank material and construction
requirements shall be as specified for the membrane process tanks.
4. Cleaning chemical dosing systems are specified in Section 11240 and related system sections.
5. Valves
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the h4FEM shall
provide the following manual CIP system valves:
TAG NUMBER TYPE SIZE [INCHES] V-0925-1
DPVS 314 V-0941-1
DPVS 314 V-0940-1
DPVS 314 V-0939-1
BFV3 6
c. For valve requirements, see Section 15100.
6. Instrumentation and Controls
a. Cleaning of individual MF units shall be manually initiated but
automatically controlled thereafter through the PLC. Cleaning solutions
shall be made up of RO permeate and the appropriate cleaning chemicals.
Tank charging shall be conducted automatically through the PLC.
1 IX6.MEMCOR CMFS SYSTEM.DOC 11306-8 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
D.
2.04
A.
B.
b. For instrument component specifications, see Section 13330.
Membrane Backwash System
1. The backwash system shall consist of a storage tank, interconnecting piping,
valves, instrumentation and controls.
2. Design and operating requirements for components of the backwash system are
included in Supplement 4.01-A, Process Equipment Schedules.
3. The backwash storage tank shall share a common wall with the CIP tank and meet
fabrication and materials requirements for the membrane tanks as herein
specified.
4. Valves
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the h4FEM shall
provide the following manual reverse flush system valves:
TAG NUMBER TYPE SIZE [INCHES] V-0920-2 8 BFV3 1
c. For valve requirements, see Section 15100.
5. Instrumentation and Controls
a. The backwash cycle shall be automatically initiated and controlled through
the PLC. Backwash cycles shall be initiated on an elapsed time of filtration
basis. The design backwash cycle interval shall be 22 minutes.
b. For instrument component specifications, see Section 13330.
INSTRUMENTATION AND CONTROLS
General
1. For general instrumentation and control system requirements, see Section 11300.
Instrumentation
1. The MFEM shall provide specified instrumentation for the MF membrane system
and related subsystems.
&
11306-9 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
2. For identification of MFEM supplied instruments, see the instrument list provided
in Supplement 4.02-B.
C. Control Panels
1. The MFEM shall provide the following control panels:
2. All panels shall be constructed in accordance with Section 13325.
D. Controls
1. The MFEM shall provide all software configuration and discrete controIs for the
system provided, including interface and control of components not furnished by
the MFEM.
2. For requirements, see the control functional descriptions provided in Supplement
4.02-C, Loop Function Data Sheets.
2.05 SPARE PARTS
A. A list of recommended spare parts and all special tools required for normal operation
and maintenance of all components furnished by the MFEM shall be submitted for
approval within sixty (60) days following Notice to Proceed. All items on this list shall
be furnished prior to the beginning of preoperational tests. The list shall include items
specified hereinbefore and the following additional items as a minimum:
Air Regulators, of each type
2 Regulator, pilot 0-125 psig CIP
1
11306.MEMCOR CMFSSYSTEM.OOC 11306-10 APRIL 27,2001
City of carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
DESCRIPTION QUANTITY
Solenoid, Type SV1 7
B. For additional spare parts requirements related to the instrumentation and control
system, see Section 13320.
PART 3 - EXECUTION - NOT USED
PART 4 - SUPPLEMENTAL INFORMATION
4.01
A.
B.
4.02
A.
B.
C.
Supplements listed below are attached following “END OF SECTION’ and are a part
of this Specification.
EQUIPMENT SCHEDULES
Process Equipment Schedules
Valve Schedules
INSTUMENTATION AND CONTROL SCHEDULES
PLC Input/Output List
Instrument List
Loop Function Data Sheets
+ + END OF SECTION + +
11306.MEMCOR CMFS SYSTEKDOC 11306-1 1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-1
MF FEED PUMPS
(P-0901-1, P-0901-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) .. 25
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 1750
Drive Variable Speed
Minimum Discharge Size (inches) 6
Minimum pump shutoff head at design speed (feet) 140
Design Capacity (am)* 800
Design TDH (feet)* I1
Minimum pump eficiency at design capacity (%) 80.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Head Cast iron, ASTM A48 or Fabricated steel ASTM A53, Grade B
Bowls Cast iron, ASTM A48
Impellers Cast iron, ASTM A48
Impeller Wear Rings Cast iron, ASTM A48
Bowl Wear Rings Cast iron, ASTM A48
Bowl and Suction Case Bearings Bronze, ASTM B584, Alloy 932
Column Steel, ASTM A53, Grade A
Lineshaft Open Type; Stainless steel, ASTM A276, Type 416
Lineshaft Bearings Bronze, ASTM B584, Alloy 836
Head Shaft Stainless steel, ASTM A276, Type 416
Impeller Shaft Stainless steel, ASTM A276, Type 416
Shaft Sleeves Stainless steel, ASTM A276, Type 410, hardened
Shaft Seal Mechanical Type
* Point must be at or near the best efficiency point
I1306.4.01A.PROCESS EQUIPMENT SCHEDULESDOC 1 1306S1A-1 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11306.4.01A-2
AUTOMATIC STRAINERS
("0906-1, "0906-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 0.25
Motor Enclosure Type TEFC
Inlet and Discharge Size (inches) 6
Screen Rating (microns) 500
Design Capacity (gpm) 800
Design Clean Pressure Drop 1 .o
11306.4.01A.PROCESSEQUlPMENTSCHEDULES.DOC 11306SlA-2 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-3
PROCESS AIR BLOWERS
("091 0-1, "091 0-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) 20
Motor Enclosure Type TEFC
Design Capacity (scfm) 680
Design Pressure (psig) 4.2
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Cast iron, ASTM A48 or Fabricated steel ASTM A53, Grade B
Impeller/Rotor Cast iron, ASTM A48
Base Plate Steel, ASTM A53, Grade A
I1306.4.01A.PROCESS EQUIPMENT SCHEDULES.M)C 1 1306s 1 A-3 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11306.4.01A-4
AIR COMPRESSORS
("091 1-1, "091 1-2)
ITEM DESIGN CONJIITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) 10
Motor Enclosure Type TEFC
Design Capacity (scfm) 10
Design Pressure (psig) 140
11306.4.01A.PROCESSEQUlPMENTSCHEDULES.WC 11306SlA-4 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-5
AIR RECEIVER
(T-0911)
ITEM DESIGN CONDITIONS
Volume (gallons) 70
Design Pissure (psig) 175
11306.4.01A.PROCESS EQUIPMENT SCHEDULES.DOC 1 1306s 1A-5 APRIL 27,2001
city of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-6
MF FILTRATE EXTRACTION PUMPS
(P-0912-1, P-0912-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 960
Motor Size (Hp) 15
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 880
Drive Variable Speed
Minimum Discharge Size (inches) 6
Minimum pump shutoff head at design speed (feet) 100
Design Capacity (am)* 550
Design TDH (feet)* 60
Minimum pump efficiency at design capacity (%) 80.0
Minimum NPSH available at design capacity (feet, absolute) 5.6
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Stainless steel, Type 316
Impellers
Shaft
Stainless steel, Type 316
Shaft Sleeve
Stainless steel, Type 316
Shaft Seal
Stainless steel, Type 316
Mechanical Type * Point must be at or near the best efficiency point
11306.4.01A.PROCESS EQUIPMENT SCHEDULES.DOC 1 1306s 1 A-6 APRIL. 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-7
MF BACKWASH TANK
(T-0920)
ITEM DESIGN CONDITIONS
Capacity (gallons)
Materials
Nominal Length (feet)
Nominal Width (feet)
Nominal Straight Shell Height (feet)
530
Type 316/316L Stainless Steel
Manufacturer’s Standard
Manufacturer’s Standard
Manufacturer’s Standard
CONNECTION SCHEDULE
Side
Filtered Water Inlet 6-in flanged
Siphon Outlet 8-in flanged
Level Switch Connections (two) 1-in flanged
Level Sight Gauge Connections (two) 2-in flanged
Drain 2-in flanged
overflow 6-in flanged
11306.4.01A.PROCESSEQUlPMENTSCHEDULES.DOC 11306SlA-7 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11306.4.01A-8
MF CIF’ TANK
(T-0925)
ITEM DESIGN CONDITIONS
Capacity (gallons) 1,585
Materials Type 3 1613 16L Stainless Steel
Nominal Length (feet)
Nominal Width (feet)
Manufacturer’s Standard
Nominal Straight Shell Height (feet)
Manufacturer’s Standard
Manufacturer’s Standard
Accessories Immersion Heater
CONNECTION SCHEDULE
Manway
Vent
Side
Permeate Fill Inlet 2-in flanged
Siphon Outlet 8-in flanged
Overflow 8-in flanged
Immersion Heater 6-in flanged
Heater RTD 3-in flanged
Level Switch Connections (two) 1-in flanged
Level Sight Gauge Connections (two) 2-in flanged
Drain 2-in flanged
24-in flanged
6-in flanged
11306.4.01A.PROCESSEQUlPMMTSCHEDULES.DOC 11306SlA-8 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01A-9
MF CP CHEMICAL DOSING SYSTEMS
ITEM DESIGN CONDITIONS
Minimum Storage Tank Capacity (gallons)
Minimum Dosing Pump Operating Capacity (gallons per hour)
250
10 - 100
APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREhIE~
TABLE 11306.4.01B-1
AUTOMATED VALVE SCHEDULE
V-0939-3 10 " " I
11306.4.01B.VALnSCHEDULES.WC 11306SlB-1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility MF EQUIPMENT PROCUREMENT
now VALVES
I I I I I I I
Votes: I. Valve furnished by strainer manufacturer. See equipment specification for requirements.
2. To be designed by MFEM. See specifications for requirements.
3. Not all flow valves are listed. MFEM shall provide required on-skid valves for his
$. Power operated valves with unique equipment numbers shown on the Drawings but not
system.
listed above will be furnished by the Installation Contractor.
11306.4.01B.VALVE SCHu)ULEs.DoC 11306SlB-2 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.01B-2
SELF-CONTAINED VALVE SCHEDULES
~~~~ ~~
PRESSURE AND VACCULTM RELlEF VALVES
Notes:
2. Not all required valves listed. See specifications for requirements. 1. To be designed by MFEM. See specifications for requirements.
3. Relief valves with unique equipment numbers shown on the Drawings but not listed above will be furnished by the Installation Contractor.
Notes: 1. To be designed by MFEM. See specifications for requirements.
2. Not all required valves listed. See specifications for requirements. 3. Regulating valves with unique equipment numbers shown on the Drawings but not listed
above will be furnished by the Installation Contractor.
i
11306.4.01B.VALVESCHEDULES.DOC 11306SlB-3 APRIL 27,200 1
: I
i t
i
i
i
t
i C
E
i C "_
,
! i
j
i t
i
i
L
i C
t
i C
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11306.4.02B-1
INSTRUMENT LIST
Notes:
1. Instrument furnished by strainer manufacturer.
2.
3.
Indicator is integral to storage tote wall and/or supplied by tote manufacturer
Provide manufacturer’s standard instrument.
I1306.4.02B.Losrmmcnl tirl.doe 11306S2B-1 APRIL 27,2001
n 0 0 -I
J m
- 0 0 N r.- N E! d 2
- 0 0 N
n 0 0 -I
M 0 0 N r-- N
m
I- Lu w
v)
r
0 J
z 1
n 0 0 J
0 0 N
t r
n 0 0 -.I
i
Jm !
I-
W w
rn I
2 a n
n 0 2
I
I
9p u r-
c
d
- 0 0 N
I- w w I v)
2 a
n
n 0 0 J
I
!
!
!
f
!
I
!
!
I
I
I , , ,
L
!
!
, L
L
! ! n ,
L ,
I
! ! ! , I
7"
c
U
0
0 ._ 5 n
I- Lu Lu I v)
2 a
n
n 0 0
i
I
r c 0
r z 0
0
..
z 8 2
I;
0 0 N t-" N
0
N 0
I
I I
i
!
1
i f
!
1
1 t
1 I
1
I
1
I
I
I I
i
! i
!
i !
i
I I t
I t
I
I
i
:
I
! i
I
0 0 N
-
a 2 n
.
1
e
E !
ii
? c
E il 6 3
L
c
c c
c 1
E ! Y i
: a E
I
c c c E ii c
E c
i ii
E c
U i
E e a
E
a E
E 1
c i
c 1
:
\
- 0 0 hl
m
4 r
r
r 0
W E
n 0
..
s
2
z
0
m 0 ..
z P 0 2
.. z a n
8 0 -I
b 0
2 1
"L
+-
8 N
r c
0
C' 9
L 0 m e e
.
!- w w
v) r
;rs U n
n 0 0 2
L
a 2 n
n 0 0 J
0 0 hl
r 01
u.
.
r
I
P
m 0 0 N
n a
3 0 0 N
0 2
3
L
! i
! !
! ,
!
I
I
D
I ,
I
- 0 0 N r" N
i
I
- 0 0 N
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
SECTION 11307
PALL SYSTEM
PART 1 - GENERAL
1.01 DESCRIPTION
A. Description of Work
1. This Detailed Specification Section covers the hollow fiber membrane filtration
treatment system equipment as supplied by Pall Corporation.
2. The MF system shall consist of two (2) 22-2-2-316L MF units, compressed air
system, membrane cleaning (CP) system, membrane backwashlreverse filtration
system, excess feed recirculation system, piping, valves, controls and
instrumentation,
B. Coordination
1. The MFEM shall furnish the majority of equipment items associated with the MF
system and shall participate in the commissioning, startup, testing, and training of
District's personnel in operation of the MF system as a whole.
2. The Installation Contractor will unpack, assemble, and install equipment items
furnished by the MFEM as shown on the Drawings and as specified herein. In
addition, the Installation Contractor will also furnish and install additional
equipment items, interconnecting piping, valves, instruments, power and control
wiring, and other appurtenances not furnished by the MFEM.
3. The Installation Contractor in association with the MFEM will be responsible for
acceptance testing of individual items of equipment as defined in the individual
equipment specifications. The Installation Contractor will also participate in the
startup of the MF system as described in Section 01670.
PART 2 - PRODUCTS
2.01 PROCESS SYSTEM DESIGN AND PERFORMANCE
A. Service Conditions
1. See Section 11300 for requirements.
B. Process Design Requirements
I IJO7.PALL SYSTEM.0OC 11307-1 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
1. See Section 11300 for requirements.
2.02 EQUIPMENT DESIGN AND FABRICATION
A. General
1. The following subsystems and components are included in the MF membrane
system:
a. Two 22-2-2-316L MF units, equipment numbers M-0912-(2) consisting of
the following:
1) 38 USV-6203 microfiltration modules;
2) Module support kame;
3) Skid mounted piping, valves, and instrumentation;
4) Electrical control panel (equipment numbers CP-0912-(2)); and
pneumatic control panel (equipment numbers CP-0911-4-(2)).
b. All required components for installation, including but not necessarily
limited to, appropriate anchor bolts, skid-mounted piping supports,
hardware, surface preparation, and shop painting.
B. Membrane System Requirements
1.
2.
3.
4.
5.
6.
The MF units shall be a product of the Pall Trinity Micro Division of Pall
Corporation.
Each unit shall contain 38 hollow fiber membrane modules. Each module shall
contain a sufficient number of fibers to provide a nominal surface area of 50
square meters based on the outside fiber diameter.
The hollow fiber membrane modules shall be polyvinylidene fluoride with a 0.1
micron nominal pore size.
The membrane modules and supporting pipe work shall be designed for a cross
flow configuration.
The units shall incorporate a primary filtrate reverse flow backwash and
secondary air scrub system to maintain filter flow performance.
Equipment furnished under this section shall be fabricated in full conformity with
the drawings, specifications, engineering data, instructions, and recommendations
of the MFEM except as modified herein.
II3OZPALL SYSTEM.WC 11307-2 APRIL 27.2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
C. Support Structure
1. All pressure vessels, piping, valves, instrumentation, control panels, and other
appurtenances which make up a single MF unit shall be supported on a single
structural frame. The frame shall be of fabricated carbon steel construction and
shall have a surface finish comprising a zinc primer, an epoxy coating and final
coat of urethane.
2. The frame shall be sized to accommodate the installed modules and related
appurtenant equipment, plus space for the future installation of an additional four
membrane modules.
3. The support frame shall be designed to resist the gravitational and seismic forces
of the pressure vessels, piping, and other related equipment supported from the
structure. The frame shall be designed to be in conformance with the latest
edition of the Uniform Building Code for Seismic Zone 4, with a seismic
importance factor of 1.0. The MFEM shall submit calculations documenting
compliance with these requirements.
D. MF Module Assemblies
1. The membrane modules shall be designed for cross flow operation. Feed shall
enter through the lower end ports and filtrate shall exit through the upper end
connection while excess recircualtion (crossflow) shall exit through the upper
connection in the side of the module pressure vessel wall.
2. The modules shall be Pall USV-6203. Module housings shall be constructed of
polyvinyl chloride, with stainless steel lower end cap.
3. The membrane modules shall be supported by a steel framework in a vertical
orientation. The modules shall be connected to their manifolds with grooved pipe
couplings and slip joint connectors. All seals shall be EPDM.
4. Thirty-eight (38) modules shall be incorporated in each unit. The modules shall
be connected in manifolded blocks and supported by the MF unit framework.
5. Modules for each block shall be tested at the factory. A certified test report
organized by module serial number shall be forwarded to the District a minimum
30 days prior to shipment of the modules to the site. The District reserves the
right to have a representative present to witness the testing.
6. Each block, once fully piped and assembled, shall be tested at the MFEM's
facility using dummy modules. This testing shall incorporate a leak check to
verify the integrity of the welded and bolted connections and will be repeated in
the field using the actual modules. The field testing shall incorporate a pressure
11307.PALL SYSTEMWC 11307-3 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
decay test hnction to verify the integrity of the membrane fibers installed in each
module. The MFEM shall furnish a certificate certifying the integrity of each 38
module block for each unit furnished prior to shipment. The District reserves the
right to have a representative present to witness the testing.
E. Reverse Filtration (RF) and Air Scrub (AS) Backwash
1. The MF units shall utilize a reverse flow back flush to remove accumulated
particulate and maintain the design filtrate production rate. Process effluent at a
pressure of roughly 20 - 40 psig shall be introduced into the filtrate side of the
fibers at a rate of 20 gpm per module, flushing dislodged solids to waste.
2. In addition, the units shall incorporate an AS sequence to periodically agitate the
exterior fiber surface. Process air shall be introduced at the bottom of the module
on the outside of the fibers coupled with a feed cross flow of 10 gpm per module.
Dislodged solids shall be diverted to waste.
3. The RF and AS cycles shall be initiated through the PLC control system at fixed
time intervals. The RF and AS processes shall be carried out automatically
through the PLC. Design cycle time for each sequence shall be 22.4 minutes,
maximum.
4. The compressed air system supplying compressed air for the AS cycle and for
pneumatic actuated valves on the MF unit will be provided by the MFEM. See
Article 2.03-B, Compressed Air System.
5. The compressed air system within the MF units shall include the following:
a. A control air manifold which supplies compressed air to solenoid valves for
control of automatic process valves;
b. A stainless steel pipework connection to supply process air to the modules.
6. All pneumatic tubing to on-skid valves shall be Type 316 stainless steel. The use
of plastic tubing will not be allowed.
F. Instrumentation and Controls
1. Each MF unit shall be equipped with the following:
a. Control enclosure containing the MF unit PLC and related equipment.
b. Pneumatic assembly for mounting solenoid valves for the on-skid pneumatic
valve operators and related equipment.
c. Pressure indicating transmitters on the feed manifold.
II307.PALLSYSTEM.DOC 11307-4 APRIL 27,2001
City of Carlsbad
CGlsbad Recycling Facility
MF EQUIPMENT PROCUREMEM
d. Feed magnetic flow meter.
e. Excess feed magnetic flow meter.
2. All control, power, and instrument wiring external to unit electrical panels shall
be run in PVC coated rigid galvanized steel conduit and fittings, flexible PVC
coated, steel core liquid tight conduit, or cable tray with wiring secured by nylon
ties. See Section 16100 for requirements.
G. Piping
1. Piping interfaces on the MF units shall be designed such that the two units can be
arranged in a single row and connected on common interconnecting pipe
manifolds.
2. The MFEM shall provide all piping integral to the MF units to terminations at the
envelope of the support framework. The Installation Contractor will supply all
interconnecting pipe work to terminal flanges outside the unit envelope.
3. All termination points shall be flanged ANSI Class 150 in sizes 2-inches and
larger; or NF'T pipe threaded in sizes less than 2-inches.
4. Terminations shall be provided for the services listed below. Pipe sizes at the
points of connection shall be per the MFEM's design.
a. MF feed inlet.
b. RF inlet.
c. MF filtrate outlet.
d. EF outlet.
e. ASRF waste outlet (two terminations per unit).
f. AS process air inlet.
g. MF control air inlet.
h. MF cleaning solution inlet.
i. MF cleaning solution outlet.
5. Piping materials for each service shall be per the MFEMs design. See
requirements for candidate piping systems in Division 15.
I1307.PALL SYSTEM.DOC 11307-5 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROWMEN
H. Valves
1. For a list of automatic flow valves to be furnished on each unit, see Supplement
4.01-B, Valve Schedules.
2. In addition to the valves listed in Supplement 4.01-B, the MFEM shall provide the
following manual MF unit mounted valves:
a. One 2-inch wafer check valve (Type SCV3).
3. For valve requirements, see Section 15100.
2.03 EQUIPMENT AND COMPONENTS
A. Feed Delivery System
1. The feed delivery system includes the MF feed pump station; automatic strainers;
interconnecting piping, valves, instrumentation and controls.
2. Design and operating requirements for components of the feed delivery system
are included in Supplement 4.01-A, Process Equipment Schedules.
3. Requirements for the MF feed pumps are specified in Section 11213.
4. Requirements for the automatic strainers are specified in Section 11340.
B. Compressed Air System
1. The compressed air system shall consist of two air compressors with integral
dryers and outlet filters; two supply air filter assemblies; one air receiver with
accessories; one process air regulator assembly; one control air regulator
assembly; two MF unit mounted pneumatic control assemblies; interconnecting
piping, valves, instrumentation and controls.
2. The compressed air system shall be suitable for supply of process air used in the
compressed air scrub system for the MF units and control air used for the
pneumatically operated valves furnished with the MF system.
3. Design and operating requirements for components of the compressed air system
are included in Supplement 4.01-A, Process Equipment Schedules.
4. Components of the compressed air system are specified in Section 11370.
C. Membrane Cleaning System
11307.PALL SYSTEM.WC 11307-6 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility m EQUIPMENT PROCUREMENT
1.
2.
3.
4.
5.
6.
7.
The cleaning system shall include dual CIP tanks and accessories, CIP pump, CIP
tank heater control panel, heaters and controls, citric acid dose system, sodium
hypochlorite dose system, sodium hydroxide dose system, instrumentation,
interconnecting piping and valves.
Design and operating requirements for components of the membrane cleaning
system are included in Supplement 4.01-A, Process Equipment Schedules.
The CIP tanks are specified in Section 11250.
The CIP pump is specified in Section 1121 1.
Cleaning chemical dosing systems are specified in Section 11240 and related
system sections.
Valves
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the MFEM shall
provide the following manual CIP system valves:
c. For valve requirements, see Section 15 100.
Instrumentation and Controls
a. Cleaning of individual MF units shall be manually initiated but controlled
automatically through the PLC thereafter. Cleaning solutions shall be made
up of RO permeate and the appropriate cleaning chemicals. Tank charging
shall be conducted automatically through the PLC.
b. For instrument component specifications, see Section 13330.
11307.PALLSYSTEM.DOC 11307-7 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
D. Backwashkverse Filtration System
1.
2.
3.
4.
5.
6.
7.
The reverse filtration system shall consist of a reverse filtrate storage tank, reverse
filtrate pumps, sodium hypochlorite dosing system, interconnecting piping,
valves, instrumentation and controls.
Design and operating requirements for components of the reverse filtration system
are included in Supplement 4.01-A, Process Equipment Schedules.
The reverse filtrate storage tank is specified in Section 11250.
The reverse filtrate pumps are specified in Section 1121 1.
Components of the sodium hypochlorite dosing system are specified in Sections
11240 and 11244.
Valves
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the MFEM shall
provide the following manual reverse flush system valves:
c. For valve requirements, see Section 15100.
Instrumentation and Controls
a. The RF cycle shall be automatically initiated and controlled through the
PLC. RF cycles shall be initiated on an elapsed time of filtration basis.
b. For instrument component specifications, see Section 13330.
11307.PALL SYSTEM.WC 11307-8 APW 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUWMENT PROCUREMENT
E. Excess Feed (EF) Recirculation System
1. The EF recirculation system shall consist of EF pumps, interconnecting piping,
valves, instrumentation and controls.
2. Design and operating requirements for components of the EF recirculation system
are included in Supplement 4.01-A, Process Equipment Schedules.
3. The EF pumps are specified in Section 1121 1.
4. Valves
a. FQ~ a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the MFEM shall
provide the following manual EF recirculation system valves:
c. For valve requirements, see Section 15100.
5. Instrumentation and Controls
a. The EF recirculation pumps shall be controlled automatically through the
PLC.
b. For instrument component specifications, see Section 13330.
2.04 INSTRUMENTATION AND CONTROLS
A. General
1. For general instrumentation and control system requirements, see Section 11 300.
B. Instrumentation
1. . The MFEM shall provide specified instrumentation for the MF membrane system
and related subsystems.
11307.PALL SYSTEM.DOC 11307-9 APRIL 27,2001
City of carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
2. For identification of MFEM supplied instruments, see the instrument list provided
in Supplement 4.02-B.
C. Control Panels
1. The MFEM shall provide the following control panels:
2. All panels shall be constructed in accordance with Section 13325.
D. Controls
1. The MFEM shall provide all software configuration and discrete controls for the
system provided, including interface and control of components not furnished by
the MFEM.
2. For requirements, see the control functional descriptions provided in Supplement
4.02-C, Loop Function Data Sheets.
2.05 SPARE PARTS
A. A list of recommended spare parts and all special tools required for normal operation
and maintenance of all components furnished by the MFEM shall be submitted for
approval within sixty (60) days following Notice to Proceed. All items on this list shall
be furnished prior to the beginning of preoperational tests. The list shall include items
specified hereinbefore and the following additional items as a minimum:
DESCRIPTION QUANTITY
Coalescer, Control Air Regulator Assembly
4 Membrane, Supply Air Filter Assembly
4 Coalescer, Supply Air Filter Assembly
2
11 Pressure gauge, panel mount MF I 1 II
Pressure gauge, 2" 0-160 psig CP 1
11307.PALL SYSTEM.WC 11307-10 APRIL 27,2001
City of carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
Grease, O-ring
Pressure Relief Valve, of each type
10
1 Automatic Drain Valve, Type ADVl
1 Pressure gauge, control air
2
.
B. For additional spare parts requirements related to the instrumentation and control
system, see Section 13320.
PART 3 - EXECUTION -NOT USED
PART 4 - SUPPLEMENTAL INFORMATION
Supplements listed below are attached following “END OF SECTION and are a part
of this Specification.
4.01 EQUIPMENT SCHEDULES
A. Process Equipment Schedules
B. Valve Schedules
4.02 INSTUMENTATION AND CONTROL SCHEDULES
A. PLC InpuVOutput List
B. Instrument List
11307.PAt.L SYSTEM.DOC 11307-1 1 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
C. Loop Function Data Sheets
+ + END OF SECTION + +
11307.PALL SYSTEM.DOC 11307-12 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMEW
TABLE 11307.4.01A-1
MF FEED PUMPS
(p-0901-1, P-0901-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm)
Motor Size (Hp)
Motor Enclosure Type
Pump Design Speed (rpm)
Drive
Minimum Discharge Size (inches)
Minimum pump shutoff head at design speed (feet)
Design Capacity (am)*
Design TDH (feet)*
1800
40
TEFC
1750
Variable Speed
6
180
775
140
Minimum pump efficiency at design capacity (%) 80.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Head Cast iron, ASTM A48 or Fabricated steel ASTM A53, Grade B
Bowls Cast iron, ASTM A48
Impellers Cast iron, ASTM A48
Impeller Wear Rings Cast iron, ASTM A48
Bowl Wear Rings Cast iron, ASTM A48
Bowl and Suction Case Bearings Bronze, ASTM B584, Alloy 932
Column Steel, ASTM A53, Grade A
Lineshaft Open Type; Stainless steel, ASTM A276, Type 416
Lineshaft Bearings Bronze, ASTM B584, Alloy 836
Head Shaft Stainless steel, ASTM A276, Type 416
Impeller Shaft Stainless steel, ASTM A276, Type 416
Shaft Sleeves Stainless steel, ASTM A276, Type 410, hardened
Shaft Seal Mechanical Type * Point must be at or near the best efficiency point
11307.4.01A.PROCESSEQUlPMMTSCHEDULES.DOC 11307SlA-1 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-2
AUTOMATIC STRAINERS
("0906-1, "0906-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 0.25
Motor Enclosure Type TEFC
Inlet and Discharge Size (inches) 6
Screen Rating (microns) 500
Design Capacity (gpm) 775
Design Clean Pressure Drop 1 .o
lI307.4.OIA.PROCESSEQUlPMENTSCHEDULES.WC 11307SlA-2 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-3
AIR COMPRESSORS
("0911-1, "0911-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 5
Motor Enclosure Type TEFC
Design Capacity (scfm) 15
Design Pressure (psig) 145
11307.4.01A.PROCESSEQUlPMENTSCHEDU~S.DOC 11307SlA-3 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-4
AIR RECEIVER
(T-0911)
ITEM DESIGN CONDITIONS
Volume (gallons) 660
Design Pressure @sig) 175
I1307.4.0lA.PROCESSEQUIPMENTSC~DULES.WC 11307SlA-4 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-5
EXCESS FEED RECIRCULATION PUMPS
(P-0932-1, P-0932-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) 2.5
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 3550
Drive Variable Speed
Minimum Discharge Size (inches) 2
Minimum pump shutoff head at design speed (feet) 100
Design Capacity (gpm)* 75
Design TDH (feet)* 60
Minimum pump efficiency at design capacity (%) 70.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUREMENTS
Casing Ductile Iron
Impellers Stainless steel, Type 316
Shaft Stainless steel, Type 316
Shaft Sleeve Stainless steel, Type 316
Shaft Seal Mechanical Type * Point must be at or near the best efficiency point
11307.4.01A.PROCESS EQUIPMENT SCHEDULES.DOC 1 1307s 1A-5 APRIL. 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-6
MF REVERSE FLUSH TANK
(T-0930-1)
ITEM DESIGN CONDITIONS
Capacity (gallons)
Materials
Nominal Diameter (feet)
Nominal Straight Shell Height (feet)
Accessories
360
FRP
Manufacturer’s Standard
Manufacturer’s Standard
None
CONNECTION SCHEDULE
m Vent with Filter 6-in flanged
Side
Siphon Drain 2-in flanged
Overflow 4-in flanged
Filtrate Inlet 2-in flanged
Level Switch Connections (two) 3-in flanged
Level Transmitter Connection 3-in flanged
Level Sight Gauge Connections (two) 2-in flanged
11307.4.01A.PROCESSEQUlPMENTSCHEDULES.WC 11307SlA-6 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-7
MF REVERSE FILTRATE PUMPS
(P-0931-1,P-0931-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) 20
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 3550
Drive Constant Speed
Minimum Discharge Size (inches) 4
Minimum pump shutoff head at design speed (feet) 100
Design Capacity (gpm)* 660
Design TDH (feet)* 60
Minimum pump efficiency at design capacity (%) 70.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Stainless steel, Type 316
Impellers Stainless steel, Type 316
Shaft Stainless steel, Type 316
Shaft Sleeve Stainless steel, Type 316
Shaft Seal Mechanical Type * Point must be at or near the best efficiency point
I1301.4.01A.PROCESS EQUIPMENT SCHEDULES.DK 1 1307s 1A-7 APRIL 27,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-8
MF CIP TANKS
(T-0925-1, T-0925-2)
ITEM DESIGN CONDITIONS
Capacity (gallons) 1,500
Materials FRP
Nominal Diameter (feet) 6
Nominal Straight Shell Height (feet) 9.5
Accessories Immersion Heater
CONNECTION SCHEDULE
rn Dosing Inlet
Cleaning Retum Inlet
Manway
Vent
Permeate Fill Inlet
- Side
Siphon Outlet
Overflow
Siphon Drain
Immersion Heater
Heater RTD
Level Switch Connections (two)
Level Transmitter Connection
Level Sight Gauge Connections (two)
4-in flanged
4-in flanged
24-in flanged
4-in flanged
2-in flanged
8-in flanged
8-in flanged
4-in flanged
6-in flanged
3-in flanged
3-in flanged
3-in flanged
2-in flanged
11307.4.01A.PROCESSEQUlPMENTSCHEDULES.WC 11307SlA-8 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-9
MF CIP PUMP
(P-0926)
~~~ ~~
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 5
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 1725
Drive Constant Speed
Minimum Suction Size (inches) 2.5
Minimum Discharge Size (inches) 2
Minimum pump shutoff head at design speed (feet) 80
Design Capacity (gpm)* 200
Design TDH (feet)* 40
Minimum pump efficiency at design capacity (%) 70.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Stainless steel, Type 316
Impellers
Shaft
Shaft Sleeve
Stainless steel, The 316
Stainless steel, Type 316
Stainless steel. Tvoe 316
Shaft Seal Mechanical Type * Point must be at or near the best efficiency point
,
11307.4.01A.PROCESSEQUlPMEhTSCHEDULES.WC 11307SlA-9 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11307.4.01A-10
MF CIP PUMP DISCHARGE STRAINER
("0926)
ITEM DESIGN CONDITIONS
Inlet and Discharge Size (inches) 6
Screen Rating (microns) 500
Design Capacity (gpm) 200
Design Clean Pressure Drop 1 .o
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Body Stainless steel, Type 316
Screen Stainless steel, Type 316
Seals EPDM
11307.4.01A.PROCESSEQUlPMENTSCHEDULES.DOC 11307SlA-10 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.01A-11
MF CIP CHEMICAL DOSING SYSTEMS
ITEM DESIGN CONDITIONS
Minimum Storage Tank Capacity (gallons)
Minimum Dosing Pump Operating Capacity (gallons per hour)
250
10 - 100
11307.4.01A.PROCESSEQUlPMENTSCHEDULES.WC 11307SlA-1 1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQU~PMENT PROCUREMENT
TABLE 11307.4.01B-1
AUTOMATED VALVE SCHEDULE
~
FLOW VALVES
Notes: 1. Valve furnished by strainer manufacturer. See equipment specification for requirements.
2. To be designed by MFEM. See specifications for requirements.
3. Not all flow valves are listed. MFEM shall provide required on-skid valves for his
4. Power operated valves with unique equipment numbers shown on the Drawings but not
system.
listed above will be furnished by the Installation Contractor.
I1307.4.01B.VALVESCHEDULES.WC 11307SlB-1 APRIL 27,2001
City of Cdsbad
Carlsbad Recycling Facility
Mi= EQUIPMENT PROCUREMENT
TABLE 11306.4.01B-2
SELF-CONTAINED VALVE SCHEDULES
PRESSURE AND VACCUUM RELIEF VALVES
Relief
Tag Size Pressure Max. Number (in.) (psig) Service Capacity Comments
V-0911-14 PA Note 1
V-0983-8 112 60 SHC
V-0983-16 112 60 SHC
Notes: 1. To be designed by MFEM. See specifications for requirements. 2. Not all required valves listed. See specifications for requirements. 3. Relief valves with unique equipment numbers shown on the Drawings but not listed above
will be furnished by the Installation Contractor.
lIM7.4.OIB.VALVESCHEDULESWC 11307SlB-2 APRIL 27,2001
L
! i
I
!
I
I
< 1
!
!
I I
!
I t
!
i
i
, I
! ! I
I
I
!
I
i I
, i
! ! I
I
I
I
!
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11307.4.02B-3
11307.4.02B.lnsbumeolLjrf.doc 11307S2B-1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
Notes:
1. Instrument furnished by strainer manufacturer.
2.
3.
Instrument integral to pressure regulating valve.
Indicator is integral to storage tote wall andlor supplied by tote manufacturer.
4. Furnish manufacturer’s standard instrument.
5. Instrument furnished with chemical feed system, see equipment specifications for requirements.
11301.4.02B.lnsmrrnrnt LsLdOc 11307S2B-2 APRIL 27,2001
L iu u I v) 2 a n
n 0 0 -I
N
I
0 0 N
I- W w
a Q n
.?
- 0 0 N
t.* N
r
n 0 2
I
P V
n 0 0 J
c 0 0 N
op V c
2 a P
- 0 0 N
L
n 0 0 A
L
r c 0
0 0 N
I-
w W
I v)
n 0 0
d 0 0 N
2 a P z 0 L
$ 0 J
L
i
f
i i ! : i
I f f
f i
i
i
1
"_
"-
"-
"-
"_
"-
P 5
0 0 N
r" N
5 a 0
8 0
I
k ._ 0
m
L w
a 2 n
u I
v)
+
I
3 0 0 N
b I?
n 0 0 J
I- w W I v)
z
I- o z 3 LL
0
n 0 2
0 0 N
c
z
I- o z 3 Y
0
n 0 0 d
0 0 N
c
L t- 0 m
I- w w I v) s a n
n 0 0
0 0 N
5
n a
b 0
0 0 N
t r
N
u T
a 2 n
c 0
- 0 0 N
r' c
1 0 m
0 0 N
+ W W I tn
n. 0 0 -I
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
SECTION 11308
ZENON SYSTEM
PART 1 - GENERAL
1.01 DESCRIPTION
A. Description of Work
1. This Detailed Specification Section covers the hollow fiber membrane filtration
treatment system equipment as supplied by Zenon Environmental Systems, Inc.
2. The MF system shall consist of two (2) ZeeWeed MF units, compressed air
system, membrane cleaning (CIP) system, membrane backpulse system,
membrane maintenance cleddeconcentration system, piping, valves, controls
and instrumentation.
B. Coordination
1. The MFEM shall furnish the majority of equipment items associated with the MF
system and shall participate in the commissioning, startup, testing, and training of
District’s personnel in operation of the MF system as a whole.
2. The Installation Contractor will unpack, assemble, and install equipment items
furnished by the MFEM as shown on the Drawings and as specified herein. In
addition, the Installation Contractor will also furnish and install additional
equipment items, interconnecting piping, valves, instruments, power and control
wiring, and other appurtenances not furnished by the MFEM.
3. The Installation Contractor in association with the MFEM will be responsible for
acceptance testing of individual items of equipment as defined in the individual
equipment specifications. The Installation Contractor will also participate in the
startup of the MF system as described in Section 01670.
PART 2 - PRODUCTS
2.01 PROCESS SYSTEM DESIGN AND PERFORMANCE
A. Service Conditions
1. See Section 11300 for requirements.
B. Process Design Requirements
11308.ZENON SYSTEM.DOC 11308-1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUPMENT PROCUREMENT
1. See Section 11300 for requirements.
2.02 EQUIPMENT DESIGN AND FABRICATION
A. General
1. The following subsystems and components are included in the MF membrane
system:
a. Two ZeeWeed MF units, equipment numbers M-0912-(2) consisting of the
following:
1) , 40 ZW-650 microfiltration modules;
2) Membrane process tank,
3) Filtrate extraction pump;
4) Skid mounted piping, valves, and instrumentation;
5) Electrical control panel (equipment numbers CP-0912-(2)).
b. All required components for installation, including but not necessarily
limited to, appropriate anchor bolts, skid-mounted piping supports,
hardware, surface preparation, and shop painting.
B. Membrane System Requirements
1.
2.
3.
4.
5.
The MF units shall be a product of Zenon Environmental, Inc.
Each unit shall contain 40 hollow fiber membrane modules. Each module shall
contain a sufficient number of fibers to provide a nominal surface area of 650
square feet based on the outside fiber diameter.
The hollow fiber membrane modules shall be a polymeric fluorocarbon derivative
membrane (manufacturer’s designation OCP) with a 0.035 micron nominal pore
size.
The membrane modules and supporting pipe work shall be designed for a cross
flow configuration in a plug flow arrangement.
The units shall incorporate a primary filtrate backpulse and secondary
maintenance cleddeconcentration system to maintain filter flow performance.
11308.ZENON SYSTEM.DOC 11308-2 APRIL 27,2001
City of carlsbad
Carlsbad Recycling Facility
MF EQuPMENT PROCUREMENT
6. Equipment hmished under this section shall be fabricated in full conformity with
the drawings, specifications, engineering data, instructions, and recommendations
of the MFEM except as modified herein.
C. Membrane Process Tanks
1.
2.
3.
4.
5.
6.
Membrane process tanks shall be constructed of all Type 3 1613 16L stainless steel
in a welded configuration for installation above grade. Components shall
conform to the following:
a. Plate: Stainless steel, Type 316L; ASTM A240 - Standard Specification for
Heat-Resisting Chromium and Chromium-Nickel Stainless Steel Plate,
Sheet and Strip for Pressure Vessels, passivated.
b. Squares, Channels, and Angles: Stainless steel, Type 316L; ASTM A479 -
Standard Specification for Stainless Steel Bars and Shapes for Use in
Boilers and Other Pressure Vessels, passivated.
c. Pipe: Stainless steel, welded process, Grade TP316L, Schedule 10s; ASTM
A312 - Standard Specification for Seamless and Welded Austenitic
Stainless Steel Pipes, passivated.
d. Flanges: Forged stainless steel; ASTM A182 - Standard Specification for
Forged or Rolled Alloy-Steel Pipe Flanges, Forged Fittings, and Valves and
Parts for High-Temperature Service, Grade F316, lap joint flange with
stainless steel stub end, ASTM A240 - Standard Specification for Heat-
Resisting Chromium and Chromium-Nickel Stainless Steel Plate, Sheet, and
Strip for Pressure Vessels, Type 316L, welded grade conforming to MSS
SP-43 - Wrought Stainless Steel Butt-welding Fittings; schedule to match
pipe.
Plate shall be a minimum 3/16-inch thick.
All welding shall be conducted in accordance with AWS D.6 - Structural
Welding Code-Stainless Steel. All welding operators shall be qualified in
accordance with current AWS requirements.
The direct current, straight polarity, gas tungsten-arc (GTAW) process shall be
used for all welding.
The method of fabrication shall be continuous fillet and bevel welds. Stitch or
spot welding is not permitted.
Passivate all finished welds.
11308.ZENON SYSTEM.DoC 11308-3 APW 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
7. The strength of the welds shall meet or exceed the strength of the structural shape
or tubing material.
8. All interior and external welds shall be ground smooth.
9. The tanks shall include all necessary support assemblies and components for the
membrane module cassettes and related piping and appurtenant equipment.
10. The tanks shall be designed for anchorage to a concrete equipment pad. The tank
shall be designed to resist the gravitational and seismic forces of the module
assemblies, piping, and other related equipment supported from the structure
when full. The tank and all anchorages shall be designed to be in conformance
with the latest edition of the Uniform Building Code for Seismic Zone 4, with a
seismic importance factor of 1.0. The MFEM shall submit calculations
documenting compliance with these requirements.
D. MF Module Assemblies
1. The membrane modules shall be designed for cross flow operation. Feed shall
enter through the membrane exterior face and filtrate shall exit through the upper
end connection while excess feed (crossflow) shall continue through the
membrane process tank and portion will overtlow to waste.
2. The modules shall be ZeeWeed ZW-650. Modules shall be arranged in cassette
assemblies with eight modules per cassette.
3. Each cassette shall be supported by a stainless steel framework in a vertical
orientation for submersion in the membrane process tank. All seals shall be
EPDM.
4. Forty (40) modules shall be incorporated in each unit. The modules shall be
connected in manifolded cassettes and supported from the membrane process tank
framework.
5. Modules for each cassette shall be tested at the factory. A certified test report
organized by module serial number shall be forwarded to the District a minimum
30 days prior to shipment of the modules to the site. The District reserves the
right to have a representative present to witness the testing.
6. The MFEM shall furnish a certificate providing the serial number and square
footage of membrane in each module for the project. No module shall have a
deviation in membrane area of more than ? 2 percent.
E. Cyclic Membrane Aeration System
i
II3OB.ZENON SYST'EM.DC€ 11308-4 APRIL 27.2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
1. The units shall be provided with an aeration system to assist in preventing particle
adherence to the surface of the membranes.
2. Course air bubbles shall flow from the bottom of the membrane modules creating
turbulence to scour and clean the outside surface of the membrane modules.
3. Cycles of process aeration shall be sequenced and controlled automatically
through the PLC.
4. The compressed air system supplying compressed air for the cyclic membrane
aeration system and for pneumatic actuated valves on the MF unit will be
provided by the MFEM. See Article 2.03-A, Compressed Air System.
5. The compressed air system within the MF units shall include the following:
a. A control air manifold which supplies compressed air to solenoid valves for
control of automatic process valves;
b. A stainless steel pipework connection to supply process air to the modules.
6. All pneumatic tubing to on-skid valves shall be Type 316 stainless steel. The use
of plastic tubing will not be allowed.
F. Filtrate Extraction System
1.
2.
3.
4.
5.
6.
Filtrate shall be extracted through the membrane modules by a vacuum induced
on the filtrate side of the hollow fibers by the unit extraction pump. The
extraction pump shall also be used to circulate membrane backpulse and cleaning
solutions.
The system shall include an air separator tank and liquid ring vacuum pumping
system.
Design and operating requirements for components of the filtrate extraction
system are included in Supplement 4.01-A, Process Equipment Schedules.
Requirements for the extraction pumps are specified in Section 11214.
Requirements for the vacuum pumps are specified in Section 11215.
Air Separator Tank:
a. Vessel construction shall comply with the requirements of the ASME Boiler
and Pressure Vessel Code, Section VIII, Code U Stamp.
b. Vessel shall be constructed of all Type 3 16L stainless steel.
11308.ZENONSYSTEM.Doc 11308-5 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMEm
c. The vessel exterior shall be glass bead blasted after fabrication. Interior and
exterior surfaces shall be passivated.
d. In addition to required process connections, vessel shall be provided with
drain, vent, and gauge outlets, minimum 1/2-inch NF'T.
G. Membrane Backpulse System
1. The MF units shall utilize a reverse flow back flush to remove accumulated
particulate and maintain the design filtrate production rate. Process effluent at a
pressure of roughly 20 - 40 psig shall be introduced into the filtrate side of the
fibers at a rate of 12.5 gpm per module, flushing dislodged solids from the
membrane surface.
2. The backpulse cycles shall be initiated through the PLC control system at fixed
time intervals. The cycles shall be carried out automatically through the PLC.
The design backpulse interval shall be 15 minutes, maximum.
H. Maintenance CleanDeconcentration System
1. A secondary maintenance cleaddeconcentration cycle shall be periodically
employed to increase the interval between required unit CIP cycles.
2. The basic cycle shall include an extended backpulse of maintenance cleaning
solution without aeration. During this period, 50 percent of the membrane
process tank volume shall be drained to waste (deconcentration).
3. Maintenance cleaning solutions shall include alternately 250 ppm sodium
hypochlorite solution and 0.2 percent citric acid solution. Both solutions shall be
prepared using permeate makeup water fkom the RO system.
4. All portions of the maintenance cleddeconcentration cycle, including solution
makeup, shall be carried out automatically through the PLC. The design
maintenance clean interval shall be minimum 3 times per week.
I. Access Provisions
1. The skid assembly shall be furnished complete with all required provisions to
access the membrane cells, including ladders, walkways, module removal gantry
and associated appurtenances.
J. Instrumentation and Controls
1. Each MF unit shall be equipped with the following:
I1308.ZENON SYSTEM.M)C 11308-6 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
a.
b.
C.
d.
e.
f.
g.
h.
1.
j.
Control enclosure for consolidated termination of control circuit wiring for
unit mounted devices.
Membrane process tank level indicating transmitter.
Membrane process tank discrete level switches (three).
Waste feed magnetic flow meter.
Filtrate magnetic flow meter.
Filtrate pressure indicating transmitter.
Air separation tank level sight gauge.
Backpulse supply high pressure switches (two).
Extraction pump discharge pressure gauge.
Extraction pump discharge pressure switch.
2. All control, power, and instrument wiring external to unit electrical panels shall
be run in PVC coated rigid galvanized steel conduit and fittings, flexible PVC
coated, steel core liquid tight conduit, or cable tray with wiring secured by nylon
ties. See Section 16100 for requirements.
K. Piping
1. Piping interfaces on the MF units shall be designed such that the two membrane
process tanks and associated filtrate extraction equipment can be arranged in a
single row and connected on common interconnecting pipe manifolds.
2. The MFEM shall provide all piping integral to the MF units to terminations at the
envelope of the membrane process tank, including components of the filtrate
extraction system. The Installation Contractor will supply all interconnecting
pipe work to terminal flanges outside the unit envelope.
3. All termination points shall be flanged ANSI Class 150 in sizes 2-inches and
larger; or NPT pipe threaded in sizes less than 2-inches.
4. Terminations shall be provided for the services listed below. Pipe sizes at the
points of connection shall be per the MFEM's design.
a. MF feed inlet.
b. RO permeate fill inlet.
11308.ZENON SYSTEM.W€ 11308-7 APRIL. 27.2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
C. MF filtrate outlet.
d. Residual feed waste outlet.
e. Membrane process tank concentrate drain outlet.
f. Cyclic process air inlet.
g. MF control air inlet.
5. Piping materials for each service shall be per the MFEM's design. See
requirements for candidate piping systems in Division 15.
L. Valves
1. For a list of automatic flow valves to be furnished on each unit, see Supplement
4.01-B, Valve Schedules.
2. In addition to the valves listed in Supplement 4.01-B, the MFEM shall provide the
following manual MF unit mounted valves (typical for each unit):
3. For valve requirements, see Section 15100.
2.03 EQUIPMENT AND COMPONENTS
A. Feed Delivery System
1. The feed delivery system includes the MF feed pump station; automatic strainers;
interconnecting piping, valves, instrumentation and controls.
2. Design and operating requirements for components of the feed delivery system
are included in Supplement 4.01-A, Process Equipment Schedules.
3. Requirements for the MF feed pumps are specified in Section 11213.
4. Requirements for the automatic strainers are specified in Section 11340.
II3OB.ZENON SYSTEM.Doc 11308-8 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility MF EQUIPMENT PROCUREMENT
B. Compressed Air System
1. The compressed air system shall consist of two separate subsystems: a process air
blower system and control air compressor system.
2. The process air blower system shall consist of the following: three aeration
blowers with inlet filter assemblies; interconnecting piping, valves,
instrumentation and controls.
3. The control air system shall consist of the following: two air compressors with
integral dryers and outlet filters; two supply air filter assemblies; one air receiver
with accessories; one control air regulator assembly; interconnecting piping,
valves, instrumentation and controls.
4. The process air blower system shall be suitable for supply to the membrane cyclic
aeration system.
5. The compressed air system shall be suitable for supply of control air used for the
pneumatically operated valves furnished with the MF system.
6. Design and operating requirements for components of the compressed air system
are included in Supplement 4.01-A, Process Equipment Schedules.
7. Components of the control air compressed air system are specified in Section
11370.
8. Components of the process air blower system are specified in Section 11375.
C. Membrane Cleaning System
1. The cleaning system shall include a CIP solution tank and accessories, citric acid
dose system, sodium hypochlorite dose system, sodium hydroxide dose system;
interconnecting piping, valves, instrumentation and controls.
2. Cleaning system components shall be used for both the in basin recovery clean
operations as well as the periodic maintenance cleddeconcentration cycle.
3. Design and operating requirements for components of the membrane cleaning
system are included in Supplement 4.01-A, Process Equipment Schedules.
4. The CIP tank is specified in Section 11250.
5. Cleaning chemical dosing systems are specified in Section 11240 and related
system sections.
6. Valves
11308.ZENON SYSTEM.Doc 11308-9 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
IIJ08.ZENON SYSTEM.WC 11308-10 APRIL 27,2001
D.
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
b. In addition to the valves listed in Supplement 4.01-B, the MFEM shall
provide the following manual CIP system valves:
TAG NUMBER TYPE SIZE [INCHES]
V-0925-2
BFV4 6 V-0925-6
BFV4 2 V-0925-5
BFV4 2 V-0925-4
BFV4 2
c. For valve requirements, see Section 15100.
7. Instrumentation and Controls
a. Maintenance cleaning of individual MF units shall be automatically initiated
and controlled through the PLC. Recovery cleans shall be manually
initiated but automatically controlled thereafter through the PLC. Cleaning
solutions shall be made up of RO permeate and the appropriate cleaning
chemicals. Tank charging shall be conducted automatically through the
PLC .
b. For instrument component specifications, see Section 13330.
Membrane Backpulse System
1. The backpulse system shall consist of a backpulse storage tank, sodium
hypochlorite dosing system, interconnecting piping, valves, instrumentation and
controls.
2. Design and operating requirements for components of the backpulse system are
included in Supplement 4.01-A, Process Equipment Schedules.
3. The backpulse storage tank is specified in Section 11250.
4. Components of the sodium hypochlorite dosing system are specified in Sections
11240and 11244.
5. Valves
a. For a list of automatic flow valves to be supplied by the MFEM, see
Supplement 4.01-B, Valve Schedules.
City of carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
2.04
A.
B.
C.
b. In addition to the valves listed in Supplement 4.01-B, the MFEM shall
provide the following manual reverse flush system valves:
1 TAG NUMBER TYPE SIZE [INCHES]
V-0930-1
2 V-0930-3
BFV4 4 V-0930-2
BFV4 8
BFV4 2 V-0930-4
BFV4
c. For valve requirements, see Section 15100.
6. Instrumentation and Controls
a. The backpulse cycle shall be automatically initiated and controlled through
the PLC. Backpulse cycles shall be initiated on an elapsed time of filtration
basis. The design backpulse cycle interval shall be 9.5 minutes.
b. For instrument component specifications, see Section 13330.
INSTRUMENTATION AND CONTROLS
General
1. For general instrumentation and control system requirements, see Section 11300.
Instrumentation
1. The MFEM shall provide specified instrumentation for the MF membrane system
and related subsystems.
2. For identification of MFEM supplied instruments, see the instrument list provided
in Supplement 4.02-B.
Control Panels
1. The MFEM shall provide the following control panels:
11308.ZENON SYSTEM.DC€ 11308-1 1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
2. All panels shall be constructed in accordance with Section 13325.
D. Controls
1. The MFEM shall provide all software configuration and discrete controls for the
system provided, including interface and control of components not furnished by
the MFEM.
2. For requirements, see the control functional descriptions provided in Supplement
4.02-C, Loop Function Data Sheets.
2.05 SPARE PARTS
A. A list of recommended spare parts and all special tools required for normal operation
and maintenance of all components furnished by the MFEM shall be submitted for
approval within sixty (60) days following Notice to Proceed. All items on this list shall
be furnished prior to the beginning of preoperational tests. The list shall include items
specified hereinbefore and the following additional items as a minimum:
DESCRIPTION QUANTITY
Coalescer, Control Air Regulator Assembly
4 Membrane, Supply Air Filter Assembly
4 Coalescer, Supply Air Filter Assembly
2
Pressure gauge, panel mount MF 1
Pressure gauge, 2" 0-160 psig CIP
1 Pressure gauge, 1.5" 0-160 psig CIP
1
~~~
Air Regulators, of each type
10 O-ring kit, module
10 O-ring kit, bundle
1 of each size Valve, Type BFV4
3 of each size Seal Kit, for Type 1P actuator
3 of each size Valve Seat, for Type BFV3
1 of each size Actuator, Type 1P
1 of each size Valve, Type BFV3
3 Solenoid, Type SV2
7 Solenoid, Type SV1
2 Regulator, pilot 0-125 psig CIP
1
Grease, O-ring
2 Pressure Relief Valve, of each type
10
11308.ZENONSYSTEM.DOC 11308-12 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
DESCRIPTION QUANTITY
Pressure gauge, control air
Automatic Drain Valve, Type ADVl
1
1
B. For additional spare parts requirements related to the instrumentation and control
system, see Section 13320.
PART 3 - EXECUTION - NOT USED
PART 4 - SUPPLEMENTAL INFORMATION
Supplements listed below are attached following “END OF SECTION” and are a part
of this Specification.
4.01 EQUIPMENT SCHEDULES
A. Process Equipment Schedules
B. Valve Schedules
4.02 INSTUMENTATION AND CONTROL SCHEDULES
A. PLC Inputloutput List
B. Instrument List
C. Loop Function Data Sheets
+ + END OF SECTION + +
11308.ZENON SYSTEM.WC 11308-13 APRIL 27,2001
City of carlsbad
MF EQUPMENT PROCUREMEM
Carlsbad Recycling Facility
TABLE 11308.4.01A-1
MF FEED PUMPS
(p-0901-1, P-0901-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 25
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 1750
Drive Variable Speed
Minimum Discharge Size (inches) 6
Minimum pump shutoff head at design speed (feet) 160
Design Capacity (gpm)* 800
Design TDH (feet)* 77
Minimum pump efficiency at design capacity (%) 80.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Head Cast iron, ASTM A48 or Fabricated steel ASTM A53, Grade B
Bowls Cast iron, ASTM A48
Impellers Cast iron, ASTM A48
Impeller Wear Rings Cast iron, ASTM A48
Bowl Wear Rings Cast iron, ASTM A48
Bowl and Suction Case Bearings Bronze, ASTM B584, Alloy 932
Column Steel, ASTM A53, Grade A
Lineshaft Open Type; Stainless steel, ASTM A276, Type 416
Lineshaft Bearings Bronze, ASTM B584, Alloy 836
Head Shaft Stainless steel, ASTM A276, Type 416
Impeller Shaft Stainless steel, ASTM A276, Type 416
Shaft Sleeves Stainless steel, ASTM A276, Type 410, hardened
Shaft Seal Mechanical Type
* Point must be at or near the best efficiency point
I1308.4.01A.PROCESSEQUlPMMTSCHEDULES.WC 11308S1A-1 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-2
AUTOMATIC STRAINERS
("0906-1, "0906-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 1800
Motor Size (Hp) 0.25
Motor Enclosure Type TEFC
Inlet and Discharge Size (inches) 6
Screen Rating (microns) 500
Design Capacity (gpm) 800
Design Clean Pressure Drop 1 .o
11308.4.01A.PROCESSEQUlPMENTSCHEDULES.DOC 11308SlA-2 APRIL 27,2001
City of carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-3
PROCESS AIR BLOWERS
("0910-1, "0910-2, "0910-3)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) . Per Manufacturer
Motor Enclosure Type TEFC
Design Capacity (scfin) 1070
Design Pressure (psig) 5.6
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Cast iron, ASTM A48 or Fabricated steel ASTM A53, Grade B
ImpellerlRotor Cast iron, ASTM A48
Base Plate Steel, ASTM AS3, Grade A
11308.4.01A.PROCESSEQUIPMMTSCHEDULES.WC 11308S1A-3 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-4
AIR COMPRESSORS
(M-0911-1, "0911-2)
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm) 3600
Motor Size (Hp) 10
Motor Enclosure Type TEFC
Design Capacity (scfm) 10
Design Pressure (psig) 140
11308.4.01A.PROCESSEQUlPMENTSCHEDULES.WC 11308SlA-4 APRIL 27,2001
City of Carlsbad
MF EQTJIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-5
AIR RECEIVER
(T-0911)
ITEM DESIGN CONDITIONS
Volume (gallons) 70
Design Pressure @sig) 175
11308.4.01A.PROCESSEQUlPMENTSCXEDULES.DOC 11308SlA-5 APFUL 27.2001
City of Carlsbad
MF EQUIPMENT PROCWMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-6
MF FILTRATE EXTRACTION PUMPS
(P-0912-1, P-0912-2)
ITEM DESIGN CONDITIONS
Maximum motor fill load speed (rpm) 960
Motor Size (I-Xp) 15
Motor Enclosure Type TEFC
Pump Design Speed (rpm) 880
Drive Variable Speed
Minimum Discharge Size (inches) 6
Minimum pump shutoff head at design speed (feet) 100
Design Capacity (gpm)* 550
Design TDH (feet)* 60
Minimum pump efficiency at design capacity (%) 80.0
Minimum NPSH available at design capacity (feet, absolute) 34
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Stainless steel, Type 316
Impellers Stainless steel, Type 316
Shaft Stainless steel, Type 316
Shaft Sleeve Stainless steel, Type 316
Shaft Seal Mechanical Type * Point must be at or near the best efficiency point
APRIL 21,2001
City of Carlsbad Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11308.4.01A-7
MF FILTRATE VACUUM PUMPS
(P-0950-1, P-0950-2)
~~ ~~
ITEM DESIGN CONDITIONS
Maximum motor full load speed (rpm)
Motor Size (Hp) Per Manufacturer
Motor Enclosure Type TEFC
Pump Design Speed (rpm) Per Manufacturer
Drive Constant Speed
Minimum Discharge Size (inches) Manufacturer’s Standard
Design Capacity (scfin)* 74
Design Vacuum (in Hg.)* 20
Minimum pump efficiency at design capacity (%) 70.0
ITEM MATERIAL AND CONSTRUCTION REQUIREMENTS
Casing Stainless steel, Type 316
Impellers Stainless steel, Type 316
Shaft Stainless steel, Type 316
* Point must be at or near the best efficiency point
11308.4.01A.PROCESSEQUlPMEMSCHEDULES.DOC 11308SlA-7 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11308.4.01A-8
MF BACKPULSE TANK
(T-0930-1)
ITEM DESIGN CONDITIONS
Capacity (gallons)
Materials
Nominal Diameter (feet)
Nominal Width (feet)
1,500
FRP
Manufacturer's Standard
Manufacturer's Standard
CONNECTION SCHEDULE
z2!2 Vent with Filter 6-in flanged
Side
Filtered Water Inlet 4-in flanged
Siphon Drain 4-in flanged
Siphon Outlet
Overflow
8-in flanged
6-in flanged
Level Transmitter Connection 3-in flanged
Level Switch Connections (two) 3-in flanged
Level Sight Gauge Connections (two) 2-in flanged
11308.4.01A.PROCESSEQUlPMMTSCHEDULES.DOC 11308SlA-8 APRIL 27,2001
City of carlsbad
Carlsbad Recycling Facility
MF EQUPMENT PROCUREMENT
TABLE 11308.4.01A-9
MAINTENANCE CLEAN TANK
(T-0925-1)
ITEM DESIGN CONDITIONS
Capacity (gallons) 1,500
Materials FRP
Nominal Diameter (feet) Manufacturer’s Standard
Nominal Straight Shell Height (feet) Manufacturer’s Standard
Accessories Hinged Access Hatch
CONNECTION SCHEDULE
DE Vent
Permeate Fill Inlet
Chemical Dosing Inlet
6-in flanged
2-in flanged
4-in flanged
Side
Siphon Outlet 6-in flanged
Overflow 6-in flanged
Level Transmitter Connection 3-in flanged
Level Switch Connections (two) 3-in flanged
Level Sight Gauge Connections (two) 2-in flanged
11308.4.01A.PROCfSSEQUIPMENTSCHEDULES.DOC 11308S1A-9 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
TABLE 11308.4.01A-10
MF CIP CHEMICAL DOSING SYSTEMS
ITEM DESIGN CONDITIONS
Minimum Storage Tank Capacity (gallons)
Minimum Dosing Pump Operating Capacity (gallons per hour)
250
10 - 100
11308.4.01A.PROCESSEQUlPMENTSCHEDULES.DOC 11308SlA-10 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11308.4.01B-1
AUTOMATED VALVE SCHEDULE
V-0930-(2)-6 BFV5 8 10 BP P1 I
11308.4.01B.VALVE SCHEDULES.DOC 11308SlB-1 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
FLOW VALVES
Oper. Max.
Tag Actuator Capacity Press. Size Valve
Number Comments Type Service (gpm) (psig) (in.) Type I y$alve furnished by strainer manufacturer. See equipment specification for requirements.
2. To be designed by MFEM. See specifications for requirements.
3. Not all flow valves are listed. MFEM shall provide required on-skid valves for his
4. Power operated valves with unique equipment numbers shown on the Drawings but not
system.
listed above will be furnished by the Installation Contractor.
11308.4.01B.VALVE SCHUIULES.DOC 11308SlB-2 APRIL 27,2001
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11308.4.01B-2
SELF-CONTAINED VALVE SCHEDULES
hown on the Drawings but not listed above
~~ ~
Notes: 1. To be designed by MFEM. See specifications for requirements.
2. Not all required valves listed. See specifications for requirements. 3. Regulating valves with unique equipment numbers shown on the Drawings but not listed above will be furnished by the Installation Contractor.
11308.4.01B.VALVESCHEDULES.WC 11308SlB-3 APRIL 27,2001
i
3
City of Carlsbad
Carlsbad Recycling Facility
MF EQUIPMENT PROCUREMENT
TABLE 11308.4.02B-1
INSTRUMENT LIST
I1308.4.02B.lnsrmment Lis1.doc 11308S2B-1 APRIL 27,2001
City of Carlsbad
MF EQUIPMENT PROCUREMENT
Carlsbad Recycling Facility
Notes:
1. Instrument fumished by strainer manufacturer.
2. Indicator is integral to storage tote wall and/or supplied by tote manufacturer.
3. Provide manufacturer’s standard insmunent.
11308.4.02B.lnsmunent Lirt.doc 11308S2B-2 APRIL 27,2001
- 0 0 N
r” N
I- w w
v)
I
5 a n z 0 F u z 3 LL n 0 0 2
e 0 0 YJ
1 c
b m e e
+ w w X
v) 2 a n
n 0 0 J
c 0
L
I-
- 0 0 N
t3
2
W I
v)
a n z 0 F 0 z
LL 3
-1-
L
L
- 0 0 N
m .-m
k m ?I 5 II v)v) an
v) I
0 0 N
L L
- 0 0 N
2 a 0
o.
0 0
0 13
I i 2 i I
I
I i I ! !
! "_
"_
"_
"_ I
i
I I I
i
L
"_
"_
2 (A
M
00 0
E 0
L i
iL
r c 0
0 0 N
0 N
..
ts w I rn 2 a 0
8 0
,-. 0 0 N
r c
V c;‘
;> m
L
LI
r." N
c 0
v) a
N m 0
0 a - 2
23 oc
- 0 0 N
r r d E d
I- W W I v)
U 2
n
L n 0 0 J
0 0 N
N r”
d
$ 0
U I
2 9 B 41
..
m
m *)
0 ..
0 2 n 0 41
- 0 0 N
r
c\ d
c iu W I
v)
UVI W
.OIL 0
8 N
L iu W I
v) 2 a n
L
L
M . 0 N
0
r c
M 0
N 0
L
!i ..
z
0 n
0 -I
m m N
0 ..
1 rn ._ i
0
m Lo -