Loading...
HomeMy WebLinkAboutWadsen LLC; 2012-10-05;Carlsbad Municipal Water District MINOR PUBLIC WORKS PROJECT Project Manager: Jase Warner (760) 438-2722 Mail or Deliver to: Water Utility Department Carlsbad Municipal Water District 5950 El Camino Real Carlsbad, CA 92008 Date Issued: October 5, 2012 Please use typewriter or black ink. DESCRIPTION Labor, materials and equipment for Maerkle Legacy Opto 22 PAC migration project. No job walk-through scheduled. Contractors to arrange site visit by contacting: Project Manager: Jase Warner Phone No. 760-438-2722 SUBJECT TO ACCEPTANCE WITHIN (90) DAYS Name and Address of Contractor WADSEN LLC Name 27636 YNEZ RD. L-7#215 Address TEMECULA City/State/Zip 801-716-2273 Telephone Fax -1 -Revised: 5/17/00 Name and TitlCSf Person contracts. orized to sign Name Title JOB QUOTATION ITEM NO. UNIT QTY DESCRIPTION TOTAL PRICE 1 Ea 1 Labor, materials and equipment for Upper and Lower Maerkle Opto 22 Migration Project $9,040.00 Quote Lump Sum, including all applicable taxes. Award is by total price. Evaluation and Award. Bids are binding subject to acceptance at any time within 90 days after opening, unless othenfl/ise stipulated by the Carlsbad Municipal Water District. Award will be made by the Purchasing Officer to the lowest, responsive, responsible contractor. The District reserves the right to reject any or all bids and to accept or reject any item(s) therein or waive any informality in the bid. In the event of a conflict between unit price and extended price, the unit price will prevail unless price is so obviously unreasonable as to indicate an error. In that event, the bid will be rejected as non-responsive for the reason of the inability to determine the intended bid. The District reserves the right to conduct a pre-award inquiry to determine the contractor's ability to perform, including but not limited to facilities, financial responsibility, materials/supplies and past performance. The determination of the District as to the Contractor's ability to perform the contract shall be conclusive. SUBMITTED BY: Contractor's License Number Authorized Sign^ Printed Name and Title /I6e.«^5^<^ Classification(s) Expiration Date Date TAX IDENTIFICATION NUMBER (Corporations) Federal Tax I.D.#: _ OR (Individuals) Social Security #: -2-Revised: 5/17/00 DESIGNATION OF SUBCONTRACTORS Set forth below is the full name and location of the place of business of each sub-contractor whom the contractor proposes to subcontract portions of the work in excess of one-half of one percent of the total bid, and the portion of the work which will be done by each sub-contractor for each subcontract. NOTE: The contractor understands that if he fails to specify a sub-contractor for any portion of the work to be performed under the contract in excess of one-half of one percent of the bid, the contractor shall be deemed to have agreed to perform such portion, and that the contractor shall not be permitted to sublet or subcontract that portion of the work, except in cases of the public emergency or necessity, and then only after a finding, reduced in writing as a public record of the Awarding Authority, setting forth the facts constituting the emergency or necessity in accordance with the provisions of the Subletting and Subcontracting Fair Practices Act (Section 4100 et seq. of the California Public Contract Code). If no subcontractors are to be employed on the project, enter the word "NONE." PORTION OF WORK TO BE SUBCONTRACTED SUBCONTRACTOR* MBE Item No. Description of Work % of Total Contract Business Name and Address License No., Classification & Expiration Date Yes No Total % Subcontracted: * Indicate Minority Business Enterprise (MBE) of subcontractor. -3-Revised: 5/17/00 CARLSBAD MUNICIPAL WATER DISTRICT MINOR PUBLIC WORKS CONTRACT (Less than $45,000) Labor: I propose to employ only skilled workers and to abide by all State and City of Carlsbad Ordinances governing labor, including paying the general prevailing rate of wages for each craft or type of worker needed to execute the contract. Guarantee: I guarantee all labor and materials furnished and agree to complete work in accordance with directions and subject to inspection approval and acceptance by: Jase Warner (project manager) Wage Rates: The general prevailing rate of wages for each craft or type of worker needed to execute the contract shall be those as determined by the Director of Industrial Relations pursuant to Sections 1770, 1773 and 1773.1 of the Labor Code. Pursuant to Section 1773.2 of the Labor Code, a current copy of the applicable wage rates is on file in the Office of the City Engineer. The contractor to whom the contract is awarded shall not pay less than the said specified prevailing rates of wages to all workers employed by him or her in execution of the contract. False Claims Contract hereby agrees that any contract claim submitted to the District must be asserted as part of the contract process as set forth in this agreement and not in anticipation of litigation or in conjunction with litigation. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. The provisions of Carlsbad Municipal Code sections 3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference. Contractor hereby acknowledges that the filing of a false claim may be subject to the contractor to an administrative debarment proceeding wherein the contractor may be prevented from further bidding on public contracts for a period of up to five years and that debarment by another jurisdiction is grounds for the Carlsbad Municipal Water District to disqualify the Contractor or subcontractor from participating in contract bidding. ^ Print Signature: Name: -4- Revised: 5/17/00 Commercial General Liability, Automobile Liability and Workers' Compensation Insurance: The successful contractor shall provide to the Carlsbad Municipal Water District, a Certification of Commercial General Liability and Property Damage Insurance and a Certificate of Workers' Compensation insurance indicating coverage in a form approved by the California Insurance Commission. The certificates shall indicate coverage during the period of the contract and must be furnished to the District prior to the start of work. The minimum limits of liability insurance are to be placed with insurers that have: (1) a rating in the most recent Best's Key Rating Guide of at least A-:V and (2) are admitted and authorized to transact the business of insurance in the State of California by the insurance Commissioner. Commercial General Liability insurance of Injuries including accidental death, to any one person in an amount not less than $500,000 Subject to the same limit for each person on account of one accident in an amount not less than $500,000 Property damage insurance in an amount of not less than $100,000 Automobile Liability Insurance in the amount of $100,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. The automobile insurance certificate must state the coverage is for "any auto" and cannot be limited in any manner. The above policies shall have non-cancellation clause providing that thirty (30) days written notice shall be given to the District prior to such cancellation. The policies shall name the Carlsbad Municipal Water District as additional insured. Indemnity: The Contractor shall assume the defense of, pay all expenses of defense, and indemnify and hold harmless the City and the District, and its officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable law, rules or regulations including those related to safety and health; and from any and ail claims, loss, damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, except for loss or damage caused by the sole or active negligence or willful misconduct of the City or the District. The expenses of defense include all costs and expenses including attorneys' fees for litigation, arbitration, or other dispute resolution method. -5- Revised: 5/17/00 Jurisdiction: The Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California. CONTRACTOR: (sign here) (print name and title) MCdi fii^t^ (e-mail address) By: (sign here) (print name and title) (e-mail address) (address) (city/state/zip) CARLSBAD MUNICIPAL WATER DISTRICT, a Public Agency organized under the Municipal Water Act of 1911, and a Subsidiary District of the City of Carlsbad By: General Manager (address) (telephone no.) ATTEST: LORRAINE M. WOOD Secretary (telephone no.) (fax no.) (Proper notarial acknowledgment of execution by Contractor must be attached. Chairman, president or vice-president and secretary, assistant secretary, CFO or assistant treasurer must sign for corporations. OthenA/ise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation.) APPROVED AS TO FORM: RONALD R. BALL, City Attorney BY: Assistant City Attorney Revised: 5/17/00 Wadsen LLC 27636 Ynez Road L-7, #215 Temecula, CA 92591 August 27, 2012 Mr. Tom Pagakis Carlsbad Water District 5950 El Camino Real Carlsbad, CA 92008 REF: Upper & Lower Maerkle Opto 22 Migration Mr. Pagakis: Thank you for allowing Wadsen LLC to provide Carlsbad Water District a proposal for the Maerkle legacy Opto 22 PAC migration project. INCLUDED SERVICES: Programming Services: Purchase and Installation ofthe new PAC Project Pro software on 2 computers. Testing the communications from the Upper Maerkle RTU site to the base processor. Testing the communications from the Lower Maerkle RTU site to the base processor. Migration ofthe program/strategy for the new PAC Opto 22 base processor. Migration ofthe program/strategy for new PAC Opto 22 processor located at the Lower Maerkle Pump site. Testing the 2 new programs/strategies for proper operation after PAC migration. Testing of the Wonderware HMI for proper operation after PAC migration. Testing the Nematron touch panel for proper operation after PAC migration. Configure/Testing of hot swap redundancy for the base PAC processors in the shop. Sta •Up and Commissioning: 2 days (16 hrs) bench testing of new RTU's and PAC processors 4 days (32 hrs) migrating legacy factory floor programs/strategies in the Maerkle and shop PAC Processors. 2 days (16 hrs) configuring the hot swap redundancy processors located in the shop. Carlsbad Water District will provide the following: • Remove legacy Opto 22 hardware. • Installation and wiring of new PAC Opto 22 Hardware. • Supplying parts and labor associated with the new PAC Hardware. • Removing of the legacy RTU modems, antermas and cabling. • Installation of the new RTU modems, antermas and cabling. Wadsen LLC 27636 Ynez Road L-7, #215 Temecula, CA 92591 TERMS AND PRICING Wadsen LLC is quoting a Fixed Price of $9040.00 for the completion of the Maerkle Migration Project. All payments are due Net 30 from date of invoice. Invoices past due will be assessed a delinquent charge of 1.5% per month (18% APR) on the unpaid balance from date of invoice. Please issue purchase order to: Wadsen, LLC 27636 Ynez Road L-7, #215 Temecula, CA 92591 Reference: Quote #08271201 E-Mail: wade@wadsenllc.com Mr. Pagakis, I hope this proposal meets with your approval. Thanks again for giving Wadsen LLC the opportunity to help Carlsbad Water District with the Migration of the legacy Maerkle systems. If you have any questions or comments regarding this proposal, please do not hesitate to call me at (801) 716-2273. Sincerely, Wade Jensen Manager Wadsen, LLC