Loading...
HomeMy WebLinkAboutZamborelli Enterprises Inc; 2005-06-09;DOC# 2006-0662756 RECORDED REQUESTED BY CITY OF CARLSBAD AND WHEN RECORDED PLEASE MAIL TO: City Clerk City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, California 92008 SEP 18, 2006 3:36 PM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE GREGORY,!. SMITH COUNT','1 RECORDER FEES: 0.00 PAGES: 1 Space above this line for Recorder's use. PARCEL NO: NOTICE OF COMPLETION 223 200 32 00 223 200 32 10 Notice is hereby given that: 1. The undersigned is owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the undersigned is City of Carlsbad, a municipal corporation. 3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008. 4. The nature of the title of the undersigned is: In fee. 5. A work or improvement on the property hereinafter described was completed on August 1, 2006. 6. The name of the contractor for such work or improvement is Zamborelli Enterprises, Inc. 7. The property on which said work or improvement was completed is in the City of Carlsbad, County of San Diego, State of California, and is described as follows: Rancho Santa Fe Road Fill Failure at Agua Dulce project, City of Carlsbad project no. 1001, FHWA project no. KJK-CBD-001-1. 8. The street address of said property is in the City of Carlsbad. CITY OF CARLSBAD COtfRAD C. HAMIvTANN, JR. City Engineer VERIFICATION OF CITY CLERK I, the undersigned, say: I am the City Clerk of the City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California, 92008; the City Manager of said City on ^"^Q plo-rrv~cJL>fr"\ i£>^. 20£>Co . accepted the above described work as completed and ordered thai a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct. Executed on iSo ptfov\(beA ^200U . at Carlsbad, California. CITY OF CARLSBAD CONTRACT PUBLIC WORKS 120s This agreement is made this 9 .+ day of Jd ~JL by and between the City of Carlsbad, California, a municipal corporation, (hereinafter called "City"), and Zamborelli Enterprises, Inc. whose principal place of business is 31877 Circle Drive, S. Laquna Beach, CA 92651 (hereinafter called "Contractor"). City and Contractor agree as follows: 1. Description of Work. Contractor shall perform all work as designed and directed by Testing Engineers-San Diego, Inc. and Earth Support Systems, Inc. on a cost plus materials basis as shown in "Exhibit A. 2. Provisions of Labor and Materials. Contractor shall provide all labor, materials, tools, equipment, and personnel to perform the work specified by the Contract Documents. 3. Contract Documents. The Contract Documents consist of this Contract and Exhibit A; which is incorporated herein by this reference. Contractor, her/his subcontractors, and materials suppliers shall provide and install the work as indicated, specified, and implied by the Contract Documents. Any items of work not indicated or specified, but which are essential to the completion of the work, shall be provided at the Contractor's expense to fulfill the intent of said documents. In all instances through the life of the Contract, the City will be the interpreter of the intent of the Contract Documents, and the City's decision relative to said intent will be final and binding. Failure of the Contractor to apprise subcontractors and materials suppliers of this condition of the Contract will not relieve responsibility of compliance. 4. Payment. For all compensation for Contractor's performance of work under this Contract, City shall make payment to the Contractor per section 9-3 PAYMENT of the Standard Specifications for Public Works Construction (SSPWC) 2003 Edition, and any supplements thereto hereinafter designated "SSPWC", as issued by the Southern California Chapter of the American Public Works Association, and as amended by the Supplemental Provisions section of this contract. The Engineer will close the estimate of work completed for progress payments on the last working day of each month. The total fee to the contractor shall not exceed $950,000 without an approved amendment to this contract. The contractor will be compensated on a time and material basis as shown in Exhibit A, and markups shall not exceed 10% 5. Independent Investigation. Contractor has made an independent investigation of the jobsite, the soil conditions at the jobsite, and all other conditions that might affect the progress of the work, and is aware of those conditions. The Contract price includes payment for all work that may be done by Contractor, whether anticipated or not, in order to overcome underground conditions. Any information that may have been furnished to Contractor by City about underground conditions or other job conditions is for Contractor's convenience only, and City does not warrant that the conditions are as thus indicated. Contractor is satisfied with all job conditions, including underground conditions and has not relied on information furnished by City. 6. Hazardous Waste or Other Unusual Conditions. If the contract involves digging trenches or other excavations that extend deeper than four feet below the surface Contractor shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: A. Hazardous Waste. Material that Contractor believes may be material that is hazardous waste, as defined in section 251 17 of the Health and Safety Code, that is required to be removed to a Class I, Class 11, or Class Ill disposal site in accordance with provisions of existing law. B. indicated. Differing Conditions. Subsurface or latent physical conditions at the site differing from those C. Unknown Physical Conditions. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in contractor's costs of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in this contract. In the event that a dispute arises between City and Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of the work, contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties. 7. Immigration Reform and Control Act. Contractor certifies it is aware of the requirements of the Immigration Reform and Control Act of 1986 (8 USC sections 1101-1525) and has complied and will comply with these requirements, including, but not limited to, verifying the eligibility for employment of all agents, employees, subcontractors, and consultants that are included in this Contract. 8. Prevailing Wage. Pursuant to the California Labor Code, the director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with California Labor Code, section 1773 and a copy of a schedule of said general prevailing wage rates is on file in the office of the City Engineer, and is incorporated by reference herein. Pursuant to California Labor Code, section 1775, Contractor shall pay prevailing wages. Contractor shall post copies of all applicable prevailing wages on the job site. 9. Indemnification. Co~a~r~~~~~~~~~he~~n~ of pay all expenses of defense, and indemnify and hold harmless the City, and its officers and employees, from all claims, loss, damage, injury and liability of every kind, nature and description, directly or indirectly arising from or in connection with the performance of the Contract or work; or from any failure or alleged failure of Contractor to comply with any applicable law, rules or regulations including those relating to safety and health; and from any and all claims, loss, damages, injury and liability, howsoever the same may be caused, resulting directly or indirectly from the nature of the work covered by the Contract, except for loss or damage caused by the sole or active negligence or willful misconduct of the City. The expenses of defense include all costs and expenses including attorneys' fees for litigation, arbitration, or other dispute resolution method. - ti tee Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, and Contractor will pay all costs, including defense costs for the City. Defense costs include the cost of separate counsel for City, if City requests separate counsel. Contractor shall also defend and indemnify the City against any challenges to the award of the contract to Contractor, arising in whole or in part from alleged inaccuracies or misrepresentation by the Contractor, whether intentional or otherwise, and Contractor will pay all costs, including defense costs for the City. Defense costs include the cost of separate counsel for City, if City requests separate counsel. IO. Insurance. Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his or her agents, representatives, employees or subcontractors. Said insurance shall meet the City's policy for insurance as stated in Resolution No. 91 -403. (A) Coverages And Limits Contractor shall maintain the types of coverages and minimum limits indicted herein: a. Comprehensive General Liability Insurance: $1,000,000 combined single limit per occurrence for bodily injury and property damage. If the policy has an aggregate limit, a separate aggregate in the amounts specified shall be established for the risks for which the City or its agents, officers or employees are additional insured. b. Business Automobile Liability Insurance: $1,000,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. The auto insurance certificate must state the coverage is for "any auto'' and cannot be limited in any manner. c. Workers' Compensation and Employers' Liability Insurance: Workers' compensation limits as required by the Labor Code of the State of California and Employers' Liability limits of $1,000,000 per incident. Workers' compensation offered by the State Compensation Insurance Fund is acceptable to the City. (B) Additional Provisions. Contractor shall ensure that the policies of insurance required under this agreement with the exception of Workers' Compensation and Business Automobile Liability Insurance contain, or are endorsed to contain, the following provisions. a. The City, its officials, employees and volunteers are to be covered as additional insured as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the contractor; premises owned, leased, hired or borrowed by the contractor. The coverage shall contain no special limitations on the scope of protection afforded to the City, its officials, employees or volunteers. All additional insured endorsements must be evidenced using separate documents attached to the certificate of insurance; one for each company affording general liability, and employers' liability coverage. b. The Contractor's insurance coverage shall be primary insurance as respects the City, its officials, employees and volunteers. Any insurance or self-insurance maintained by the City, its officials, employees or volunteers shall be in excess of the contractor's insurance and shall not contribute with it. c. to the City, its officials, employees or volunteers. Any failure to comply with reporting provisions of the policies shall not affect coverage provided d. Coverage shall state that the contractor's insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer's liability. (C) Notice Of Cancellation. Each insurance policy required by this agreement shall be endorsed to state that coverage shall not be nonrenewed, suspended, voided, canceled, or reduced in coverage or limits except after thirty (30) days' prior written notice has been given to the City by certified mail, return receipt requested. (D) Deductibles And Self-Insured Retention (S.I.R.) Levels. Any deductibles or self-insured retention levels must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retention levels as respects the City, its officials and employees; or the contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration and defense expenses. (E) Waiver Of Subrogation. All policies of insurance required under this agreement shall contain a waiver of all rights of subrogation the insurer may have or may acquire against the City or any of its officials or employees. (F) Subcontractors. Contractor shall include all subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each subcontractor. Coverages for subcontractors shall be subject to all of the requirements stated herein. (G) Acceptability Of Insurers. Insurance is to be placed with insurers that have a rating in Best's Key Rating Guide of at least A-:V. Insurers must also be authorized to transact the business of insurance by the State of California Insurance Commissioner as admitted carriers as evidenced by a listing in the official publication of the Department of Insurance of the State of California and/or under the standards specified by the City Council in Resolution No. 91-403. (H) Verification Of Coverage. Contractor shall furnish the City with certificates of insurance and original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be in forms approved by the City and are to be received and approved by the City before the Contract is executed by the City. (I) in the Contractor's bid. Cost Of Insurance. The Cost of all insurance required under this agreement shall be included 11. Claims and Lawsuits. All claims by contractor for $375,000 or less shall be resolved in accordance with the provisions in the Public Contract Code, Division 2, Part 3, Chapter 1, Article 1.5 (commencing with section 201 04) which are incorporated by reference. A copy of Article 1.5 is included in the Supplemental Provisions I section. The contractor shall initially submit all claims over $375,000 to the City using the informal dispute resolution process described in Public Contract Code subsections 201 04.2(a), (c), (d). Notwithstanding the provisions of this section of the contract, all claims shall comply with the Government Tort Claim Act (section 900 et seq., of the California Government Code) for any claim or cause of action for money or damages prior to filing any lawsuit for breach of this agreement. (A) Assertion of Claims. Contractor hereby agrees that any contract claim submitted to the City must be asserted as part of the contract process as set forth in this agreement and not in anticipation of litigation or in conjunction with litigation. (B) False Claims. Contractor acknowledges that if a false claim is submitted to the City, it may be considered fraud and the Contractor may be subject to criminal prosecution. (C) Government Code. Contractor acknowledges that California Government Code sections 12650 et seq., the False Claims Act, provides for civil penalties where a person knowingly submits a false claim to a public entity. These provisions include false claims made with deliberate ignorance of the false information or in reckless disregard of the truth or falsity of the information. (D) Penalty Recovery. If the City of Carlsbad seeks to recover penalties pursuant to the False Claims Act, it is entitled to recover its litigation costs, including attorney's fees. (E) Debarment for False Claims. Contractor hereby acknowledges that the filing of a false claim may subject the Contractor to an administrative debarment proceeding wherein the Contractor may be prevented from further bidding on public contracts for a period of up to five years. (F) Carlsbad Municipal Code. The provisions of Carlsbad Municipal Code sections 3.32.025, 3.32.026, 3.32.027 and 3.32.028 pertaining to false claims are incorporated herein by reference. (G) Debarment from Other Jurisdictions. Contractor hereby acknowledges that debarment by another jurisdiction is grounds for the City of Carlsbad to disqualify the Contractor or subcontrac- tor from participating in future contract bidding. (H) Jurisdiction. Contractor agrees and hereby stipulates that the proper venue and jurisdiction for resolution of any disputes between the parties arising out of this agreement is San Diego County, California. I have read and understand all provisions of Section 11 above- init init 12. Alternate Security for a Labor and Materials Bond. The City has determined that a cash deposit of $250,000 is an appropriate security that can be substituted for a Labor and Materials Bond due to the emergent nature of this contract. The condition of this obligation is such that if the Contractor or hidher subcontractors fail to pay for any materials, provisions, provender, supplies, or teams used in, upon, for, or about the performance of the work contracted to be done, or for any other work or labor thereon of any kind, consistent with California Civil Code section 3181, or for amounts due under the Unemployment Insurance Code with respect to the work or labor performed under this Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the contractor and subcontractors pursuant to section 13020 of the Unemployment Insurance Code with respect to the work and labor, that the City will pay for the same, and, also, in case suit is brought upon the bond, reasonable attorney's fees, to be fixed by the court consistent with California Civil Code section 3248. 13. Maintenance of Records. Contractor shall maintain and make available at no cost to the City, upon request, records in accordance with sections 1776 and 181 2 of Part 7, Chapter 1 , Article 2, of the Labor Code. If the Contractor does not maintain the records at Contractor's principal place of business as specified above, Contractor shall so inform the City by certified letter accompanying the return of this Contract. Contractor shall notify the City by certified mail of any change of address of such records. 14. Labor Code Provisions. The provisions of Part 7, Chapter 1, commencing with section 1720 of the Labor Code are incorporated herein by reference. 15. Security. Securities in the form of cash, cashier's check, or certified check may be substituted for any monies withheld by the City to secure performance of this contract for any obligation established by this contract. Any other security that is mutually agreed to by the Contractor and the City may be substituted for monies withheld to ensure performance under this Contract. 16. Provisions Required by Law Deemed Inserted. Each and every provision of law and clause required by law to be inserted in this Contract shall be deemed to be inserted herein and included herein, and if, through mistake or otherwise, any such provision is not inserted, or is not correctly inserted, then upon application of either party, the Contract shall forthwith be physically amended to make such insertion or correction. 17. Additional Provisions. Any additional provisions of this agreement are set forth in the "General Provisions" or "Supplemental Provisions" attached hereto and made a part hereof. NOTARIAL ACKNOWLEDGMENT OF EXECUTION BY ALL SIGNATORIES MUST BE ATTACH ED (CORPORATE SEAL) CONTRACTOR: CITY OF CARLSBAD a municipal corporation ZRm~UL; EfaRWs (name of Contractor) By: (sign here) (print name and title) By: (sign here) (print name and title) President or vice-president and secretary or assistant secretary must sign for corporations. If only one officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under the corporate seal empowering that officer to bind the corporation. APPROVED AS TO FORM: RONALD R. BALL City Attorney By: Debuty City Attorn& EXHIBIT "A" April 26,2005 ZEI Est. NO. 05 1-05 T&M R2 CITY OF CARLSBAD 5950 El Camino Real Carlsbad, CA 92008 Ph: (760) 602-2780 ext. 7321 Fx: (760) 438-4178 % Attn: Skip Hammann RE: AGUA DULCE SLIDE REPAIR Carlsbad, CA Pages: total f Dear Mr. Hammann: In accordance with our site meeting and conversations, Zamborelli Enterprises, Inc. (ZEI) proposes to complete work on a Time and Materials contract. The following pages list the Time and Material rates and conditions for the proposed work. The Time and Materials Contract is in accordance with our conversations, our scope of work, and the attached special clarifications: SCOPE OF WORK: Field Fabricate Tieback Pockets. 0 Machine Drill & Place Soldier Piles. Soldier Piles Furnished by Others. Furnish & Install Timber Lagging. Machine Install Tiebacks per Plans. Tieback Materials Furnished by ZEI. Tension Tiebacks in accordance with design furnished by Earth Support Systems, Inc. TIME AND MATERIAL RATES: 1. Equipment Earthdrill Th55 (Operated with Oiler) $375.00/Hour Tieback Machine (Operated) $375.00/Hour 900 cfm Compressor $325.00/Day Reach Forklift $375.00/Day 375 Air Compressor $200.00/Day Service Truck(s): $ 70.00/Day Welding Machine: $ 1 lO.OO/Day Small Tools: $ 150.00/Day 90 Ton €UT (bare rental to remove casings) $825.00/Day Front End Loader (to move drill spoils) $350.00/Day Vibratory Hammer and Powerpack $225.00/Day Standby $950.00/Day in operation Crane mats (for level access on drill pad) $ 1 O.OO/each per day Supplemental Equipment if required: AGUA DULCE SLIDE REPAIR Page 2 of3 April 26,2005 ZEI Est. NO. 051-05 T&M R2 2. 3. 4. 5. 6. 7. 8. 9. Mobilization - Demobilization for equipment. Mobilization and Demobilization shall be billed cost plus 10% to and from the equipment’s point of origin. MINIMUMS: ZEI Personnel will be paid a 4 or 8 hour minimum. Drilling tools, supplies, or any materials transported by ZEI to and from the jobsite will be at the following rates, portal to portal, including loading and unloading time: 1 Ton Pickup wl trailer $ 75.00/Hour 40’ Flatbed $ 85.00/Hour 5-Axle $1 1 O.OO/Hour Any fabrication or repairs to drilling tools or casings completed at the jobsite or at ZEI’s yard will be charged at $1 05.00hour plus materials. Drilling tool accessories such as teeth, pilots, pockets, blocks, etc. will be charged as consumable items at cost plus 10%. A daily report will be completed by the ZEI authorized representative (copy attached). This report shall be submitted to the Contractor’s Representative for approval daily. Lack of Contractor’s signature does not invalidate daily reports. Labor: Emdoyees Hourly Rate O/T Prem. DIT Prem. (Saturday) (Sunday) Superintendent $75.00 $35.00 $75.00 Operator $70.00 $35.00 $70.00 Oiler $70.00 $35.00 $70.00 Laborer $60.00 $30.00 $60.00 *Subsistence shall be billed at $75/man day for days worked over 10 hr shifts. Costs for material, rental equipment, subcontractor invoices, shipping costs, small tools and other miscellaneous items not listed above will be charged at cost plus 10%. 10. 1 1. Payment schedule shall be mutually agreed upon between ZEI and the Contractor prior All work to be accomplished under the direction of the Contractor’s Representative. AGUA DULCE SLIDE REPAIR Page 3 of3 April 26,2005 ZEI Est. NO. 05 1-05 T&M R2 We wish to thank you for giving us the opportunity of quoting on this project and we hope that we may be of service. Respectfully submitted, ACCEPTED: MBORELLI ENTERPRISES, INC. CITY OF CARLSBAD Brad Suburu By: Project Manager Title: Date: Attachments: *:* ZEI Standard Conditions (2 pgs) BKS Bid: 05 14STBcM R2