Loading...
HomeMy WebLinkAbout1972-11-02; City Council; 933; Cannon Road Improvement - Contract No.1012&$/<.--. C ITY OF CARLSPAD, CAL I FC-' IA >' 2 *- - Agenda Bill No. 933 Date November 2. 1972 Referred To: Subject: Submitted By: . Cannon Road Improvement - Contract No. 1012 Director of Pub1 ic Works t. Change Order No. 1 and No. 2 I - L_- State.ment of the Matter The City wishes to delete certain work under subject contract as described in Resolution No, 3010 and shown on the revised plans. The Contractor has agreed to these deletions at no change in contract unit prices. This will be known as change order No. 1 and will reduce the contract price by $ The City also wishes to construct a 12' width of pavement on the south side of Cannon Road from El Arbol to Carlsbad Blvd. The Contractor has agreed to this additional. work at the same irnit prices. This will be known as change' order No. 2 and the cost . will not exceed $7,000 and will be based on unit prices of assess- ment district contract.' The City will pay for change .order #2, -. * Exhibit 1) Change Order No. 1 (To be prepared) 2) Change Order No. 2 (To be prepared) Staff Recommendations Adopt a motion - 1) Approving subject change orders no. 1 and no. 2 2) Approve payment of Change Order No. 2 from Gas Tax Funds in amant not to exceed $7,000. ."- AB No. City Manager's Recommendation Co unci 1 Ac t 3 on Date: 11-2-72 Change Orders #1 and #2 were approved. Change Order #1 will reduce the contract price by $18,986.33 and Change Order #2 was approved for payment in an amount not to exceed $7,000. -2- 4 C I TY OF CARLSBAD PUBLIC WORKS PROJECT CHANGE ORDER CHANGE ORDER NO. 1 DATE November 3, 1972 CONTRACT NO. 1012 ASSESSMENT DISTRICT 1-1970 CONTRACTOR'S NAME R.E. HAZARD CONTRACTING CO. PROJECT NAME AND NO. CANNON ROAD IMPROVEMENT - CONTRACT 1012 Changes for the Cannon Road Improvement District were ordered by the City Council of the City of Carlsbad. The changes included elimination of street improvements on the south-side of Cannon Road from Carlsbad Blvd. to El Arbol Drive, revision of the center line median from Station lZ+7O to Station 15t-75, revised sewer stub at Auto Plaza Blvd. The following additions and deletions are necessary to perform the contract : DEDUCT: ITEM UNIT REV I SED MO N ETA RY CONTRACT PRICE QUANT ITY CHANGE 15,032 cu.yds. 0.60 / 13,587 cu.yds, $ 867.00 I 2. Excavation 4. 6" Aggregate Base 139,840 sq.ft. 0.17 118,652 sq.ft. 3,601.96' 5. 4" AC Paving 139,840 sq.ft. 0.22 1 118,652 sq.ft. 4,661.36' 4 6. AC Paving Transi- I 7. 2" A.C. Paving 9,359 sq.ft. t ion 2,080 sq.ft. 0.15 -0- 312.00i 0.27 4 6,847 sg.ft. 678.24 4 364.77/ 8. 2" A.C. Paving- D r i vewa y s 1,891 sq.ft. 0.27' 540 sq. ft. 9. Type llC? & "G'J Curb E Gutter 5,743 L.F. 2.65' 4,647 L.F. 2,904.40' 10. 6" PCC Cross Gutter 4,090 sq.ft. 0.75 J 2,854 sq-ft, 927.OOJ 11. 6'' conc. driveways 1,690 sq.ft. 0.75 1,388 sq,ft, 226.50 I 1 13. 4" conc. sidewalk 17,691 sq;ft. 0.60 14,585 sq.ft. 1 ,863,601/ J 2,500.00 14. Conc. block retain- ing wall 5.5' high 100 L.F. 25.00' 0 16. Chain Link Fence I 250,OO J 200 L.F. 4 I high 300 L,F, 2.50 c I h Page 2 L REV I SED MO N E TA RY UNIT ITEM C 0 NTRA C T PR ICE QUANTITY CHANGE Bedd i ng J,578 L.F. 9.50J 1,568 L.F. - 95.00 # 32. 10" ESVCP Sewer & / $4. Replace PCC steps 1 ea, 200.00 # 0 - 200.00 TOTAL - $19,451.83 ADD - J J 1,640 cu.yds. $ 385.00 Bedd i ng 308 L.F. 8.50' 318 L.F. 85.00 3. ' Decomposed Granite / Base 1,570 cu,yds 5.50 33. 8" ESVCP sewer & / TOTAL $470.00 TOTAL DEDUCT ITEMS $19,451.83 TOTAL ADD ITEMS $ 470.00 TOTAL CONTRACT REDUCED BY $18,981.83 A P P R OVA L : A City Engineer Vat& CONTRACT I NG CO. CITY OF, CARLSBAD PUBLIC WORKS PROJECT CHANGE ORDER CHANGE ORDER NO. 2 CONTRACT NO. 1012 DATE ASSESSMENT DISTRICT 1 - 1970 CONTRACTOR ' S NAME R. E. HAZARD CONTRACTING CO. PROJECT NAME AND NO. CANNON ROAD IMPROVEMENT - CONTRACT 1012 Changes for the Cannon Road Improvement District were ordered by the City Council of the City of Carlsbad, included construction of a 12.00 foot driving lane on the south side of Cannon Road between stations 1+49 and 8+81, asphaltic concrete driveways, asphaltic concrete daylight paving and base for El Arbol, Los Robles Drive and Carlsbad Boulevard and con- struction of asphaltic concrete curb. The changes The following additions are necessary to perform the contract: ADD : ITEM DESCRIPTION QUANTITY PRICE AMOUNT APPROXIMATE UNIT 2 Excavation 1,072 cu. yds 0.60 $ 643.20 4 6" aggregate base 10,810 sq, ft, 0.17 1,837.70 5 4" A.C. paving 10,810 sq. ft. 0.22 2,378.20 7 2" A.C. paving 1,520 sq, ft. 0.27 410.40 8 2" A.C. driveway 1,600 sq. ft. 0.27 432.00 Type E asphalt curb 639 lin. ft. 1.00 639.00 Total Add Items $6,340.50 Contract increased by: $6 , 340.50 APPROVAL : CONTRACTOR: R, E. Hazard Contracting Co. City Engineer A 6 Johnson, Vice Preoldsnt //-/7- iw Date