HomeMy WebLinkAbout1972-11-02; City Council; 933; Cannon Road Improvement - Contract No.1012&$/<.--. C ITY OF CARLSPAD, CAL I FC-' IA >' 2
*- -
Agenda Bill No. 933 Date November 2. 1972
Referred To:
Subject: Submitted By: .
Cannon Road Improvement - Contract No. 1012 Director of Pub1 ic Works
t. Change Order No. 1 and No. 2
I -
L_- State.ment of the Matter
The City wishes to delete certain work under subject contract as described in Resolution No, 3010 and shown on the revised plans.
The Contractor has agreed to these deletions at no change in
contract unit prices. This will be known as change order No. 1 and will reduce the contract price by $
The City also wishes to construct a 12' width of pavement on the south side of Cannon Road from El Arbol to Carlsbad Blvd. The
Contractor has agreed to this additional. work at the same irnit
prices. This will be known as change' order No. 2 and the cost
. will not exceed $7,000 and will be based on unit prices of assess- ment district contract.' The City will pay for change .order #2,
-. * Exhibit
1) Change Order No. 1 (To be prepared)
2) Change Order No. 2 (To be prepared)
Staff Recommendations
Adopt a motion
-
1) Approving subject change orders no. 1 and no. 2 2) Approve payment of Change Order No. 2 from Gas
Tax Funds in amant not to exceed $7,000.
."-
AB No.
City Manager's Recommendation
Co unci 1 Ac t 3 on
Date:
11-2-72 Change Orders #1 and #2 were approved. Change Order #1 will reduce the contract price by $18,986.33 and Change Order #2 was approved for payment in an amount not to exceed $7,000.
-2-
4
C I TY OF CARLSBAD
PUBLIC WORKS PROJECT CHANGE ORDER
CHANGE ORDER NO. 1 DATE November 3, 1972
CONTRACT NO. 1012 ASSESSMENT DISTRICT 1-1970
CONTRACTOR'S NAME R.E. HAZARD CONTRACTING CO.
PROJECT NAME AND NO. CANNON ROAD IMPROVEMENT - CONTRACT 1012
Changes for the Cannon Road Improvement District were ordered by the
City Council of the City of Carlsbad. The changes included elimination
of street improvements on the south-side of Cannon Road from Carlsbad
Blvd. to El Arbol Drive, revision of the center line median from
Station lZ+7O to Station 15t-75, revised sewer stub at Auto Plaza Blvd.
The following additions and deletions are necessary to perform the
contract :
DEDUCT:
ITEM
UNIT REV I SED MO N ETA RY CONTRACT PRICE QUANT ITY CHANGE
15,032 cu.yds. 0.60 / 13,587 cu.yds, $ 867.00 I 2. Excavation
4. 6" Aggregate Base 139,840 sq.ft. 0.17 118,652 sq.ft. 3,601.96'
5. 4" AC Paving 139,840 sq.ft. 0.22 1 118,652 sq.ft. 4,661.36'
4
6. AC Paving Transi- I
7. 2" A.C. Paving 9,359 sq.ft.
t ion 2,080 sq.ft. 0.15 -0- 312.00i
0.27 4 6,847 sg.ft. 678.24 4
364.77/ 8. 2" A.C. Paving- D r i vewa y s 1,891 sq.ft. 0.27' 540 sq. ft.
9. Type llC? & "G'J
Curb E Gutter 5,743 L.F. 2.65' 4,647 L.F. 2,904.40'
10. 6" PCC Cross Gutter 4,090 sq.ft. 0.75 J 2,854 sq-ft, 927.OOJ
11. 6'' conc. driveways 1,690 sq.ft. 0.75 1,388 sq,ft, 226.50 I
1 13. 4" conc. sidewalk 17,691 sq;ft. 0.60 14,585 sq.ft. 1 ,863,601/
J 2,500.00 14. Conc. block retain-
ing wall 5.5' high 100 L.F. 25.00' 0
16. Chain Link Fence I 250,OO J 200 L.F. 4 I high 300 L,F, 2.50
c I h Page 2
L
REV I SED MO N E TA RY UNIT ITEM C 0 NTRA C T PR ICE QUANTITY CHANGE
Bedd i ng J,578 L.F. 9.50J 1,568 L.F. - 95.00 # 32. 10" ESVCP Sewer &
/ $4. Replace PCC steps 1 ea, 200.00 # 0 - 200.00
TOTAL - $19,451.83
ADD -
J
J
1,640 cu.yds. $ 385.00
Bedd i ng 308 L.F. 8.50' 318 L.F. 85.00
3. ' Decomposed Granite / Base 1,570 cu,yds 5.50
33. 8" ESVCP sewer &
/ TOTAL $470.00
TOTAL DEDUCT ITEMS $19,451.83
TOTAL ADD ITEMS $ 470.00
TOTAL CONTRACT REDUCED BY $18,981.83
A P P R OVA L :
A
City Engineer Vat&
CONTRACT I NG CO.
CITY OF, CARLSBAD
PUBLIC WORKS PROJECT CHANGE ORDER
CHANGE ORDER NO. 2
CONTRACT NO. 1012
DATE
ASSESSMENT DISTRICT 1 - 1970
CONTRACTOR ' S NAME R. E. HAZARD CONTRACTING CO.
PROJECT NAME AND NO. CANNON ROAD IMPROVEMENT - CONTRACT 1012
Changes for the Cannon Road Improvement District were ordered
by the City Council of the City of Carlsbad,
included construction of a 12.00 foot driving lane on the south
side of Cannon Road between stations 1+49 and 8+81, asphaltic
concrete driveways, asphaltic concrete daylight paving and base
for El Arbol, Los Robles Drive and Carlsbad Boulevard and con-
struction of asphaltic concrete curb.
The changes
The following additions are necessary to perform the contract:
ADD :
ITEM DESCRIPTION QUANTITY PRICE AMOUNT
APPROXIMATE UNIT
2 Excavation 1,072 cu. yds 0.60 $ 643.20
4 6" aggregate base 10,810 sq, ft, 0.17 1,837.70
5 4" A.C. paving 10,810 sq. ft. 0.22 2,378.20
7 2" A.C. paving 1,520 sq, ft. 0.27 410.40
8 2" A.C. driveway 1,600 sq. ft. 0.27 432.00
Type E asphalt curb 639 lin. ft. 1.00 639.00
Total Add Items $6,340.50
Contract increased by: $6 , 340.50
APPROVAL : CONTRACTOR: R, E. Hazard
Contracting Co.
City Engineer A 6 Johnson, Vice Preoldsnt
//-/7- iw
Date