Loading...
HomeMy WebLinkAbout1972-11-21; City Council; 940; Office Facilities For Planning & EngineeringI /- Agenda Bill “o. 94@ 0 Date November 21, Referred To: - Sub j ect : Submi tted By: Re-allocation and re-location of office facilities \ Planning and Engineering Pub1 ic Works Direc / - - - Statement of the Matter - In order to make use of the existing limited floor space allocated tc the Planning and Engineering offices, and in cOnSideration of the additicnal personnel in those departinents (8 additional employees recruited this last year), it is proposed that minimal interim reall( of office sDace be approved as shown on enclosed plan. Cost of matei (labor by City Forces ,) would be approximately $1,550.00. Exhibit 1) Proposed Floor Plan 2) Estimated Cost Staff Recommendations Adopt a motion approving the expenditure of unappropriated General Funds not to exceed $1,550.00 for the re-allocation and relocation of office space within the planning and engineering areas of City Hall, as per exhibit. . m mber 21. 1972 Date: Nave ^9 v e A3 No. 7, O. .. .. - -e City Manager's Recommendation .- .I Concur. .. 1 .. .' counci I -A= tion -11-21-72 - approval was g'iven the expenditure of unappropriated general general funds not to exceed -$1,550.00 for the re-location of office space within the pknning and engineering areas e of City Hall. e 3 I .. .. .* - .- 0 :., . .-& - e e L/ :sFE RBf YO c ITEM 1 Phone relocation QUANTITY PRICE AYOU 2 ea $40 si 2 3 t * Wall phone installation L 1 ea 60 1 'Partition Removal (7 ft. height) 10 L.F. 2 4 Partition Construction (7 ft. height) 57 L.F. 10 5 5 Door 2 6 Conference Table 1 ea . 10 ea 189 IC 7. Electrical wiring [extens.) L.S. - 75 I Swing out Map Display Board L.S. - 200 Miscellaneous (P-sint, Signing, Bracket L.S. - 200 c, .I arie I ves I I I Tota 1 2( 2( - $1 ,I plus 10% contingency - TOTAL 1 1 1 . ! I I $1,: t a -_ .