HomeMy WebLinkAbout1974-10-15; City Council; 3199-1; Request of approval of SP-161 and CT 74-17CITY w F CARLSBAD,CALIFORNIA
Agenda Bill No. _3J_£9_ Supplement No. 1
Referred To:
Date: October 15, 1974
Subject:Submitted By:
Planning Co:Request for Approval of Specific Plan 161 and
Tentative Map (CT74-17), Pacific Point
Applicant; Pacific Point Development Co. (McReynolds)
Statement of the /fatter
The Planning Commission at its regularly scheduled meeting of
September 10, 1974, recommended to the City Council approval of the
Specific Plan 161 on Tentaitve Subdivision Map CT74-17.
The subject, request is the first phase of development for
McReynolds Master Plan (MP-107) adopted by Ordinance 9394, June 18,
1974. The proposed Specific Plan and Tentative Map conform to the
requirements of the Master Plan.
The development contemplates construction of 201 condominium units
on 37.5 acres north and east of Lowder Lane (Paseo Del Norte) and south
of Las Encinas Creek.
The proposed Specific Plan and Tentative Map meet all requirements of
the City of Carlsbad, including public facilities.
The Planning Commission added Condition #14 to the Tentative Subdivision
Mag which requires provision for the City to enforce the California Vehicle
Exhibit • Code on private streets.
1. Planning Department staff report, September 10, 1974.
2. Planning Director report to City Manager, October 9, 1974
3. Exhibit A of Planning Commission Resolution No. 1094, Specific Plan Map.
4. Planning Commission Resolution 1092, Tentative Map (CT74-17).
5. Planning Commission Resolution 1094, Specific Plan 161.
Staff Recommendations to the City Manager
The staff recommends approval of Specific Plan 161 and Tentative Map
(CT74-17) as outlined in Planning Commission Resolution No. 1094 and
1092 and also the addition of a condition to the Specific Plan and
Tentative Map requiring evidence of a California Coastal Commission Permit
as outlined in Planning Director's memo to City Manager dated October 9, 1974
If Council concurs the action would be for City Council to instruct the
City Attorney to prepare the necessary documents.
:
h
AB- -No .Date: October 15, 1974
City Manager's Recommendation
Concur with staff recommendations,
Council'Action
10-15-74 The staff was directed to prepare the documents necessary for
approval of Specific Plan #161 and the tentative map for Carlsbad
Tract 74-17, subject to the conditions set forth in Resolution
Nos. 1094 and 1092 of the Planning Commission, and the addition
of a condition to the Specific Plan and tentative map, requiring
evidence of a California Coastal Commission permit as outlined
in the Planning Director's memorandum to the City Manager dated
October 9, 1974.
-2-
CITY OF CARLSBAD
PLANNING DEPARTMENT
STAFF REPORT
September 10, 1974
TO:
FROM:
REPORT ON:
APPLICANT:
PLANNING COMMISSION
PLANNING DEPARTMENT
SP-161
CT 74-17 PACIFIC POINT
PACIFIC POINT DEVELOPMENT CO
c/o MR. DUANE NILES
1100 GLENDON AVENUE
SUITE 14.39.
LOS ANGELES, CA 90024
*• REQUEST: The applicant is requesting approval of a Specific
Plan and Tentative Map to allow the development of 201
Condominium units on 37.5 acres in the P-C Zone located on
the north side of Lowder Lane between Palomar Airport Road
and the northerly terminus of Camino del Parque. The property
is described as:
A portion of lot "H" of the Rancho Agua Hedionda in
the City of Carlsbad, County of San Diego, State of
California, according to map thereof No. 823 on file
in the office of the County Recorder, described as
follows: Parcel B of Parcel Split No. 140-A on file
in the office of the City Engineer of said City.
II. RECOMMENDATIONS:
A- Specific Plan 161: Staff recommends approval of
SP-161, subject to conditions listed below, for the
following reasons:
(1) Conformance to all appl icable ^requirements of the
Municipal Code.
(2) Conformance to the adopted General Plan.
B. Conditions of Approval for SP 161:
(1) The approval is granted for the land described in the
application and any attachments thereto, and as
shown on the plot plan submitted labeled Exhibit A.
The location of all buildings, fences, signs, road-
ways, parking areas, landscaping, and other facilities
or features shall be located substantially as shown
on the plot plan labeled Exhibit A, except or unless
indicated otherwise herein. All buildings and
structures shall be of the design as shown on
the elevation plans labeled Exhibit B.
(2) Any minor change may be approved by the Planning
Director. Any substantial change will require
the filing of an application for an amendment to
be considered by the Planning Commission.
(3) All requirements of any law, ordinance or regulation
of the State of California, City of Carlsbad, and
any other governmental entity shall be complied with.
(4) The project shall be generally phased as follows:
PHASE 1 - March 1 , 1975
PHASE Z - September 1, 1975
PHASE 3 - February 1, 1976
PHASE 4 - October 1, 1976
PHASE 5 - January 1, 1977
This approval shall be null and void if construction
is not commenced on the final phase, five years from
the date of this approval.
(5) All utilities including electrical, telephone and
cable television, shall be installed underground and/or
shall be completely concealed from view.
(6) A detailed landscape and sprinkler plan prepared by a
landscape architect, shall be submitted to the Parks
and Recreation Department.
(7) Prior to occupancy, the applicant shall submit plans
to the appropriate entity providing domestic water to
the proposed development, for its approval of the
location, type and adequacy of water lines, and to
this fire department for approval of the location of
fire hydrants.
(8) All outside storage areas shall be screened from
adjacent property and streets.
(9) Prior to occupancy of each phase, all . .-,,''
landscaping shall be installed. Said landscaping
shall, at all times, be maintained in a manner accept-
able to the Planning Director.
C. Tentative Map: Staff recommends approval of CT 74-17
based on the following justification:
(1) Conformance to the Subdivision Map Act.
(2) Compliance to the General Plan and applicable
Municipal Code requirements.
D. Recommended Conditions of Approval for CT 74-17:,
(1) The development of the property described herein
shall be subject to the restrictions and limitations
set forth herein which are in addition to all the
requirements, limitations and restrictions of all muni-
cipal ordinances and State and Federal statutes now
in force, or which, hereafter, may be in force for the
purpose of preserving the residential characteristics
of adjacent properties.
(2) The C.C. & R.'s for this development shall be
submitted to the Planning Director for review and
approval prior to the issuance of any building permits.
(3) Park land dedication, bonds, fees, deposits shall be
offered to the City prior to City Council approval
of the Final Map.
(4) In order to provide for reasonable fire protection
during the construction period, the subdivider shall
maintain passable vehicular access to all building
and adequate fire hydrants with required fire flows
shall be installed as recommended by the Fire Depart-
ment.
(5) All public improvements shall be made in conformity
to the City of Carlsbad Engineering Design Criteria
and Standard Plans, the Subdivision Ordinance and
other City Standards, to the satisfaction of the
City Engineer, without cost to the City of Carlsbad
and free of all liens and encumbrances. Improvement
plans for water and sewer systems shall meet the
requirements of the respective service districts.
(6) All utilities, including provisions for cable TV,
shall be placed underground and/or shall be completely
concealed from view.
(7) Ornamental street lighting shall be provided for as
required by Municipal Ordinance Code. The Developer
shall post a bond and/or cash in the amount necessary
to energize said street lights for an eighteen month
period after construction, to permit the incorporation
of the subdivision into a maintenance district.
(8) All land and/or easements required by this Ordinance
shall be granted to the City of Carlsbad without
cost to the City, and free of all liens and encum-
brances. No easements shall be recorded prior to
recordation of the final map unless approved by the
City Engineer.
(9) The improvement plans shall include a report of a
geological investigation and a complete grading
plan of the entire site when required by the City
Engineer. The report and plan shall be prepared by
civil engineers licensed by the State of California,
and experienced in erosion control who shall be
acceptable to the City Engineer and they shall
certify that they have investigated the site and
prepared data with full consideration of the
consequences to the included and neighboring properties
and conform to the standards of the Geological Safety
Element of the General Plan.
(10) Private street sections are approved on the condition
that adequate guest parking bays are shown and that
vertical curbs are required except as approved by the
City Engineer.
(11) An all-weather access shall be constructed to "loop"
"F" Street during construction of Unit 3 or construct
temporary fire access through Lot 83.
(12) Paseo del Norte half-street improvements shall be
completed to the easterly boundary during construction
of Unit No. 4.
(13) On the private streets, centerline radii shall be
40' minimum and curbs radii at cul-de-sacs shall be
40' minimum.
(14) Developer shall participate in traffic signal install-
ation at Paseo del Norte and Palomar Airport Road as
determined by any future policy of City Council.
(15) Access rights shall be dedicated where open space
lots border Paseo del Norte.
(16) Cut and fill slopes shall be 2:1 except as approved
by City Engineer.
III. ENVIRONMENTAL IMPACT REQUIREMENTS: The subject property was
Master Planned and zoned in 1973. An environmental impact re-
port was accepted for the project in May, 1973.
The applicant for the Pacific Point project has submitted a
supplement to the E.I.R. which staff considers sufficient in
addressing additional impacts posed by this specific project.
IV. PUBLIC FACILITIES POLICY: The applicant has obtained the
necessary evidence to show that public facilities will be avail-
able to serve the project. A copy of a letter from the Carlsbad
Unified School District has been attached.
V. PARKS ORDINANCE REQUIREMENTS: An 8 acre portion of the subject
property has been identified in the Carlsbad Open Space and
Element as a greenbelt/park corridor. The applicant
staff concurs that this corridor (Lot 41) be
the City in order to satisfy the Parks Ordinance
The actual dedication requirement for the project
acres.
Conservation
proposes and
dedicated to
requi rement.
is about 1 .2
VI. BACKGROUND:
A. Zo n i n g
Existing - P-C
North - P-M
South - P-C
East - P-C
West - M
B.Land Use
Existing:
North:
South:
East:
West:
Vacant
Vacant (flood
Alta Mira
Vacant
Vacant
control channel)
General Plan: The adopted General Plan shows the subject
property as Low Density Residential at 3-7 DU/acre. The
proposed Land Use Element shows the property as Residential
Medium High Density at 4-10 DU/acre. The applicant is
proposing a density of 5.4 DU/acre.
D. Bedroom Count:
Model Bedrooms Number of Units
A
B
C
D
2 + Den
3 + Den
2 + Den
3
70
36
66
29
TOTAL 201
Circulation and Parking: The applicant with the concurrence
of the Fire and Engineering Departments, has designed a
private street system at a 32' ROW with parking on only
one side of all streets. No parking signs will be posted
on the other side of the streets. The California Vehicle
Code now allows public agencies to enforce traffic restriction
on private streets.
The applicant is providing a 2 car garage for each unit plus
12 guest spaces at the recreation area adjacent to Lowder
Lane.
Recreational Amenities: The applicant proposes two recreation
areas, to be built with the first two phases of development.
Recreation buildings, tennis courts and swimming pools will
be provided. Lot 41, which is to be dedicated to the City
for Park purposes, will be readily accessible to the
residential units.
Attachments:
EIR Supplement
Plot Plan SP-161, Exhibit A
Tentative Map, CT 74-17
Letter from Carlsbad Unified School District
DATE: OCTOBER 9, 1974
TO: CITY MANAGER
FROM: PLANNING DIRECTOR
SUBJECT: PLANNING COMMISSION ACTION SP-161, TENTATIVE
SUBDIVISION MAP, CT 74-17—PACIFIC POINT
The Planning Commission at its regularly scheduled meeting
of September 10, 1974, recommended that the City Council
approve the Specific Plan and Tentative Map for Pacific Point.
The Planning Commission recommended the following changes
and additions to staff recommendations on conditions of
approval:
1. CT 74-17:
(a) Condition 13 be revised to read:
"On private streets, center line radii shall be
40' minimum and curb radii shall be 38' minimum."
(b) Condition 14: "Developer shall participate in
traffic signal installation at Lowder Lane and
Palomar Airport Road as determined by any future
policy of the City Council."
2. SP-161:
(a) Condition 10 was added to insure satisfactory en-
forcement of on-street parking and traffic speed
on private streets. "The developer must indicate
his concurrence in writing that the City's action
to enforce the California Vehicle Code on private
streets is acceptable."
The staff recommends condition 10 of SP-161 be
revised for the City Council Ordinance adopting
the specific plan. Condition 10 should read:
"On-street parking and traffic control shall be
enforced pursuant to the California Vehicle Code.
The applicant shall acknowledge his concurrence
in writing prior to approval of the Final Map
for CT 74-17."
City Manager
October 9, 1974
Page Two
The staff has contacted the Coast Regional Commission
staff regarding approvals of Carlsbad developments within
the California Coastal Zone Permit Area. The staff recom-
mends as a result of those discussions that the City Council
add a condition to all discretionary actions within the per-
mit zones. The condition should read as follows:
"The action of the City Council is granted only after
the Planning Director has satisfactory evidence that
the California Coastal Zone Conservation Commissions,
Regional and/or State, have issued a permit for develop-
ment. No permits, final map approvals or other entitle-
ments will be granted or issued by the City of Carlsbad
until the California Coastal Zone Permit has been issued.
It is recommended this condition be added to the Pacific
Point Specific Plan, Tentative Map to insure legal require-
ments of Proposition 20 as well as City of Carlsbad Ordi-
nance and Policies.
Don Agatep, Planning Director
RP:af
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
PLANNING COMMISSION RESOLUTION NO. 1092
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY
OF CARLSBAD, CALIFORNIA, CONCERNING THE TENTATIVE
MAP TO ALLOW THE DEVELOPMENT OF 201 CONDOMINIUM
UNITS ON 37.5 ACRES IN THE P-C ZONE LOCATED ON THE
NORTH SIDE OF LOUDER LANE BETWEEN PALOMAR AIRPORT
ROAD AND THE NORTHERLY TERMINUS OF CAMINO DEL PARQUE.
CASE NO. 74-17, APPLICANT: PACIFIC POINT DEVELOPMENT
COMPANY
WHEREAS, a verified application for a certain property, to wit:
A portion of Lot "H" of the Rancho Aqua Hedionda in the City
of Carlsbad, County of San Diego, State of California, according
to map thereof No. 823 on file in the office of the County
Recorder, described as follows: Parcel B of Parcel Split
No. 140-A on file in the office of the City Engineer of said
City;
has been filed with the City of Carlsbad and referred to the Planning
Commission; and
WHEREAS, said verified application constitutes a request as provided by
Title 21 of the "Carlsbad Municipal Code"; and
WHEREAS, the applicant has complied with the Public Facility Policy of the
City of Carlsbad and has provided the necessary information which insures
Public Facilities will be available and current with need; and
WHEREAS,the subject application has complied with the requirements of the
City of Carlsbad "Environmental Protection Ordinance of 1972"; and
WHEREAS, said Commission considered all factors relating to the Tentative
Map and found the following facts and reasons to exist:
1. The requested use conforms to the Subdivision Map Act.
2. The requested use complies to the General Plan and applicable
Municipal Code requirements.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City of
Carlsbad, California, as follows: That a Tentative Map is approved for use of
said property to allow the development of 201 condominium units on 37.5 acres
in the P-C Zone located on the north side of Lowder Lane between Palomar Air-
port Road and the northerly terminus of Camino Del Parque, and subject to the
following conditions:
1. The development of the property described herein shall be subject to
1
2
3
4
5
•*••*•
•jo
2Q
22
23
24
25
27
29
31
32
recordation of the final map unless approved by the City Engineer.
21
the restrictions and limitations set forth herein which are in. addi-
tion to all the requirements, limitations and restrictions of all
municipal ordinances and State and Federal statutes now in force, or
which, hereafter, may be in force for the purpose of preserving the
residential characteristics of adjacent properties.
2. The C.C. & R. 's for this development shall be submitted to th§
Planning Director for review and approval prior to the issuance
of any building permits.
3. Park land dedication, bonds, fees, deposits shall be offered to the
City prior to City Council approval of the Final Map.
*:
4. In order to provide for reasonable fire protection during the con-
struction period, the subdivider shall maintain passable vehicular
access to all building and adequate fire hydrants with required fire
flows shall be installed as recommended by the Fire Department.
5. All public improvements shall be made in conformity to the City of
Carlsbad Engineering Design Criteria and Standard Plans, the Sub-
division Ordinance and other City Standards, to the satisfaction of
the City Engineer, without cost to the City of Carlsbad and free of
'•*•* all liens and encumbrances. Improvement plans for water and sewer
systems shall meet the requirements of the respective service dist-
ricts.
6. All utilities, including provisions for cable TV, shall be placed
__ underground and/or shall be completely concealed from view.J.O
Ornamental street lighting shall be provided for as required by
Municipal Ordinance Code. The Developer shall post a bond and/or
-„ cash in the amount necessary to energize said street lights for an
eighteen month period after construction, to permit the incorporation
-0 of the subdivision into a maintenance district.
J-O
8. All land and/or easements required by this Ordinance shall be granted
to the City of Carlsbad without cost to the City, and free of all
liens and encumbrances. Mo easements shall be recorded prior to
9. The improvement plans shall include a report of a geological investi-
gation and a complete grading plan of the entire site when required
by the City Engineer. The report and plan shall be prepared by civil
engineers licensed by the State of California, and experienced in
erosion control who shall be acceptable to the City Engineer and they
shall certify that they have investigated the site and prepared data
with full consideration of the consequences to the included and
neighboring properties and conform to the standards of the Geological
Safety Element of the General Plan.
10. Private street sections are approved on the condition that adequate
guest parking bays are shown and that vertical curbs are required
except as approved by the City Engineer.
28 11. An all-weather access shall be constructed to "loop" "F" Street during
Lot 83.
30
construction of Unit 3 or construct temporary fire access through
12. Paseo del Norte half-street improvements shall be completed to the
easterly boundary during construction of Unit No. 4.
13. On the private streets, centerline radii shall be 40' minimum and
curbs radii at cul-de-sacs shall be 38' minimum.
-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
14. Developer shall participate in traffic signal installation at Paseo
del Norte and Palomar Airport Road as determined by any future policy
of City Council.
15. Access rights shall be dedicated where open space lots border Paseo
del Norte.
16. Cut and fill slopes shall be 2:1 except as approved by City Engineer.
17. Developer must indicate his concurrence, in writing, that the City's
action to enforce the California Vehicle Code on private streets is
acceptable.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City of Carlsbad
Planning Commission held on September 10, 1974 by the following vote, to wit:
AYES: Commissioners Watson, Dominguez, Wrench, Jose, Casler
NOES: None
ABSENT: Commissioner Fikes
ABSTAIN: None
Mary Casl,er, Chairman
ATTEST:
Donald A. Agatep,
Secretary
-3-
1 PLANNING COMMISSION RESOLUTION NO. 1094
2 RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, CONCERNING THE
3 SPECIFIC PLAN TO ALLOW THE DEVELOPMENT OF 201
CONDOMINIUM UNITS ON 37.5 ACRES IN THE P-C ZONE
4 LOCATED ON THE NORTH SIDE OF LOWDER LANE BETWEEN
PALOMAR AIRPORT ROAD AND THE NORTHERLY TERMINUS
5 OF CAMINO DEL PARQUE. CASE NO. SP-161, APPLICANT:-
PACIFIC POINT DEVELOPMENT COMPANY
6
WHEREAS, a verified application for a certain property, to
8 wit:
9 A portion of Lot "H" of the Rancho Aqua Hediondo in
The City of Carlsbad, County of San Diego, State of
California, according to map thereof No. 823 on file
in the office of the County Recorder, described as11 follows: Parcel B of Parcel Split No. 140-A on file
in the office of the City Engineer of said City.
has been filed with the City of Carlsbad and referred to theJLo
Planning Commission; and
WHEREAS, said verified application constitutes a request as15
provided by Title 21 of the "Carlsbad Municipal Code"; and
.„ WHEREAS, the public hearing was held at the time and in the
_0 place specified in said notice on September 10, 1974; and
J-O
ig WHEREAS, the applicant has complied with the Public Facility
Policy of the City of Carlsbad and has provided the necessary
information which insures Public Facilities will be available and
current with need; and
WHEREAS, the subject application has complied with the
requirements of the City of Carlsbad "Environmental Protection
Ordinance of 1972"; and
WHEREAS, at said public hearing, upon hearing and considering
the testimony and arguments, if any, of all persons who desired
2Q to be heard, said Commission considered all factors relating to
the Specific Plan and found the following facts and reasons to
exist:30
1. The requested use conforms to all applicable requirements
of the Municipal Code.
32 2. The requested use conforms to the adopted General Plan.
1 NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of
r>the City of Carlsbad, California, as follows: That a Specific Plan
•z is approved for use of said property to allow development of 201
condominium units on 37.5 acre parcel and subject to the following
i conditions:
1. The approval is granted for the land described in the
application and any attachments thereto, and as shown on
the plot plan submitted labeled Exhibit A. The location
10 shown on the elevation plans labeled Exhibit B.
11
12
13
14
15
16
17
18
19
20
21
22
26
27
28
29
30
31
32
of all buildings, fences, signs, roadways, parking areas,
landscaping, and other facilities or features shall be
located substantially as shown on the plot plan labeled
Exhibit A, except or unless indicated otherwise herein.
All buildings and structures shall be of the design as
2. Any minor change may be approved by the Planning Director.
Any substantial change will require the filing of an applica-
tion for an amendment to be considered by the Planning
Commission.
3. All requirements of any law, ordinance or regulation of the
State of California, City of Carlsbad, and any other govern-
mental entity shall be complied with.
4. The project shall be generally phased as follows:
Phase 1 - March 1, 1975
Phase 2 - September 1, 1975
Phase 3 - February 1, 1976
Phase 4 - October 1, 1976
Phase 5 - January 1, 1977
This approval shall be null and void if construction is not
commenced on the final phase, five years from the date of
this approval.
5. All utilities including electrical, telephone and cable
television, shall be installed underground and/or shall be
completely concealed from view,
23 A detailed landscape and sprinkler plan prepared by a land-
24 scape architect, shall be submitted to the Parks and
Recreation Department.
25 Prior to occupancy, the applicant shall submit plans to the
appropriate entity providing domestic water to the proposed
development, for its approval of the location, type and
adequacy of water lines, and to this fire department for
approval of the location of fire hydrants.
.8. All outside storage areas shall be screened from adjacent
property and streets.
9. Prior to occupancy of each phase, all landscaping shall be
installed. Said landscaping shall, at all times, be maint-
ained in a manner acceptable to the Planning Director.
10. Developer must indicate his concurrence, in writing, that
the City's action to enforce the California Vehicle Code
on private streets is acceptable.
-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
of Carlsbad Planning Commission held on September 10, 1974 by the
following vote, to wit:
AYES: Commissioners Watson, Dominguez, Wrench, Jose,,
Casler
NOES: None
ABSENT: Commissioner Fikes
*
ABSTAIN: None
Mary Caser, Chairman
ATTEST:
Dp n a I d 7\. Ag a t e p
Secretary V
-3-
Supplemental Environmental Impact Report
for the
A.W. McReynolds Property
Status. The A.W. McReynolds Property comprises approximately
110 acres located in the City of Carlsbad southeast of the intersection
between Palomar Airport Road and the Interstate 5 Freeway. The General
Envelopment Plan proposed that the property be divided into three parcels
to be developed for residential and industrial usage. Subsequent to the
approval by the City of Carlsbad, a Rezoning Application was approved
designating Parcel B as PC to permit the construction of 7 dwelling units
per acre. A Development Plan was later filed on Parcel C requesting ap-
proval to construct 7 dwelling units per acre.
Purpose. The purpose of this Supplemental Environmental Impact
Report is to provide additional information regarding the development
of Parcel B. The original Environmental Impact Report, prepared by James
E. Petteway, A.I .A. , and certified by the City of Carlsbad, anticipated
that Parcel B would involve the construction of 7 dwelling units per acre.
Subsequent planning studies suggested that 201 dwelling units would be
more appropriate. This reduction in density would in turn modify the
Environmental Impacts associated with the project. This document has
therefore been prepared to analyze the new development plans with re-
gard to Environmental Impacts which are dependent upon density.
Project Description. The proposed development of Parcel B antici-
pates the construction of a single-family planned residential community
consisting of 201 homes. Houses will be constructed of wood and stucco
materials and will be arranged as duplexes. A 28-foot wide private resi-
dential street (48-foot right-of-way) will be constructed to provide access
to the six cul-de-sacs within the development. Utilities will connect to
mains located within Lowder Lane, a newly constructed major collector
street adjacent to the property. Parking will be provided for approximately
844 cars.
As proposed, the 201 dwelling units will be constructed in five phases,
each of which will consist of approximately 40 dwelling units. Recreational
facilities will also be provided. During the first phase, 2 tennis courts, a
swimming pool, therapy pool, and recreational building with facilities will
be provided. An additional swimming pool, therapy pool, cabana, and re-
creational area will be constructed during the second phase.
Approximately 81 percent of the property will be retained as open space.
Eight acres of the site, consisting of natural habitat, will be dedicated to
the City of Carlsbad as open space and blended with the recreation and
tennis court area. The remainder of the open space will be divided be-
tween the privately-owned lots and common open space available to be
residents.
Environmental Impact of the Proposed Action
•x.
Grading. The development of the project site to accommodate 201
home sites will necessitate approximately 350,000 cubic yards of grading
resulting in a maximum fill of 30 feet and maximum exposed cut slope of
approximately 20 feet. Grading will be restricted from the northerly slopes
of the mesas as that area will be dedicated as natural open space. As
mentioned in the original Environmental Impact Report, a portion of the
material to be graded will be placed in Parcel A for flood control purposes.
Other impacts related to grading have been discussed in the original Envir-
onmental Impact Report.
Traffic Condition. Access and egress to the property will be pro-
vided by Palomar Airport Road, one-quarter mile north of the site, and
Lowder Lane, adjacent to the southerly boundary of the site. Palomar
Airport Road is designated by the City of Carlsbad as a prime arterial
having an existing traffic volume of 3,200 average daily trips (ADT). The
future traffic projection for Palomar Airport Road is 25,000 ADT. Lowder
Lane is designated as a secondary arterial having an existing traffic
volume of 500 ADT and future volume of 7 ,000 ADT.
Assuming a factor of 10 vehicle trips per day for each dwelling unit,
the proposed project would generate 2,010 vehicle trips on a daily basis.
This traffic volume represents 8 percent of the future traffic volume anti-
cipated for Lowder Lane. The traffic generated by the project will not ex-
ceed the total volume anticipated for this area.
Noise. There are two major noise generators in the vicinity of the
project site. The first of these is aircraft noise generated by Palomar Air-
port, 1-1/2 miles east of the site. The attached map indicates noise con-
tours as prepared by Daniel, Mann, Johnson, and Mendenhall for the County
of San Diego in November, 1972. According to their report, the 65 CNEL
noise level contour (the maximum acceptable noise level) is located 4,000
feet northeast of the subject property. Noise generated by the airport, there-
fore, should not adversely affect the project.
-2-
The secondary noise source is automobile and truck traffic on roads
adjacent to the property. Noise levels were analized using procedures out- •
lined in the National Coorperative Highway Research Program Report No. 117.
(See attached calculations). Calculations were based on future traffic pro-
jections for Lowder Lane (7,000 vehicles per day), Palomar Airport Road
(25,000 vehicles per day), and the Interstate 5 Freeway (93,000 vehicles
per day). As the traffic volume approaches the future projections, noise
generated by Palomar Airport Road and the Interstate 5 Freeway would not
adversely affect the project site. Noise generated by Lowder Lane would
be marginally unacceptable as it slightly exceeds the 70 dBA L^Q limit. As
the noise level exceeds the acceptable limit by only 1 dBA, it should be
possible to attenuate the excess noise by installing landscaping.
Air Quality. Future residential development of the project site will
cause a decrease in air quality in the area. This decrease is a result of
(1) projected increases in vehicular traffic, (2) use of natural gas and electri-
city, and (3) dust generated by the short-term activities associated with
grading operations. An analysis of automobile emissions is included in the
Appendix of this report.
Public Utilities. The future construction of 201 dwelling units will
increase the demand on water, sewer, electricity, and telephone systems.
All utilities are presently located in Lowder Lane immediately adjacent to
the property.
Water will be provided by the Carlsbad Municipal Water District from
an existing 10-inch AC water main. Water consumption for the completed
project, based on a population of 603 (3.0 persons per dwelling unit) and
a per capita consumption rate of 200 gallons of water per day (Holmes and
Narver Curve prepared for the City of Carlsbad). The proposed development
would require 120, 600 gallons of water on a daily basis.
Sewer service will be provided by the City of Carlsbad from an ex-
isting 8-inch main. Based on a factor of 100 gallons per capita per day,
the proposed project would generate 60,300 gallons of sewage per day.
San Diego Gas and Electric Company presently provides service to
the area by means of underground transmission lines in Lowder Lane. Based
on a consumption rate of 5,738 kilowatt hours of electricity per year for
the average residence (according to the San Diego Gas & Electric), the pro-
posed development would require 3,160 kilowatt hours of electricity per day.
Community Services. Police, fire, and school services have presently
been extended to the Alta Mira community located south of the project site.
These existing services will be provided for the proposed project.
-3-
Police protection will be provided by the Carlsbad Police Department
located at 1200 Elm Avenue. At present, there are 45 employees on the
staff. At a desired ratio of 2 policemen for each 1,000 population, the
proposed project may require the addition of one policeman to the department.
Fire protection services will be provided by the City of Carlsbad Fire
Department. The project site is presently located midway between the station
at 1275 Elm Avenue and the station at the intersection of El Camino Real and
Arenal Drive. Future plans anticipate the construction of a new station at
the intersection of Interstate 5 and Palomar Airport Road.
The proposed project site is located within the Carlsbad Unified
School District. School children from the development will attend one of
four schools as follows:
Grade School Capacity Projected Enrollment
K-3 Jefferson Elementary School 460 353
4-6 Pine Elementary School 352 296
7-8 Valley Junior High School 783 713
9-12 Carlsbad High School 1,280 1,572
According to the Carlsbad Unified School District's Estimate of School-
Age Students, the student population of the development will be as follows:
Grade Number of Students
K-6 74
7-8 22
9-12 36
Except for grades 9-12, the proposed development should not adversely
affect the present school situation. The phased type of development proposed
(approximately 40 dwelling units in each phase) should minimize the impact.
As each phase is completed, the development would add approximately 7
students to the high school thereby providing time for the schools to expand
their facilities as necessary. To offset the costs of this expansion, the
development will be providing $78,993.00 for school fees.
Visual Aesthetics. The general appearance of the site will be modified
as a result of the proposed project. The mesa will be reduced in elevation
and graded to flatten the slopes sufficient to permit construction. The land
form will remain a mesa in shape and height but will simply be a little lower.
—4 —
No changes will be made to the north slope of the mesa where native
growth exists. The most significant impact will be the conversion of
open land to urban development. To mitigate this impact, approximately
81 percent of the site will be retained as open space, landscaping will
installed, and the houses will be architecturally coordinated with the
community.
-5-
NOISE CALCULATIONS
Lowder Lane - Future Prediction
Daily Traffic Volume = 7,000 vehicles per day
Peak Hour Traffic = 0.11 x 7,000 = 770 vehiclesAour
Trucks = 0.05 x 770 = 39 truck sAour
Automobiles = 0.95 x 770 = 731 automobiles/hour
Speed Limit = 35 miles per hour
Distance to Site = 70 feet
From graphs outlined in Report 117 of the National Cooperative Highway
Research Program:
Automobile s Trucks
Distance to Observer = 70 feet
' LJQ reference at feet 58 57
Distance, width adjustment 0 0
L1Q - LSQ adjustment +5 +13
LJQ reference at Observer 63 dBA 70 dBA
Combined Noise Level = 71 dBA L
Conclusion: A narrow portion of the property will be marginally unacceptable
for residential purposes as traffic volumes reach the future prediction.
-6-
Noise Calculations
JPalomar Airport Road - Future Prediction
Daily Traffic Volume = 25,000 vehicles per day
Peak Hour Traffic = 0.11 x 25,000 = 2,750 vehicle s,/hour
Trucks = 0.05 x 2,750 = 138 trucksAour
Automobiles = 0.95x 2,750 =2,612 automobile s/hour
Speed Limit = 55 miles per hour
Distance .to Site = 700 feet
From graphs outlined in Report 117 of the National Cooperative Highway
Research Program:
Automobiles Trucks
Distance to Observer =700 feet
LSQ reference at feet 68 72
Distance , width adjustment -13 -13
L|Q - Lg0 adjustment +2 +5
LIO reference at • 57 dBA 64 dBA
Combined Noise Level = 65 dBA LIQ
Conclusion: The site will be acceptable for residential purposes.
—7—
Noise Calculations
Interstate 5 - 1995 Prediction
Daily Traffic Volume = 93,000 vehicles per day
Peak Hour Traffic = 0.11x93,000 = 10,230 vehicles/hour
Trucks = 0.04 x = 409 trucks/hour
Automobiles = 0.96 x = 9,821 automobiles/hour
Speed Limit = 55 miles per hour
Distance to Site = 400 feet
From graphs outlined in Report 117 of the National Cooperative Highway
Research Program:
Automobiles Trucks
Distance to Observer = 400 feet
1,50 reference at 100 feet 73 72
Distance , width adjustment ' -9 -9
L10 ~ L50 adJ'ustment +2 +4
L10 reference at ' 66 dBA 67 dBA
Combined Noise Level = 70 dBA LIQ
•
Conclusion: The project site will be acceptable for residential purposes.
-8-
APPENDIX B
AIR QUALITY AND NOISE ANALYSIS
AUTOMOBILE EMISSIONS
Daily vehicle trips generated from
201 residences X 10 trips/residence/day = 2»010trips/day
Daily motor vehicle miles generated by
2,010trips/day x. 7 miles/trip* =14,070miles/day
* (average length of trip from and to residences within San Diego region).
1980
Automobile Age Distribution and Miles Driven (California Statistical Abstract,
Table J-9) :
Year
1980
1979
1978
1977
1976
1975
1974
1973 or
older
Age
Class
1
2
3
4
5
6
7
7+
Percent of
Total Automobile
8.09
10.06
9.79
8.47
8.84
9.22
8.53
37.00
Miles/Day
By Class
1,138
1,415
l',377
1,192
1,244
1,297
1,200
5,207
TOTALS ' 100.00 14,070
-9-
J
The following are emissions in grams/mile based on "worst possible case"
future state standards to 1977 and projected standards thereafter (Federal
Registers: Vol. 37, No 221, November 15, 1972; Vol. 38, No. 124, June 28,
1973; Vol. 38, No. 151, August 7, 1973):
Age Hydrocarbon (HO) Carbon Monoxide (CO) Oxides of Nigrogen
Class Grams/Mile Grams/Day Grams/Mile Grams/Day Grams/Mile Grams/Day
1
2
3
4
5
6
7
7+
0.41
0.41
0.41
0.41
0.41
0.9
3.0
3.2
Totals
Total Tons/Day
466.6
580.2
564.6
488.7
510.0
1,167.3
3,600.0
16,662.4
24,039.8
0.026
3.4
3.4
3.4
3.4
3.4
9.0
28.0
34.0
3,869.2
4,811.0
4,681.8
4,052.8
4,229.6
11,673.0
33,600.0
177,038.0
243,955.4
0.269
0.4
0.4
0.4
0.4
0.4.
2.0
3.1
3.5
455.2
566.0
550.8
476.8
497.6
2,594.0
3,720.0
18,224.5
27,084.9
0.030
(Gram = 1 .102 x 10"6 Tons)
1990
TT j v. 0.4 gram miles 1.102 X10"6
ft n_._ T/DayHydrocarbons: —fiftfe x 12'070x ~day~ x gram—T =0.006 i/Lfay
~ u ,, ., 3.4 grams ,, n7n miles 1.102 x 10"6 . n_.0 T/DayCarbon Monoxide : — r- - x!4,070x— — — x — q"ram x - =0.053
Oxides of Nitrogen: °'ram x!4,070x S x1'™ °"6 =O.OQ6 T/Day
-10-
•'* /JO
/
!V
-:^vW."-.;\..v•TS^V-- \^V~V~T
'A -'^^^'^y^^^^f-.
'V/E %i \•^••^<^"O /*:3/:^-'<\^:\^5^t*^' ,/±j•y f:#^> - / ,-£J7/-^%:--~^ /. - ^V ».••''.-.>,. • * ••' -. *-*%_ •
•V' f-'-\if '•'£•' ». * \ >-—/r • V-^vl'-'1.'^-'/'"' Vi-^1
-* '^^__--3 f •'
\VJ>
v r?*Waf5r
A^ Ta°ks.
%•»
•\\-..'\^
^.' '•- »«-f?1**
\\
• -**"
•>>-i' --X,"-.
<<. .
•H^
cV/eH
\-•? *;
Farr X-^x»=
::feA:vV-
\
•/^»;
~^*if*f>pfir
» - .,-~^>. N
I'
.-Si
ife%%-s
A//\!M i v*»:
ROA!
= = *«s«
^AA'\^j ; i
20 \v •;/f,I-is**'
\\ „„"V5
1—1
n \
.JS ^\\
.\ :
\ -
r\. \ -
\ J^'^A^
s^~m ^v-««:. ,_5*4££=5S-
LOCATION MAP
\:
\^V.
\
\
\
-\» \\»
- ov^ •*- ~r-', ^\ V^t^vi^l-
M SCALE T'^OOO1 ^i^>
rv^k,."" S.\-^—r
!\
32\» \> • .\
/^r"