Loading...
HomeMy WebLinkAbout1975-12-02; City Council; 3530; Development of Laguna Riviera Park District 4CITY OF CARLSBAD AGENDA BILL No. � b Initial: Dept.Hd. . DATE: De ---- •— C. Atty.0 DEPARTMENT: Parks and Recreation C. Mgr. Subject: Development of Laguna Riviera Park - District 4 Statement of the Matter A park is needed in this area because of the total number of residents who are not in ready access to a public park. $35,000 has been budget- ed and approved for the 1975-76 fiscal year. 'Exhibit K ite Location B. Cost Estimate of Project C. Park Design D. Development Procedures E. Work Schedule Recommendation That projec.t'be approved and•staff directed to proceed with project. Council action Council 'Action 12-2-75 The design was approved for Laguna Riviera Park development. n GN AU7 I' 0'10' 258 MILS � 3 Miles i I UTM GRID AND 15E8 MAGNETIC NORIH DECLINATION AT CENTER OF SHEET 1 1 SCALE 1:24000 1000 0 1000 2000 3000 4000 5000 6000 70,M FEET -� I 5 �--�_0_ 1 KILOMETER CONTOUR INTERVAL 20 FEET DOTTED LINES REPRESENT 10•FOOT CONTOURS DATUM IS MEAN SEA LEVEL DEPTH CURVES AND SOUNDINGS IN FEET —DATUM IS MEAN LOWER LOW WATER SHORELINE SHOWN REPRESENTS THE APPROXIMATE LINE OF MEAN HIGH NATER THE MEAN RANGE OF TIDE IS APPRO.XWATELY A FEET THIS MAP COMPLIES WITH NATIONAL MAP ACCURACY STANDARDS FOR SALE BY U.S. GEOLOGICAL SURVEY, DENVER, COLORADO 80225. OR WASHINGTON. D. C. 2024 A FOLDER DESCRIBING TOPOGRAPHIC MAPS AND SYM. ul-S IS AVAILABLE ON REQUEST -- PROJECT NUMBER 13 LAGUNA RIVIERA COST ESTIMATE CONSTRUCTED 1975 1976 BY FACILITIES PHASE I PHASE II TOTAL S 5 Park Benches @ $100 500 500 S 7 Light Standards @ $400 1000 1800 2800 C 1 Comfort Station @ $12,000 1.2,000 12,000 S(P-W) 1 Sewer Hook -Up @ $600 600 600 S(P-W) 1 40x80 Paved Court @ $3,000 3,000 3,000 S 1 Drinking Fountain @ $200 200 200 S 1 Tot Lot @ $2,000 2,000 2,000, S 1 Apparatus Area @ $3,000 3,000 3,000 S 5 Picnic Tables @ $250 1,250 1,250 S 4 Barbecue Stands @ $100 400 400 C 900' Cor_crete Sidewalk @ $4,100 4,100 4,100 S 8 Trash Cans @ $50 400 400 S 2 Bike Racks @ $100 200 200 S 2 Ball Fields @ $1,500 3,000 3,000 Sub -Total 27,550 5,900 33,450 LANDSCAPING S Irrigation System 3,000 3,000 S Soil Amendments 2,000 2,000 S Plant Material 2,000 2,000, Sub -Total 7,000 7,000 S-Staff C-Contract GRAND TOTAL 34,550 5,900 40,450 P-W-Public Works ---- ------ JV RCJ,31c. iLiZAA GAG 17. 0 7;C PROJECT NUi BER 13 PARKS AND RECREATION DEPARTMENT DEVELOPMENT PROCEDURES LAGU17A RIVIERA PARK PRE -SITE PREPARATION 1. Take soil samples. 2. Shoot grades and establish drainage. 3. Remove all vegetation from area (scrape). 4. Apply a 7-14 day weed killer. 5. Locate and stake all structures and courts. SOIL PREPARATION 1. Rip and cross rip area with tractor. 2. Apply Gypsum @ 1 Ton/10,000 sq. ft. 3. Apply redwood shavings @ 2 yds./1000 sq. ft. 4. Rip in all amendments and level to grade. 5. Mound soil (rough). CONSTRUCTION 1. Locate and run sewer 'line to comfort station. 2. Establish grades and drainage for concrete. 3. Set forms and grade (include comfort station). 4. Run plumbing and electrical lines. 5. Install tracer lines under forms for electrical and irrigation system. 6. Set light stations. 7. Form for concrete mowing edge. 8. Pour and finish all concrete. 9. Form multi -purpose court and pave (in conjunction with concrete forming and pouring). 10. Commence building of comfort station. 11. Pull forms and grade. LANDSCAPE IRRIGATION (In Conjunction with Rough Grading) 1. Locate main lines and stake. 2. Run new main lines and set up drinking fountain. 3. Stake heads and run (trench) lines. 4. Install irrigation system. 5. Blow out lines and check coverage. 6. Make alterations to system. LANDSCAPE GRADING 1. Rough grade all lawn areas and mounds to 2. Stake out trees. 3. Run irrigation system and backfill (tamp in laterals). 4. Bring to finish grade. LANDSCAPE PLANTING 1. Plant all large specimens stake or guy. 2. Fine grade shrub area. 3. Plant large and small shrubs. 4. Plant ground cover 5. Apply 16-20-0 fertilizer and rake into lawn area @ 10 lbs./1000 sq. ft. 6. Fine grade lawn area. I 1k, 5 - 2 - MISCELLANEOUS INSTALLATIONS 1. Install light fixtures. 2. Install drinking fountains. 3. Install benches. 4. Install apparatus and tot lot. 5. Finish comfort station. 6. Install picnic tables. 7. Hook up and install irrigation clock (important to coordinate with construction of comfort station and planting timing). S. Install barbecue stands. 9. Install trash can locations. 10. Install bike rabks. 11. Install backboards and paint court LANDSCAPE PLANTING 1. Plant lawn and start irrigation cycle @ 4 times a day. Na • r