HomeMy WebLinkAbout1976-07-06; City Council; 3693; Partial refund of sewer lateral charges- CITY OF CARLSBAD ..- DATE: July 6, 1976 DEPARTMENT: Enqineerina Initial- Dept. Hd :y& C . Atty . vF& R C. Mgr. J 1 - Subject: PARTIAL REFUND OF SEWER LATERAL CHARGES - ST. PATRICKS CHURCH. ADAMS AND PI0 PICO. Statement of the Matter Lateral charges were computed and paid for a sewer connection on Adams Street for the new St. Patricks Church. The amount paid was $713.50. It was subsequently determined that an Adams Street con- nection was not feasible, so the lateral was installed on Pi0 Pic0 Drive at the Citys normal charges for a lateral of $214.50. A re- imbursement of $499.00 is in order due to the overpayment of sewer lateral fees. Exhibit 7 - A. Letter from St. Patricks Church requesting refund B. Application for sewer lateral on Adams Street C. Actual installation work order - Pi0 Pic0 Drive Recommendation It is recommended that the City Council by minute motion, approve a refund of $499.00 to the St. Patricks Church for overpayment of sewer lateral fees. Council action 7-6-76 Approval was given for a refund of $499.00 to the St. Patricks Church for overpayment of sewer lateral fees. c --. APPLICATION FOR PERMIT TO CONNECT TO CITY SEWER SYSTEM CITY OF CARLSBAD ENGINEERING DEPARTMENT 729-1181 EXT. 35 FOR APPLICANT TO FILL IN 727- 6020 CONTRACTOR'S S~bVqL~lTDI ADDRESS SSL- Mk R. 4 2014 NEW BUILDING )c EXISTING BUILDING p#a.&z LEGAL DESCRIPTION Pwa SP~il- tfi 3-55 1c.i # 3qgt-7 REMARKS: LATERAL LOCATION I I ST. 1 I LATERAL NO. INSTALLATION DATE I N9 SE 1746 I ENGINEERING DEPT. ISSUED BY DATE ISSUED b VAL1 DATI ON LATERAL CHARGE COMPUTATION FT. .A v. -Q F T. CHARGE (REPAVING ETC.) I. w3i75.. a- W 1N 70 tCH- - LINE COST DATA fifi DIST. NO. TOTAL COST PER FT. COST PER UNIT TOTAL 50 c #- Xork Order # gg(l (Sewer - 3) 'P *-. .- * CITY OF CARLSBAD JgEpLpCg3 ENGINZERING DEPT . i is'*, s 3 -2- 3 APPLICATION AND COST ESTIMATE OF SANITARY SEWER LATERAL CONNECTION *f?. . Date 2 - 2 7- 743 Lot 'SAL #Z Owner > cic5 cf-cdu- Block P&F. MJ(Prpe 3 3 go Sewer Location Address 35?-.\ &- 9FIMJ 37 Subdivision Mailing Address ALA ?hCL, 1911 Act Phone - - Assessment No. Minimum 4-inch clay sewer pipe in place Not to exceed 10 ft. dtsp and 30 lin. Et. Additional charges for any depth exceeding 10 ft. @O horizontal distance. ........... $ 17s - - ft. deep at per ft. ..... $ Additional charges for any distance exceeding 30 lin. ft. horizontally - ft. at per ft. ..... $ 1 qs Total charges .for constcucth$ - CO ... iq Sc ?.dditional chzqes fcr City of Czrlsba? s-rvices S@ Receipt No. -&.a/$ .- sj I7L. Total Charges ... $ At+ -- at 10% of above charges. ......... $ I Lateral Location ft. from northerly or ft. from southerly or westerly manhole easterly manhole Attention of Public Works Director: Signatures: Public Wks . Director &b3(ic'Wks .gen .Foreman Sanit .Foremar 0 Checked in Sewer Book Line cost receipt no. G& Connection Fee receipt no. qp0 huTf 36JWtr f -_ MEMORANDUM July 26, 1976 TO : / Public Works Administrator Utilities Maintenance Director Planning Director Dan Groth, Associate Civil Engineer, Current Development Joe Spano, Associate Civil Engineer, Engineering Design FROM: City Engineer SUBJECT: MASTER SEWER STUDY - PHASE I ENGINEERING Attached is a copy of the final draft of the engineering portion of the subject study for your review. Please excuse the incompleteness of some of the tables, charts, and figures of the report. Also, the report refers to specific proposed trunk sewer lines by number. I have placed the only copy of the sewer map on the wall in my office for your reference in your review. I would appreciate your comments (detailed, I hope) by August 9, 1976. It is anticipated that the report will be finalized and printed in early September. Tim Flanagan TCF : ms