J 1 - Subject: PARTIAL REFUND OF SEWER LATERAL CHARGES - ST. PATRICKS
CHURCH. ADAMS AND PI0 PICO.
Statement of the Matter
Lateral charges were computed and paid for a sewer connection on
Adams Street for the new St. Patricks Church. The amount paid was
$713.50. It was subsequently determined that an Adams Street con- nection was not feasible, so the lateral was installed on Pi0 Pic0
Drive at the Citys normal charges for a lateral of $214.50. A re- imbursement of $499.00 is in order due to the overpayment of sewer
lateral fees.
Exhibit
7 - A. Letter from St. Patricks Church requesting refund
B. Application for sewer lateral on Adams Street
C. Actual installation work order - Pi0 Pic0 Drive
Recommendation
It is recommended that the City Council by minute motion, approve a
refund of $499.00 to the St. Patricks Church for overpayment of
sewer lateral fees.
Council action
7-6-76 Approval was given for a refund of $499.00 to the St. Patricks Church for overpayment of sewer lateral fees.
c
--.
APPLICATION FOR PERMIT TO CONNECT TO CITY SEWER SYSTEM
CITY OF CARLSBAD
ENGINEERING DEPARTMENT
729-1181 EXT. 35
FOR APPLICANT TO FILL IN
727- 6020
CONTRACTOR'S S~bVqL~lTDI
ADDRESS SSL- Mk R. 4 2014
NEW BUILDING )c EXISTING BUILDING p#a.&z LEGAL DESCRIPTION
Pwa SP~il- tfi 3-55 1c.i # 3qgt-7
REMARKS:
LATERAL LOCATION
I I ST. 1 I
LATERAL NO. INSTALLATION DATE
I N9 SE 1746 I ENGINEERING DEPT.
ISSUED BY
DATE ISSUED b
VAL1 DATI ON
LATERAL CHARGE COMPUTATION
FT. .A
v. -Q F T.
CHARGE (REPAVING ETC.) I. w3i75.. a- W 1N 70 tCH- -
LINE COST DATA
fifi DIST. NO.
TOTAL COST PER FT.
COST PER UNIT TOTAL
50
c
#-
Xork Order # gg(l
(Sewer - 3)
'P *-. .- * CITY OF CARLSBAD JgEpLpCg3
ENGINZERING DEPT . i is'*, s 3 -2- 3
APPLICATION AND COST ESTIMATE
OF
SANITARY SEWER LATERAL CONNECTION
*f?. .
Date 2 - 2 7- 743 Lot 'SAL #Z
Owner > cic5 cf-cdu- Block P&F. MJ(Prpe 3 3 go
Sewer Location
Address 35?-.\ &- 9FIMJ 37 Subdivision
Mailing Address ALA ?hCL, 1911 Act
Phone
-
- Assessment No.
Minimum 4-inch clay sewer pipe in place
Not to exceed 10 ft. dtsp and 30 lin. Et.
Additional charges for any depth exceeding 10 ft.
@O horizontal distance. ........... $ 17s -
- ft. deep at per ft. ..... $
Additional charges for any distance exceeding
30 lin. ft. horizontally - ft. at per ft. ..... $
1 qs Total charges .for constcucth$ - CO ...
iq Sc ?.dditional chzqes fcr City of Czrlsba? s-rvices
S@ Receipt No. -&.a/$ .- sj I7L. Total Charges ... $ At+ --
at 10% of above charges. ......... $
I
Lateral Location ft. from northerly or
ft. from southerly or
westerly manhole
easterly manhole
Attention of Public Works Director:
Signatures:
Public Wks . Director &b3(ic'Wks .gen .Foreman Sanit .Foremar
0 Checked in Sewer Book
Line cost receipt no. G&
Connection Fee receipt no. qp0 huTf 36JWtr
f
-_
MEMORANDUM
July 26, 1976
TO : / Public Works Administrator
Utilities Maintenance Director Planning Director
Dan Groth, Associate Civil Engineer, Current Development Joe Spano, Associate Civil Engineer, Engineering Design
FROM: City Engineer
SUBJECT: MASTER SEWER STUDY - PHASE I ENGINEERING
Attached is a copy of the final draft of the engineering portion of the subject study for your review.
Please excuse the incompleteness of some of the tables, charts, and figures of the report. Also, the report refers to specific proposed trunk sewer lines by number.
I have placed the only copy of the sewer map on the wall in my office for your reference in your review.
I would appreciate your comments (detailed, I hope) by
August 9, 1976.
It is anticipated that the report will be finalized and
printed in early September.