Loading...
HomeMy WebLinkAbout1976-08-17; City Council; 3611-3; ELM AVENUE - VALLEY TO DONNA CONSULTANTS AGREEMENT FOR CONSTRUCTION STAKINGAGENDA BILL NO. DATE : . August 17, 1976 3611 - SUPPLEMENT #3 CITY OF CARLSBAD ENGINEERING C. Mgr. 5 DEPARTMENT: J ELM AVENUE - VALLEY TO DONNA - (Contract No. 1032) CONSULTANTS AGREEMENT FOR CONSTRUCTION STAKING Statement of the Matter The subject contract was awarded to Asphalt Service Co. of Oceanside, California on August 3, 1976. Construction will start by September 1, 1976. Due to the size of the project, considerable field surveying is required to establish line and grade for the construction. The Engineering Department is not presently staffed to field a survey crew for the length of time required by this contract. Three local private engineering firms were contacted and asked to submit proposals for the work. As outlined in AB 3611, Supplement #2, funds are available in the project budget to cover this work. 1 c ,- EXHIBITS : 1. Request for proposals 2. Proposal by Rick Engineering 3. for engineering services 4. Agreement with Rick Engineering Resolution No.399& authorizing execution of Agreement RECOMMENDATION : Adopt Resolution No. 39?& authorizing Mayor to execute agreement with Rick Engineering for field engineering services. Council action 8-17-76 Resolution #3992 was adopted, approving agreement between City and Rick Engineering Company for field engineering servi ces. J ri r- --/ 1200 EM AVENUE CARLSBAD, CALIFORNIA 92008 - ... T E Le PHONE: (714) 729-1 181 July 12, 1976 Rick Engineering 3088 Pi0 Pico, Suite 202 Carlsbad, California 92008 Gentlemen: SUBJECT: ELM AVENUE - VALLEY STREET to DONNA DRIVE The City of Carlsbad is investigating the feasibility of contracting for Construction Surveying Services €or the construction of Elm Avenue between Valley and Donna Drive, as shown on City Draw'ing No. 132-48 attached hereto. It is anticipated that construction will sFart on August 15, 1976 and be completed February 1, 1977. ! , Outline of work to be provided by Engineer: 1. Establlshrnent of constructilon and permanent 2. street cente,rline Rough and final grade stakes for centerline, quarterpoint and cut and fill slopes at required intervals (50 ' 1 3. Final grade stakes for curb line at required intervals (50' ) 4. Line and grade stakes at street grade for sanitary sewer, storm drain and water line replacement at required intervals (50') 5. Ties to permanent centerline monuments Outline of work to be provided by City: 1. Existing field survey data 2. Consultation as required 3. Advance notice for field work z -2- SUBJECT: ELM AVENUE - VALLEY STREET to DONNA DRIVE Information to be submitted: 1. A narrative statement clearly explaining the firm's 2. A list of personnel to be assigned to project 3. A procedure for providing line and grade for the 4. capabilities for providing the services storm drain and sewer line A total lump sum fee for the services to be performed Deadline for Submittal: Proposals must be received by the City Engineer by 5:OO P.M., July 16, 1976 to be eligible for consideration. If you are interested in submitting a proposal for this work, please contact Joe Spano on extension 34. Yours very truly, Tim Flanagan City Engineer I RaCK ENGINEERING COMPANY I K%Y%Ei?l% 3088 PI0 PIC0 DR. SUITE 202 CARLSBAD, CA 92008 P.O.BOX1129 PHONE AREACODE714 729-4987 July 19, 1976 City of Carlsbad 1200 Elm Avenue Carls bad , California 92008 Attention: Mr. Tim Flanagan RE: PROPOSAL FOR CONSTRUCTION SURVEYING; SERVICES OF ELM AVENUE BETWEEN VALLEY STREET AND DONNA DRIVE, PER CITY DRAWINGS 132-40 q 13 Gentlemen: Our fee for providlng the services as outlined in your letter dated July 12, 1976. would be $6,030. Currently, we have three two-man survey crews. The avalla biiity of these crews would be on twenty-four hour previous notice and would lnclude the Zollowing personnel: Robert Leger Robert Johnson Ed Bohrer Steven Linden Wayne Savole Ken Hunt Ted Amox Pertaining to the procedure of providing line and grade for storm draln and sewer line, thler would bg accomplished by off-set stakes with cuts to design grade at whatever time you request. Thank you for considering Rick Engineering for this service e Robert L . Leger, Field Supervieror RLka h .: c ... .-- .- . . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 ' 16 17 ia 19 20 ._ 1 21 22 23 * 24 25 26 27 4 2a 29 30 31 I 32 -. I RESOLUTION NO. 3992 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING AN AGREEMENT BE- TWEEN THE CITY OF CARLSBAD AND RICK ENGINEERING COMPANY FOR FIELD ENGINEERING SERVICES ON ELM AVENUE CONSTRUCTION AND AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT The City Council of the City of Carlsbad, California does hereby resolve as follows: 1) That certain Agreement between the City of Carlsbad and Rick Engineering Company for field engineering services on the construction of Elm Avenue, a copy of which is attached hereto marked Exhibit "A" and incorporated herein by reference, is hereby approved. 2) That the Mayor of the City of Carlsbad is hereby authorize and directed to execute said agreement for and on behalf of the City of Carlsbad. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad, California, held on the 17th day of August , 1976, by the following vote, to wit: AYES : Councilmen Frazee, Lewis, Skotnicki and Counci lwoman Cas1 er NOES : None ABSENT : Councilman Packar ATTEST : (seal) AGREEMENT . TO PROVIDE FIELD ENGINEERING SERVICES FOR THE CONSTRUCTION OF ELM AVENUE FROM VALLEY STREET TO DONNA DRIVE This agreement is made and entered into this 17th day of August , 1976, by and between Rick Engineerinq Company hereinafter referred to as "Engineer", and the City of Carlsbad, hereinafter referred to as "City". RECITALS City proposes to construct certain street improvements on Elm Avenue from Valley Street to Donna Drive, as shown on City Drawing No. 132-4D. Engineer has submitted a proposal to perform construction engi- neering services in connection with this project to include one set of stakes for each of the following: I 1) Establish construction and perrnaoent street centerTine. 2) Provide rough and final grade stakes for centerline, quarterpoint, and cut and fill slopes. 3) Provide final grade stakes for curb line. 4) Provide line and grade stakes at street grade for sanitary sewer, storm drain, and water line reconstruc- tion. Any additional staking required by the contractor shall be billed to the contractor by the Engineer at the rates indicated on the fee schedule attached as Exhibit "A". --- AGREEMENT 1) City engages the Engineer to furnish the services hereinafter mentioned at and for the compensation herein stipulated and the Engineer accepts said engagement upon terms hereinafter set forth. 2) Engineer shall: a) Establish the construction cernterline within 30 days b) Furnish grade stakes as required by the contractor upon (3) three days advance notice. c) Furnish ties for permanent well monuments for the contractor's use in setting monuments and for the City's records. after execution of this agreement. 3) City shall provide Engineer with: a) Existing field survey data. b) Consultation as needed. c) Advance notice for field work. 4) City reserves the right to term-inate the agreement at any time by written notice to the Engineer. In the event the City terminates this agreement, it shall reimburse the Engineer a portion of his fee based on actual costs and percentage of work done as determined by the City Engineer. 5) In consideration of the performance of the above described engineering services, City agrees to pay the Engineer a fee of $6,030, payable as follows: 1/3 upon Go-mpletion of grade staking; 1/3 upon completion of utility staking; and 1/3 upon completion of final monuments. In witness whereof, the parties have executed this Agreement as of this day and year first hereinabove written. CITY OF CARLSBAD d RICK ENGINEERING BY: CITY ATTORNEY Attest: -2- . RICK ENGINEERING COMPANY August 1. 1976 CURRENT HOURLY RATES Through August 1. 1977 Off ice PRINCIPAL .................... 42.00 PRINCIPAL PROJECT ENGINEER ........... 35.00 PRINCIPAL SURVEY ANALYST ............ 28.00 ASSOCIATE PROJECT ENGINEER ........... 32.00 ASSISTANT PRINCIPAL ENGINEER DESIGNER ...... 28. 00 SURVEY ANALYST ................. 25.00 PRINCIPAL ENGINEERING DESIGNER ......... 26.00 ASSOCIATE ENGINEERING DESIGNER ......... 24.00 PRINCIPAL ENGINEERING DRAFTSMAN .......... 22.00 ASSOCIATE ENGINEERING DRAFTSMAN ......... 20.00 ASSISTANT ENGINEERING DESIGNER ......... 17.00 ASSISTANT ENGINEERING DRAFTSMAN ......... 15.00 SECRETARY (Special Assignment) ......... 10.00 TYPIST (Special Assignment) ........... 7.00 ELECTRONIC COMPUTER ................ 11.00 PRINCIPAL ENGINEER ................ 37.00 PRINCIPAL CONSULTANT .............. 38.00 Field FIELD SUPERVISOR ................. 27.50 ONE-MAN SURVEY PARTY .............. 27.50 TWO-MAN SURVEY PARTY .............. 51.00 THREE-MAN SURVEY PARTY .............. 67.00 GEODIMETER (During periods of operation) .... 50.00 Unless otherwise agreed upon. we shall charge. at cost. for blueprinting and reproduction desired by the client or public agencies. out-of-town transportation and ex- penses. and telephone calls . Exhibit "A" E