SUBJECT; mest for an mmt to the Specific plan for the power plant site
to allow the construction of water treatrent facilities and a maintenance
building. Case No: -SP-l44(C) Applicant: San Diego Gas and Electric. *
STAPENEIIT OF THE MATTER
REQUEST:
The water treatment is a-requirement of Federal Environmental regulati
and needs to be installed by July 1, 1977.
Treatment pon& will improve the water quality discharge. maintenance buil.ding will be for consolidating certain shops and stora
activities now occuring at various places around the power plant prope
The Planning Commission recpmmended approval of this amendment.
Exhibits:
Planning Commission Resolution No. 1338
Location Map, Exhibit "A"
Letter to Don Agatep dated, September 8, 1976.
The future
.. . Staff Report dated, March 9, 1977.
. Recommendation:
It is recommended that the City.Attorney be directed to prepare docume
Council Action:
4-5-77 The City Attorney was di-rected to prepare the documents neces! for approval of sp-144(~), as per Planning Commission Resoiut'
* approving SP-l44(C) as per .Planning Resolution No. 1338.
. No. '1338.
..
.. ..
FORM PLANNING 73
---n -- .s- :
,J.
2
3
4
5
6
7
8
9
10
11
12
13
l4
I.5
16
l7
I.8
19
2o
21
22
23
24
25
26
27
28
0
PLANNING COMMISSION RESOLUTION NO. 1338
RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF AN AMENDMENT TO SPECIFIC PLAN * (SP-144) TO ALLOW THE CONSTRUCTION OF WATER TREATMENT FACILITIES AND A MAINTENANCE BUILDING AT THE ENCINA PONER PLANT.
APPLICANT: SAN DIEGO GAS & ELECTRIC CO. CASE NO.: SP-144 (c)
WHEREAS, a verified application for an amendment to SP-ld
to permit the construction of water treatment facilities and l
maintenance bui ldi ng for the foll owing described property:
Those portions of Lots 'IF" and I'H" of Rancho Agua Hedionc Map 823, and Block "W" of Palisades Number Two, Map 1803,
in the City of Carlsbad, County of.San Diego, State of California, shown and delineated cii S.B.E. Map 141-37-73- Parcels 1 through 10.
WHEREAS, in accord with Title 21 of the Carlsbad Municipi
Code, the matter was referred to the Planning Commission for
public hearing.
WHEREAS, a duly noticed public hearing was held at the t
and in the place specified in said notice on March 9, 1977,
at which time all interested persons were heard, and
WHEREAS, the applicant has complied with the Public Faci
Element of the General Plan and has provided the necessary in-
formation which insures Public Facilities will be available
concurrent with need; and I
WHEREAS, the subject application has complied with the
requirements of the City of Carlsbad "Environmental Protectioi
Ordinance of 1972" in that an Environmental Impact Report on
the project was certified in 1973 and has be-en fully suppleme
with additional current information which constitutes prior
compliance. In addition, an EIR for the entire related Encin
: .P,* .+' 1
I 1
2
-3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
a 22
23
,24
25
26
27
28
0
5 project as certified by the Public Utilities Commission acti
as lead agency on the project has been considered; and
WHEREAS, at said public heari'ng, upon hearing and conside
the testimony and arguments, if any, of all persons who desire
to be heard, said Commission considered all factors relating
to the Specific Plan 'Amendment and found the following facts a
reasons to exist:
1) The proposed Specific Plan Amendment is consistent with th General Plan because:
a) The Land Use Map of the General Plan shows the subjecl property as "U" (Pub1 ic Utility). The proposed projec is consistent with that designation.
2) The proposed Specific Plan Amendment is consistent with tt City of Carlsbad Environmental Protection Ordinance of 197
4 because:
a) A negative dec7aration has been issued for the projecl based on the following findings:
1) The construction of the treatment facilities is a necessary water pollution control measure which i: required by the U. S. Environmental Protection Agc Discharged water must be treated so that levels 01 copper, iron, oil, grease, and s.uspended solids wi be reduced;
The construction of the treatment facilities will increase the amount of fresh water discharged intc the ocean but will simply improve the quality of ' discharged water, in accordance with all State an( Federal requirements;
3) The amount of grading associated with the project
2)
not substantial, and does not pose any special geotechnical problems;
Landscaped berms will surround, the ponds;
seepage from the ponds. As an auxilliary measure a subdrain system will be constructed to accommod
seepage should the liner be punctured;
6) The applicant will construct overflow pipes to pr discharge from rising too high in the pohds; and
4) The treatment ponds will not be visible from offs
5) An impervious liner will be installed to prevent
-2-
.,. r
.1
2
3
4
5
6
.7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
e -0
7) Boiler blow-down water, which accounts for approxir 37% of the water which the company could legally
discharge into the ocean, will be reused.
b) The maintenance building is exempted by Section 19.04.r a.1.
3) The proposed project conforms to applicable City policies i ordinances dealing with public facilities because:
a) The project will not increase the need for any existin!
4) This amendment is consistent with the Carlsbad General Plai
and all applicable specific plans. The project is a logici extension of an existing use located in an area already committed to heavy public utility operations.
facilities.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission
the City of Carlsbad as follows:
A) That the above recitations are true and correct,
. B) That an amendment to SP-744 be approved and is subjec to the following cunditions:
1) The approval is granted for the land described in the application and any attachments thereto an1 as shown on the plot plan labeled Exhibit A, date( January 31, 1977. The location of all proposed facilities shall be located substantially as show1 on said plot plan except or unless indicated othe herein.
2) The water treatment ponds shall be constructed ani maintained to the following standards to minimize the likelyhood of the ponds serving as mosquito breeding sources:
a) Confine standing water impoundment to as smal an area as possible.
b) All ponds areas shall be lined with a nonTpor material acceptable to the City Engineer,
c) Maintain a removal program of dense aquatic vegetation, such as cattai-ls, bulrush, tule,
d) Maintain a mosquito fish (Gambusia affinis) population, as necessary.
e) Maintain routine (weekly) inspections of wate impoundments to detect mosquito breeding.
. pondweed, etc.
-3-
, - -, ./ 7
a
2
3
4
5
6
7
8
9
10
11
% 12
13
14
2.5
16
.l?
18
19
20
21
22
23
24
25
26
27
28
0 ‘0
f) Abate any mosquito breeding, as it is detected
3) Prior to the issuance of building permits for the maintenance building, the applicant shall submit a
plot plan to the Planning Director for review and
approval showing which existing shops and storage
activities are to be removed and consolidated into the new structure.
4) Prior to the issuance of building permits, the applicant shall submit a revision to Exhibit A of SP-l44(B), incorporating these new facilities on said exhibit. .The revised exhibit shall be a reproducible mylar.
PASSED, APPROVED AND ADOPTED at a regu’lar meeting of the
City of Carlsbad Planning Commission held on March 9, 1977, by
the following vote, to wit:
AYES: Commissioners Larson, Rombotis, Jose, L’Heureux, Nelson, Fikes and Watson,
li /-
C LARS N, CHAIRMAN
ATTEST:
0 m w- -,, .. f
STAFF REPORT
March 9, 1977
TO: PLANNING COMMISSION
FROM: PLANNING DEPARTMENT
CASE NO: SP-144 (C)
APPLICANT: SAN DIEGO GAS AND ELECTRIC
REQUEST: Approval of an amendment to the Specific Plan for the power plant site to allow the construction of water treatment facilities and a maintenance building.
SECTION I: RECOMMENDATION:
Staff recommends APPROVAL of SP-144 (C) for the following reasons and subject to the following conditions:
' FINDINGS:
1) The Croposed Specific Plan Amendment is consistent with the General Plan because:
a) The Land Use Map of the General' Plan shows the subject property as "U" (Public Utility). The proposed project is consistent with that. designation.
2) The proposed Specific' Plan Amendment is consistent with the Citj of 'Carlsbad Environmental Protection Ordinance of 1972 because:
a) A negative declaration has been issued for the project basec on the following findings:
1) The construction of the treatment facilities is a nec- essary water pollution contro-1 measure which is require( the U.S. Environmental Protection Agency. Discharged water must be treated so that levels of copper, iron, 0' grease, and suspended solids will be reduced;
increase the amount of fresh water discharged into the I
but wiJ1 simply improve the quality of that discharged water, in accordance with all State and Federal require rnents ;
not substantial, and does not pose any special geotech- ni cal probl ems ;
Landscaped berms will surround the ponds;
-1-
2) The construction of the treatment facilities will not
3) The amount of grading associated'with the project is
4) The treatment ponds will not.be visible from offsite.
e 0 I <. )
I
5) An impervious liner will be installed Lo prevent see-
subdrain system will be constructed to accommodate see- page should the liner be punctured;
discharge from rising too high in the ponds; and
37% of the water which the company could legally dis- charge into the ocean,. will be reused.
page from the ponds. As an auxilliary measure, a
6) The applicant will construct overflow pipes to prevent
7) Boiler blow-down water, which accounts for approximate1
b) The maintenance building is exempted by Section 19.04.090.
ordinances dealing with public facilities because:
a) The project will not increase the need for any existing
3) The proposed project conforms to applicable City policies and
facilities.
CONDITIONS:
. 1) The approval is granted for the land described in the applicati and any attachments thereto and as shown on the plot plan label Exhibit A, dated January 31, 1977. The location of all proposs facilities shall be located substantially as shown on said plot plan except or unless indicated otherwise herein.
2) The water treatment ponds shall be constructed. and maintained tc the follewing standards to minimize the likelyhood of the ponds serving as mosquito breeding sources:
a). Confine standing water impoundment to as small an area as
b) All ponds areas shall be lined with a non-porous material
possible.
acceptable to the City Engineer.
C) Maintain a removal program of dense aquatic vegetation, su(
d) Maintain a mosquito fish (Gambusia affinis) population, as
e) Maintain routine (weekly) inspections of water impoundment!
f) Abate any mosquito breeding, as it is detected.
as cattails, bulrush, tule, pondweed, etc.
necessary.
to detect mosquito breeding.
I.
4
-2- .
*C. , '3) Pri0.r to the i suance of building permit ur the maintenance
Director for review and approval showing which existing. shops and storage activities are to be removed and consolidated into
,I building, thdplicant shall submit a p @ plan to the Plannin ',,
I the new structure.
'4) Prior to the issuance of building permits, the applicant shall submit a revision to Exhibit A of SP-144 (B), incorporating these new facilities on said exhibit. my1 ar. The revised exhibit shall be a reproducible
SECTION 11: BACKGROUND:
- Location and Description of Property:
.The proposed project is located on the existing site of the Encina
'related to the power plant operation, Power Plan. The existing uses include various structures and facj]
Existing Zoning:
Subject Property: P-U North: 0-S East: P-U
West: 0-S South: R-1 & 0-S
Existing Land Use:
Subject Property: Encina Power Plant North: Agua Hedionda Lagoon
South: Terramar East: Oil Tanks and 1-5
West: Pacific Ocean
Past History and Related Cases:
SP-144, - 144(A) and - 144(B) all have to do with various phases o the existing power plant operation.
Pub1 i c Faci 1 i ties:
Water and sewer services are provided by the City of Carlsbad.
Major Planning Considerations
Are these proposed facilities necessary?
SECTION 111: DISCUSSION:
Federal environmental regulations mandate that the water _- treatment ponds and facilities be installed by July 1, 1977.-
A letter from F.M. Dudly of SDG&E, dated January 26, 1977, states the future maintenance bui'ding will be ''for consolidating certain . shops and storage activities now occurring at various places aroun the power plant property." The conditions of approval cover this
Attachments: Location Map, Exhibit A, Dated January 31, 1977
MZ:ar
--
(3/4/77) -3-
* e. .. -,.- L I.
c -- G- L'a&& SAN DIEGO GAS & ELECTRIC COPAPAiYY
p.2 ?>x 15s; SAX D!EGO. CAL!F~;RN!F\ 921-2 i, -. ,A,; 232-4''i^ Lr'
September 8, 1976
6
FILE NO MUC [
t 3-pcETy.EG LA a
Mr. Don Agatep jl. SE? 09 1996 Planning Director
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008 CITY OF CAFltSf3P.D
Planning Depxtnent Dear Don :
This letter is in response to your request for ad-
ditional information concerning the Encina Power Plant Water Treatment Facilities.
Question 1: Wnat is the volume'of water being
discharged? \
Answer: The amount of water discharged into the -. _-- ponds will vary from day to day due to the fact that extended
power plant operatior,s require varying axounts of fresh water.
Our NPDES permit #CA 0001350 application to the California Regional Water Quality Control Board for Encina Stipulates
the following:
1. Extended (zeta1 cleaning) discharge waters
will not exceed 21,000 gpd.
2, Low vol-une discharge water will not exceed
135,000 gpd.
It should be noted that boiler blowdown, which is
not to exceed 90,000 gpd, has Eot been included in the above
quantities. We will attempt to recover and reuse as much
of this water as possible.
:!-* Question 2: What is fresh water used for in the __
Lr) dLerinal power plant proccss?
Answer: Fresh water is used for:
1. Boiler fee2waker. This prepar3d water replenishes
boiler blowdswn and s~~plies steam atomization (for stack No control). X
2. Circulating water pimp lubrication.
3. Seceral plant cleaning proeess~s.
- ,\ .:I. ', , = 5 -. I, . *
e:
.. - e \. t ?I
_. - __
Mr. Don llgatep
September 8, 1976
Page 2
G&&p
hrny can't all discharge water be re-
-4% s~.p%?y=E-~7e~~ - _- - 7- d2L .#
Question 3:
used in the power plant?
Answer: San Diego Gas & Electric Company will
attempt to recycle the 90,000 gpd of boiler biowdown water
because the quality is far better than City water. The re- maining low volume and extended water discharges will be of
' harder quality and thus not suita/bL for the above use-
1
sincerely,
"' \ 'i!\L\ 4 - -. -JL -3. ! I,, r ---.
1 /' L ------ ___ ___ F. M. Dudley
Supervisor
Land Planning
L-iI '
FMD : ha
Extension: 1885
d
.. ' 'SPECIFIC Pi-AN 144. (G ,.
COIL?f'ILED L3Y CI1-Y Os-. > C;.!l-?LSEAD PLA@d@NG DCPT
a. e*
,NOTICE OF PUBLIC WEARING
SPECIFIC PLAPi SP-l44(C) .
NOTICE IS HEREBY GIVEN that the City Council of the City of
Carlsbad will hold a public hearing at the City Councfl Chambers, 1200 Eim Avenue, Carlsbad, California, at 7:OO P.M. C!I Tuesday, April 5, 7977, tc consider an appljcation for adoption of a specifjc plan amendment to allow water treatment po~iis and a future maintenance 5u.ilding 02 property l'ocated at tile Eflcina Power Plant,
west of Freeway 1-5 and south of the Aqua Hedioncia Lagoon, and as
shown on the map below:
APPLICANT: Slil" DIEGO GAS AND ELECTRIC
PUBLISH: March 23, 1977
*..
CARLSBAD CITY couruL
-..
_._
.. .
..
. ..- --
NOTICE OF PUBLIC tiEARIl4G
SPECIFIC PLAN SP-144 (C)
--
I4OTICE IS HEREBY GIVE!{ that the Planning Commission of the
City of Car'lsbad will hold a publ-ic liearing at th2 City Council Chainhel-s, 1290 Elm Hvence, Carlsbad, Cal ifornia, at 7:OO P.i"i. on Wednesday, Kctrch 9, 1977, to consider an application for
adoption of a speci Fi c p1.ar-i amendment to a1 1 OW water treatment polids and a ftiture maintenar,ce building on property located at the Erlcina P3i.ier Plant, west of Freeway 1-5 and south of the
Agua Hedionda Lagoon, and as shown on the map below:
Those persons"wishing to speak on this proposal are cordially invited to attend the public hearing. If you have any questions, please call 729-1181 and ask for the Planning Department. .
APPLICANT:' SAN DIEGO GAS AND ELECTRIC
PUBLISH: February 26, 1977 CITY OF CARLSBAD PLANN I NG COt\lMI S
-.
I ,
- - --_ ~ ~- - -._- - -7 -- ~
.-
I
. r -/