Loading...
HomeMy WebLinkAbout1977-06-21; City Council; 5111; La Costa Canyon ParkCrTY OF CARLSBAD Initial : AGENDA BILL NQ ,x/// ' ' ' ' ' ' ' ' ' ' ' Hd. D~IE*. .. Dept. ....... .June. 21.. 1977.. City Atty DEPARTMENT:. ' 'PAPJCS' AND RECREATION ................ * City Mgr. '$ .......... .. ................................... LA COSTA CANYON PARK SUBJECT : Statement of the Matter La Costa Canyon Park, 9 acres located at the southwest end of San Xarcos Canyon in La Costa Vale, is designated in the Parks and Recreation . Element of the Carlsbad General Plan as Canyon Park. At its March 21, .: 1977, meeting the Parks and Recreation Commission recommended changing the name to La Costa Canyon Park. The 1976-77 final budget approved $100,000 from Area #7 Park-in-Lieu fees for the project. City Council Resolution iu'o. 5005 authorized Kater and As'sociates, Landscape Architect, to develop a cost estimate and an architectural design of the park which have been accomplished. In addition to the construction, planting and irri ation cost estimate of $91,035, the estimated architectural fees are ! 3,975 for a total of $100,000. at its May 16, 1977, meeting approved the design concept and the pre- liminary cost estimate. The Parks and Recreation Commission, EXHIBITS : Resolution No. ' Design Concept Preliminary Cost Estimate redesignating the name to La Costa Canyon MCONM.ENDATION : . Adopt Resolution No. Park, approving the and Preliminary Cost Estimate, and authorizing the landscape architect to complete the requirements specified in Kesolution Xo. 5005. COUNCIL ACTION : 6-21-77 Resolution No. 5128 was adopted. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 -. 21 22 23 24 25 26 27 28 I *- I c- . RESOLUTION NO. 51 28 A RESOLUTION OF THE CITY OF CARLSBAD, CALIFORNIA,. REDESIGNATING THE NAME OF CANYON PARK TO LA COSTA CANYON PARK, APPROVING THE DESIGN CONCEPT AND LANDSCAPE ARCHITECT TO COMPLETE THE REQUIREMENTS SPECIFIED IN RESOLUTION NO. 5005 PRELIIIINARY COST ESTIMATE, AND AUTHORIZING THE WHEREAS, La Costa Canyon Park, nine acres located at the southwest end of San Marcos Canyon in La Costa Vale, is designated in Parks and Recreation Element of the Carlsbad General Plan as Canyon Park; and WHEREAS, The Parks and Recreation Commission at its March 21, 1977, meeting recommended changing the name of Canyon Park; and WHEREAS, the 1976-77 final budget approved $100,000 from Area /,7 Park-in-Lieu fees for the project; and WHEREAS, the City Council, in City Council Resolution 5005, authorized Kater and Associates, Landscape Architect, to develop a cost estimate, and architectural design and other related work; and WHEREAS, the landscape architect has completed an architectural design and a cost estimate for construction, planting and irrigation for $91,035 at a fee of approximately $8,975; and WHEREAS, the Parks and Recreation Commission at its May 16, 1977, meeting approved the design concept and the preliminary cost estimate; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad as follows: 1. That the above recitations are true and correct. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 - 9. 21 22 23 24 25 26 27 28 I 2. That the project name be redesignated La Costa Canyon Park. 3. That the Design Concept and Preliminary Cost Estimate be approved. That the landscape architect be authorized to complete requirements specified in Resolution 4. No. 5005. PASSED, APPROVED AND ADOPTED, by the City Council of Carlsbad, California, at a meeting held on the 21st day of June , 1977, by the following vote, to wit: AYES : Councilmen Frazee, Lewis, Packard and Counc NOES : None. ABSENT : Councilman S kotni cki . 1 woman Cas1 ern C$k?C ROBERT C . FRAZEE C/Mayor ATTEST : NORA K. GARDINER, Deputy City Clerk (seal) ./ CANYON PARK (Lower Level, Preliminary Cost Estimate - Alternative I March 21, 1977 1 i ! ! CONSTRUCTION: 1 1. Earthwork Allow. 2. Comfort Station 3. Parking Lot 11 II 4. Demountable Ramp Posts (2) L.S. 5. Volley Ball/Sand Pit & Equipm. L.S. $ 3,000.00 21,000.00 6,500 .OO 300.00 2,400.00 6. Multi-Purpose Court & Equipm. L.S. 3,500 .OO 7. 8. 9. 10. 11. 12. 13. 14. Sand Play Area/Sand/Curb/Drains L.S. 4 Picnic Tables 4@ $450.00/each 2 B.B.Q. Units 2@ 60.00/each 4 Trash Receptacles 4@ 175.00/each 4 Benches 4@ 350.00/each 1 Drinking Fountain 1@ 175.00/each 4' High Chain Link Fence 410 L.F.@ 4.50/L.F. Catch Basins 3@ 300.00/each 15. Storm Drain L.S. 16. Sewer L.S. 17. Electrical & Lighting L.S. 18. Telephone Conduit 250 L.F.@ 1.50/L.F. 19. Play Equipment 20. Concrete Paving 21. Concrete Mowing Curb Allow. 6,500 S.F.@ 1.00/S.F. 460 L.F.@ 2.25/L.F. PLANTING: 22. Turf & Soil Preparation 26,760 S.F.@ -0 8/S .F. 23. Ground Cover & Soil Prep. 8,575 S.F.@ .15/S. F. 24. 1-Gal. Shrubs 40 @ 5.OO/each 6,400 .OO 1,800 .OO 120.00 700.00 1,400.00 175.00 1,845 .OO 900*00 1,500 .OO 1,000 .oo 4,500.00 375.00 8,000 .OO 6,500 .OO 1,035.00 $72,950.00 2,140.00 1,280.00 200.00 i 40 @ 14.00/each 560.00 , 25. 5-Gal. Shrubs 26. 15-Gal. Trees 38 @ 40.00/each 1,520.00 27. 24" - Box Trees IRRIGATION: - 5@ 210.00/each 1,050.00 $ 6,750.00 I I 28. Automatic' Irrigation System L.S. 7,000.00 Sub Total $86,700.00 f Contengencies 5% 4,335.00 ~ i TOTAL $91,035.00 i