CONSTRUCTION OF STREET IMPROVEMENTS ON SOUTH SIDE OF BASSWOOD -
MONROE TO VALLEY AND EAST SIDE OF MONROE - VALLEY TO CHESTNUT --
Statement of the Matter
The Carlsbad Unified School District is proposing to install curb, gutter and
sidewalk along the Basswood frontage of the high school site. It will be
necessary to widen the pavement after construction of curb and gutter. The '
City has agreed to pay for the cost of paving as well as provide the necessary
design and field engineering required for this project.
The School District has verbally offered to extend the terms of the agreement
to provide similar improvements on Valley from Basswood to Chestnut.
Exhibit
Memo from Public Works Administrator to City Manager dated 12/27/77
.
Recommendation
If City Council concurs, they should accept the School District's offer and
instruct the City Manager to prepare an agreement with the Carlsbad Unified
School District to provide public improvements along Valley Street.
If Council approves this project, a fund transfer will be required frm
Gas Tax Reserves.
Council action
1-3-78 The School District's offer was accepted, the City Manager was instructed to prepare an agreement with the Carlsbad Unified
School District,. and authorization was given for a fund transfer
from Gas Tax Reserves.
MEMORANDUM
TO : City Manager
FROM : Pub I i c Works Admi n i strator
DATE : December 27, 1977
SUBJECT: Street Improvements - Carlsbad High School
As a condition of the Pool Agreement, the Carlsbad Unified School District
and the City will be installing curb, gutter, sidewalk and pavement on Bass-
wood Avenue along the school's northerly boundary.
proposed to extend the cooperative project to install curb, gutter, sidewalk
and pavement on Valley Street along the westerly school property frontage.
The District has verbal ly
The Engineering Department has plans on file which can be readily revised to
establish the grades for the curb on both streets. Pavement must be extended
to meet the new gutter line and certain areas overlayed to provide for proper
drainage and riding surface.
The estimated costs of the project are itemized as follows:
Unit Cost Basswood Val ley BY Sidewalk, Curb & Lump Sum $ 5,000 $ 2,300 Di sTi ct
Gutter Excavation
Curb & Gutter 5.50 L.F. 5,500 4,400 Di str
P.C.C. Sidewalk 1.20 S.F. 6,000 4,800 Di str
Pavement 1.00 S.F. 12,000 8,000 City
Roadway Excavation Lump Sum 5,000 3,000 City
Construction Staking
& Inspection Lump Sum 3,000 2,000 City
Contingencies Lump Sum 3,500 2,500 City
TOTAL $40,000 $27,000
The above estimates do not include any work behind the sidewalk which might
be required on School District property.
ct
ct
This expanded project would complete all public improvements on this block
except for the northeast corner which is privately owned. It would facili-
tate maintenance of the street and provide a pedestrian walkway in an area
where it is badly needed.
City Manager -2- December 27, 1977
If the Council decides to accept the School District's offer and contribute
to the expanded project, I would propose that we delay work at the corner
of Basswood and Valley until work on the new school tennis courts is complete.
RECOMMENDATION
That City Council accept the School District's offer and instruct the City
Manager to prepare an agreement with the Carlsbad Unified School District to
provide pub1 ic improvements along Val ley Street.
I
Ronald A. Beckman, P.E.
Pub1 ic Works Administrator