Loading...
HomeMy WebLinkAbout1978-04-18; City Council; 3552-7; Magee Park Master Plan*/ ' CITY OF CARLSBAD AGENDA BILL NO. DATE : April 18, 1978 3552 - Supplement #7 DEPARTMENT: Public Works Dept Initia1:3 . Hd, C, c* Mgr: Atty*Z - --- -- - Sub J ect . MAGEE PARK MASTER PLAN '4 Statement of the Matter The City Council, on February 21, 1978, reviewed the proposed Magee Park master plan prepared by Lawrence Black 6 Associates. concern about several issues, Council instructed staff to return at a later date w5th alternative development plans, including an option to provide for construction with presently budgeted funds. After expressing The attached staff report gives details of staff's analysis for Council's consideration. Exhibit Staff report dated April 11, 1978 ' Recommendation It is recommended-that the Ci'ty Council: 1. Give direction to staff regarding the scope of the proposed Magee Park development program. 2. Authorize staff to initiate the selection process to retain a design firm to prepare construction plans and specifications. Instruct the Parks and Recreation Department to include in the 1978-79 budget the necessary funds to complete the project authorized by Council. 3. Council action 4-18-78 The Council approved Alternate #2, with the deletion of the lawn bowling, walkway and lighting around the lawn bowling area; and with the addition of the restrooms. Staff was directed to initiate selection of' design consultant, and the Parks and Recreation Commission to include the additional , funds needed in the 1978-79 budget. TO: City Manager FROM: public Works Administrator DATE: April 11, 1978 SUBJECT: MAGEE PARK MASTER PLAN A proposed master ~lan for the development of Magee Park, prepared by the firm of Law- rence Black 6 Associates, was presented to the City Council on February 21, 1978. In response to concerns expressed by Council, staff met with the Architect, analyzed the developmental program for Magee Park, and developed two alternative improvement schemes in addition to the master plan as previously presented. tions, as follows: Construction A1 te mate Improvements Estimate 1 Irrigation, landscaping, walkways, parking lot $ 68,000 The two new plans have varia- IA 2 2A Same as Alternate 1 plus area lighting, old City Hall and guest house relocation 90,400 Irrigation, landscaping, walkways, parking lot, lighting, lawn bowling, shuffleboard and picnic tables Same as Alternate 2 plus old City Hall, guest house, res trooms 182,000 139,000 3 Architect's original proposal 205,270 The above alternates do not include the cost of preparing plans and specifications ($8,000 to $18,000 desnzg on project approved for construction) and constructing street improvements on Garfield, Beech and Carlsbad Boulevard ($48,000 estimate) . Funds are budgeted for this project as follows: Amount Source $68,000 Revenue Sharing (1977-78) Purpose Landscaping and park development 48,000 Revenue Sharing (1977- 78) Public improvements Park-in-lieu funds for Park Area No. 1 in the amount of $34,000 are also available for expenditure on this project. Additional funds, if required, would have to be included in the 1978-79 budget. A summary of the estimated costs, available funds and needed funds to complete the al- ternatives follows : .- City Manager - 2- April 11, 1978 Alternate Alternate Alternate Alternate No. 1 No. lA No. 2 No. 2A Construction $ 68,000 $ 90,400 $139,000 $182,000 Pub1 i c Improvements 48,000 48,000 48,000 48,000 Design 8,000 9,600 12,000 18,000 To tal $124,000 $148,000 $199,000 $248 , 000 Available Funds 116,000 116 , 000 116 , 000 116,000 Additional Funds Required $ 8,000 $ 32,000 $ 83,000 $132,000 As an observation, it is my opinion that when an estimate was first prepared for this project, there was no provision for public improvements. This would seem to be some- what consistent with the Alternate No. 2 project minus two years' inflation. The di- version of $48,000 from the construction budget to ~ public improvements, while neces- sary to adhere to the City's public improvements policy, severely downgrades the scope of the park development program. within budget except for the cost of design. Alternate No. 1 provides an essentially passive park with all activity centered at the Magee House. Parking is provided. old City Hall (relocated as part of the Harding Street Community Center project) will be without a foundation until additional funds are budgeted. Alternate No. lA, while still essentially passive, will provide some interior park lighting. guest house and old City Hall and for a fence along the north property line. is demolished. It is possible, however, to bring the project in The guest house and barn are demolished and the It will also provide for relocation of the guest house, foundations for the The barn Alternate No. 2 will make the project a semi-active park. board, horseshoes and lawn bowling. drinking fountains would be provided. foundation is provided for the old City Hall. It will provide for shuffle- No Interior lighting, benches, picnic tables and two The old barn and guest house are demolished. Alternate No. 2A allows for the same project as Alternate No. 2 but adds a restroom fa- cility, relocation and foundation for guest house, foundation for old City Hall, a trash enclosure and a fence along the north property line. The attached exhibit gives breakdowns of the cost estimates. RECOMVENDATI ON It is recommended that the City Council: 1. Give direction to staff regarding the scope of the proposed Magee Park development program. . c ..f City Manager - 3- April 11, 1978 2. Authorize staff to initiate the selection process to retain a design firm to prepare construction plans and specifications. Instruct the Parks and Recreation Department to include in the 1978-79 budget the necessary funds to complete the project authorized by Council. 3. 9diR=L Ronald A. Beclanan, P.E. Public Works Administrator RAB : veb CC: Parks Department Attachment MAGEE PARK DEVELOPMENT Alternate No. 1 Bonds, preliminary work Site demolition (barn, guest house, existing walks) Clearing and grubbing Water service and meter Rough grading Parking lot Walkways Finish grade and soil amendments Irrigation Lawn Ground cover Trees and shrubs Maintenance Sub tot a1 Contingencies TOTAL Alternate No. l.4 Foundation for City Hall Add Foundation for guest house and relocation Add Additional concrete walkways Add Minimm lighting Add Fence at north property line Add Subtotal TOTAL NOTE: Estimates do not include project design costs $ 1,000 5,000 1,900 1 , 000 3 , 000 9,000 4 , 500 10,150 18,000 7,500 700 1,250 1.500 $64,500 $10,000 3 , 000 1,000 7 , 000 1,500 $22.500 $90 , 400 1. Alternate No. 2 Bonds, preliminary work Site demolition (barn, guest house, existing walks) Clearing and grubbing Water service and meter Rough grading Parking lot Concrete walkways Concrete mow strips Walk lighting Picnic tables Benches Drinking fountains Irrigation system Soil preparation and finish grading Landscaping (lawn, ground cover, trees, shrubs) Maintenance Shuffleboard Lawn bowling Horseshoe court Restrooms Sub tot a1 Contingencies TOTAL Alternate No. 2A Add Foundation for City Hall Add Foundation for guest house and relocation Add Fence at north property line Add Z’rash enclosure Add Sub tot a1 TOTAL $ 1,000 5,000 1 , 900 1,000 3,000 9 , 000 10 , 500 1 , 200 23 , 000 4 , 200 3 , 000 800 18,000 11 , 500 12,500 3,000 7 , 000 10 , 700 1,000 $127,300 $ 27,500 10 , 000 3 , 000 1,500 1 , 000 $ 43,000 $182 .OOO NOTE: Estimates do not include project design costs i I 4 OY d 40 sP, PY oa fr 0 "; 5ct s 2 ct 5 (I, s (D Y m r m a 1 z 0) P- a d VI 0 r 0 P, Y P [I] d' D a G .