HomeMy WebLinkAbout1978-04-18; City Council; 3552-7; Magee Park Master Plan*/ '
CITY OF CARLSBAD
AGENDA BILL NO.
DATE : April 18, 1978
3552 - Supplement #7
DEPARTMENT: Public Works
Dept Initia1:3 . Hd,
C, c* Mgr: Atty*Z
- --- -- - Sub J ect . MAGEE PARK MASTER PLAN
'4 Statement of the Matter
The City Council, on February 21, 1978, reviewed the proposed Magee Park master plan prepared by Lawrence Black 6 Associates. concern about several issues, Council instructed staff to return at a later date w5th alternative development plans, including an option to provide for construction with presently budgeted funds.
After expressing
The attached staff report gives details of staff's analysis for Council's consideration.
Exhibit
Staff report dated April 11, 1978 '
Recommendation
It is recommended-that the Ci'ty Council:
1. Give direction to staff regarding the scope of the proposed Magee Park development program.
2. Authorize staff to initiate the selection process to retain a design firm to prepare construction plans and specifications.
Instruct the Parks and Recreation Department to include in the 1978-79 budget the necessary funds to complete the project authorized by Council. 3.
Council action
4-18-78 The Council approved Alternate #2, with the deletion of the lawn bowling, walkway and lighting around the lawn bowling area; and with the addition of the restrooms. Staff was
directed to initiate selection of' design consultant, and the
Parks and Recreation Commission to include the additional
, funds needed in the 1978-79 budget.
TO: City Manager
FROM: public Works Administrator
DATE: April 11, 1978
SUBJECT: MAGEE PARK MASTER PLAN
A proposed master ~lan for the development of Magee Park, prepared by the firm of Law- rence Black 6 Associates, was presented to the City Council on February 21, 1978. In response to concerns expressed by Council, staff met with the Architect, analyzed the developmental program for Magee Park, and developed two alternative improvement schemes
in addition to the master plan as previously presented. tions, as follows: Construction
A1 te mate Improvements Estimate
1 Irrigation, landscaping, walkways, parking lot $ 68,000
The two new plans have varia-
IA
2
2A
Same as Alternate 1 plus area lighting, old City Hall
and guest house relocation 90,400
Irrigation, landscaping, walkways, parking lot, lighting,
lawn bowling, shuffleboard and picnic tables
Same as Alternate 2 plus old City Hall, guest house,
res trooms 182,000
139,000
3 Architect's original proposal 205,270
The above alternates do not include the cost of preparing plans and specifications
($8,000 to $18,000 desnzg on project approved for construction) and constructing street improvements on Garfield, Beech and Carlsbad Boulevard ($48,000 estimate) .
Funds are budgeted for this project as follows:
Amount Source
$68,000 Revenue Sharing (1977-78)
Purpose
Landscaping and park development
48,000 Revenue Sharing (1977- 78) Public improvements
Park-in-lieu funds for Park Area No. 1 in the amount of $34,000 are also available for expenditure on this project. Additional funds, if required, would have to be included in the 1978-79 budget.
A summary of the estimated costs, available funds and needed funds to complete the al- ternatives follows :
.-
City Manager - 2- April 11, 1978
Alternate Alternate Alternate Alternate No. 1 No. lA No. 2 No. 2A
Construction $ 68,000 $ 90,400 $139,000 $182,000
Pub1 i c Improvements 48,000 48,000 48,000 48,000
Design 8,000 9,600 12,000 18,000
To tal $124,000 $148,000 $199,000 $248 , 000
Available Funds 116,000 116 , 000 116 , 000 116,000
Additional Funds Required $ 8,000 $ 32,000 $ 83,000 $132,000
As an observation, it is my opinion that when an estimate was first prepared for this project, there was no provision for public improvements. This would seem to be some- what consistent with the Alternate No. 2 project minus two years' inflation. The di- version of $48,000 from the construction budget to ~ public improvements, while neces- sary to adhere to the City's public improvements policy, severely downgrades the scope of the park development program. within budget except for the cost of design.
Alternate No. 1 provides an essentially passive park with all activity centered at the
Magee House. Parking is provided. old City Hall (relocated as part of the Harding Street Community Center project) will
be without a foundation until additional funds are budgeted.
Alternate No. lA, while still essentially passive, will provide some interior park lighting. guest house and old City Hall and for a fence along the north property line. is demolished.
It is possible, however, to bring the project in
The guest house and barn are demolished and the
It will also provide for relocation of the guest house, foundations for the The barn
Alternate No. 2 will make the project a semi-active park. board, horseshoes and lawn bowling. drinking fountains would be provided. foundation is provided for the old City Hall.
It will provide for shuffle-
No Interior lighting, benches, picnic tables and two The old barn and guest house are demolished.
Alternate No. 2A allows for the same project as Alternate No. 2 but adds a restroom fa-
cility, relocation and foundation for guest house, foundation for old City Hall, a trash enclosure and a fence along the north property line.
The attached exhibit gives breakdowns of the cost estimates.
RECOMVENDATI ON
It is recommended that the City Council:
1. Give direction to staff regarding the scope of the proposed Magee Park development program.
. c ..f
City Manager - 3- April 11, 1978
2. Authorize staff to initiate the selection process to retain a design firm to prepare construction plans and specifications.
Instruct the Parks and Recreation Department to include in the 1978-79 budget the necessary funds to complete the project authorized by Council. 3.
9diR=L
Ronald A. Beclanan, P.E.
Public Works Administrator
RAB : veb
CC: Parks Department
Attachment
MAGEE PARK DEVELOPMENT
Alternate No. 1
Bonds, preliminary work
Site demolition (barn, guest house, existing walks)
Clearing and grubbing
Water service and meter
Rough grading
Parking lot
Walkways
Finish grade and soil amendments
Irrigation
Lawn
Ground cover
Trees and shrubs
Maintenance
Sub tot a1 Contingencies TOTAL
Alternate No. l.4
Foundation for City Hall Add
Foundation for guest house and relocation Add
Additional concrete walkways Add
Minimm lighting Add
Fence at north property line Add
Subtotal
TOTAL
NOTE: Estimates do not include project design costs
$ 1,000
5,000
1,900
1 , 000
3 , 000
9,000
4 , 500
10,150
18,000
7,500
700
1,250
1.500
$64,500
$10,000
3 , 000
1,000
7 , 000
1,500
$22.500
$90 , 400
1.
Alternate No. 2
Bonds, preliminary work
Site demolition (barn, guest house, existing walks)
Clearing and grubbing
Water service and meter
Rough grading
Parking lot
Concrete walkways
Concrete mow strips
Walk lighting
Picnic tables
Benches
Drinking fountains
Irrigation system
Soil preparation and finish grading
Landscaping (lawn, ground cover, trees, shrubs)
Maintenance
Shuffleboard
Lawn bowling
Horseshoe court
Restrooms
Sub tot a1 Contingencies
TOTAL
Alternate No. 2A
Add
Foundation for City Hall Add
Foundation for guest house and relocation Add
Fence at north property line Add
Z’rash enclosure Add
Sub tot a1
TOTAL
$ 1,000
5,000
1 , 900
1,000
3,000
9 , 000
10 , 500
1 , 200
23 , 000
4 , 200
3 , 000
800
18,000
11 , 500
12,500
3,000
7 , 000
10 , 700
1,000
$127,300
$ 27,500
10 , 000
3 , 000
1,500
1 , 000
$ 43,000
$182 .OOO
NOTE: Estimates do not include project design costs
i
I
4
OY
d 40 sP, PY oa fr 0 ";
5ct s
2
ct 5
(I,
s
(D Y m r m
a
1
z
0) P- a d
VI
0 r
0 P, Y P [I] d' D a
G
.