HomeMy WebLinkAbout1978-06-20; City Council; 5270-3; Construction and Installation of Gas Mixing System for Digestion Tank No 2 at Encina Water Pollution Control Facility' 1CITY OF CARLSBAD ^ " y
AGENDA BILL NO. 5270 - Supplement #3 Initial: v/J.
Dept. Hd. J/\&
DATE: June 20, 1978 _ .. .C. Atty.
DEPARTMENT:Water Pollution C. Mgr. jS
SUBJECT: Contract No> 1050
Construction and installation of a Gas Mixing System for Digestion Tank No. 2
at the Encina Water Pollution Control Facility.
Statement of the Matter
At the May 16, 1978 Council meeting, the Purchasing Department was authorized to pro-
ceed with the Encina Digester Mixing System Project in accordance with "open market"
procedures.
Two of the necessary purchases, the gas compressors and the draft tube assembly, will
exceed $5,000. Two quotations for the draft tube were received and two for the gas
compressors. The total bids for these items is $20,607.40. Additional materials for
installation will cost an estimated $10,000. Installation is estimated at about $20,000.
The Encina 1977-78 approved budget contains $35,000 for the total project, of which
$30,000 will be spent for materials. Installation will be accomplished in the next
fiscal year under separate contract.
Exhibits
a. Memo to Ruth Fletcher, Purchasing Agent, of June 14, 1978.
b. Quotation from San Diego Fabricators.
c. Quotation from El Camino Iron.
d. Quotation from Fuller Company.
e. Quotation from Harmon Pump Co.
f. Resolution No^f/^'f approving purchase of draft tube assembly
g. Resolution No• JTtfu^Q approving purchase of two gas compressors
Recommendation
Authorize the purchase of the Digester Mixing System materials for the Encina Water
Pollution Control Facility including two gas compressors from Harmon Pump Co. at a
total cost of $8,613.40 and a draft tube assembly from San Diego Fabricators at a
cost of $11,994.
If Council concurs, they should adopt Resolution &if£7 and Resolution
Council action
6-20-78 Resolution #5467 was adopted, approving purchase of draft tube
assembly, and Resolution #5468 was adopted, approving purchase
of two gas compressors.
ME_M£I*Aflp_UM
TO: Ruth Fletcher, Purchasing Agent DATE: june 14, 1978
FROM: Les Evans, Encina General Manager
SUBJ : Contract No. 1050 - Open Market Purchase (Revised)
The Plans and Specifications for construction and installation of a replacement
gas mixing system for Digestion Tank No. 2 at the Encina Water Pollution Control
Facility were completed in March, 1978.
The Carlsbad City Council authorized advertisement for bids at their April 4,
1978 meeting. Bids were originally scheduled for opening on April 19, 1978 but
the time was extended to May 3, 1978 due to the lack of response by general con-
tractors. At the time of the May 3 bid opening, no bids had been received.
On May 9, 1978, the JAC met in special session to consider alternatives for com-
pleting the project. It was decided that the Carlsbad "open market" procedure
as described in the Carlsbad Purchasing Manual should be utilized. On May 16, 1978,
the Carlsbad City Council authorized the Purchasing Department to proceed with the
Encina Digester System Project in accordance with "open market" procedures.
Still in hopes of inducing a local general contractor to bid the job as a whole,
we contacted Taylor and Hoover Construction and Thibodo Construction both of
which have experience in wastewater treatment plant work. Both firms agreed to
quote us a price for the total job in another formal bid opening situation set
for June 5, 1978.
On June 5, bids from the two construction firms were opened. The bids were as
follows:
Taylor and Hoover $77,821
Thibodo 83,650
Engineer's estimate 44,000
Encina budget amount 35,000
Obviously, the bids were far above both our budget and our engineer's estimate.
The contractors were contacted and informed that due to lack of budgeted funds
and the insistence of our engineer that his estimate was correct, we would at-
tempt to be our own general contractor and subcontract for materials and labor.
Attached are quotations for various materials including gas compressors (blowers),
draft tube and accessories, pipe fittings and electrical materials.
In that delivery time on the gas compressors is 8-10 weeks and fabrication of
the draft tube assembly is 4-6 weeks, we have not requested bids for electrical
work and other installation. These contracts will be force account through San
Diego County, equipment rental, and several subcontracts for installation.
The attached quotations total about $25,000 which is well within the $35,000
Ruth Fletcher, Pure
Contract No. 1050 -
ing Agent
'en Market Purchase (Revised)
June 14, 1978
Page 2
included in the approved 1977-78 Encina Budget. The installation contracts will
be carried out under next year's Encina Budget at an estimated cost of about
$20,000. Some additional materials such as conduit and pipe will also be needed
at a cost of about $5,000.
I would like to proceed with the material purchases, for which we have quotations,
as soon as possible.
Blowers
SUMMARY OF QUOTATIONS
MD Pneumatics
$8,613.40 (phone quotation)
Draft Tube Assembly San Diego Fabricators
$11,994
Pipe Fittings Republic Supply
$3,091.73 + tax
Electrical Equipment Electric Supplies Dist. Co.
$1,225.40 + tax
Sutorbuilt
$10,465 + tax
El Camino Iron
$13,777
Kelly Pipe Co.
$3,757.84 + tax
LE/mgt
attach.
SAN DIEGO FABRICATORS, INC.
3468 HANCOCK STREET • SAN DIEGO, CALIFORNIA 92110
(714) 299-3410
June 6, 1978
Encina Joint Powers
6200 Avenida Encinas
Carlsbad, CA 92008
Attention: Mr. Les Evans, General Manager
Subject: Construction and Installation of Gas Mixing System for
Digestion Tank No. 2 -- Contract No. 1050
Gentlemen:
We have reviewed the drawing titled "Encina WPCF, Digester
No. 2 Mixer System" dated 3-10-78 by CM Engineering Associates, Sheets
1 and 2.
This quotation to you includes all the metal components as
depicted on Sheet 1 in the portions titled "Cover Plate Detail" (bottom left
hand corner), "Drafttube Assembly" (center top), "Section A-A" (center
bottom) and "Baffle Plate Detail (bottom right); and on Sheet 2 "Seal Pipe
Detail" (top center) plus Details "A" through "E" (bottom left) refering to
"Drafttube Assembly" as shown on Sheet 1. -
None of the items under the list titled "Assembly Schedule"
on Sheet 1 (upper right) are included in our considerations. This means
therefore that the five 21/2 inch diameter stainless steel tubes (type 304)
are terminated just prior to the fittings shown on a level with Item (5) and
do not include components above or beyond that level. Anchor bolts either
at the .top cover plate or through the steel (1/2 inch thick) foot plates shown
in Detail "A" (Sheet 2) are not included. The neoprene gasket material for
the digestion tank top opening is included, but 35 Durometer has been sug-
gested by the supplier in lieu of 30. None of the piping or fittings exterior
to the Drafttube Assembly is included with the exception of the 21/2 inch
diameter stainless steel pipe up to the first fittings (not including them) on
top as above referred to.
All structural steel will be prepared for painting by grinding
and chemical washes prior to application of the primer coat. Sandblasting
as called out in Paragraph 7.1 on Page 17 of the specifications is not feas-
ible under our shop procedures. We would perform no on-site installation
services, but of course would guarantee our portions of the system as to
workmanship but not as to design or function.
- 1 -
Encina Joint Powers - ~ Digestey Page Two
Our price, good for 20 days, for *he metal fabrication work
as defined in the foregoing paragraphs is .$11, 994.00
Terms: To be negotiated but would require either a down
payment of $6, 000 or some equally effective method for purchase of
materials. Final payment after delivery of fabricated metal portions would
be as soon as possible, but not to exceed ten (10) days.
Delivery: FOB our plant in San Diego 4 to 6 weeks AJRO.
Thank you for this opportunity to bid on your requirements.
Ve ry fcouly your s,
JL1HN
JLVJjbbj (PresjLePeiit and General Manager
- 2 -
SAN DIEGO FABRICATORS, INC.
- Propos Pago No.
',&i&*#&&.^!~>r^f-rs-<s^»if«*i,s.-'* ,
6-S-17U
of Pages
Attn: Les ;.-;vans
9302 Jarrujcha Road
Spring Valley. CA 92077
STATE CONTRACTORS LICENSE NO. 7.S89S3
PHONE 464-8436
BEST
COPY
PROPOSAL 5U3MITTED TO DATE
)O8 NAME
|l 62.0.0 Avenida. Enclnasi CITY. STATE AND ZIP CODE
ARCHITECT . C a. .__22Gfifi DATE OF PLANSJDATE OF PL/»
^ ___..
Power JOB PHONE
I1-
We hereby submit sogcifications and estimates for: •& r\, n T^X, t ».r.u»5. Jcpgi,te.
furnish material and labor par drawings 1 & 2 to fabricate One (1)
Drafttube Assembly consisting of all steel and stainless steel
frors El. lS.19 to end of stainless steel pipe l»-9" above El. 52.25.
Our quoataticn also includes |" x 12" Keoprene Ring Gasket, steel
sandblasted and Zinc Chromate Primed, no galvanising or finish
paint. Shop drawings to be submitted for approval.
We Exclude: All cost of test or inspection, and anchor* bolts "
This proposal being sent to you per the request of Mr. J.S. Murk
of CM Engineering Assoc. y£r vX4r
W C L FOpOSC hereby to furnish material and labor — complete in accordance with above specifications for
hirteen Thousand Seven SB verit
'.Pctyritent to be made as follows:
;;£"•"•. Ket 10th prox. following date of invoice. No Retention.
dolfars ($ 15>
i'AH ma^e^8l guaranteed to be v, specified. All vxwk to b. complatad in * work-nvin'ik* mannw according to standard practices. Any alteration or deviation fromebov« specifications involving extra costs will be executed only upon writtenand v/iil boeomo an extra ehnfse over and above the estimate. All agree-contingent upon strikes, accident! or delays boyond our control. Owner to
'"""'"*'• ** *"**" '" **"
Authorized / ~ ^
CarlTEri
Note: This proposal may __
withdrawn by us if not accepted with!-days.
Of' X^MlflpOSat __ yhe above p<lces, sp/ac-
and conditions are satisfactory and are hersby accepted^ You Signature
IMir
FULLER POMPAIM^'
A GATX COMBA.v'ji
S96G EAST VIC^^llA STREET
POST OFFICE BOTT 43OB. COMPTON. CALIP ORNIA £
TEU tai3) 639-76OO (213)633-3821 TELEX'67-46O7
To:
PROPOSAL
Proposal Number.51270 SVM-1
Encina Joint Powers
6200 Avenue Encinas
Carlsbad CA 92008
Attn: Mr Les Evans, Gen Mgr
Your Inquiry M.imh.r'1056
1978
Compton
Terms:Net 30 Days
For Acceptance within.30 .Days.
Subject:
Gentlemen:
SUTORBILT BLOWERS WITH ACCESSORIES TO THE EXTENT
OUTLINED BELOW FOR THE EN.CINA, CA. STP
CONTRACT NO.. 1050
In response to your request for a blower quotation for the
above project we propose the following: : .
1. Two Sutorbilt gas pumps, size 7HXB with Teflon impregnated
packings. . .
2. Two bases to accommodate blowers and el. motors.
3. Two V-belt drives for 210 CFM.
4. Two drive guards.
5. Two el. motors 20 HP, 1800 RPM, 3/60/460; TEEP, l.ChS.F.
with rails or slide bases.
6. Two 2" PRV's.
7. Four flexible connectors, 4".
8. Initial installation and startup check-out.
The total price of the equipment outlined above is -$10,210.
net, F.O.B. Compton, California for shipment during 1978.
, Total weight is 3500 Ibs. -
Normal shipping time is 8-10 weeks after complete approval.
No sales/, use or state taxes are included in the price.
For this quotation our terms and conditions apply as per this
proposal form.
Please note the following exceptions .and clarifications:
1. We take exception to "internal venting", which we do not
recommend anymore.
All ORDERS ARE SUBJECT TO ACCEPTANCE BY AN AUTHORIZED EXECUTIVE OF FUUER COMPANY AND ARE SUBJECT TO THE TERMS AND cS VERSE SIDC
v
2. The motors will be 460 volt which now is industry standard.
They will have a 1.0 service factor which also is industry
.; standard.
.i • •
A service factor is not needed, since the gas pumps only
draw 14.2 BHP at the maximum operating conditions.
3. Extra sheaves for conditions other than the specified
210 CFM are available any time after installation, but
are not included in the above price.
We appreciate your continued interest in our equipment and we
hope to be honored with your order.
Yours very truly,
FULLER COMPANY
S. V. Malmgren
Sutorbilt Products
SVM/ph
G
SAN MARCOS* SAN BERNAHD.NO. CALIFORNIA
CMECKEDBY
JOB DESCRIPTION
j *HEgT /OF
"2C?SO
Gu/WTttY AMoofiJT
3
5
4
4
S
7
Z-
z
3
£
loo
7-"-2^
2«"
l'/l"
2.V
Z'/i
V''
// /'
II
"
til
4"
4"
n.)
•Tee - CX
'
PI fill
70* 5/-S -
30 #>
V*J
3*
37
, ^o
, bo
7. 42
39.
32*2?
//3,/f
4900
..... . ......
t
SAN MARCOS. SAN MHMMOINO. CAUFWNM
DATE /
JOB DESCRIPTION Co.Co///e r
77/-S"3'/
4z
7
2-
^
3
2
/^?D
2^
Z'/i
Z'/l,
* '' >'
i/ a
*'
4
f//
"
^'V/77
^/x4'7
*' ~i "&'**'•>
i$
27
ptfiQ.
77)
•Tec -
&OSS --75
V
*£
XS3./Z
72.%
2.9.
fg.oo
C ENGINEERING QUOTATloO
Industrial Pumps
HARMAN PUMP COMPANY
A DIVISION OF HARMAN INDUSTRIES, INC.
1110 E. 14TH STREET . LOS ANGELES, CALIFORNIA 90021 . PHONE: (213)748-0106
QTY.
2-ONLY
SALES
SERVICE
ENGINEERING
AIR COMPRESSORS-OIL FREE:
Siemen & Hinsch (SIHI)
• CENTRIFUGALS-ALL TYPES:
Aurora. Barnes. Berkeley,
Eastern, Fairbanks Morse,
Harman, March, Micro,
Midland, Paco, Price, Trl-Clover, Weinman, Worthington
• CHEMICAL PROCESS:
Ace, Atlas, Barnes, Eastern.
Flotec, Jabsco. Masterflex,
Micro, Price, —
Kuthman, Tri-Clover
< COOLANT-MACHINE:
Graymills, Pioneer, Ruthman
> FOOD PUMPS-SANITARY:
Flotec, Jabsco,
Masterflex, Tri-Clover
• GEAR & ROTARY PUMPS:
Eastern, Micro, Oberdorfer,
Tri-Rotor, Worthington
• HIGH PRESSURE:
Cat, Eastern, Grover,
Hydra-Cell, Siemen & Hinsch
• METERING-INJECTION:
AMF, Blue White, Neptune
• PAINT & SLURRY:
Diaphragm, Gatigher,
Grover. Ruthman
• PERISTALTIC:
Amtec. Litttle Giant,
MasterHex, Randolph
• REGENERATIVE TURBINE:
Aurora, MTH Turboflex, Paco,
Siemen « Hinsch, V/estco
• SEWAGE & SUMP PUMPS -
ALL TYPES:Barnes, Berkeley, Crown,
Fairbanks Morse, Enpo,
Penberthy, Prosser, Trident
• VARIABLE VOLUME:
Flotec, Tri-Rotor
• VACUUM PUMPS:
Leybold-Heraeus, Skidmore,
Siemen A Hinsch
• VERTICAL TURBINE PUMPS:
Berkeley, Layne t Bowler,
Western
Methane & CO
14 June 1978 QUOTATION NO.-1061478-WP
TO:City of Carlsbad
6200 AvenLda Enlinas
Carlsbad, C A 92008
ATTN:
Les Evans
DESCRIPTION NET PRICE
4009/S57 Gas tight M. D. Blower
complete on steel base with "vee" belt drive,
totally enclosed buard and 20 H. P., 1750 RPM
30, 230/460 volt, 60 Hz (Class 1, Group "D")
explosion proof motor
NET price each: . . .$3,945.00
Total net for two units:
A Harman Pump Co. representative will be
available at $250. 00 per day for start-up
$7,890.00
.SG_.08 -Vise.._Temp._90aF
Pump: G.P.M.._Tdh__Ft._P.S.I.G. 7.5
NPSH Available.
Driver: Elec. Motor: H.P 20
NPSH Required.
B.P.AA. 2800
CFAA 320
.SealQ
PPAA 1750 Vo|tc230/460 Phase
_lnches Hq
3 u, 60
Enclosure: Odp Q TE Q Expl. Pr. 0 , Class [TJ, Group [TJ, Other.
Driver: Other:.
p Q g Springfield, Missouri
Terms: Net 1 Oth Prox.
Subject to terms and conditions on reverse.
Est. Shipping Date 6 weeks Aro Appro* Wright 850# ea
Engineer
1
2
3
4
5
6
7
8
9
10
13.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 5 4 6 7
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING A BID AND AUTHORIZING THE EXECUTION C
A CONTRACT FOR TI% PURCHASE OF A DRAFT TUBE ASSEMBLY
BE IT RESOLVED by the City Council of the City of Carlsbad as follows:
1. That the bid of San Diego Fabricators, 3468 Hancock Street, San
Diego, California, 92110, is hereby accepted and the City Manager is hereby
authorized to execute a contract in the amount of $11,994.00.
PASSED, APPROVED AND ADOPTED by the City Council of the City of
Carlsbad at a regular meeting held the 20th day of June , 1978,
by the following vote, to wit:
AYES : Councilmen Packard, Skotnicki, Anear and
NOES : None Councilwoman Casler
ABSENT: None
ROW C. PACURD, Nayor
ATTEST :
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
C - ' ' • ~ .
RESOLUTION NO. '5468
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, ACCEPTING A BID AND AUTHORIZING THE EXECUTION OF
A CONTRACT FOR THE PURCHASE OF TWO GAS COMPRESSORS
BE IT RESOLVED by the City Council of the City of Carlsbad, California,
as follows:
1. That the bid of Harmon Pump Co., 110 E. 14th Street, Los Angeles,
California, 90021, is hereby accepted and the City Manager is hereby authorized
to execute a contract in the amount of $8,613.40.
PASSED, APPROVED AND ADOPTED by the City Council of the City of
at a regular meeting held the 20th day of June , 1978, by the
vote, to wit:
AYES: Councilman Packard, Skotnicki, Anear and
Councilwoman Casler
NOES: None
ABSENT: None /^^ J /^ ' /
&t^s^^/&/*^£^~^^*^
RONALD C. PACKARD, Mayor
ATTEST:
// /*4-4.AjzJs &• (/7SUf^7t>&SMARGARET/. ADAMS, City( Clerk
/
(SEAL)
,-