HomeMy WebLinkAbout1978-10-03; City Council; 5599; Professional Office BuildingCITY OF CARLSBAD AGENDA BILL NO._ DATE: ' October 3, 1978 DEPARTMENT:Engineering Initial: C. AttyJ C. Mgr. Subject:PROFESSIONAL OFFICE BUILDING - SEWER ALLOCATION REQUEST BLA.NKENSHIP. Statement of the Matter Jack'MeKeown, a rch i tect " f or Jef-f B 1 ankens h'i p , is requesting, an allocation of the necessary EDUs to provide sewer service for a professional office building to be located at the southeast corner of Grand and Jefferson._ The new 1 3,200-squa re foot struc- ture will replace an existing 1,1 AO-squa re foot office building. The sewer allocation system provides for Council's allocation of sewer service for projects within the redevelopment area from the contingency reserve of the First Phase Sewer Allocation System. Based on the proposed increased floor area of 12,060 square feet, the Engineering Department staff has determined that 6.7 EDUs are required. Exh i b? ts 1 2 3 Memo from Redevelopment Coordinator dated 9-28-78 Letters from Jeff Blankenshig dated 4-17-78 and 7-28-78 V i c i n i ty Map Recommendat ion~~ '"" " ...--- ^ ^ Staff recommends that the.Co'uncil consider all the information available and take one of the following actions: 1. Direct the City Attorney fo prepare the necessary 'documents allocating sewer capacity of 6.7 equiva1 ent dwelling units from the contingency rese rve 'unde r the second • rev i s i on. of the First Phase A'Pfqcation System for this project, subject to Coastal Commission approval and building permit issuance within six months of Council action; or 2. Deny the applicant's request for 6.7 equivalent dwelling units of sewer capacity. Agenda Bill No. 5599 Page 2 Council Action: 10-3-78 Council continued the matter until such time as the Redevelopment Plan is complete, following which the item will be given immediate consideration. MEMORANDUM DATE: September 28, 1978 TO: Tim Flanagan, City Engineer FROM: Jack Henthorn, Redevelopment Coordinator SUBJECT: BLANKENSHIP - SEWER ALLOCATION REQUEST BACKGROUND On April 19, 1978 a sewer allocation request was received from Mr. Jeff Blankenship. The request entailed the construction of a 3800 square foot restaurant at 2910 Jefferson Street. Staff acknowledged receipt of the request and notified the applicant that the matter would be presented to the Council. Subsequent to the request Mr. Blankenship perceived that the site was not capable of accomodating the original restaurant proposal in that parking, landscape and other site requirements could not be met. Upon realizing that the restaurant proposal was not feasible Mr. Blankenship began working with staff to determine what type of development could be accomodated. On July 28, 1978 Mr. Blankenship formally notified the City that he was changing his request from restaurant development to office development. Concept plans for the office development were presented to staff in early August. On September 15, 1978 Mr. Blankenship1s architect delivered the plans to the Redevelopment Coordinator for processing in accordance with the revised request. The project will result in the removal of a delapidated structure at the corner of Grand and Jefferson. In addition, it will result in furtherance of the emerging office development surrounding the Village Area. RECOMMENDATION Therefore, it is recommended that the subject request be forwarded to Council for consideration of the basis of benefit to the redevelopment effort. JH:ms July 28, 1978 Jeff Blankenship P. 0. Box 33 Carlsbad, Ca. 92008 Mr. Paul Bussey • ' City Manager City of Carlsbad 1200 Elm St. Carlsbad,- Ca. 92008 Dear Mr. Bussey: • The attached letter was sent to the City on April 17, requesting that development of the subject site be given consideration of the sewer allocation system. I am writing to reaffirm my interest in pursuing this project. During the past few months, I have retained an architect and un- dertaken analysis of the site toward the end of preparing plans for submission to the City. Our initial finding is that the best use, from the standpoint of compatibility with existing uses, is office- professional. It appears as though we-can meet all esta- blished city standards for this type of development. I will be presenting my preliminary plan to staff for their re- view withinthe next week. We feel that our concept will improve the area immensely and definitely inhance the Village-like character; I look forward to working with the city and participating in the" revitalization effort currently being supported by the City. Very truly yours, aE -i •'. Jef^f Blankenship 2942 Harding Street Carlsbad, CA 92008 April 17, 1978 Mr. Paul Bussey City Manager . . • City of Carlsbad . 1200 Elm Avenue ' Carlsbad, CA 92008 Dear Mr. Bussey: I "am part owner of property located at 2910 Jefferson Street (intersection with Grand Avenue) in Carlsbad. The site is a corner 75'x 140' with alley access. It -is improved with an older single family residence. The land is zoned C-2. It is within the Central Business District land designation of the Village Area Preliminary Plan. We are presently negotiating with a local Carlsbad restaurateur to construct a 3800 square foot commercial building with "an appurtenant long term lease. Inasmuch as the existing improve- ments .appear as a blight on the area and there is no economic return we are anxious to proceed with our building. We have been in contact with Jack Henthorn, Redevelopment Coordinator as to the sewer allocation system.' It is our understanding a formal request is necessary in order to" obtain increased sewer capacity for our project. Please regard this letter as a request for additional sewer ' capacity to allow us to proceed with our commercial building which we feel will conform to the philosophy of the Village Area concept. We. are prepared to submit architectural plans arid lessees 'name upon request. Very truly yours, lankenship