HomeMy WebLinkAbout1979-03-20; City Council; 5786; Traffic Signal UpgradingCITY OF CARLSEAD -- -I AGENDA BILL NO. --- March 20, 1379 Engineering DATE : DEPARTMENT : Dept Initia1:2 . Hd .2[2 C. Mgr. J _L_- Sub] ect : TRAFFIC SIGNAL UPGRADING - CARLSBAD BOULEVARD & ELI! AVEt'4UE Statement of the Matter The City has $1 2,500 budgeted for construction necessary to modify the traffic signal at the intersection of Carlsbad Boulevard and Elm Avenue. The work would consist mainly of replacing the existing two-phase controller with a ' three-phase controller, installing signal standards with mast arms on the northwest and southeast corners, installing new loop detectors, replacing all defective wiring (which is considerable) and rewiring the interconnect to the intersection of Carlsbad Boulevard and Grand Avenue. Signal Maintenance, Inc. (StlI) has proposed to do this work for $12,000 plus replacing all the field wiring as a part of its current contract*with the.City for extraordinary maintenance. Exhibits 1. Memorandum to City Engineer dated February 27, 1979 2. Letter from Sf41 dated Februai-y 21, 1979 3. Signal Modification Plan (on file in Engineering Department) Recommenda t i on . If Council concurs, authorize the City Manager to award the necessary signal upgrading work to SMI. Council Action: 3-29-79' Council authorized the City Manager to award the necessary signal upgrading work at Carlsbad Boulevard and Elm Avenue to S?lI. MEMORANDUM TO : City Engineer FROM: Transportation Engineer DATE: February 27, 1979 SUBJECT: TRAFFIC SIGNAL - CARLSBAD BOULEVARD AND ELM AVENUE The attached letter from Signal Maintenance, Inc. (SMI) bears good news as far as getting the signal upgraded at the intersection of Carlsbad Boulevard and Elm Avenue. The City has $12,500 budgeted for this upgrading; however, receipt of some informal proposals indicated that this upgrading could cost considerably more. I propose that we do whatever we can to expedite this work and award it to SM I 1. 2. 3. 4. 5. 6. for the f ol 1 owi ng reasons : The existing two-phase controller (inherited from CALTRANS) cannot provide the desired phase to split the eastbound and westbound traffic on Elm Avenue. Automatic Signal 1826-N controller, which will provide the additional phasing and has a low maintenance history, if the City will trade in its two type 1022 controllers (which are in poor condition and were purchased from CALTRANS for $15 each) for salvage. SMI will furnish and install a completely recondbtioned SMI will replace the non-working detector loops with new quadropole detectors. Because of burnt up, defective and temporary wires, all of the field wiring should be replaced as soon as possible. would normally do as a part of its maintenance contract; however, this new wiring should not be installed until the upgrading takes place. This is something SMI Since so much of the improvement would require work from SMI, costs can be minimized by awarding all the work to SMI. The three previous informal bids came in as follows: a. b. SMI - $18,610.95 (excluding type 1826 controller) Perry Electric - $14,200 (excluding any new controller, inter- connect wiring and inspection) c. Arrow Electric - $10,920 (excluding all controller work, inter- connect wiring, prewiring of cabinet and inspection) SMI's quoted price of $12,000 shall remain in effect for only a period of 45 days since the letter was sent. Note that the lower bids exclude considerable work that will eventually have to be added to the estimated costs. the most realistic cost and approach to the problem. SMI's recent letter represents Considering the tentative shape that the intersection is now in, I would recommend that action be taken as soon as possible. Kent A. Whitson, P.E. Transportation Engineer KAW: pab attach. cc: U/M Director -2- i i . SIGNAL MAINTENANCE INC. MAIN OFFICE: 2720 E. REGAL PARK DR., ANAHEIM, CA 92806 (7141 630-4900 . REGIONAL OFFICE: 3395 VIS0 CT., SANTA CLARA. CA 95050 0 (408) 988-5541 February 21, 1979 Mr. Kent Whitson CITY OF CARLSBAD 1200 Elm Avenue Carlsbad, Ca. 92008 \I,.-.-.--. Subject: TKAFFIC SIGNALS - CARtSBAD & ELM Dear Kent: Pursuant to our recent telephone conversation regarding the above noted intersection, the following counter-proposal to your original upgrade plans and specifications is submitted for your approval. As we are all aware, this location has a long history of problems with burnt up wiring in the conduits, At present, overhead temporary wiring has replaced the North-South Run on the West side and there is known defective wiring in the East-West Run on the North side, which could cause a major problem at any time. It is, therefore, recommended that all of the field wiring at this location be replaced as soon as possible to insure a safe operation for the motoring public. It is suggested this work be done on a time and material basis as part of extraordinary maintenance. Enclosed is a Red lined copy of your original plans for this intersection, which reflects changes that would enable SML to upgrade the control equipment a ype of operation you desire for a Lump Sum price You will note that SMI would furnish and inst reconditioned Automatic Signal 1826-N controller and cabinet wired completely to provide master control operation to Grand and Carlsbad. This quoted price shall remain in effect for a period of forty- five (45) days. Please feel free to call if you have any further questions.