HomeMy WebLinkAbout1979-11-20; City Council; 6079; School FeesCITY OF CARLSBAD
AGiiMDA BILL NO. h>O 7 9 Initial:
Dept.Hd.
DATE: NOVEMBER 20. 1979 c Atty.
DEPARTMENT: CITY MANAGER C. Mgr.
Subiect:J SCHOOL FEES
Statement of the Matter
Amendments to the State Law and the Carlsbad Municipal Code regarding
school fees made it necessary for school districts which declared
overcrowding to make new fee recommendations to the City of Carlsbad.
The Encinitas, San Dieguito,- and San.Marcos districts have submitted
revised fee recommendations. The revised fees recognize the limitation
imposed by AB-8 limiting the fee to an amount necessary to pay five
annual lease payments for temporary facilities.
The revised fees recommended by the districts may be implemented by
the Council by the adoption of the attached resolutions.
Exhibits;
1. Letter from Encinitas Union School District dated October 30, 1979.
/
2. Letter from San Dieguito Union High School District dated
October 29, 1979.
3. Letter from San Marcos Unified School District dated Septem-
ber 13, 1979.
4. Memo to City Manager dated November 9, 1979.
5. Resolution No. ^ J 9 7 ^ 9 9 <P and ^jT 999 •
Recommendation
Adopt Resolution No. ^T 9 9 7 ^f ? 9 f and ^? ??
Council Action:
11-20-79 Council continued the matter.
11-28-79 Council adopted Resolutions No. 5997, 5998 and 5999
Council directed staff to return with a seh edule re release of funds
as required by the Municipal Code. Council directed staff to prepare
a report regarding specific dollar amounts of administrative fees
to be charged for handling funds, and an opinion re City's
liability as to releasing or retaining the school fees in view
of pending litigation.
DATE: NOVEMBER 13, 1979
TO: CITY MANAGER
FROM: Assistant to City Manager
SUBJECT: SCHOOL FEES
Pursuant to the provisions of Government Code Sections 65970, the
City Council has adopted Chapter 21.55 of Carlsbad Municipal Code
to provide for the dedication of land and the payment of fees for
interim school facilities. The 1979 session of the State Legis-
lature amended the provisions of the law which allow the City to
collect school fees. Those amendments were contained as part of
AB-8. In response to that legislation, the Carlsbad City Council
amended Chapter 21.55 to bring it in conformance with the new
state law. The most significant effect of the legislation is to
limit the amount of fees which we can collect to the amount neces-
sary to pay five annual lease payments for interim facilities which
are now defined as temporary classrooms, not constructed with
permanent foundations. Because of this limitation, it was necessary
for school districts to recommend new standards for the amount of
fees to be collected within their attendance areas lying within the
City of Carlsbad.
San Marcos Unified School District, San Diequito Union High School
District, and Encinitas Union School District have all responded
with fee recommendations. In addition, the Encinitas, San Diequito
and San Marcos School Districts have all certified that their
attendance areas will continue to be overcrowded, along with infor-
mation concerning use of fees and are in compliance with the reporting
requirements of Chapter 21.55.
Carlsbad Unified School District has not declared a condition of
overcrowding, and therefore, fees will not be established pursuant
to Chapter 21.55 for that district. The Vista Unified School
District has declared overcrowding. Vista's resolution of over-
crowding and fee recommendation will come before the Council at its
next meeting as a separate item.
AB-8 was an urgency measure which was signed into law on July 24, 1979
and became immediately effective. The limitation that school fees
not exceed five annual lease payments, became operative on that date.
The City, therefore, has retained all school fees collected after
that date in trust, until new fees are established. After new fees
are established, the difference between the amount collected and
the new fee will be refunded to developers, and the balance of the
trust funds will be available for release to the school districts.
Page 2-
November 20, 1979
Snhool Fees
Chapter 21.55 does not specify a procedure for release of funds
but mentions that such funds will be released from time to time,
as the City Council may determine. Section 21.55.250 of the Code
provides that if two separate school districts operate schools,
and in an attendance area where the City Council has concured
that overcrowding conditions exist for both school districts, the
City Council will enter into an agreement with the governing body
of each school district for the purpose of determining the distri-
bution of revenues from the fees levied pursuant to Chapter 21.55.
A significant amount of funds is beginning to be accumulated in
trust for the benefit of school districts, and the school districts
are now seeking release of those funds. The staff would recommend
that the funds be released to the district on a calendar quarter
basis, and if the Council concurs, an agreement memorializing that
understanding between the districts and the Council will be prepared.
The fee recommendations and a comparison with last year's adopted
fees are listed below. Although the amount of fee recommended by
each district varies, a logical rationale is advanced by each
relating the amount of fee to the needs of the district and to the
limits imposed by AB-8.
SCHOOL FEES FOR NEW DEVELOPMENTS
Fee Adopted New Fee
last year Recommended
By Council By Districts
San Dieguito Unified High School District
Single or multiple family, 3 or more
bedrooms or equivalent rooms $2,145 $1,481
Single or mult, family, 2 bedrooms or
equivalent rooms. $931 $640
Multi-family homes, 1 bedroom or
equivalent rooms. $ 347 $ 240
Encinitas Union School District
Per bedroom or like room. $400 $410
San Marcos Unified School District
Single family dwelling unit,
per bedroom to a maximum of
$1,188 per dwelling unit. $ 396 $ 396
Attached dwelling units each
bedroom. $ 216 $ 216
It is recommended that the Council adopt the fees recommended by
the school districts.
FRANK N. MANNEN
Assistant to the Manager
VMM • rrh
TY LEVIN -
PRESIDENT
. LORETTA M. SMITH
CLERK
MARY LOU SCHULTZ
G. RONALD SMITH
DONALD E. LINDSTROM
SUPERINTENDENT & BOARD SECRETARY
Cncmitag Union School district
189 UNION STREET /£.
ENCINITAS, CALIFORNIA 92024 '
TELEPHONE 753-1152 .'_r
30 October 1979
CAPRI SCHOOL
941 CAPRI ROAD
CENTRAL SCHOOL
185 UNION STREET
FLORA VISTA SCHOOL
1690 WANDERING ROAD
OCEAN KNOLL SCHOOL
910MELBAROAD
PACIFIC VIEW SCHOOL
608 THIRD STREET
PARK DALE LANE SCHOOL
2050 PARK DALE LANE
J. Wayne Dernetz, City Manager \-
City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Dear Sir:
The Encinitas Union School District has reviewed their cost in providing
interim facilities for developments that are contributing to our over-
crowding conditions.
We see no significant change in our fee structure of four hundred dollars
($400.00) per bedroom.
La Costa developments have contributed significantly to our dilemma.
These developments are approximately four to five miles from our nearest
school. Two of our schools are already substandard in acreage, therefore
it is not feasible to place portables on these sites. Another factor
that the school district must take into consideration is the cost of
transporting these children.
The Encinitas Union School District has a ten-acre site in the La Costa
area. Our immediate future plan is to place interim modular-type buildings
that conform as closely as possible architecturally with the community.
These buildings could be moved to other sites. Our future student population
projections will be in the east and northeast portion of our district.
We have placed five of our six schools on a year-round schedule and we are
nearing our capacity on this schedule. Our long range plans are to lease/
purchase the modular portable buildings to attempt to return, if at all
possible, to a traditional schedule since the majority of the community
would prefer a traditional schedule according to our last survey.
Attached is justifiable evidence of our developer fees.
Sincerely,
DONALD E. LINDSTROM
SUPERINTENDENT
Warren Roberts
Director of Planning
bh
cc: Donald E. Lindstrom
encl.
EXCELLENCE IS OUR GOAL
TY LEVIN
PRESIDENT
®mon fccfjool ® (strict
MARY LOU SCHULTZ
G.RONALD SMITH
DONALD E. LINDSTROM
SUPERINTENDENT & BOARD SECRETARY
189 UNION STREET
ENCINITAS, CALIFORNIA 92024
TELEPHONE 753-1152
CAPRI SCHOOL
941 CAPRI ROAD
FLORA VISTA SCHOOL
1690 WANDERING ROAO
OCEAN KNOLL SCHOOL
910MELBAROAD
PACIFIC VIEW SCHOOL
608 THIRD STREET
PARK DALE LANE SCHOOL
2050 PARK DALE LANE
30 October 1979
J. Wayne Dernetz
City Manager
City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Dear Sir:
The Encinitas Union School District has not received any SB201 fees from
the City of Carlsbad.
The Encinitas Union School District has a Master Plan to place a school
on a site in La Costa; this site belongs to the District. This school
could be a modular school with a core in the center, or it may be a
permanent facility. The decision is still in the exploratory and dis-
cussion stage.
Sincerely,
DONALD E. LINDSTROM
SUPERINTENDENT
Warren Roberts
Director of Planning
/bh
cc: Donald E. Lindstrom
EXCELLENCE IS OUR GOAL
o o o o
COS.T r OR .PORTAB_LE_AND _SyPIJpRT_SERVI£b_S_
T
Portable - $43/ sq. ft. x 940 ' $40,420
Pad preparation __ 650
Walkways "~ 400
Architectural fees 3,500
Furniture and equipment 4,000
Utility hookups 5,000
State/city fees 4,700
Portable restrooms $27360 f 10 = 2736 x 2 5,500
Inflation factor (9%) * ^SjJTS.
$69,945
Support services - one unit per ten classrooms
Office and lounge - $69,945 -. 10 6,994
Work area/equipment housing 6,995
13% interest on $40,500
First year $5,265 interest + $8,100 principal
Second year $4,212 interest + $8,100 principal
Third year $3,159 interest + $8,100 principal
Fourth year $2,106 interest + $8,100 principal
Fifth year $1,053 interest + $8,100 principal
Interest 15,795
TOTAL $99,729
$99,728 7 81 three bedroom houses = $1,231
$1,231 j 3 = $410 per bedroom
ENCINITAS UNION SCHOOL DISTRICT
Resolution No. 7-7980
RESOLUTION RE CONDITIONS OF OVERCROWDING
IN SCHOOL ATTENDANCE AREAS
On motion of Member SCHULTZ * seconded by Member
R. SMITH _» the following resolution is adopted:
WHEREAS, for some time past there has been a continuing and sub-
stantial increase in population within the boundaries of the Encinitas Union
School District to the extent that the school facilities of this district have
become overcrowded; and
WHEREAS, in the absence of assistance in the form of financial con-
tributions or dedications of land from the developers of such new residential
developments this district would not have financial resources adequate to pro-
vide proper educational facilities for all the children residing in this district;
4and
WHEREAS, Chapter 4. 7 (commencing with Section 65970; added by
Stats. 1977, Chap. 955), Division 1, Title 7 to the Government Code making
provision for financial or other assistance by developers to school districts if
the governing board of a school district has made a finding that conditions of
overcrowding exist in one or more attendance areas of the district including
the specific data specified in Government Code Section 65971; NOW THERE-
FORE :
IT IS RESOLVED AND DETERMINED that, pursuant to Government
Code Section 65971, this governing board makes the following findings:
(1) Conditions of overcrowding exist in the following attendance areas
of the Encinitas Union School District which will impair the
normal functioning of educational programs in those areas:
Year-round schools: Capri, Flora Vista, Ocean Knoll, Park Dale Lane.
Pacific View - year round at parental request.
Traditional school: Central School
(2) Reasons for the conditions of overcrowding in the above-mentioned
attendance areas include the following:
a. An influx of large single and multiple family dwellings by large
developers.
b. Letters of availability issued to developers for 8800 homes. 3300
have been completed and approximately 5500 are in some process of comple-
tion. These homes to be completed represent a potential 1740 students.
Survey- A recent survey indicates that 62% of the parents prefer a
traditional school over a year round program, 28% prefer year round
and 10% was undecided or other.
Under policy 1-43 we are not meeting the adequate needs of the com-
munity according to the recent survey.
(3) All reasonable methods of mitigating conditions of overcrowding
have been evaluated and no feasible method for reducing such conditions
exists. Mitigation measures considered by the governing board of this dis-
trict to reduce the overcrowded conditions include the following:
a. Year-round school adopted in four of six schools for overcrowding
as per District Policy 6159 requiring return to traditional track when facilities
are available.
b. Increased class size beyond Board practices from 27:1 to 32:1
teacher contract maximum.
c. Passage of a lease/purchase bond was accomplished prior to
Proposition 13.
d. Portable classrooms through lease/purchase - presently out to bid
for an additional unit.
e. District maintains open intra-district boundaries to equally distribute
student population.
(4) The conditions of overcrowding in this District and the explosive
population growth projected for this area can only be accommodated by the
new schools for the long-term; placement of temporary use buildings/reloca-
table structures and busing of .students are stop-gap measures for the near-
term only, and in and of themselves do not significantly reduce the condi-
tions of overcrowding. Support by developers in the form of financial
contributions or dedications of land is necessary in order to try to keep
abreast of population growth, and even with such assistance, any significant
reduction in the conditions of overcrowding will not occur until additional
classroom buildings can be constructed.
BE IT FURTHER RESOLVED AND ORDERED that the Secretary of
this Board deliver certified copies of this resolution to the city councils
and/or Board of Supervisors of all cities and County within whose
boundaries the school district lies, together with copies of this District's
policy on the subject of developers', subdividers1, and builders' contribu-
tions to mitigate impact on school facilities, to indicate the type and
scale of assistance considered appropriate to meet the needs of -this District.
PASSED AND ADOPTED by the Board of Trustees of the Encinitas __
Union School District of San Diego County, California, this Second day of
October , 1979.
Members of the Board of
Trustees of the Encinitas
Union School District.
ROLL CALL VOTE:
AYES; Members Schultz, L. Smith, R. Smith, Levin
NOES: NQNE
ABSENT: NONE
STATE OF CALIFORNIA)
) ss
COUNTY OF SAN DIEGO)
I, Loretta M. Smith Clerk of the Board of Trustees of the Encinitas
Union School District of San Diego County, California, do hereby certify that
the foregoing is a full, true, and correct copy of a resolution adopted by said
Board at a Regular Meeting thereof held at its regular place of meeting at the
time and by the vote above-stated, which resolution is on file in the office of
said Board.
_ ^ _Lore'tta/M. Smith, Clerkta
7
3211
BUSINESS -
New Construction
Financial Assistance from Developers:
It is the intent and purpose of this Board in adopting this policy that ade-
quate school facilities will be available to meet the needs of students
coming from new residential units in the District.
This Board finds that increased construction of residential units in the
District has and will continue for some time to tax the present school
facilities far beyond acceptable limits and that the District is not in a
financial position to provide the needed additional facilities concurrent
with demand. In order to resolve this situation on an interim basis, it
has become necessary for this Board to seek financial assistance from
developers prior to commencement of construction of new residential
units using all appropriate means. The financial assistance needed by
this District is not less than $400. per bedroom or like-type room.
Such financial assistance will allow the District to take appropriate steps
in attempting to provide adequate facilities for such pupils as needed.
Thus, this Board declares that it is the policy of this District to confer
with developers concerning the anticipated needs of new residents in such
developments in a mutual effort to provide such residents with adequate
school facilities concurrent with the requirements.
Further the Superintendent of this District is authorized to negotiate agree-
ments on behalf of this Board, and subject to ratification by this Board
with developers and other owners of land on the terms and conditions set
forth in the documents entitled "Secured Agreement between Owner as
Developer and Encinitas Union School District" and "Secured Agreement
between Owner, Developer, and Encinitas Union School District" respec-
tively. ,. ;
This policy will undergo annual review by the Board of Trustees to ensure
adequate financial contributions from developers.
Legal Reference: Education Code
65970-
65978 School facilities (passed 21 Sep 77)
Policy
Adopted: March 7, 1978
Revised:,.„ March 20, 1979
62S North Vulcan Av*nu*
Leucodia. California 92024
714/753-6491
.San.
Union Hi<zh School District.October 29, 1979 °
Carlsbad City Council
c/o Mr. Ronald C. Packard, Mayor
1200 Elm Avenue
Carlsbad, California 92008
Dear Mr. Packard:
Enclosed please find the following:
Re: Carlsbad City Ordinance No. 9500/
School Faci 1 i ti es
1. Resolution Re: Conditions of Overcrowding in School Attendance Areas in the
San Dieguito Union High School District
2. Policy of the San Dieguito Union High School District Re: "Availability of
Facilities" that contains a fee schedule to provide relocatable classrooms
consistent with Government Code Section 65978 and Section 21.55.250 of the
above named ordinance
The Board of Trustees thoroughly reviewed the current enrollment situation along
with the potential for growth that continues to exist in the San Dieguito area.
The Trustees respectfully request that the City Council take the following action:
1. Approve the attached Resolution of Overcrowding
2. Approve the revised fee schedule for providing temporary classrooms
3. Authorize release of developer fees collected by the City since July 24,
consistent with the new fee schedule.
Additional information is available upon request.
Sincerely,
lO/juu^
bfs
Attachments
cc: Mr. Wayne Dernetz, City Manager
William A. Berrier
Superintendent
RESOLUTION RE: CONDITIONS OP-OVERCROWDING
.IN SCHOOL ATTENDANCE AREAS
On motion of Member Thompson t seconded by Member
Sensibaugh , the following resolution is adopted:
WHEREAS, for some time past there has been a continuing and substantial
increase in population within the boundaries of the San Dieguitp Union High School
District to the extent that the school facilities of this district have become
overcrowded; and
WHEREAS, a very significant proportion of the increase in population in this
district results from construction of residential units in new housing developments
within the district; and
WHEREAS, in the absence of assistance in the form of financial contributions
or dedications of land from the developers of such new residential developments
this district would not have financial resources adequate to provide proper educa-
tional facilities for all the children residing in this district; and .
WHEREAS, Chapter 4.7 (commencing with Section 65970; added by Stats. 1977,
Chap. 955), Division 1, Title 7 to the Government Code making provision for financial
or other assistance by developers to school districts if the governing board of a • .
school district has made a finding that conditions of overcrowding exist in one or
more attendance areas of the district includina the specific data specified in
Government Code Section 65971; NOW, THEREFORE ~
IT IS RESOLVED AND DETERMINED that, pursuant to Government Code Section 65971,
this governing board makes the following findings:
(1) Conditions of overcrowding exist in the following attendance areas of the
San Dieguito Union High School District which will impair the normal functioning of
educational programs in those areas:
San Dieguito High School - Grades 9-12
Torrey Pines High School - Grades 9-12
Oak Crest Junior High School - Grades 7-8
Earl Warren Junior High School - Grades 7-8
(2) Reasons for the conditions of overcrowding in the above-mentioned attendance
<areas include the following:
•CURRENT CURRENT CAPACITY
ENROLLMENT PERMANENT AND PORTABLE
San Dieguito High School 1995 1811
Torrey Pines High School 1953 1734
Oak Crest Junior High School 890 983
Earl Warren Junior High School 725 332
In addition to the students presently enrolled, the County or the responsible
City has approved numerous developments in each of the above named attendance areas
that have potential for further impacting District schools. The annual increase
in student population has averaged approximately 4% per year over the past four years
and this rate is expected to continue in the -immediate future. The students
currently enrolled, combined with those anticipated from new developments already
approved, has resulted in an overcrowded condition at each of the schools listed above.
(3) All reasonable methods of mitigating conditions of overcrowding have been
evaluated and no feasible method for reducing such conditions exists. Mitigation
measures considered by the governing board of this district to reduce the overcrowded
conditions include the following:
a) The District has entered into agreements with developers who have
contributed financial assistance toward the cost of providing temporary use buildings.
Other temporary buildings have been financed out of the District's general fund so
that each site contains a mix of temporary and permanent facilities.
b) District voters approved a bond measure that provided the first phase
of a new high school in 1974 that is seriously overcrowded in spite of the addition
of sixteen (16) portable classrooms at that site since the fall of 1975.
c) Student busing and boundary realignments are not feasible alternatives
at the high school level since both of the District's two comprehensive high schools
are overcrowded. These alternatives have been implemented at the junior high level;
and even so, those campuses are projected to exceed capacity prior to the completion
of developments that have been approved by the appropriate governmental body.
d) Such alternatives as year-round operation and double sessions have been
examined by committees of parents and staff, but have been rejected due to what is
considered to be a negative impact on the instructional program.
e) The District has no "surplus" real property or "low priority school
facilities"; therefore, this is not a feasible alternative for increasing school
capacity.
f) Following a comprehensive study by a "Facilities Committee", the Board,
on June 1, 1978, identified the facilities required to keep pace with District growth.
One new junior high school was called for plus additional permanent facilities on
each of the District's four existing campuses. Passage of Proposition 13 has made
H impossible to finance new school construction through bond issues that are repaid
by a tax on property.
(4) The conditions of overcrowding is this district and the explosive population
growth projected for this area can only be accommodated by the construction of new
permanent facilities on existing sites and/or the development of additional sites.
The use of additional temporary use buildings/relocatable structures to accommodate
future growth on developed District sites is limited to one junior high campus.
Support by developers in the form of financial contributions or dedications of land is
necessary in order to try to keep abreast of population growth and even with such
assistance, any significant reduction in the conditions of overcrowding will be difficult
until sufficient funds can be generated to provide additional permanent facilities.
RE IT FURTHER RESOLVEr~~iD ORDERFD that the Secretary ^"this Board deliver
certified.copies-of this re-^lution to the city councils anu/or the Board of Super-
Visors of all cities and County within v/hose boundaries the school district lies
together with copies of this District's policy on the subject of developers',
subdividers1, and builders' contributions to mitigate impact on school facilities
to indicate the type and scale of assistance considered appropriate to meet the
needs of this district.
PASSED AND ADOPTED by the Governing Board of the San Dieguito Union High School
District of San Diego County, California, this 25th day of October ,
Members of the Governing Board
of the San Dieguito Union High
School District.
NEW CONSTRUCTION 7100
3110
Availability of Facilities
It is the goal of the San Dieguito Union High School District Board of Trustees to
provide the best possible learning environment for all of the students who live
within the boundaries of the San Dieguito Union High School District. In the absence
of a method to finance school construction through bond issues, the District will seek
alternative solutions to the school housing problems on an interim basis. The
District will utilize temporary classrooms along with other alternatives to the maximum
extent feasible in order to avoid the requirements to operate on double sessions.
The administration and Board of Trustees will explore every legally available avenue
to secure funds and/or financial assistance to provide the space needed to maintain
a quality educational program.
Because a high quality educational program benefits not only students and the community,
but also benefits land developers and builders by facilitating the sale of their homes,-
it shall be the policy of the Board to include property developers and builders
within the class of persons from whom financial and other contributions will be vigor-
ously solicited.
It will be the policy of the Board of Trustees, within the legal limits of its
discretion, to extend cooperation to developers and builders who assist the District
in the task of providing interim measures to maintain the high quality of the educa-
tional program and such cooperation shall be in the same measure as the assistance
provided by the developer.
The Superintendent is authorized to prepare administrative regulations that will (a)
provide guidelines for determining the availability of school facilities to meet the
needs of the projected enrollment and (b) identify the level of developer support
required to mitigate conditions of overcrowding in District schools. Among the
factors to be considered are:
1. The availability of school facilities to accommodate the projected enrollment.
2. The anticipated impact of proposed development on school enrollment.
3. The timing and certainty of the developer's building plans.
4. The type of school facility needed when conditions of overcrowding exist.
5. The provisions of local building ordinances with regard to residential
development.
Policy Adopted: December 1, 1977 (effective 12/2/77) 1/1
Revised: September 28, 1978
Revised: October 25, 1979
NEW CONSTRUCTION - — 7100/AR-l
3110/AR-l
Availability of Facilities
I. Facility Capacity
The following factors will be considered in determining the availability of
facilities to meet the needs of the projected student population:
A. Projected Enrollment
The administration will project the enrollment for each campus for the
following school year by the beginning of the second semester. The pro-
jections will take into consideration such factors as:
1. Enrollment in the feeder elementary districts.
2. Current enrollment at the secondary level.
3. Projected enrollees as a result of new residential units planned for
each attendance area.
B. Current Capacity
The capacity of each campus is determined by the number of students who
may be served by the existing facilities. The following factors will
be taken into consideration in determining the capacity of a given campus:
1. Number of teaching stations in permanent facilities.
2. Number of teaching stations in temporary facilities.
3. The staffing pattern and level of educational program offered at the
school site.
C. Maximum Capacity
Maximum capacity is deemed to be the greatest number of students who can
be provided a quality educational program and school environment on a
conventional time schedule. The administration will monitor plant capacity
annually and make recommendations to the Board with regard to maximum student
enrollment consistent with a proper learning environment.
II. School Availability
Facilities will be determined to be available at a particular school site if one
of the following circumstances exist:
A. Current capacity will accommodate the projected enrollment.
B. Plant capacity is modified to accommodate the projected enrollment by
a procedure acceptable to the Board of Trustees.
If the projected enrollment for the school is greater than the current capacity
but does not exceed the maximum considered acceptable by the Board of Trustees
to maintain a proper learning environment, interim steps are possible with
developer or other assistance to increase plant capacity.
Administrative Regulation Issued: December 1, 1977 (effective 12/2/77) 1/2
Revised: September 28, 1978
Revised: October 25, 1979
NtW CONSTRUCTION ' • '-" 7100/AR-l•-;"';* 3110/AR-i
III. Cooperation with Governmental Agency Responsible for Residential Development
The administration is to evaluate the impact of each proposed subdivision,
rezone, or special use permit, to determine the impact that will occur on the
District's ability to provide adequate school services and facilities for area
students.
A. Sufficient Capacity - If it can be determined that the capacity of the
particular school is sufficient to accommodate the projected enrollment,
a letter of availability will be provided to the appropriate governmental
agency.
IV. Increasing Enrollment Capacity
The administration shall explore with developers and others, interim measures
to mitigate projected overcrowded conditions in District schools. Developers
shall be encouraged to assist the school district to accommodate students pro-
jected from new developments through such efforts as the donation of land for
school sites or through financial contributions for facilities.
Plant capacity will be considered adequate when the developer has entered into
a secured agreement with the District to provide assistance acceptable to the
Board of Trustees. When such conditions exist, the administration shall provide
a letter of availability to the appropriate governmental agency.
V. Monitoring System for Developer Contributions
Any monies that accrue to the District as a result of agreements with developers
shall be placed in a special reserve fund for use in mitigating overcrowded
conditions in District schools. A report shall be filed with the appropriate
governmental agency that will account for the funds on an annual basis.
Administrative Regulation Issued: December 1, 1977 (effective 12/2/77) 2/2
Revised: September 28, 1978
Revised: October 25, 1979
NEW CONSTRUCTION _ „ ATTACHMENT A
7100<;—•
3110
SAN DIEGUITO UNION HIGH SCHOOL DISTRICT
STUDENT HOUSING CAPACITY - FALL 1979
I. 9-12 High Schools - Regular Schedule
The capacity of a senior high school plant is calculated on a space utilization
factor of approximately 85% of the teaching stations at 30 students each. The
ability to fully utilize available instructional space depends on such factors
as properly balanced classes and a class size average close to the maximum.
1. San Dieguito currently has 71 teaching stations including six physical
education classes.
71 x 30 = 2130 x 85% = 1811
2. Torrey Pines has 68 teaching stations including six physical education
classes (including lecture hall and I.A. room)
68 x 30 = 2040 x 85% =1734
II. 7-8 Junior Highs - Regular Schedule
The capacity of a junior high plant is normally calculated on a utilization
factor of 90% with 28 students per teaching station.
'• Earl Warren now has 33 teaching stations.
33 x 28 = 924 x 90% = 832
2. Oak Crest now has 39 teaching stations.
39 x 28 = 1092 x 90% = 983
III. Exceeding Capacity - It is possible to exceed projected capacity at both the
high school or junior high level by such procedures as:
A. Schedule modification - extending the school day to permit more
students to take advantage of specialized facilities such as shops
and laboratories.
. 8. Facility modification - utilization of space not specifically
designed for instructional purposes, i.e., faculty lounges, storage
areas, etc.
While both procedures have been utilized to increase plant capacity, they do
not provide an optimum learning environment for students.
9/28/78 1/1
10/25/79
NEW CONSTRUCTION ATTACHMENT C
7100<—
3110
I. ESTIMATED COST OF PORTABLE FACILITIES
The cost of providing a portable classroom facility on District property is
estimated based on the following factors:
Cost of building including carpet, air conditioning, delivery,
installation, foundation. (Basis for computation $43.00 per
sq. ft. x 960 sq. ft. plus interest for five years.)
Grading
Fees, architect and others
Concrete walkways (1640 x $2 per sq. ft.)
Utilities, Electrical
Water
Gas
Sewer
Contingency
Subtotal
Toilet facilities 1,456 sq. ft. per 10 classrooms
Resource center 1,960 sq. ft. per 10 classrooms
Furniture
Lockers
Landscaping
Total
Cost per student
(30 students x 85% utilization factor)
$57,200
3,000
9,000
3,280
3,000
1,000
1,000
2,000
3,000
82,480
4,104
8,248
3,050
1,683
2,500
$102,065
$ 4,003
3 Br, 4003
2 Br. 4003
1 Br. 4003
Pupil
Generation
Factor
7-8
.12
.05
.02
Cost
480
200
80
Pupil
Generation
Factor
9-12
.25
.11
.04
Cost
1001
440
160
Pupil
Generation
Factor
7-12
.37
.16
.06
Total
7-12
1,481
640
240
10/25/79 VI
NEW CONSTRUCTION ATTACHMENT D
7100 <
3110
Explanation of Major Components in Proposed Developers' Fee Schedule
Cost of building:
Grading:
A standard classroom is 960 square feet; the unit cost is
based on $43 per square foot. Interest at 13% is also
included, since the supplier would be submitting his bid on
an amount per year during the lease period.
Preparation of a site is required to put the building in
place. The school district is usually responsible to prepare
the site ready for foundations.
Architect fees, etc.: Each building requires architectural service; other fees
are required to the State Department of Education, the State
Architect, etc. for plan conformance. Engineering services
are required for site work and utilities. A building
inspector is required during construction.
Cement walkways:
Utilities:
Contingency:
A walk ten feet wide surrounding the building has been District
standard for recent portables.
Cost can only be an estimate since each location is different.
Some campuses will require more, some less, than the estimated
amounts due to the location of existing available lines.
This is an estimate of additional expenses during construction.
Toilet facilities: As needed, these would be incorporated on a campus, but are not
needed for each building. The estimated amount shown would
provide adequate funds to provide these as they are required.
The facility could also provide a custodial room and minimum
storage.
Resource center:
Lockers:
Landscaping:
If the amount shown is collected for each building put in place,
the tenth building could also include the lease of a resource
center as the required funds would be available for use.
This estimate will provide a book locker and a P.E. combination
locker for each student.
A minimum landscaping could be provided with this estimate to
blend the portable building into the existing site.
10/25/79 VI
629 North Vulcan Avenu*
Uucodla, California 92024
7U/753-049I Union High School District
July 20, 1979
Carlsbad City Council »
Mr. Ronald C. Packard, Mayor \/
1200 Elm Avenue v
Carlsbad, California 92008 RE: Carlsbad City Ordinance No. 9500/SB 201 "
Dear Mr. Packard:
Following is a report submitted to comply with Section 21.55.250 of the
above named ordinance:
1. Balance in the account at the end of the previous fiscal year - 0.«
2. Facilities leased, purchased, or constructed during the previous fiscal
year - None
3. Which attendance areas will continue to be overcrowded when the fall
term begins -
All attendance areas in the San Dieguito Union High School District will
continue to be overcrowded during the 1979-80 school year. The Board
took action in the spring of 1979 to adjust attendance boundaries in
order to better equalize enrollment at the two junior high schools in
the San Dieguito Union High School District. The District anticipates
the overcrowded conditions to continue into the foreseeable future.
Additional information is available upon request.
Sincerely,
William A. Berrier
Superintendent
bfs
3>
San Marcos unified School District
270 San Marcos Boulevard
San Marcos, California 92069
Phone: (714) 744-4776
August 1, 1979
Paul D. Bussey
City Manager
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
The following information is hereby submitted in order to comply with the
provisions of Carlsbad City Ordinance 9533, Title 20, Chapter 20.20 and Title
21, Chapter 21.55 relating to School Fee and Land Dedication Ordinance and
S.B. 201.
Our school district maintains a separate fund for recipts and disbursements
of the aforementioned fees. On June 30, 1979 the cash balance in that fund
was $82,066.94 of which $9,952.54 was unencumbered.
During the 1978-79 fiscal year the District has provided air conditioning in
the five relocatables in Woodland Park and partitions to separate classes
and provide more classroom space at Woodland Park and the Junior High School.
We have purchased two relocatable classrooms for Alvin Dunn School, lease/
purchase three special education relocatables — one at Richland, one at San
Marcos Elementary, and one at Alvin Dunn -- and lease/purchase four relocatable
classrooms -- three at Richland and one for Alvin Dunn. We have also rented
one portable unit at Richland which will be replaced with one of the four
relocatables recently bid.
The first payment on the lease/purchase classrooms is included in the contract
payments for next year. The subsequent four year payments are not at this time
budgeted or encumbered. That will have to be provided out of future year
budgets.
To summarize, we have provided housing for approximately 216 additional students
in very acceptable facilities. We have improved the quality of the educational
environment for several hundred additional students. The usuage of the funds
collected in this district has been carefully monitored and is in full compliance
with the letter and intent of Senate Bill 201. The funds have been used only
for the provision of interim school facilities.
I'ncome to Data 5170,145.00
Expenditures and Reserve:
Reserve for contract payments 553,360.73
Air conditioning—Woodland Park 9,550.53
Alvin Dunn relocatablas — complete 70,997.40
Special Ed relocatables excluding -
contract payment due in July and
reflected in reserve amount above 3,345.53
La Costa Land Appraisal 1,500.00
Rental of Portable and ocher costs 5,298.12 160,552.46
Unencumbered Balance 5 9 ,592.54
At the regular meeting of the Board of Trustees of the San Marcos Unified
School District on July 24, 1979 the Board adopted a resolution stating
that conditions of overcrowding existed in school attendance areas of the
San Marcos Unified School District.
If there are any questions regarding this report, please contact David L.
Larson, Director of Business Operations at San Marcos Unified School
District, 270 San Marcos Boulevard, San Marcos, CA 92069.
Sincerely,
David L. Larson
Director Business Operations
San Marcos Unified School District
DLL:!
RESOLUTION RE CONDITIONS
OF OVERCROWDING
IN SCHOOL ATTENDANCE AREAS
On motion of Member • Ham , seconded by Member
Katz , the following resolution is adopted:
WHEREAS, for some time past there has been a continuing and
substantial increase in population within the boundaries of the San Marcos
Unified School District to the extent that the school facilities
of this district have become overcrowded; and
WHEREAS, a very significant proportion of the increase in population
in this district results from construction of residential units in new housing
developments within the district; and
WHEREAS, in the absence of assistance in the form of financial
contributions or dedications of land from the developers of such new residential
developments this district would not have financial resources adequate to
provide proper educational facilities for all the children residing in this
district; and
WHEREAS, Chapter 4.7 (commencing with Section 65970; added by Stats.
1977, Chapter 955), Division 1, Title 7 to the Government Code making provision
for financial or other assistance by developers to school districts if the
governin-g board of a school district has made a finding that conditions of
overcrowding exist in one or more attendance areas of the district including
the specific data specified in Government Code Section 65971; NOW THEREFORE
IT IS RESOLVED AND DETERMINED that, pursuant to Government Code
Section 65971, this governing board makes the following findings:
(1) Conditions of overcrowding exist in the following attendance
areas of the San Marcos Unified School District which will impair
the normal functioning of educational programs in those areas:
(a) San Marcos High School
(2) Reasons for the conditions of overcrowding in the above-mentioned
attendance areas include the following:
(2) The existing enrollment, the anticipated additional
enrollment*, total enrollment, school capacity, and the anticipated
enrollment exceeding school capacity for each of the above listed
attendance areas is as follows:
Present Anticipated Total Capacity Anticipated
Enrollment Enrollment * Enrollment of School Excess
San Marcos
High School
Alvin M.
Dunn School
Rich land
School
San Marcos
School
Woodland Park
School
San Marcos
Junior High
New Horizons
1294
573
604
590
302
643
67
134
66
95^
34
31
20
33
1429
644
699
624
833
663
100
1350
695
711
653
838
792
106.
7-9 '
0
Q
0
0
0
0
* The anticipated additional enrollment is derived front yield factors
applied to residential units under construction or approved and awaiting construction.
(3) All reasonable methods of mitigating conditions of overcrowding
have been evaluated and no feasible method for reducing such conditions exists
except (a) below. Mitigation measures considered by the governing board of this
district to reduce the overcrowded conditions include the following:
(a) Agreements between subdividers and the district whereby
temporary use buildings are leased to the school district with funds
made available by subdividers.
(b) The use of temporary use buildings or relocatable structures.
The use of such buildings is a feasible solution to part of the housing
needs of the district but they are not suitable for all types of classes,
particularly at the secondary level. Mobile home type portable class-
rooms are not adequate in size for the average class size of 31 students.
Furthermore, the funds to obtain such relocatable classrooms would have
to be made available to the district either by agreements with subdividers
or by supplemental district financing such as a bond issue.
(c) Student busing. Student busing is not a feasible alternative
in that there is no space available in other schools of the district to
which the students may be transported. Busing students would also require
• a considerable added cost to the district for buses and drivers.
(d) Double sessions. This is not a feasible alternative in that
the instructional time for each sutdent is reduced and students are
required to attend school at times of the day that are not most conducive
to learning. Double sessions also disrupt the home life of families and
cause excessive wear on school facilities.
(e) Year-round schools. This is not considered a favorable
alternative in that a citizens committee recommended that year round
school not be considered as a feasible educational system at this time
and the Board of Trustees has found no reason to disagree with this finding.
(f) School boundary readjustment. This is not a favorable
alternative in that there is not space available in any of the attendance
areas of the elementary schools or in the high school attendance area.
Boundary readjustments should not be made frequently as they disrupt the
identification of students and families with particular school.
(cj) Elimination of low priority school facility uses. This is
not an alternative in this district inasmuch as there are no low priority
facilities.
(h) The use of available annual tax rate and bond revenues. The
use of available annual tax rate revenues is not a favorable alternative
in that the general fund tax revenue is needed to fund the normal operations
of the district. There are no available funds from this source to provide
facilities for students generated by new housing.
The governing board of this district called a bond election
for March 7, 1978. That bond election was not successful; therefore,
no bond revenues are available to provide some facilities for new
students.
(1) The use of funds available from the sale of surplus school
district real property and other available funds. This is not a
feasible alternative in that the district does not have funds available
from other sources and does not have surplus real property available
to sell.
(4) The conditions of overcrowding in this district and the explosive
population growth projected for this area can only be accomcdated by new schools
for the long-term; placement of temporary use buildings/relocatable structures
and busing of students are stop-gap measures for the near-term only and in
themselves do not significantly reduce the conditions of overcrowding. Support
by developers in the form of financial contributions or dedications of land is
necessary in order to try to keep abreast of population growth, and even with
such assistance, any significant reduction in the conditions of overcrowding will
be difficult until permanent additional classroom buildings can be constructed.
BE IT FURTHER RESOLVED AND ORDERED that the Secretary of this Board
deliver certified copies of this resolution to the City Councils and/or Board
of Supervisors of all cities and County within whose boundaries the school
district lies together with the copies of this District's policy on the subject of
developers'; subdividers' and builders' contributions to mitigate impact, on
school facilities to indicate the type and scale of assistance considered
appropriate to meet the needs of this district.
PASSED AND ADOPTED by the Governing Board of the c;ar, Ma**™* iinifioH
School District of San Diego County, California
this ?ath day of ,i,,iv , 1979.
Ralph- £. KeF logg
Superintendent of Schools and
Secretary to the Governing Board
Members of the Governing Board of the
San Marcos Unified School District
San Marcos Unified School District
270 San Marcos Boulevard
San Marcos, California 92069
Phone (714) 744-4776
November H, 1978
FEE SCHEDULE. FOR INTERIM FACILITIE5/S.3, 201
Purchase Price Clow quote - 30v x 32v relocatable)
Sales Tax
Site Preparation, Utilities, Engineering, Walkways
Furniture and Equipment
Sub Total
Plus 10% Inflation
Total Cost Per Classroom
10% for Special Education
Total Cost Per Student @ 31 Per Classroom
$29,250
1,750
5,000
3,500
$39,500
3.950
$43,450
4,345
$47,795
$ 1,542
FEE SCHEDULE
1. Single Family Dwelling Units (.0,77 student generation factor per
dwelling unit = $1,188 per dwelling unit]
Each bedroom = $396 to a maxium of $1,188 per dwelling unit
2. Attached Dwelling Units CO,28 student generation factor = $432 per
dwell ing unit)
Each bedroom = $216
3. Lot splits and land subdivisions where no building permit is involved,
Per lot - $1,188
(City of Vista only)
4. Retirement homes, convalescent hospitals, industrial, commercial and
professional.
Mo fae.
1 RATIONALE FOR FEE SCHEDULE FOR INTERIM FACILITIES/S,B. 2012
3 The passage of Proposition 13 removed all existing sources of funds for
4 school facilities except S.B. 201, It is no longer feasible to lease
5 relocatable classrooms and plan on replacing them with permanent buildings
5 at the end of the lease period. This fee schedule, therefore, is based on
7 purchasing standard size relocatable classrooms with appurtenant costs of
8 site preparation, utility connections, engineering, walkways and furniture
9 and equipment. The present cost of a classroom and attached costs is $39,500.
10
11 It is assumed that this fee schedule will be in force for approximately one
12 year. The inflation rate in the construction industry in running 1% per month.
13 Best indications at this point is that this rate will increase in the near
T4 future. A modest 10% inflation factor is ,included,
1515 At the present time, 10% of the district's classrooms are devoted to special
17 education classes. This proportion ts increasing markedly due to Federal
]Q legislation requiring programs for all handicapped students by type of handi-
19 cap. The number of additional classrooms needed for special education over
2Q the next two years approximates the number needed for regular students,
2122 The district contract with the teaching personnel calls for a maximum average
23 class size of 31. This has been the practice in the district for some time,
24 Using 31 students per classroom as a divisor, the cost per student is $1542.
25 The student generation factors computed by the San Diego Department of
27 Education for the San Marcos Unified School District are 0.77 students per
23 dwelling unit in single family dwellings and 0.28 for attached dwelling units
2g (apartments, condominiums, etc.}, Accordingly, the cost to house the students
2Q generated per dwelling unit becomes $1,188 for single family units and $432
21 for attached units.
32
33 It is assumed that the average single family dwelling unit in San Marcos has
24 three bedrooms, so the cost per bedroom becomes $396; $1,1-38 per dwelling
'i- j unit - 3 bedrooms per dwelling unit. It is assumed that the average attached
^ dwelling unit has two bedrooms, so the cost per bedroom is $216. The reason
^ for assessing the fee on a per-bedroom basis is that the number of bedrooms
,o has some positive relation to the number of children in the family,oo
^ In some cases it is impossible to determine the number of bedrooms at the
4^ time the fee is assessed. This would be true in a lost split or a sub-
4], division of land, other than a housing tract, in a jurisdiction that assesses
42 the fee at the time of tentative or final tract or parcel map approval even
43 though the fee is not collected until building permits are issued. This
44 would not be a problem in a jurisdiction that assesses the fee at the time
45 building permits are issued.46
47 It is assumed that a lost split or land subdivision will result in single
48 family residences as apartment houses or condominiums generally require
49 larger lots. The fee assessed, therefore, for lot splits or land sub-
50 divisions where the number of bedrooms is not known is the fee for a single
51 family residence ($1,188) per lot.52
53
54 !
55 j
56 j
/ /V . /•/•<•>'•'
"
San Marcos Unified School District
270 San Marcos Boulevard
San Marcos, California 92069
Phone: (714) 744-4776
August 20, 1979
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
Re: Recertification of School Overcrowding Conditions
Under S.B. 201 - San Marcos Unified School District
Please find enclosed an amended REsolution Re Conditions of Overcrowding
in the San Marcos Unified School District school attendance areas passed
and adopted by the Governing Board of the San Marcos School District on
July 24, 1979.
Sincerely,
David L. Larson
Director of Business and Operations
San Marcos Unified School District
DLL:1
RESOLUTION RE CONDITIONS
OF OVERCROWDING
IN SCHOOL ATTENDANCE AREAS
On motion of Member • Ham , seconded by Member
Katz , the following resolution is adopted:
WHEREAS, for some time past there has been a continuing and
substantial increase in population within the boundaries of the San Marcos
Unified School District to the extent that the school facilities
of this district have become overcrowded; and
WHEREAS, a very significant proportion of the increase in population
in this district results from construction of residential units in new housing
developments within the district; and
WHEREAS, in the absence of assistance in the form of financial
contributions or dedications of land from the developers of such new residential
developments this district would not have financial resources adequate to
provide proper educational facilities for all the children residing in this
district; and
WHEREAS, Chapter 4.7 (commencing with Section 65970; added by Stats.
1977, Chapter 955), Division 1, Title 7 to the Government Code making provision
for financial or other assistance by developers to school districts if the
governing board of a school district has made a finding that conditions of
overcrowding exist in one or more attendance areas of the district including
the specific data specified in Government Code Section 65971; NOW THEREFORE
IT IS RESOLVED AND DETERMINED that, pursuant to Government Code
Section 65971, this governing board makes the following findings:
(1) Conditions of overcrowding exist in the following attendance
areas of the San Marcos Unified School District which will impair
the normal functioning of educational programs in those areas:
(a) San Marcos High School
(2) Reasons for the conditions of overcrowding in the above-mentioned
attendance areas include the following:
(2) The existing enrollment, the anticipated additional
enrollment*, total enrollment, school capacity, and the anticipated
enrollment exceeding school capacity for each of the above listed
attendance areas is as follows:
Present Anticipated Total Capacity Anticipated
Enrollment Enrollment * Enrollment of School Excess
San Marcos
High School
Alvin M.
Dunn School
Rich! and
School
San Marcos
School
Woodland Park
School
San Marcos
Junior High
New Horizons
1294
578
604
590
302
643
67
134
66
95>
34
31
20
33
1 429
644
699
624
833
663
IOC
1350
695
711
653
838
792
106
7-9
0
Q
0
0
0
0
* The anticipated additional enrollment is derived from yield factors
applied to residential units under construction or approved and awaiting construction.
(3) All reasonable methods of mitigating conditions of overcrowding
have been evaluated and no feasible method for reducing such conditions exists
except (a) below. Mitigation measures considered by the governing board of this
district to reduce the overcrowded conditions include the following:
(a) Agreements between subdividers and the district whereby
temporary use buildings are leased to the school district with funds
made available by subdividers.
(b) The use of temporary use buildings or relocatable structures.
The use of such buildings is a feasible solution to part of the housing
needs of the district but they are not suitable for all types of classes,
particularly at the secondary level. Mobile home type portable class-
rooms are not adequate in size for the average class size of 31 students.
Furthermore, the funds to obtain such relocatable classrooms would have
to be made available to the district either by agreements with subdividers
or by supplemental district financing such as a bond issue.
(c) Student busing. Student busing is not a feasible alternative
in that there is no space available in other schools of the district to
which the students may be transported. Busing students would also require
• a considerable added cost to the district for buses and drivers.
(d) Double sessions. This is not a feasible alternative in that
the instructional time for each sutdent is reduced and students are
required to attend school at times of the day that are not most conducive
to learning. Double sessions also disrupt the home life of families and
cause excessive wear on school facilities.
(e) Year-round schools. This is not considered a favorable
alternative in that a citizens committee recommended that year round
school not be considered as a feasible educational system at this time
and the Board of Trustees has found no reason to disagree with this finding.
(f) School boundary readjustment. This is not a favorable
alternative in that there is not space available in any of the attendance
areas of the elementary schools or in the high school attendance area.
Boundary readjustments should not be made frequently as they disrupt the
identification of students and families with particular school.
(g) Elimination of low priority school facility uses. This is
not an alternative in this district inasmuch as there are no low priority
facilities.
(h) The use of available annual tax rate and bond revenues. The
use of available annual tax rate revenues is not a favorable alternative
in that the general fund tax revenue is needed to fund the normal operations
of the district. There are no available funds from this source to provide
facilities for students generated by new housing.
The governing board of this district called a bond election
for March 7, 1978. That bond election was not successful; therefore,
no bond revenues are available to provide some facilities for new
students.
(1) The use of funds available from the sale of surplus school
district real property and other available funds. This is not a
feasible alternative in that the district does not have funds available
from other sources and does not have surplus real property available
to sell .
(4) The conditions of overcrowding in this district and the explosive
population growth projected for this area can only be accomodated by new schools
for the long-term; placement of temporary use buildings/relocatable structures
and busing of students are stop-gap measures for the near-term only and in
themselves do not significantly reduce the conditions of overcrowding. Support
by developers in the form of financial contributions or dedications of land is
necessary in order to try to keep abreast of population growth, and even with
such assistance, any significant reduction in the conditions of overcrowding will
be difficult until permanent additional classroom buildings can be constructed.
BE IT FURTHER RESOLVED AND ORDERED that the Secretary of this Board
deliver certified copies of this resolution to the City Councils and/or Board
of Supervisors of all cities and County within whose boundaries the school
district lies together with the copies of this District's policy on the subject of
developers'; subdividers' and builders' contributions to mitigate impact, on
school facilities to indicate the type and scale of assistance considered
appropriate to meet the needs of this district.
PASSED AND ADOPTED by the Governing Board of the san Marrng
this ?ath day of .ii,iy , 1979.
School District of San Diego County, Cal ifornia,g iinifi
, Cal if
Ralph £. KeTTogg
Superintendent of Schools and
Secretary to the Governing Board
Members of the Governing Board of the
San Marcos Unified School District
-4-
1
2
3 , REVISING THE AMOUNT OF FEES TO BE REQUIRED AS Ai
4 MENT WITHIN CERTAIN AREAS OF THE SAN MARCOS
5
- WHEREAS, pursuant to Chapter 4.7, Division 1, Title 7 of theo
7
0ibad, California has adopted a School Facilities Dedication ando
_iFee Ordinance (Carlsbad Municipal Code Chapter 21.55); and
10
16
17
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 5997
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AMENDING RESOLUTION 5580
REVISING THE AMOUNT OF FEES TO BE REQUIRED AS 1
CONDITION OF APPROVAL FOR RESIDENTIAL DEVELOP-
MENT WITHIN CERTAIN AREAJ
UNIFIED SCHOOL DISTRICT.
California Government Code, the City Council of the City of Carls-
WHEREAS, Section 21.55.150 of the Carlsbad Municipal Code
__ provides that the standards for the amount of fees to be required
.. p, pursuant to such ordinance shall be determined by the City Council
_„ and set by resolution. The City Council's determination is to be
.. . made after consideration of recommendations from the governing
board of the affected school district; and
WHEREAS, the City Council established standards for the amount
of fees to be required pursuant to Chapter 21.55 in Resolution
No. 5580; and
WHEREAS, amendments to Chapter 4.7, Division 1, Title 7 of the
California Government Code and to Chapter 21.55 of the Carlsbad
Municipal Code limit the amount of fee that can be required; and
WHEREAS, the City of Carlsbad has requested the San"Marcos
Unified School District to submit revised fee recommendations; and
WHEREAS, the City Council is in receipt of recommendations
in regards to revised amount of fees from the San Marcos Unified
School District. Their recommendation is attached hereto as
Exhibit A, and is made a part hereof; and
WHEREAS, the City Council fully considered the matter at the
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
regular meeting of November 20, 1979 at which the City Council
determined to concur in the revised standards as recommended by
the Board of the San Marcos Unified School District;
' NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad as follows:
A. That the above recitations are true and correct.
B. That the standard for the amount of fees to be required
as a condition of approval for residential developments within
that portion of the City of Carlsbad, which is also within the
boundaries of the San Marcos Unified School District, shall be
as contained in Exhibit A.
C. This determination is based upon the City Council's
concurrence in the recommendations made by the Governing Board of
the San Marcos Unified School District, including the facts support-
ing such recommendations as contained in Exhibit A.
D. Unless the decision-making body especially determines to
the contrary, the City Council hereby determines that the following
findings and requirements shall apply to any residential develop-
ment of fifty units or less:
1. All such developments shall be required to pay fees
in accordance with the schedule in Exhibit A.
2. The City Council has reviewed that portion of the
General Plan which applies to the San Marcos Unified
School District and finds that it provides for the
location of public schools.
3. That the fees to be paid shall be used for the
purpose of providing interim school facilities.
4. That the fees to be paid for each unit bear a reasonable
relationship to the burdens placed on the School District
by such unit and that the fees will be used to mitigate
that burden.
5. That the school facilities to be funded by the fees are
-2-
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
consistent with the City's General Plan.
E. The standards adopted by this resolution do not at this
time require the dedication of land. The San Marcos Unified
School District is developing standards regarding such dedications.
When the District is prepared to make their recommendation in that
regard, the City Council intends to amend this resolution to
include provisions for requiring the dedication of land as they
determine to be in the public interests.
and adjourned
PASSED, APPROVED AND ADOPTED at 2ac/regular meeting of the
City Council of the City of Carlsbad, California, held on the
28th Day Of November , 1979 by the following vote, to
wit:
AYES: Mayor Packard, Councilman Skotnicki, Lewis, Anear; and
NOES: None
ABSENT:
Councilwoman Casler
RONALD C. PACKARD, Mayor
ATTEST:
ALETHA L. RAUTENKRANZ, City Cjlerk
(SEAL)
' • • . EXHIB" "A to Resolution No. 5997
3 RATIONALE FOR FEE SCHEDULE FOR INTERIMTACILITIES/S,B. 201'•2-. ~ ; : :
3 The passage of Proposition 13 removed all existing sources of funds for
4 school facilities except S,B, 201, It is no longer feasible to lease
5 relocatable classrooms and plan on replacing them with permanent buildings
6 at the end of the lease period. This fee schedule, therefore, is based on
7 purchasing standard size relocatable classrooms with appurtenant costs of
8 site preparation, utility connections, engineering, walkways and furniture
9 and equipment. The present cost of a classroom and attached costs is $39,500.
10
11 It is assumed that this fee schedule will be in force for approximately one
12 year. The inflation rate in the construction industry in running 1% per month.
13 Best indications at this point is that this rate will increase in the near
14 future. A modest 10% inflation factor is .included,
1516 At the present time, 10% of the district's classrooms are devoted to special
17 education classes. This proportion is increasing markedly due to Federal
18 legislation requiring programs for all handicapped students by type of handi-
19 cap. The number of additional classrooms needed for special education over
2Q the next two years approximates the number needed for regular students.
2122 The district contract with the teaching personnel calls for a maximum average
23 class size of 31. This has been the practice in the district for some time,
24 Using 31 students per classroom as a divisor, the cost per student is $1542.
2525 The student generation factors computed by the San Diego Department of
27 Education for the San Marcos Unified School District are 0.77 students per
2Q dwelling unit in single family dwellings and 0.28 for attached dwelling units
2g (apartments, condominiums, etc.), Accordingly, the cost to house the students
2Q generated per dwelling unit becomes $1,188 for single family units and $432
21 for attached units.
3222 It is assumed that the average single family dwelling unit in San Marcos has
24 three bedrooms, so the cost per bedroom becomes $396; $1,188 per dwelling
^ unit - 3 bedrooms per dwelling unit. It is assumed that the average attached.
^ dwelling unit has two bedrooms, so the cost per bedroom is $216. The reason
^ for assessing the fee on a per-bedroom basis is that the number of bedrooms
^o has some positive relation to the number of children in the family,Jo
^ In some cases it is impossible to determine the number of bedrooms at the
49 time the fee is assessed. This would be true in a lost split or a sub-
41 division of land, other than a housing tract, in a jurisdiction that assesses
42 the fee at the time of tentative or final tract or parcel map approval even
43 though the fee is not collected until Building permits are issued. This
44 would not be a problem in a jurisdiction that assesses the fee at the time
45 building permits are issued.46
47 it is assumed that a lost split or land subdivision will result in single
48 family residences as apartment houses or condominiums generally require
49 larger lots. The fee assessed, therefore, for lot splits or land sub-
50 divisions where the number of bedrooms is not known is the fee for a single
51 family residence (.$1,188). per lot,
53
54
55
56
San Marcos Unified School District
270 San Marcos Boulevard
San Marcos, California 92069
Phone: (714) 744-4776
November 14, 1978
FEE SCHEDULE. FOR INTERIM FACILITIES/S.B, 201
Purchase Price Clow quote - 30* x 321- relocatable)
Sales Tax
Site Preparation, Utilities, Engineering, Walkways
Furniture and Equipment
Sub Total
Plus 10% Inflation
Total Cost Per Classroom
10% for Special Education
Total Cost Per Student @ 31 Per Classroom
$29,250
1,750
5,000
3,500
$39,500
3,950
$43,450
4,345
$47,795
$ 1,542
FEE SCHEDULE
1. Single family Dwelling Units (.0,77 student generation factor per
dwelling unit = $1,188 per dwelling unit]
Each bedroom = $396 to a maxium of $1,188 per dwelling unit
2. Attached Dwelling Units CO,28 student generation factor = $432 per
dwell ing unit)
Each bedroom = $216
3. Lot splits and land subdivisions where no building permit is involved,
Per lot - $1,188
(City of Vista only)
4. Retirement homes, convalescent hospitals, industrial, commercial and
professional.
No fee.
San Marcof ~* Jnified School District
270 San Marcos Boulevard
San Marcos, California 92069
Phone:(714)744-4776
September 13, 1979
Paul D. Bussey
City Manager
City of Carlsbad
1200 Elm Avenue
Carlsbad, CA 92008
Dear Mr. Bussey:
Please be advised that the payment of fees for interim school facilities for the
San Marcos Unified School District is based on a five year lease/purchase. The
enclosed fee schedules are the San Marcos Unified School District suggestions
as to collecting of S.B. 201 funds for the coming year.
Sincerely,
David L. Larson
Director of Business and Operations
San Marcos Unified School District.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO.5998
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AMENDING RESOLUTION 5580
REVISING THE AMOUNT OF FEES TO BE REQUIRED AS A
CONDITION OF APPROVAL FOR RESIDENTIAL DEVELOP-
MENT WITHIN CERTAIN AREAS OF THE SAN DIEGUITO
UNI3S HIGH SCHOOL DISTRICT.
WHEREAS, pursuant to Chapter 4.7, Division 1, Title 7 of the
California Government Code, the City Council of the City of Carls-
bad, California has adopted a School Facilities Dedication and
Fee Ordinance (Carlsbad Municipal Code Chapter 21.55); and
WHEREAS, Section 21.55.150 of the Carlsbad Municipal Code
provides that the standards for the amount of fees to be required
pursuant to such ordinance shall be determined by the City Council
and set by resolution. The City Council's determination is to be
made after consideration of recommendations from the governing
board of the affected school district; and
WHEREAS, the City Council established standards for the amount
of fees to be required pursuant to Chapter 21.55 in Resolution
No. 5580; and
WHEREAS, amendments to Chapter 4.7, Division 1, Title 7 of the
California Government Code and to Chapter 21.55 of the Carlsbad
Municipal Code limit the amount of fee that can be required; and
WHEREAS, the City of Carlsbad has requested the San Dieguito
Union High School District to submit revised fee recommendations;
and
WHEREAS, the City Council is in receipt of recommendations
in regards to revised amount of fees from the San Dieguito Union
High School District. Their recommendation is attached hereto as
Exhibit A, and is made a part hereof; and
7
8
10
11
12
13
14
15
16
17
18
19
20
21
23
24
25
27
28
WHEREAS, the City Council fully considered the matter at the
regular meeting of November 20, 1979 at which the City Council
determined to concur in the revised standards as recommended by
the Board of the San Dieguito Union High School District;
• NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad as follows:
A. That the above recitations are true and correct.
B. That the standard for the amount of fees to be required
as a condition of approval for residential developments within
that portion of the City of Carlsbad, which is also within the
[boundaries of the San Dieguito Union High School District, shall
be as contained in Exhibit A.
C. This determination is based upon the City Council's
concurrence in the recommendations made by the Governing Board of
the San Dieguito Union High School District, including the facts
supporting such recommendations as contained in Exhibit A.
D. Unless the decision-making body especially determines to
the contrary, the City Council hereby determines that the following
findings and requirements shall apply to any residential develop-
ment of fifty units or less:
1. All such developments shall be required to pay fees
in accordance with the schedule in Exhibit A.22
2. The City Council has reviewed that portion of the
General Plan which applies to the San Dieguito Union
High School District and finds that it provides for
the location of public schools.
That the fees to be paid shall be used for the
purpose of providing interim school facilities.26
That the fees to be paid for each unit bear a reasonable
relationship to the burdens placed on the School District
by such unit and that the fees will be used to mitigate
that burden.
-2-
1
9
5. That the school facilities to be funded by the fees are
consistent with the City's General Plan.
2,
E. The standards adopted by this resolution do not at this
3
time require the dedication of land. The San Dieguito Union High
4
School District is developing standards regarding such dedications.
5
{When the District is prepared to make their recommendation in that
6
regard, the City Council intends to amend this resolution to
7
[include provisions for requiring the dedication of land as they
8
determine to be in the public interests.adjourned
PASSED, APPROVED AND ADOPTED at 3gc/regular meeting of the
10
Council of the City of Carlsbad,California, held on the
28th Day of November , 1979 by the following vote, to
AYES: Mayor Packard, Councilmen Skotnicki, Lewis, Anear; and
12
13
14
NOES: None
15
ABSENT:16
17
18
19
20 ATTEST:
Councilwoman Casler
21
22
RONALD C. PACKARD
JL.•
ALETHA L. RAUTENKRANZ, City CjLerk&o
24
25
26
27
28
NEW CONSTRUCTION ATTACHMENT C
7100<—
3110
EXHIBIT A To
Resolution No.5998
I. ESTIMATED COST OF PORTABLE FACILITIES
The cost of providing a portable classroom facility on District property is
estimated based on the following factors: ,
Cost of building including carpet, air conditioning, delivery,
installation, foundation. (Basis for computation $43.00 per
sq. ft. x 960 sq. ft. plus interest for five years.)
Grading .
Fees, architect and others
Concrete walkways (1640 x $2 per sq. ft.)
Utilities, Electrical x
Water
Gas
Sewer
Contingency -
Subtotal
Toilet facilities 1,456 sq. ft. per 10 classrooms
Resource center 1,960 sq. ft. per 10 classrooms
Furniture
Lockers
Landscaping
Total
Cost per student
(30 students x 85% utilization factor)
.$57,200
3,000
9,000
3,280
3,000
1,000
1,000
2,000
3.000
82,480
4,104
8,248
3,050
1,683
2,500
$102,065
$ 4,003
.
3 Br. 4003
2 Br. 4003
1 Br. 4003
Pupil
Generation
• Factor
7-8
.12
.05
.02
Cost
480
200
80
Pupil
Generation
Factor
9-12
.25
.11
.04
Cost
1001
440
160
Pupil
Generation
Factor
7-12
.37
.16
' .06
.
Total
7-12
1,481
640
240
10/25/79 VI
NEW CONSTRUCTION ATTACHMENT D
7100<=
3110
Explanation of Major Components in Proposed Developers' Fee Schedule
Cost of building: A standard classroom is 960 square feet; the unit cost is
based on $43 per square foot. Interest at ~\Z% is also
included, since the supplier would be submitting his bid on
• -an amount per year during the lease period.
Grading:Preparation of a site is required to put the building in
place. The school district is usually responsible to prepare
the site ready for foundations.
Architect fees, etc.: Each building requires architectural service; other fees
are required to the State Department of Education, the State
Architect, etc. for plan conformance. Engineering services
are required for site work and utilities. A building
inspector is required during construction.
Cement walkways:
Utilities:
Contingency:
A walk ten feet wide surrounding the building has been District
standard for recent portables.
Cost can only be an estimate since each location is different.
Some campuses will require more, some less, than the estimated
amounts due to the location of existing available lines.
This is an estimate of additional expenses during construction.
Toilet facilities: As needed, these would be incorporated on a campus, but are not
needed for each building. The estimated amount shown would
provide adequate funds to provide these as they are required.
The facility could also provide a custodial room and minimum
storage.
Resource center:
Lockers:
Landscaping:
If the amount shown is collected for each building put in place,
the tenth building could also include the lease of a resource
center as the required funds would be available for use.
This estimate will provide a book locker and a P.E. combination
locker for each student.
A minimum landscaping could be provided with this estimate to
blend the portable building into the existing site.
10/25/79 VI
1
2
3
4
SCHOOL DISTRICT.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 5999
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AMENDING RESOLUTION 5580
REVISING THE AMOUNT OF FEES TO BE REQUIRED AS A
CONDITION OF APPROVAL FOR RESIDENTIAL DEVELOP-
MENT WITHIN CERTAIN AREAS OF THE ENCINITAS UNION
WHEREAS, pursuant to Chapter 4.7, Division 1, Title 7 of the
California Government Code, the City Council of the City of Carls-
bad, California has adopted a School Facilities Dedication and
Fee Ordinance (Carlsbad Municipal Code Chapter 21.55); and
WHEREAS, Section 21.55.150 of the Carlsbad Municipal Code
provides that the standards for the amount of fees to be required
pursuant to such ordinance shall be determined by the City Council
and set by resolution. The City Council's determination is to be
made after consideration of recommendations from the governing
board of the affected school district; and
WHEREAS, the City Council established standards for the amount
of fees to be required pursuant to Chapter 21.55 in Resolution
No. 5580; and
WHEREAS, amendments to Chapter 4.7, Division 1, Title 7 of the
California Government Code and to Chapter 21.55 of the Carlsbad
Municipal Code limit the amount of fee that can be required; and
WHEREAS, the City of Carlsbad has requested the Encinitas
Union School District to submit revised fee recommendations; and
WHEREAS, the City Council is in receipt of recommendations
in regards to revised amount of fees from the Encinitas Union
School District. Their recommendation is attached hereto as
Exhibit A, and is made a part hereof; and
WHEREAS, the City Council fully considered the matter at the
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
regular meeting of November 20, 1979 at which the City Council
determined to concur in the revised standards as recommended by
the Board of the Encinitas Union School District;
H
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad as follows:
A. That the above recitations are true and correct.
B. That the standard for the amount of fees to be required
as a condition of approval for residential developments within that
portion of the City of Carlsbad, which is also within the boundaries
of the Encinitas Union School District, shall be as contained in
Exhibit A.
C. This determination is based upon the City Council's
concurrence in the recommendations made by the Governing Board of
the Encinitas Union School District, including the facts support-
ing such recommendations as contained in Exhibit A.
D. Unless the decision-making body especially determines to
the contrary, the City Council hereby determines that the following
findings and requirements shall apply to any residential develop-
ment of fifty units or less:
1. All such developments shall be required to pay fees
in accordance with the schedule in Exhibit A.
2. The City Council has reviewed that portion of the
General Plan which applies to the Encinitas Union
School District and finds that it provides for the
location of public schools.
3. That the fees to be paid shall be used for the
purpose of providing interim school facilities.
4. That the fees to be paid for each unit bear a reasonable
relationship to the burdens placed on the School District
by such unit and that the fees will be used to mitigate
that burden.
5. That the school facilities to be funded by the fees are
—2—
23
24
25
26
27
28
consistent with the City's General Plan.
E. The standards adopted by this resolution do not at this
time require the dedication of land. The Encinitas Union School
District is developing standards regarding such dedications. When
the District is prepared to make their recommendation in that
regard, the City Council intends to amend this resolution to include
provisions for requiring the dedication of land as they determine
to be in the public interests.
adj ourned
PASSED, APPROVED AND ADOPTED atx&/regular meeting of the
City Council of the City of Carlsbad, California, held on the
28th day of November 19?9 -by the following vote, to
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BONALD C. PACKARD, Mayor
18
,ATTEST:
19
20
21 i
ALETHA L.~ RAUTENKRANZ, City
(+>(*f
it:
AYES: Mayor Packard, Councilmen Skotnicki, Lewis, Anear; and
Councilwoman Casler
NOES: None
ABSENT:
/^cnA /* - v\ Q
(SEAL)
-3-
, TY LEVIN
PRESIDENT
LORETTA M. SMITH
• O.ERK
MARY LOU SCHULTZ
G. RONALD SMITH
DONALD E. LINDSTROM
SUPERINTENDENT & BOARD SECRETARY
Crainitag Union &ef)0oi Bisrrict
189 UNION STREET
ENCINITAS. CALIFORNIA 92024
TELEPHONE 753-1152
EXHIBIT A
to Resolution No,
CAPRI SCHOOL
941 CAPRI ROAD
CENTRAL SCHOOL
185 UNION STREET
FLORA VISTA SCHOOL
169O WANDERING ROAO
OCEAN KNOLL SCHOOL
910MELBAROAD
PACIFIC VIEW SCHOOL
608 THIRD STREET
PARK DALE LANE SCHOOL
205O PARK DALE LANE
5999
November 14, 1979
To Whom It May Concern:
The following is an excerpt from the Minutes of a Regular
Meeting of the Board of Trustees of the Encinitas Union
School District held on Tuesday, November 13, 1979:
Be it resolved that the Board of Trustees
of the Encinitas Union School District
does hereby approve the above (attached)
justification for setting of developers'
fees, on motion by Ronald Smith, seconded
by Loretta Smith, and unanimously carried.
I hereby certify the above to be a true and correct copy of
the Minutes as indicated.
Donald E.
and Board Secretary
uperiritendent
EXCELLENCE IS OUR GOAL
3.5 Resolution .in Support of Developers' Fees
BACKGROUND: The Encinitas Union School District notified the
San Diego County Board of Supervisors in February, 1978, of a
fee structure to be charged developers. The fee structure was
based on information available at the time. The fee established
was $400./bedroom or like-room and reflected the cost of a perma-
nent school facility in 1978.
As a result of A.B.-8, it is necessary that the District evaluate
its fee structure in accordance with the cost of portable school
structures.
Administrators from Cardiff, Encinitas, San Dieguito High School
and Solana Beach met on three occasions to discuss the situation.
As a result of their efforts, the following information was pre-
pared by Mr. Roberts for Encinitas.
PORTABLE
Cost of building, including carpeting,
air conditioning, delivery, installa-
tion: (90 sq.ft. @ $43./sq.ft.) $ 40,420.
Pad preparation 650.
Cement walkways 400.
Architectural, State, County, Engineer-
ing, and other fees 8,200.
Furniture and equipment 4,000.
Utility hook-ups 5,000.
Restroom facilities ($27,360. (rental) -r
10 (units) = $2,736. x 2 (facilities) 5,500.
Inflation factor (9%) 5,775.
TOTAL $ 69,945.
Support services (one unit per ten class-
rooms) - Lounge - Resource Center
($69,945. -r 10) 6,994.
- Work area - equipment housing 6,994.
13% interest on 5-year lease 15,795.
Yr.l $8,100. prin. + $5,265. int.
" " + 4,212. "
" " + 3,159. "11 " + 2,106. "
. " " + 1,053. "
GRAND TOTAL $ 99,725.
$99,725. -r 81 3-bedroom houses = $1,231.
$1,231. t 3 (average no. of bedrooms) = $ 401,/bdrm.
Current District developer's fee: $400./bdrm.
(See attached schedules from Cardiff, San Dieguito
High School, and Solana Beach for comparisons.
Agenda No. 3.5
November 13, 1979
3.5 Resolution in Support of Developers' Fees, Continued
RECOMMENDATION: The Superintendent recommends the following:
RESOLUTION: Be it resolved that the Board of Trustees of the
Encinitas Union School District does hereby approve the above
justification for setting of developers' fees.
Agenda No. 3.5
November 13, 1979