HomeMy WebLinkAbout1980-01-02; City Council; 6073-1; Apartment to Condominium ConversionAGENDA BILL NO. _
DATE: January 2, 1980
CITY OF CARLSBAD
6073, SUPPLEMENT NO. 1
DEPARTMENT: Planning
INITIAL
_Dept. Hd.
_Cty. Atty.
_Cty. Mgr.
SUBJECT:
CONVERSION OF 7 APARTMENT UNITS INTO CONDOMINIUMS
CASE NO: CT 79-15/CP-18 APPLICANT: LAPORTE
STATEMENT OF THE MATTER~~
On November 20, 1979, the City Council approved a Variance to
allow reduction of dwelling setback from a driveway and
approved the subject seven unit condominium.
Both the Planning Commission and Planning Staff had recommended
denial of the Commission and tract map and therefore there
were no findings or conditions forwarded to the City Council.
The City Council therefore directed the Planning Commission
to prepare such findings and conditions. This was done by
the Planning Commission on December 12, 1979, and are
attached for your action.
EXHIBITS
Staff Report dated December 12, 1979 (Revised 12/2&/79)
Staff Report dated October 24, 1979
RECOMMENDATION
The Planning Commission and Planning Staff recommend that the
City Council direct the City Attorney to prepare documents
APPROVING CT 79-lS7CP-l#, as per attached Planning Commission
findings as conditions as requested by the City Council.
Council Action:
1-2-80 Council directed the City Attorney to prepare documents approving
CT 79-15/CP-18 as per the attached Planning Commission findings.
STAFF REPORT
DATE: December 12, 1979 (Revised 12/26/79)
TO: Planning Commission
FROM: Planning Department
RE: CT 79-15/CP-18, Courtyard Townhomes
FINDINGS AND CONDITIONS OF APPROVAL
Background
On November 20, 1979, the City Council held a public hearing
on CT 79-15/CP-18. The Council has returned the item to the
Commission for approval of findings and conditions. The
variance for the setbacks, which was denied by the Commission,
was approved on appeal by the Council.
Findings
1. . The proposed project is consistent with the Land Use
Element of the General Plan because it is within the
density range allowed by the General.Plan. The criteria
which must be met to allow the increase in density from
10 du/ac to 18 du/ac have been fulfilled.
2. The proposed project is consistent with all applicable
public facilities policies and ordinances and with the
Public Facility Element because:
A. Seven sewer permits have been obtained from the
Leucadia County Water District.
B. Water service will be provided through separate
cold water meters and a common hot water meter as
approved in V-294 by the Carlsbad Municipal Water
District.
C. Gas and Electric service will be provided by SDG&E
through separate meters.
D. Park-in-lieu fees are required as a condition of
approval.
E. All ne'cessary on-site and adjacent public improve-
ments have been provided or will be required as
conditions of approval.
F. At this time, all other public facilities necessary
to serve this project will not be available con-
current with need. The Planning Commission has,
by inclusion of an appropriate condition> required
that the project contribute to the cost of such
facilities. Since the development will pay for its
proportionate share of the public facilities which
it will require, the Planning Commission is satisfied
that the requirements of the public facilities
element of the General Plan have been satisfied.
3. This project is consistent with all other elements of
the General Plan.
4. The proposed conversion has been processed through
environmental review and a negative declaration, Log
No. 581, has been issued for the following reasons:
A. The project is consistent with the General Plan
land use designation, and with surrounding develop-
ment .
B. The site has been previously graded and is devoid
of any significant flora or fauna, or any unique
or historical environmental resources.
C. Only minimal site protection is necessary in order
to develop the property as proprosed.
5. This project is consistent with all requirements of
Title 21 because:
A. A variance has been approved, V-294, allowing a
common hot water meter and reducing the required
setbacks from 10'feet to 1 foot.
B. All other development standards have been met.
C. The design criteria have been satisfied.
6. The site is physically suitable for the type and density
of development because:
A. Subterranean parking has been provided allowing
more living and open space.
B. The lot is relatively level and little is devoted
to unusable slopes.
Conditions
1. Approval is granted for CT 79-15/CP-18 as -shown on
Exhibit A (10/8/79) B and C (9/12/79) on file in the
Planning Department. Development shall be substantially
as shown unless otherwise noted herein.
.2
2) The applicant shall submit a reproducible copy of
the condominium plan prior to approval of the final
map. The reproducible shall include a note indicating
that laundry facilities and utility meters with the
exception of the hot water meter will be provided
individually. This plan shall incorporate all require-
ments of approval and shall be subject to approval of
the Planning Director.
3) The applicant shall comply with all rules and regulations
of the respective sewer and water districts regarding
sewer to the property.
4) The applicant shall pay park-in-lieu fees prior to
approval of the final map.
5) This subdivision is approved upon the express condition
that the final map shall not be approved unless the
City Council finds at the time of such approval that
sewer service is available to serve the subdivision.
6) Street trees of a variety approved by the Parks and
Recreation Department shall be installed to City
specifications at 40 foot intervals along all public
street frontages.
7) Prior to the final map approval, the applicant shall
pay a public facility fee as established in City
Council Policy No. 17 as agreed by the applicant.
8) The applicant shall provide a minimum of eight square
feet per unit of containerized planters along the
driveway and shall provide embossed concrete and
lighting as shown on Exhibit "A" dated 10/8/79.
Attachments
Staff Report dated 10/24/79
.3
STAFF REPORT
DATE: October 24, 1979
TO: Planning Commission
FROM: Planning Department
RE: CT 79-15/CP-18
APPLICANT: Courtyard Townhomes
REQUEST: Tentative Map and Condominium Permit for a
Seven Unit Condominium Conversion.
I. BACKGROUND
Location 'and Description of Property
The subject property consists of .40 acre on the west side
of Jerez Court, north of Gibraltar. The lot is relatively
level and abuts the La Costa Golf Course. Construction has
begun on the units.
Existing Zoriirxg.
Subject Property: RD-M
North: RD-M
South: RD-M
East: RD-M
West: PC, RD-M
Existing Land Use
Subject Property: Under Construction
North: Vacant, condos
South: Condos
East: Condos
West: Golf Course,
Environmental Impact Information
This project has been processed through environmental
review and a negative declaration, Log No. 581, has been
issued on this project based on the following reasons:
1) The project is consistent with the general plan land
use designation, and with surrounding development.
2) The site has been previously graded and is devoid of
any significant flora or fauna, or any unique or
historical environmental resources.
3) Only minimal site preparation is necessary in order
to develop the property as proposed.
General Plan Information
A. Land Use Element:
The Land Use Element designates this property as RH,
Residential High Density, 20-30 du/ac. The recommended density
is 20 du/acre. The subject property, which contains .41 acres
and has 7 units has a density of 17.5 du/acre. In staffs
opinion, this density is close enough to the recommended
density to be consistent.
B. Public Facilities:
The Public Facilities Element requires that adequate
public facilities be available to service the project at the
time of approval.
Sewer: This property will be serviced by the Leucadia
County Water District. Seven sewer units have
been allocated to this project.
Schools: If approved, school fees would be paid to
both the Encinitas and San Dieguito School
Districts before the final map is recorded.
SDG&E: SDG&E will provide service and separate meters
for each unit.
Water.: Water service will be provided by the Carlsbad
Municipal Water District. Separate cold water
meters will be provided.
On-Site and Adjacent Public Improvements: All necessary
public improvements were required with the building
permit.
Other Public Facilities: The City Council has determined
that they are not prepared to find that all other public
facilities necessary to serve this project will be
available concurrent with need. The Planning Commission
may, by inclusion of an appropriate condition, require
that the project contribute to the costs of such
facilities according to City Council Policy No. 17.
Since the development would pay its appropriate share
of the public facility it would require, the Planning
Commission could be assured that the requirements of
the Public Facilities Element of the General Plan .
would be satisfied.
C. Other Elements:
This project is consistent with all other elements of
the General Plan.
.2
History and Related Cases
CT 79-3/CP-3. (Von Elten), City Council Resolution No. 5832,
denied on July 3, 1979.
This proposal involved the conversion of an 80 unit apartment
complex, located on the east side of El Camino Real and
north of El Camino Real, to condominiums. The proposed .
conversion was denied based on findings which included:
lack of a comprehensive overall design; insufficient provision
of improvements required by the condominium ordinance; and
lack of adequate setbacks and parking.
CT 79-7/CP-lO, Fries, Planning Commission Resolution No. 1544,
City Council Resolution No. 5951.
This 39 unit condominium on the southwest corner of Santa
Isabel and El Fuerte was approved on September 18, 1979.
Questions on this project concerned density, circulation and
on street parking. Although the Planning Commission approved
this project, there was some concern about the overall design
and the provided amenities.
CT 77-18(A)/CP-1, Linguiti, Planning Commission .Resolution .
No. 1500; City Council Resolution No. .5750.
On April 17, 1979, the City Council approved a condominium
permit for 3 additional units on an already approved 16 unit
project. This property is just south of the courtyard
development. The project is a high density project,
du/acre. Since the first 16 units were approved prior to
addoption of the condominium ordinance, not all of the
required amenities and standards have been provided.
II. Major Planning Considerations
1) Does this project meet all the design standards concern-
ing access to the recreation area and the dominance of
the driveway?
2) Will these units be suitable for ownership housing?
3) Have development standards been met? The required
10 foot setback and the required separate meters have
not been provided.
III. Discussion
This project is a request for approval of a 7 unit condominium
project on the west side of Jerez Court. The west side of
the lot abuts the golf course. This action should follow
the action on V-294, which concerns the water meters and
setbacks for this project.
.3
If the variance is denied, this project cannot be approved
since the requirements of Section 21.47 have not been met.
Development Standards
The requested variance concerns two of the development
standards. The ten foot setback and the individual water
meters have not been provided. (For further discussion of
these two sections, see V-294). Other development standards
have been met.
Design Standards
Section 21.47.120 gives criteria which are to be used in
evaluating the design of a condominium project. The fourth
criteria (21.47.120(4)) states that the internal street
system shall not be dominant nor disruptive feature in the
project. The driveway in the proposed project runs the
length of the lot and occupies the center portion. The front
of the units, and second floor decks look out over the
driveway. Although the driveway is dominant, attempts
have been made to minimize the impact of the drive on the
units. Containerized landscapingjembossed concrete and
lighting have been used to reduce the visual dominance of
the driveway.
Another problem is presented by the location of the common
recreation area and. the access to this area (21.47.130(5)
and (6)). The common area is located on the northwest
corner of the project, which is a considerable distance
from Units 4 and 3. The pedestrian circulation, which
provides access to this area, is an embossed and colored
concrete walkway through the driveway. This walkway passes
in front of the garage and crosses the guest parking adjacent
to the common area. The common area itself has parking
spaces on two sides, which, although they may shield the
area from living units, could have a disruptive effect on
the recreation area. This project was originally intended
to be a condominium development. Since the City had no
condominium ordinance when the project was started, the
applicant tried to meet the anticipated requirements.
Even if the Planning Commission approves the variance,
staff finds that the design criteria have not been met.
Recommendat ion
Staff recommends DENIAL of CT 79-15/CP-18 based on the
following findings:
1) If the variance is denied, the development standards
have not been met.
.4
a) The 10 foot setback between buildings
and driveways have not been provided
as required in Section 21.47.130(1)(B).
b) The individual water meters have not been
provided as required in Section 21.47.130
(11)(B).
2) The design criteria have not been fulfilled..
a) The street system is a dominant and
disruptive feature in the project (Section
21.47.120(4)).
b) The common recreation area is not equally
accessible to all the units (Section
21.47.120(5)).
c) The pedestrian circulation has been provided
along the driveway and along garage openings
and cannot be considered safe. (Section
21.47.120(6)).
Attachment
Location Map
Exhibit A dated 10/8/79
Exhibit A & C dated September 12, 1979
KL:ar
.5
L
rn
or 7q-ia/cp-ie/v-
CASE NO CT 73- 1 5/CP-Rec'd
Description of Request =
T
DCC Date; \n}\ti>]f\?C Date
g. £?UBT7lV/lfbinsi
Address or Location of Request;\Fr?3iE:-Z.^4/OFi:^T4
Applicant:
Engr. or Arch.
Brief Legal; ]_/JT
T73 LTO.
^OL(TV4 LiMlT SlO.f:), IKJ
Assessor Book:
General Plan Land. Use Description:
Existing Zone;
. AO
Page:Parcel:_____
• V4lAVA
Proposed Zone:
Acres:_
School District:
Water District:
Coast Permit Area:
No. of Lots:
1
DU's -7
nkbnsl
Sanitation District t
JbJO.
_DU/Acrej;