STATEMENT OF THE MATTER
Covington/Papagayo has submitted a request to construct the first phase (253,000 gallons/ day) of a satellite treatment and reclamation facility north of Bataquitos Lagoon in the vicinity of 1-5. supporting their proposal of a site specific. project is consistent with the "Wastewater Reclamation Master Plan Study" being reviewed by Council.
Accompanying their letter were several copies of an engineering report It is their contention that the proposed
The developers acknowledge that the"appropriate action would be to refer the request and reports to staff for analysis and recommendation. their proposal would take place at a subsequent meeting. Council action to approve or deny
EXHIBITS
1. Letter to Nayor and Council dated March 19, 1980.
2. Engineering report on Bataqui tos proposal , Lowry & Associates, February, 1980.
R EC OMME N DAT I 0 N
That City Council refer the request and report to staff for analysis and recommendation.
Council Action:
4-1-80 Council referred the matter to staff for analysis and recommendation.
March 19, 1980
Honorable Mayor Ronald Rtckard and
City of Carlsbad
1200 Elm Avenue
Carlsbad, California 92008
Members of the City Council
Attn: City Manager
We would like to request that the Papagayo,/Covington proposal to construct
a satellite wastewater reclamation facility in the vicinity of the .Batiquitos
lagoon be placed on the City Council agenda for April 1, 1980.
Si ncere I y , e- \
Edward G. Sloman Larry D. Hunts, A.I.A.
Vice Resident, Fbject Management General krtner
Covington Brothers Technologies Rtpagayo Developers
2451 East Orangethorpe P. 0. Box 787
Fullerton, California 92631 Carlsbad, California 92008
Honorable Mayor Ronald Packard
CITY OF CARLSBAD
1200 Elm Avenue
Carlsbad, California 92008
and Members of the City Council
Dear Mayor bckard and Members of the City Council:
A little over a year ago, Fbpagayo Developers and Covington Brothers appeared
before you to request approval of a two-part proposal.
the first portion of that proposal, the funding of a master plan study for waste-
water reclamation and an environmental impact report on that study. Now that
you have certified the e.i.r. and adopted the master plan, we would like to
request your approval of the second part of that proposal: ,Papagayo/Covington
asks your permission to develop, finance, construct, and dedicate to the City
a 250,000 gallon per day (gpd) wastewater reclamation plant referred to in the
master plan as the Batiquitos facility.
At that time you approved
Lowry and Associates has prepared for you a more complete analysis of this
facility than was presented within the scope of the master plan study and Recon
has prepared for you a report of supplemental environmental information.
of these reports are enclosed.
Copies
They should answer your technical questions.
The approval of this proposal will be an important step in the implementation of
the wastewater mclamation program.
capacity for two previously appmved residential developments within the City of
Carlsbad. Future flows from the approved Covington tract (75,000 gpd) will be
treated at the facility.
and Seaport developments will be treated at the plant, freeing sufficient capaci-
ty at the Encina Joint Treatment Rant to reserve 75,000 gpd for the kpagayo
tmct and to provide approximately 400 additional units of capacity (100,000
gpd) to be distributed at City discretion.
It will also provide all necessary sewer
In addition, flows from the existing Spinnaker Hills
We would respectfully request that the Council take the appropriate actions
necessary to implement the requests and recommendations presented in Chapter
IX of the Lowry and Associates report entitled Batiquitos Waste Water Reclama-
tion Project, City of Carlsbad. Essentially, we are asking that you approve in
concept the proposal as outlined in the Lowry report and authorize your staff to
take the necessary actions to implement the project.
It is our sincere belief that this proposal will provide significant benefits to the
City of Carlsbad through the generation of reclaimed water for beneficial reuse
and the implementation of your wastewater reclamation plan, as well as solving
part of our mutual sewer capacity problems. We hope that this proposal meets
with your approval.
Sincerely,
Edward G. Sloman
Vice Resident, Roject Management
Covington Brothen Technologies
2451 East Orangethorpe
Fullerton, California 92631
lclny D. Hunts, A.I.A.
General krtner
Fbpagayo Developen
P. 0. Box 787