HomeMy WebLinkAbout1980-10-28; City Council; 6405; Lake Calavera Hills Sewer Service Area Moratoriumv^?^ CITY OF CARLSBAD ^ , c *—— LErmmt
AGENDA BILL NO./W#^"" , Initial:
- Dept. Head
DATE: October 28, 1980 C. Atty
DEPARTMENT: Engineering C. Mgr.
SUBJECT: LAKE CALAVERA HILLS SEWER SERVIC£ AR£A MORATORIUM
STATEMENT OF THE MATTER
Standard Pacific is the developer of the 225-lot Quail Ridge Subdivision.
The tract is located along Elm Avenue east of El Camino Real, and is
included in the Lake Calavera Hills Sewer Service Area. McMillin Develop-
ment, Inc. is the developer of the Templin Heights subdivision which has
108 lots in its final two phases. Both subdivisions are in the Lake
Calavera Hills Sewer Service Area and cannot receive final map approval
from the City Council until the Lake Calavera Hills Sewer Service
area moratorium is lifted by a finding that sewer is in fact available.
The Council has previously determined that the sewer moratorium in Lake
Calavera Hills area will be lifted at such time as (1) the Lake Calavera
Hills Sewage Treatment Plant is complete; (2) the right-of-way for the
effluent disposal line has been acquired; and (3) the construction of >
the effluent disposal line is guaranteed. The Lake Calavera Hills
developer has projected a completion date of January 1, 1981 for these
items. Therefore, both subdivisions could receive final approval on this
date. However, Standard Pacific and McMillin Development want to start
construction immediately and have asked that they be assigned temporary
capacity from Encina in order that the Council can make the finding that
sewer service is available and give final approval to the tract maps.
The Council previously "loaned" the Lake Calavera Hills developer 142
EDU's of Encina capacity in order that Tract 76-12 could be finaled.
It appears that Quail Ridge, Templin Heights and CT 76-12 are the only
approved tentative subdivisions in the Lake Calavera Hills Sewer Service
Area, so it is unlikely there will be any further requests for a loan.
FISCAL IMPACT
Should the Lake Calavera Hills Sewage Treatment Systems not be in operation
at the time of completion of the Quail Ridge and Templin Heights homes,
sewage flows would be diverted to Encina, but 95% of the connection fees
for capacity would be paid to Lake Calavera Hills. The Quail Ridge
Development will require a small pump station with an annual operating
cost of about $2000 per year.
EXHIBITS
1. Staff Report.
2. Location Map.
3. Resolution No. (4
RECOMMENDATION
If the City Council concurs, your action is to adopt ResolutionNO. (o 3
AGENDA BILL NO. 6405 Page 2
Council Action:
10-28-80 Council adopted Resolution No. 6340, approving the temporary assignment of
333 edu's of Encina sewer capacity to the Quail Ridge and Tempi in Heights
Subdivision.
MEMORANDUM
TO: ASSISTANT CITY MANAGER/DEVELOPMENT
FROM: CITY ENGINEER "j5^»
DATE: OCTOBER 10, 1980
SUBJECT: LAKE CALAVERA HILLS SEWER SERVICE AREA MORATORIUM
Standard Pacific is the developer of the 225-lot Quail Ridge Subdivision.
The tract is located along Elm Avenue east of El Camino Real, and is
included in the Lake Calavera Hills Sewer Service Area. McMillin Develop-
ment Inc, is the developer of the Tempi in Heights subdivision which has
108 lots in its final two phases. Both subdivisions are in the Lake Cala-
vera Hills Sewer Service Area and cannot receive final map approval from
the City Council until the Lake Calavera Hills Sewer Service Area Moratorium
is lifted.
The Council has previously determined that the sewer moratorium in the Lake
Calavera Hills area will be lifted at such time as (l) the Lake Calavera
Hills Sewage Treatment Plant is complete; (2) the right-of-way for the
effluent disposal line has been acquired; and (3) the construction of the
effluent disposal line is guaranteed. The Lake Calavera Hills developer
has projected a completion date of January 1, 1981 for these items. There-
fore, both subdivisions could receive final approval on this date. However,
Standard Pacific and McMi11 in Development want to start construction immed-
iately and have asked that they be assigned temporary capacity from Encina
in order that the Council can make the finding that sewer service is avail-
able and give final approval to the tract maps. The Council previously
"loaned" the Lake Calavera Hills developer 1^2 EDUs of Encina capacity in
order that Tract 76-12 could be finaled.
It appears that Quail Ridge, Tempi in Heights and CT 76-12 are the only
approved tentative subdivisions in the Lake Calavera Hills Sewer Service
Area. When the Council "loaned" the Lake Calavera Hills developer (CT 76-12)
1A2 EDUs they concluded that it would be at least a year to 18 months before
homes could be built and occupied in the 1A2 lot development. They also
found that the Lake Calavera Hills Sewage Treatment Plant was essentially
complete and only the effluent disposal line construction needed to be
accomplished. The number of EDUs of sewage capacity remaining at Encina is
over 2500 connections which is projected to last for over two years. The
completion of the Encina Treatment Plant expansion is almost two years away
and the proposed Palomar Airport Sewage Treatment Plant could also be avail-
able in two years. Based on this information, staff would recommend to
Council that the Quail Ridge and Tempi in Heights subdividers be granted a
temporary assignment of 333 EDUs of Encina capacity in order to final their
tentative subdivision maps and proceed with developing their property.
As an alternative to the "loan" of Encina capacity the Council could lift
the moratorium in the Lake Calavera Hills Sewer Service Area, since there
are no approved tentative maps remaining in the service area other than
Quail Ridge, Tempi in Heights and CT 76-12. There is no reason to continue
the moratorium.
LE:mmt
1
2
3
4
5
o
._K
.
0
8
10
11
12
CO t 18 13
CM
£ 14
« H S ul n K£5 £ < -. 10
;
z "J 8 dUJ £ W <-
O
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 6340
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF CARLSBAD APPROVING THE TEMPORARY
ASSIGNMENT OF 333 EDU'S OF EWCINA SEWER
CAPACITY TO THE QUAIL RIDGE AND TEMPLIN
HEIGHTS SUBDIVISIONS'.'
WHEREAS, the conditions of approval of the Quail Ridge and
Templin Heights Subdivisions include provisions that the final
maps will not be approved unless the City Council finds that
sewer service is available to serve the project; and
WHEREAS, the Lake Calavera Hills Reclamation Facilities
are under construction and scheduled for completion within six
months; and
WHEREAS, the City Council has recently acquired 1800 EDU'S
of Encina sewage treatment capacity of which only a small part
has been issued; and
WHEREAS, the actual completion and occupying of homes in the
two subdivisions will not occur until after the Calavera Plant is
completed;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That 225 EDU'S of Encina Treatment Capacity is found to
be available for the Quail Ridge Subdivision and 108 EDU'S of
such capacity is found to be available for the Templin Heights
subdivision,
3. That the 333 EDU'S of Encina Treatment Capacity shall be
returned to the Encina Sewer Service Area at such time as the
City determines, but after the completion and acceptance of the
0<to
5<
coo
8en
2%
t-
o
m
3cc.
1
2
5
4
5
6
7
8
9
10
11
12
13 i
14'
15
16
17
18
19
20
21
22
23
24
25
26
27
28
Lake Calavera Kills Reclamation Facility,
adjournedPASSED, APPROVED AND ADOPTED at a /regular meeting of the.
City Council of the City of Carlsbad, California, on the__28th_
day of October , 1980, by the following vote to wit:
AYES: Council Members Packard, Casler, Anear, Lewis and Kulchin
NOES: None
' ABSENT: None
R'ONALD C. PACKARD, Mayor
ATTEST:
ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)