Loading...
HomeMy WebLinkAbout1981-04-21; City Council; 6569; ZC Change L C to CT Q and Appeal of ConditionV CITY OF CARLSBAD ,. ^ > ^ "INITIAL BH:ar 4 AGENDA BILL NO: Cf & (0 y DEPT. HD. DATE: APRIL 21, 1981 CTY. ATTY. DEPARTMENT: PLANNING CTY. MGRV SUBJECT: ZONE CHANGE FROM L-C TO CT-Q AND AN APPEAL OF A CONDITION OF APPROVAL OF A SITE DEVELOPMENT PLAN RELATING TO AN EQUESTRIAN EASEMENT. CASE NO; ZC-223/SDP 80-13 APPLICANT; VALLAS STATEMENT OF THE MATTER: This item is a request for approval of a zone change from L-C to CT-Q and an appeal of condition no. 21 of Resolution No. 1783 (SDP 80-13) relating to a 10' equestrian easement on property located on the southwest corner of Palonar Airport Road and El Camino Real. The Planning Comnission has made the necessary findings for approval of a zone change, and therefore, is recommending approval of ZC-223 to the City Council. With respect to condition no. 21, of Resolution No. 1783, the Planning Conmission conditioned approval of SDP 80-13 upon the owner of the property granting a 10' equestrian easement along the south and east property lines to provide a link between the Palctnar Airport Business Park and properties east of El Camino Real. Although the Planning Commission did not believe the location of the easement in relation to Palomar Airport was the most desirable, they felt the acquisition of this easement was necessary until such time as an alternate route is determined. In view of this, staff was directed to study alternative equestrian trail routes. Phil Safford, Palcmar Airport Manager, contends that the easement will pose a liability problem if its located near Palcmar Airport, and further, that such an easement may not be approved by the F.A.A. To mitigate airport impacts, the Planning Comnission changed staff's original recormendation of locating the trail on the north property line by locating it on the south property line, further away from the airport. ENVIRONMENTAL REVIEW The Planning Director has determined that this project will not cause any significant environmental impacts and, therefore, has issued a Negative Declaration dated February 20, 1981, which, was approved by the Planning Conmission on March 25, 1981. A copy of the environmental documents is on file in the Planning Department. FISCAL IMPAPCTS The applicant and property owner will provide all necessary public improvements to serve this development. Also, the applicant has agreed to pay a public facilities fee to offset the costs of providing all other public services to the project. RECOMMENDATION 1) Both the planning staff and Planning Conmission recommend that this application be APPROVED and that the City Attorney be directed to prepare documents APPROVING ZC-223/SDP 80-13, per Planning Comnission Resolution Nos: 1782 & 1783. 2) It is recommended that the City Council uphold condition no. 21 of Planning Comnission Resolution No. 1783 requiring a 10' equestrian easement along the southern and eastern boundaries of the property. ATTACHMENTS; 1) PC Resolution Nos: 1782 and 1783 2) Staff Report with attachments, dated March 25, 1981 AGENDA. BILL NO. 6569 April 21, 1981 Page 2 COUNCIL ACTION: 4-21-81 Council directed the City Attorney to prepare documents approving ZC-223, and granting the appeal by deleting the equestrian trail for SDP 80-13, with the inclusion of a condition for hold-harmless clause, inclusion of a condition requiring double water lines for the use of reclaimed water on the land scaping, and modifying condition #25, to allow the Planning Director to bring the matter back to public hearing if he finds that there is a problem with the golf course. i 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PLANNING COMMISSION RESOLUTION NO 1782 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY CITY OF CARLSBAD, CALIFORNIA, RECOMMENDING APPROVAL OF A ZONE CHANGE FROM L-C (LIMITED CONTROL) TO CT-Q (TOURIST COMMERCIAL WITH Q-OVERLAY) ON PROPERTY GENERALLY LOCATED ON THE SOUTHWEST CORNER OF EL CAMINO REAL AND PALOMAR AIRPORT ROAD. APPLICANT: VALLAS CASE NO: ZC-223 WHEREAS, a verified application for certain property, to wit: That portion of Palomar Airport in Lot "G" of Rancho Agua Hedionda, County of San Diego, according to Map No. 832. has been filed with the city of Carlsbad, and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did on the llth day of March, 1981, and on the 25th day of March, 1981, hold a duly noticed public hearing as prescribed by law to consider said re- quest; and WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to the the Zone Change; and NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the City of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hearing, the Commission recommends APPROVAL OF ZC-223, based on the following findings and subject to the following conditions: 2 5 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Findings; 1) That the proposed CT-Q zone is consistent with the RC (Recreation/Commercial) land use designation of the General Plan for the reasons stated in the staff report. 2) That uses allowed in the CT-Q zone are compatible with surrounding zoning and land uses, both existing and future, for the reasons stated in the staff report. 3) That the project as conditioned is consistent with all other applicable elements of the General Plan. 4) That the project will not create a significant environmental impact and that the Planning Director has issued a Negative Declaration, dated February 20, 1981, which was approved by the Planning Commission on March 28, 1981. 5) That the Q Overlay will ensure proper site design and planning prior to any development of the subject site. Conditions: 1) 2) 3) Approval is granted for ZC-223 as shown on Exhibit "Y", dated February 20, 1981, incorporated by reference and on file in the Planning Department. This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This project is approved upon the express condition that the applicant shall pay a public facilities fee as required by City Council Policy No. 17, dated August 29, 1979, on file with the City Clerk and incorporated herein by reference, and according to the agreement executed by the applicant for payment of said fee. A copy of that agreement dated March 4, 1981, is on file with the City Clerk and incorporated herein by reference. If said fee is not paid as promised, this application will not be consistent with the General Plan and approval for this project shall be void. PC RESO #1782 2- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 e> PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the city of Carlsbad, California, held on the 25th day of March, 1981, by the following vote, to witt AYES: Chairman Marcus, Commissioners Jose, Friestedt, Larson, Rombotis, L'Heureux, and Leeds. NOES: None. ABSENT: None. ABSTAIN: None. CUS, Chairman D PLANNING COMMISSION ATTEST : S C. HSGSMAN ,x?Secretary ARLSBAD PLANNING? COMMISSION PC RESO #1782 — 3— f • 1(0.. STAFF REPORT DATE: March 11, 1981 TO: Planning Commission FROM: Planning Department SUBJECT: ZC-223/SDP 80-13/CUP-186, VALLAS - Request for a zone change from L-C to CT-Q, a site develop- ment plan for a recreational/commercial develop- ment, and a conditional use permit to allow the sale of alcoholic beverages on property located on the southwest corner of Palomar Airport Road and El Camino Real. I. PROJECT DESCRIPTION The applicant requests approval of 1): a zone change from L-C (Limited Control) to CT-Q (Commercial/Tourist w/Q overlay),2) a site development plan for a recrea- tional/commercial development consisting of a 48 unit motel, club house, four racquetball courts, swimming pool, six tennis courts, two helicopter pads, and an Olympic golf course, and 3) a conditional use permit for the sale of alcoholic beverages. The property is owned by the county of San Diego and will be leased to the applicant. The site is relatively flat and has not been graded. A small drainage course runs along the northern portion of the property and should not affect the development of this parcel. II. ANALYSIS Planning Issues (ZC-223) 1. Is the CT-Q Zone consistent with the RC (Residential- Commercial) designation of the General Plan? 2. Are uses allowed in the CT-Q Zone compatible with surrounding land uses and zoning? Discussion The City Council recently approved a General Plan Amendment on this site to RC (Recreation/Commercial). <c c They felt that recreation-commercial uses were compatible with the site and surrounding land uses. The Council cited the subject property's proximity to a major inter- section and to Palomar Airport as major reasons for their determination. The C-T zone is the most compatible zone with the RC land use designation and staff feels the Commission is able to make a general plan consistency finding. With respect to surrounding land uses, to the south and west is light industrial development, to the north is Palomar Airport, and to the east is vacant. The proposed use and other uses allowed in the CT zone are compatible with these surrounding uses. Because both planning issues can be satisfactorily resolved, staff is recommending approval of the zone change. Planning Issues (SDP 80-13/CUP-186) 1. Can both on-site and off-site traffic impacts be mitigated by the design of this project? 2. Is the project comprehensively designed and compatible with surrounding land uses? 3. Is the proposed heliport a compatible and suitable use for this location? 4. Is the serving of alcoholic beverages suitable at this location? Since the project is located on a major intersection, a primary concern of staff's is the traffic impacts created by this project. As shown on Exhibit "B", the applicant is proposing an entry driveway on Palomar Airport Road near the intersection of El Camino Real. Staff feels a driveway at this location would create severe traffic impacts and recommends its deletion. This would limit access to one driveway on El Camino Real some distance away from the intersection which would satisfactorily provide access to the property and not create severe traffic hazards. A traffic report completed by a traffic engineering consultant (see attachment) indicates potential hazards created by left hand turn movements into the project from El Camino Real during peak hours. This report recommends that a median island be constructed along El Camino Real allowing left turn movements into the project, however, restricting left turns out of the project. Staff concurs with this recommendation and has added this as a condition of approval. With regards to on-site circulation and parking, the project is not optimally designed. First, there appears to be inadequate turn around room for cars who cannot find parking spaces at the ends of each aisle. Room exists on site to provide more turnaround room, thus/ staff has added an appropriate condition to require turnaround areas. Also, the applicant is 15 spaces short of parking requirements for the various uses. Again, room exists on site to create more parking, and staff has added a condition requiring that the additional spaces be provided. The building orientations and the relationship of various uses appear to be well integrated. The applicant has successfully segregated pedestrian and vehicle circulation. The only apparent drawback to the building layout is the small amount of parking located adjacent to the motel. As shown on Exhibit "A", most parking is located closer to the tennis courts and club house. The reason for this situation is the location of the driveway on El Camino Real which was placed as far from Palomar Airport Road as possible. Staff feels the driveway location is more critical than parking location and believes the proposed layout is an acceptable compromise. Another concern of staff's is the proposed heliport on the northern portion of the site. In most cases, a heliport is not compatible with recreational/ commercial uses. In this case, the applicant contends the heliports will be an integral part of the development; it would be used for transporting guests to and from the facility. Because of the nature of the use and its proximity to Palomar Airport, staff feels in this case a heliport is not necessarily incompatible with the other uses, however, has added a condition to require a one year review of the use by the Planning Director to ensure its compatibility. The conditional use permit would allow the sale and con- sumption of alcoholic beverages in the restaurant and club house. Staff feels that alcoholic beverages are a normal part of a club house and restaurant use. The serving of alcoholic beverages at this site would not create detri- mental impacts to surrounding properties and would not be injurious to the public health and welfare. Staff can make all the required findings for a conditional use permit and therefore recommends approval. III. ENVIRONMENTAL REVIEW The Planning Director has determined that this project will not create a significant impact on the environment and has therefore issued a Negative Declaration, dated February 20, 1981. -3- c o IV. RECOMMENDATION It is recommended that the Planning Commission approve the Negative Declaration issued by the Planning Director, adopt Resolution No. 1782, recommending APPROVAL of ZC-223 to the City Council and adopt Resolution Nos: 1783 and 1784 APPROVING SDP 80-13 and CUP-186, based on the findings and subject to the conditions contained therein. ATTACHMENTS PC Resolution No. 1782 (ZC-223) PC Resolution No. 1783 (SDP 80-13) PC Resolution No. 1784 (CUP-186) Location and Zoning Map (Exhibit "Y", dated February 20r 1981) Background Data Sheet Reduced Site Plan Disclosure Statement Traffic Impact Report Environmental Documents Exhibits "A" - "E", dated February 20, 1981 BH:ar 3/5/81 -4- c M P-M hC to CT-Q u-c 2-20-61 CASE NO. APPLICANT .BACKGROUND DMA SHEET CASENO: ZC-223/SDP 80-13/CUP-186 APPLICANT: VALLAS REQUEST AND LOCATION: Zone Change from L-C to CT-Q, Site Development Plan for a recreation/cxarrnercial facility, and a conditional use permit for alcoholic beverages. _ • _ _ _ LEGAL DESCRIPTION: That portion of paTomay Airport in lot; 6 pf Ranchp Hedionda, County of San Diego/ Map No. 852. Assessors Parcel Number: 213 - 010 10 Acres 17 No. of Lots 1 GENERAL PLAN AND ZONING General Plan Land Use Designation Density Allowed N/A Density Proposed Existing Zone L-C . Proposed Zone CT-Q Surrounding Zoning and Land Use: Zoning Land Use North M Palomar Airport South P-M : Light Industrial East C (County) Vacant West P~M Light Industrial PUBLIC FACnJTIES School District N/A Water District Carlsbad Sewer District Carlsbad ' _ .EDO's MRPPW A.Public Facilities Fee Agreement, dated ' *' (Other: _ __________ ENVIPONMENTAL IMPACT ASSESSMENT •^ _ Negative Declaration, issued Fphr-nary ?n, 1.981 _E.I.R. Certified, dated _ _ Other, wrnr ' 1JL ' \ * '.If after the information yet* have submitted has been reviewgd, it is determined that further information i£j}equircd, you will be so APPLICANT: AGENT: / k»*/n* K« V+JLL*-* Name (individual, partnership, joint venture, corporation, syndication) Business Address Telephone Dumber Name Business Address MEMBERS: Telephone Number Name (individual, partner, joint venture, corporation, syndication) Business Address Home Address Telephone Number Telephone Number Name Home Address Business Address Telephone Number Telephone Nua\ber (Attach more sheets if necessary) I/We declare under penalty of perjury that .the information contained in this dis closure is true and correct and that it will remain true and correct and may be relied upon as being true and correct until amended. (\L»ji Applicant c CITY OF CARLSBAD OLYMPIC GOLF-PALOMAR AIRPORT PROJECT TRAFFIC IMPACT ANALYSIS- Prepared by: BERRYMAN § STEPHENSON, INC, 200 North Ash..Street, Suite 110 Escondido, CA 92027 c CITY OF CARLSBAD OLYMPIC GOLF-PALOMAR AIRPORT PROJECT TRAFFIC IMPACT ANALYSIS I. INTRODUCTION The proposed development is known as "Olympic Golf-Palomar Airport." The site for this development is an 18.04-acre parcel of land located immediately south of Palomar Airport Road and immediately west of El Camino Real, in the City of Carlsbad (see Exhibit I). The proposed project, as of August 17, 1980, consists of three major land use components: 1) a 6-tennis court racquet club with a club- house/restaurant, swimming pool, and 4 racquet ball courts; 2) a 48-room motel; and 3) an 18-hole "Olympic Golf" course. The restaurant facility is proposed with a bar and seating for 150. Under the City of Carlsbad's current land use plan, the subject site is zoned for "governmental facilities" ("G" designation). Areas immediately adjacent to the subject site are zoned for "planned industrial" development ("PI" designation), as shown in Exhibit II. The proposed project would require a zone change to "commercial- tourist" ("C-T" designation). The specified uses permitted under the C-T zone are given in Appendix A. Development of the subject site, as proposed, will result in the generation of additional vehicular traffic directly onto Palomar Airport Road and El Camino Real. The magnitude and impact of this additional traffic is the subject of this analysis. II. TRIP GENERATION The proposed project is characterized by a combination of normally compatible land uses and building types. This project does feature a rather unique facility known as Olympic Golf, proclaimed as being different in playing characterisitics from miniature golf or a "par 3" course. Due to the variety of independent variables that can be used in analyzing the proposed project, the following estimations are given for a "worst case" (i.e., maximum trip generation) situation and a "best case" (i.e., minimum trip generation) situation. Two widely used sources of trip generation data are the Institute of Transportation Engineer's (ITE) Trip Generation report and the San Diego Comprehensive Planning Organization1^ (CPOj Traffic Generators report. Jt e A review of both documents reveals sufficient data on facilities similar or identical to those proposed for trip generation estimation purposes. Racquet Club The ITE report describes racquet clubs as privately owned facilities with tennis courts -- some with swimming pools, racquet ball courts, and other minor gymnastic facilities. The following excerpt Is taken from the ITE report: "The racquet clubs surveyed generate on the average 42.6 weekday vehicle trip ends per court, 8.9 weekday vehicle trip ends per 1000 gross square feet of building area, 35.6 weekday vehicle trip ends per employee and 0.59 weekday vehicle trip ends per member. In some cases the peak hour generated trips coincide with the peak hour of the adjacent street traffic..." The report further states "It is believed that the number of courts and members are best related to trip making." For the proposed project, the number of courts (i.e., 6 tennis courts), and the square footage of the clubhouse (15,186 square feet, including balcony) are known. Utilizing the average trip generation rates given above, the proposed racquet club facilities could generate as many as 256 vehicle trip ends per average weekday (based on the number of counts) or as few as 135 vehicle trip ends per average weekday (based on building size). Weekend trip generation for a racquet club can be expected to be around 20% lower than during the weekday. Motel The proposed 48-room motel can be analyzed on the basis of trip ends generated per room. The ITE report indicates fairly good correlation between total rooms and trip generation. However, the highest correlation coefficient is achieved when actual occupancy rates are known. As an estimation of the occupancy rate for the proposed motel, the developer suggests that 601 would be a reasonable figure for the first three years of operation. The average trip generation rate for a motel in California is 10.14 vehicle trip ends per occupied room. Thus, it can be expected that the, proposed 48-room motel, at 601 occupancy, will generate 292 vehicle trip ends per average weekday. -2- c c If the proposed motel is successful, the occupancy rate should approach 90% of the available rooms, or 438 vehicle trip ends per average weekday. Weekend trip generation for a motel can be expected to be around to 151 lower than during the weekday. Golf Course The proposed Olympic Golf Course requires approximately 10 acres of land. By comparison, most golf courses require 100 to 300 acres. The developer estimates that up to 60,000 rounds of golf could be played annually on the proposed course (or 165 rounds per day on an average). Most public golf courses generate between 60,000 and 120,000 rounds, annually. Although Olympic Golf is unconventional, with respect to the land acreage required for the course layout, the playing characteristics are similar to those of a 9-hole par-3 course. 18-holes of Olympic Golf are said to require around \h hours of playing time, in comparison to 1% to 2 hours for 9-holes of par-3 golf. Trip generation data for golf courses is limited. The best correlation is found between trip generation and the number of parking spaces (i.e., 8.2 vehicle trip ends per parking space per average weekday). Since the proposed project does not differentiate parking by use, no assumptions can be made at this time regarding parking provisions for the Olympic Golf facility. Conservatively, if it is assumed that the average car occupancy for patrons of the Olympic Golf facility is 2.0, and the average group has 3 players, 165 rounds per day would generate 496 vehicle trip ends per day (i.e., 165 rounds/day x 3 players/round 7 2.0 players/ car x 2 trip ends/car = 496 trip ends/day). This figure does not include employees, delivery vehicles, etc. If only 30,000 rounds were played annually (as suggested by the developer as a more conservative estimate) the trip generation rate would be 248 trip ends per average weekday. Restaurant The proposed restaurant within the clubhouse complex is expected to generate traffic independent of the racquet club, motel, and Olympic Golf facilities. Under a "worst case" assumption, the 150-seat restaurant may be expected to generate 1.20 vehicle trip ends per average weekday, or 180 total trip ends per average weekday. Since it is reasonable to assume that a good number of restaurant patrons will be generated from motel guests, racquet club members, and Olympic Golf players, it is unlikely that the "worst case" situation described above would occur. A conservative estimate of independent restaurant patrons is 50% of the total business. Under this assumption, the proposed restaurant may be expected to generate 90 vehicle trip ends per average weekday. -3- e Weekend trip generation for a quality restaurant can be expected to be around 251 to 40% higher than during the weekday. Total Traffic The total traffic generated by the proposed project will range from a low (i.e., "best case" situation) of 765 trip ends per average weekday, to a high (i.e., "worst case" situation) of 1,370 trip ends per average weekday. An average of these two figures is 1,068 trip ends per average weekday. This average figure is used in the proceeding analysis. However, no specific recommendation should be construed as to the use of any of these figures. III. TRIP DISTRIBUTION The site plan for the subject project indicates two driveways are proposed -- one on Palomar Airport Road (approximately 100 feet west of the intersection of Palomar Airport Road and El Camino Real); and one on El Camino Real (approximately 500 feet south of the same intersection). All entering and exiting traffic generated by the proposed development will be distributed via these two points of access. The CPO's regional trip distribution model is not applicable in site specific cases of limited size and/or land use intensity. Thus, no attempt was made to utilize this information. Although specific trip distribution data for the area around the project site is currently unavailable, it can generally be assumed that the external trip "attractors" in the area and turn movement restrictions will result in the following distribution of project generated traffic: Entering Traffic 351 eastbound right-turn on Palomar Airport Road 40% southbound right-turn on El Camino Real 251 northbound left-turn on El Camino Real Exiting Traffic 201 right-turn onto Palomar Airport Road 50% left-turn onto El Camino Real 301 right-turn onto El Camino Real Exhibit III. illustrates the distribution of traffic based on the above assumptions. -4-17 IV. TRAFFIC IMPACTS The traffic generated by the proposed project will have a significant impact on the adjacent street system. It is estimated that approxi- mately 701 of all entering and exiting traffic will pass through the intersection of Palomar Airport Road and El Camino Real. Palomar Airport Road Driveway The proposed driveway on Palomar Airport Road, as shown on the latest site plan (8/17/80), could create undue congestion and accident potential. The proximity of the intersection of Palomar Airport Road and El Camino Real is such that traffic entering and exiting this driveway will interrupt the high speed, high volume flow of traffic on Palomar Airport Road. Of particular concern are the weaving conflicts created by development- generated traffic on Palomar Airport Road turning into and out of the proposed driveway while street traffic is turning right at the intersection with El Camino Real (see Exhibit IV) . As shown in Exhibit IV, any substantial queueing in the right-turn lane will block the driveway -- preventing vehicles from entering or exiting. El Camino Real Driveway The proposed driveway on El Camino Real poses the problem of potential high left-turn ingress and egress. During peak hours of traffic generation, left-turn ingress and egress could be seriously impeded by conflicting traffic flow on El Camino Real. If sufficient delay is experienced by left-turning vehicles, the build up of a queue could interfere with on-site circulation and/or northbound through traffic on El Camino Real (see Exhibit IV). Gn-Site Parking § Circulation 115 on-site parking spaces are proposed. Based on the preceding trip generation analysis, this provision may not be sufficient. The City of Carlsbad specifies parking requirements for motels and restaurants. However, no specifications are available for the racquet club or the Olympic Golf facilities. Since 72 of the 115 spaces are required by the City for the motel and restaurant, only 43 spaces remain to be designated for use in conjunction with the racquet club and the Olympic Golf facility. On-site circulation is restricted to two-way movement along a single parking aisle parallel to El Camino Real. If all parking spaces were filled at any given instance, drivers looking for parking would have to either double park in the aisle or circulate out onto Palomar Airport Road or El Camino Real. -5- The lack of a continuous on-site circulation system places a high priority on assuring adequate on-site parking. No street parking will be available within the immediate project area. However, the opportunity for common parking may become available with future development to the south, along El Camino Real. V. ALTERNATIVE LAND USES An alternative land use for the subject 18-acre site is "light industrial." Developed as an industrial park, the site would generate traffic similar in intensity to that of the proposed development. As an estimate of trip generation potential, the ITE report suggests the use of a rate of 59.9 trip ends per acre per average weekday. The CPO report suggests a much higher rate of 90.8 trip ends per acre per average weekday. Thus, the range of total traffic generated by ligh industrial development of the subject site is 1,081 vehicle trip ends per day (ITE rate) to 1,638 vehicle trip ends per day (CPO rate). Based on the above estimations, the proposed commercial-tourist development would in all probability generate no more (and perhaps less) traffic than an industrial park development. With an industrial park development, it is reasonable to assume that at least one driveway will be required on Palomar Airport Road and on El Camino Real. A greater opportunity may exist for joint use or common access with adjacent properties along both streets. VI. CONCLUSIONS § RECOMMENDATIONS The analysis presented herein suggests that the Olympic Golf-Palomar Airport project will impact the adjacent street system. The magnitude of additional traffic generated by the proposed development is not as significant as the access and circulation problems created if the current site plan is adopted. The proposed development will generate between 765 and 1,370 vehicle trip ends per average weekday. By comparison, an industrial park development on the same site will most likely generate between 1,081 and 1,638 vehicle trip ends per average weekday. Weekend traffic generated will be slightly lower than on weekdays for the proposed development, and significantly lower for an industrial park. The distribution of traffic generated by the proposed development could create congestion and delay on both Palomar Airport Road and El Camino Real. The relocation of driveways further away from the intersection of these two streets will mitigate the impacts to some degree. -6- /***% It is strongly recommended that the driveway on Palomar Airport Road be relocated at least 500 feet away from the intersection, and that median islands be constructed to control turn movements on both Palomar Airport Road and El Camino Real. On-site parking and circulation provisions may be inadequate, as currently proposed. Additional parking and the introduction of an internal "loop" system are effective mitigating measures that can be taken. The developer's site plan should be revised, as necessary, to reflect the recommendations presented herein. EXHIBIT I. OLYMPIC GOLF- PALOMAR AIRPORT SITE PLAN PI / OS PI RLM RLM RM EXHIBIT II. CITY OF CARLSBAD LAND USE PLAN 227 Palomar Airport Road 107 150 187 PROJECT SITE 267 214 133 160 O B> 3 5'o o 0> EXHIBIT III. TRIP DISTRIBUTION • I;TI" fO*iiBfliihi ii'iVi in i BLOCKED DRIVEWAY ON-3ITE QUEUEINQ PROJECT SITE LEFT TURN QUEUEINQ ' ---~—~~* EXHIBIT IV. TRAFFIC IMPACT AT DRIVEWAYS 1200 ELM AVENUE CARLSBAD. CALIFORNIA 92008 A1/. TELEPHONE: (714) «8 5621 '..,... -Citp of Cartebab ."'•"• NEGATIVE DECLARATION - PROJECT ADDRESS/LOCATION: Southwest corner of El Camino Real and Palomar •_ • . • Airport Road. L ^_; • • /_ t"- •'.".'._ _ :_ .. •_; ;...; PROJECT DESCRIPTION: A Site Development Plan 63 unit irptel. tennis courts. Olympic golf course, roquetball, restaurant, and cocktail lounge on a 1.6 -. •••••• • - - • r . ... . acre site; a change, of zone from L-C (Limited Control) to CT-Q (Tbxirist Oomnercial), and a conditional use permit to allow the sale of _ alcoholic beverages. - The City of Carlsbad has conducted an environmental review of the abo$e described project pursuant to the Guidelines for Implementation of the California Environmental Quality Act and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said review, a Negative Declaration (declaration that the project will not have a significant impact on the environment) is hereby issued for the subject project. Justification for this action is on file in the Planning Department. . . A copy of the Negative Declaration with supportive documents is on file in the Planning Department, City Hall, 1200 E]m Avenue, Carlsbad, CA. 92008. Comments from the public are invited. Please submit commcat^^ff^^ Department within ten (10) days of date of publication. ''"::' ^ •^•"-"'?^<* . . . DATED: February 20, "1981 SIGNED:- ""••- '• ^.~-.^ \_ f -I- CASE NO: ZC-223/SDP 80-13/CUP-186 Al'PLlCANT:VAELAS JANES C. MACAMAM \ „. Director of Planning City of Carlsbad PUBIJS!! DATE: February 25, 1981 1200 ELM AVEMUE CARLSBAD, CALIFORNIA 92008 c Citp of PUBLIC NOTICE OF PREPARATION TELEPHONE: (714) 729-1181 PLEASE TAKE NOTICE: The Planning Department of the City of Carlsbad intends to prepare a X Negative Declaration, Conditional Negative Declaration, . Environmental Impact Report for the following project: Project Description: 63 unit motel , tennis courts,, Olympic golf course, raquetball, restaurant, ana cocktail lounge on a 16 acre site; a change of zone from L-C (Limited Control) to CT-z (Tourist Commercial) ; and a conditional to allow the sale of alcoholic beverages. Project address/Location: 'Southwest corner of Road and El Camino Real. . ' ' ' ' Anticipated significant impacts: No significant adverse environmental impacts are associated with this We need to know your ideas about the effect this project might have on the environment and your suggestions for ways the project could be re- vised to reduce or avoid any significant environmental damage. Your ideas will help us decide what issues to analyze in the environmental review of this project. Your comments on the. environmental impact of the proposed project may be submitted in writing to the Planning Department, 1200 Elm Avenue, Carlsbad, CA 92008, no later than February 25, 1981 . DATED: February 2, 1981 \^ CASE NO: ZC 223/SDP. 80-13/CUP 186 £ APPLICANT: VALLAS ' ' DATH : February 4, 1981 JAM-S_C. WGAMAN Planning Director, City of Carlsbai 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 <C PLANNING COMMISSION RESOLUTION NO. 1783 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING A SITE DEVELOPMENT PLAN TO DEVELOP A RECREATIONAL COMMERCIAL FACILITY TO INCLUDE A MOTEL, REST- AURANT, OLYMPIC GOLF COURSE, CLUB HOUSE, HELIPORT, TENNIS COURTS AND RACQUET BALL COURTS ON PROPERTY GENERALLY LOCATED ON THE SOUTHWEST CORNER OF EL CAMINO REAL AND PALOMAR AIRPORT ROAD . APPLICANT : VALLAS CASE NO: SDP 80-13 _ __ WHEREAS, a verified application has been filed with the city of Carlsbad, and referred to the Planning Commission; and WHEREAS, said verified application constitutes a request as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, pursuant to the provisions of the Municipal Code, the Planning Commission did, on the llth day of March, 1981, and the 25th day of March, 1981, consider said request on property described as: That portion of Palomar Airport in Lot "G" of Rancho Agua Hedionda, County of San Diego, according to Map No. 832 WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Commission considered all factors relating to Site Development Plan No. 80-13. NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planning Commission of the city of Carlsbad as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, the Commission APPROVES SDP 80-13, based on the following findings and subject to the following conditions: Findings; 1) The site is physically suitable for the type, density and ' f 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 design of the development since the property is adequate in size and topography to accommodate the project and still meet all city regulations without any significant environ- mental impacts. 2) The project is consistent with all city public facility policies and ordinances since: a) The applicant has agreed and is required by the inclusion of an appropriate condition to pay a public facilities fee. Performance of that contract and payment of the fee will enable this body to find that public facilities will be available concurrent with need as required by the General Plan. b) All necessary public improvements have either been provided or will be required as conditions of approval. c) The Planning Commission has, by inclusion of an appropriate condition, insured that the project will not be approved unless the City Council finds that sewer service is available to serve the project. Since that project cannot be approved unless sewer service is available, and building cannot occur within the project unless sewer service remains available, the Planning Commission is satisfied that the requirements of the public facilities element of the General Plan have been met insofar as they apply to sewer service for this project. 3} The design of the project and all required improvements will not cause any significant environmental impacts, and a Declaration of Negative Environmental Impact has been issued by the Planning Director on February 20, 1981, and approved by the Planning Commission on March 25, 1981. 4) The proposed development is consistent with the Land Use Element and all other applicable elements of the General Plan. 5) The proposed development as conditioned is consistent with surrounding development, both existing and future. Conditions 1) Approval is granted for SDP 80-13, as shown on Exhibit A-E, dated February 20, 1981, incorporated by reference and on file in the Planning Department. Development shall occur substantially as shown unless otherwise noted in these conditions. 2) This project is approved upon the express condition that building permits will not be issued for development of the subject property unless the City Engineer determines that sev/er facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. PC RESO #1783 -2- 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3) 4) 5) 6) 7) 8) 9) 10) 11) 12) This project is approved upon the express condition that the applicant shall pay a public facilities fee as required by City Council Policy No. 17, dated August 29, 1979, on file with the City Clerk and incorporated herein by reference, and according to the agreement executed by the applicant for payment of said fee. A copy of that agreement dated March 4, 1981, is on file with the City Clerk and incorporated herein by reference. If said fee is not paid as promised, this application "will not be consistent with the General Plan and approval for this project shall be void. Approval of this request shall not excuse compliance with all sections of the Zoning Ordinance and all other applicable city ordinances in effect at time of building permit issuance, This approval shall become null and void if building permits are not issued for this project within one year from the date of project approval. The applicant shall prepare a reproducible mylar of the final site development plan incorporating the conditions contained herein. Said site plan shall be submitted to and approved by the Planning Director prior to the issuance of building permits. The applicant shall prepare a detailed landscape and irrigation plan which shall be submitted to and approved by the Planning Director prior to issuance of building permits. Said plan shall include landscaping and mounding along El Camino Real to screen the parking lot from this street. Parking lot trees shall be a minimum 15 gallon size. All landscaped areas shall be maintained in a healthy and thriving condition, free from weeds, trash, and debris. No signs are approved as part of this application. Any signs proposed for this development shall be designed in conformance with the city's Sign Ordinance and shall require review and approval of the Planning Department prior to installation of such signs. A uniform sign program for this development shall be sub- mitted to the Planning Department for their review and approval prior to occupancy of any building. Trash receptable areas shall be enclosed by a 6 foot high masonry wall with gates pursuant to city standards. Location of said receptacles shall be approved by the Planning Director prior to the issuance of a building permit. PC RESO 11783 -3- 1 2 3 4 5 6 7 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 13) All roof appurtenances, including air conditioners, shall be architecturally integrated and shielded from view and the sound buffered from adjacent properties and streets to the satisfaction of the Planning Department and Building Director. 14) The project shall provide bus stop facilities at locations subject to the satisfaction of the North County Transit District. Said facilities shall at a minimum include a bench, free from advertsing and a pole for the bus stop sign. The bench and pole shall be designed in a manner so as to not detract from the basic architectural theme of the project and said design shall be subject to the approval of the Planning Director and North County Transit District. 15) Approval of SDP 80-13 is granted subject to approval of Zone Change 223 by the City Council. 16) The driveway access on Palomar Airport Road shall be moved to a point at least 500 feet west of El Camino Real. Only right turns in and out shall be permitted and no median break shall be allowed. The driveway shall be shown on the revised Site Development Plan required pursuant to Condition No. 6 and shall be subject to the approval of the City Engineer. 17) The applicant shall provide 15 additional parking spaces on-site and adequate vehicle turnaround space at the end of each driveway aisle. Said parking spaces and turnaround areas shall be shown on the revised Site Development Plan (Condition No. 6) and shall be subject to the approval of the Planning Director prior to the issuance of a building permit. 18) Lighting of the tennis courts, golf course, and parking lot shall be directed inward to the site and shall not reflect or spill over to adjacent properties or streets subject to the satisfaction of the Planning Director. 19) A median island shall be constructed along El Camino Real for the entire length of the property which shall allow left turn movements for traffic proceeding north on El Camino Real into the site, however, which shall prohibit left turn movements out of the site. The design of said median island shall be subject to the approval of the City Engineer and shall be installed prior to occupancy of any buildings. 20) The applicant shall construct half street improvements along the entire length of El Camino Real and along Palomar Airport Road extending from the access driveway, to the intersection of El Camino Real prior to occupancy of any buildings. Also, the applicant shall construct a half median along the entire length of El Camino Real and along Palomar Airport Road from the access driveway to the intersection of El Camino Real and Palomar Airport Road prior to occupancy of any buildings. Additionally, the owner shall enter into a lien contract for future half street improvements along Palomar Airport Road for the remaining property frontage prior to the issuance of building permits. PC RESO #1783 ^° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 27 2C 21) A 10' wide equestrian trail shall be provided along the south and east side of the property by easement or other form to the satisfaction of the Planning Director and Parks and Recreation Director prior to final occupancy of any buildings. The revised site plan required per Condition NO. 6 shall indicate the location of this easement. • 22) The developer shall obtain a grading permit prior to the commencement of any clearing or grading of the site. 23) Additional drainage easements and structures shall be provided or installed as may be required by the County Department of Sanitation and Flood Control or the City Engineer. 24) Direct access rights shall be waived along all property frontages on Palomar Airport Road and El Camino Real except for one driveway access on each street as shown on the revised Site Development Plan. 25) The Planning Director shall review this Site Development Plan after one year to ensure that there are no problems with the operational aspects of the use including but not limited to traffic circulation, lighting, signing and golf course use. The Director shall recommend to the Planning Commission that the public hearing on this item be reopened if he determines the operational aspects of the use is detrimental or injurious to the public's health and welfare. PASSED, APPROVED AND ADOPTED at a regular meeting of the Planning Commission of the City of Carlsbad, California, held on the 25th day of March, 1981, by the following vote, to wit: AYES: Chairman Marcus, Commisioners Jose, Friestedt, Larson, Rombotis, L'Heureux, and Leeds. NOES: None. ABSENT: None. ABSTAIN: None. ATTEST:MARY CARLSB^ S, Chairman PLANNING COMMISSION C. HAGHHANV Secretary/ARLSBAD PLANN/NG^^OMMISSION PC RESO #1783 -5-