Loading...
HomeMy WebLinkAbout1981-07-21; City Council; 6674; Traffic signal - Levante at El Camino Real- d CITY OF CARLSBAD - L_ ..-, Initial: LCD:ls Dept . Head € AGENDA BILL NO. LL7# DATE: JULY 21, 1981 city Atty \/m City Mgr.p DEPARTMENT: ENGINEERING SUBJECT: TRAFFIC SIGNAL - LEVANTE AT EL CAMINO REAL STATEMENT OF THE MATTER The County opened bids for the construction of the traffic signal at El Camino Real and Levante. $48,962. agreement provides for City approval of the bids prior to award of contract. The lowest responsible bidder was Lekaunas Electric at The County has estimated the total project cost at $66,158. The FISCAL IMPACT The City's share of the project cost is estimated at $7,045. a balance of $848,542 in the Contingency Reserve account. This will leave ENVIRONMENTAL IMPACT The environmental impacts of the project were handled administratively by the County. RECOMMENDATION That the City Council approve the project as bid and authorize a maximum expen- diture of $7,045 from account number 1-139-2450 and authorize the transfer of this amount from the Contingency Reserve account. Adopt Resolution No. &/3 . EXH I BITS 1. 2. Resolution No. 66/3 authorizing transfer of funds. Letter and bid summary from County. APPROVED e. COUNTY OF SAN DIEGO DEPARTMENT OF PUBLIC WORKS R. J. MASSMAN. Director Offices of: County Engineer Countv Road Commissioner County Surveyor Countv Airports Flood Control Liquid Waste Solid Wayte Transportation Opar8tionS Mr. Les Evans City Engineer City of Carlsbad 1200 Elm Ave.- Carlsbad, CA 92008 BUILDING 2 5555 OVERLAND AVENUE SAN DIEGO, CALIFORNIA 92123 TELEPHONE: (714) 565-5177 July 9, 1981 Dear Mr. Evans: Subject: El Camino Real/Levante Street Traffic Signal BOARD OF SUPERVISORS TOM HAMILTON First District PAUL W. FORDEM Second District ROGER HEDGECOCK Third District JIM BATES Fourth District PAUL ECKERT Fifth District Bids for the construction of the traffic signal were opened July 2, 1981. As indicated on the attached Bid Summary, Lekaunas Electric Inc. is the lowest responsible bidder, having submitted a lump sum bid of $48,962. Based upon this bid, estimated total project costs are as indicated in the following tabulation: Preliminary Engineering Consultant Design $2,800 -... County Engineering Labor $7,500 Subtotal ‘m Construction Contract Low Bid $48,962 - Contract Contingencies 4,896 Subtotal $52,858 Construction InsDection Subtotal $3,000 Total Project Cost $66,158 , .- t ‘.I <’ / Pursuant to Section 5 of the City-County Agreement for the construction and maintenance of the traffic signal, City approval to award the construction contract is requested. scheduled for July 21, 1981. Therefore, receipt of City approval prior to July 20, 1981 will be greatly appreciated. Contract award by the Board of Supervisors is .* Mr. Evans - 2- July 9, 1981 Proportionate sharing of project costs is indicated in the following tabulation: Estimated Actual Construction Cost Less Developer Deposit Construction Cost to be Shared $52,858.00 45,000.00 $ 7,858.00 Consultant Design Cost $ 2,800.00 County Labor and Overhead: Preliminary Engineering Construction Inspection $ 7,500.00 $ 3,000.00 Total Project Cost to be Shared $21,158.00 City Share of Project Cost at 33-1/3 percent County Share of Project Cost at 66-213 percent $ 7,045.61 $14,112.39 Invoices which reflect cost sharing as indicated above will be forwarded at an early date. Additional information relative to subjects covered herein may be obtained from Rob Robinson of this department, telephone 565-3904. Very truly yours, R. J. MASSMAN, Director Department of Public Works B. F. Walsh: RJM:HGR: sm Principal Civ'if mxne:neeT At tach en t . k G .. a 0 LL v) n Q c - z * 00. w f 4 E w I- - 1 3 2 c; * 4 f c r E I I( 11 1: 1: 14 1E 1E 17 1E 14 2c 21 ' 22 23 24 25 26 27 28 RESOLUTION NO. 6613 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSSAD, CALIFORNIA, AUTHORIZING THE TRANSFER OF FUNDS FOR THE CON- STRUCTION OF TRAFFIC SIGNALS AT LEVANTE AND EL CAMINO REAL BE IT RESOLVED by the City Council of the City of Carlsbad as follows: 1. The transfer of Seven Thousand Forty Five Dollars ($7,045) from the Contingency Reserve, Account 1-40. 1-139-2450, to the El Camino Real/Levante Signal Account, No. 1-170-3123, is hereby authorized and approved. 2. The Department of Finance Fund Transfer No. 2 on file in said depart- ment and incorporated by reference herein is approved. PASSED, APPROVED AND ADOPTED by the City Council of the City of Carlsbad at a regular meeting held the 21st day of Jdy , 1981, by the fol- lowing vote, to wit: AYES : NOES: None Council Kenhers Packard, Casler , Anear, Ms and Kulchin ABSENT: NOW &dJizL:d/&G/ RONALD C. PACKARD, MAYOR ATTEST: 4 A 2. R,& - ALETHA L. RAUTENKRANZ, CITY CLERK (SEAL) , 1200 ELM AVENUE C Af-I LS D A D , C A I- I F 0 R F! I A 9 ZOO0 July 23, 1-981 R. F. VJalsh Departitlent of Public Works Building 2 5555 Overland Avenue San Diego, CA 92123 . County of San Diego Enclosed for your records, please find a copy of the f o 1 1 owiii g Re s 6 Xu t ion 6 6 1 --.----_I_ 3 , adopted by the Carlsbad City Counci.1 on July 21, 1981 Siiicerely , V City Clerk LR: adm Enclosures ( 1 ) ..