SUBJECT: TRAFFIC SIGNAL - LEVANTE AT EL CAMINO REAL
STATEMENT OF THE MATTER
The County opened bids for the construction of the traffic signal at El Camino
Real and Levante.
$48,962.
agreement provides for City approval of the bids prior to award of contract.
The lowest responsible bidder was Lekaunas Electric at The County has estimated the total project cost at $66,158. The
FISCAL IMPACT
The City's share of the project cost is estimated at $7,045.
a balance of $848,542 in the Contingency Reserve account.
This will leave
ENVIRONMENTAL IMPACT
The environmental impacts of the project were handled administratively by the
County.
RECOMMENDATION
That the City Council approve the project as bid and authorize a maximum expen- diture of $7,045 from account number 1-139-2450 and authorize the transfer of
this amount from the Contingency Reserve account. Adopt Resolution No. &/3 .
EXH I BITS
1. 2. Resolution No. 66/3 authorizing transfer of funds.
Letter and bid summary from County.
APPROVED
e.
COUNTY OF SAN DIEGO
DEPARTMENT OF PUBLIC WORKS
R. J. MASSMAN. Director
Offices of:
County Engineer
Countv Road Commissioner
County Surveyor
Countv Airports
Flood Control
Liquid Waste
Solid Wayte
Transportation Opar8tionS
Mr. Les Evans
City Engineer
City of Carlsbad
1200 Elm Ave.-
Carlsbad, CA 92008
BUILDING 2 5555 OVERLAND AVENUE
SAN DIEGO, CALIFORNIA 92123
TELEPHONE: (714) 565-5177
July 9, 1981
Dear Mr. Evans:
Subject: El Camino Real/Levante Street Traffic Signal
BOARD OF SUPERVISORS
TOM HAMILTON First District
PAUL W. FORDEM Second District
ROGER HEDGECOCK Third District
JIM BATES Fourth District
PAUL ECKERT Fifth District
Bids for the construction of the traffic signal were opened July 2, 1981.
As indicated on the attached Bid Summary, Lekaunas Electric Inc. is the
lowest responsible bidder, having submitted a lump sum bid of $48,962.
Based upon this bid, estimated total project costs are as indicated in
the following tabulation:
Preliminary Engineering
Consultant Design $2,800 -...
County Engineering Labor $7,500
Subtotal ‘m
Construction Contract
Low Bid $48,962 -
Contract Contingencies 4,896
Subtotal $52,858
Construction InsDection
Subtotal $3,000
Total Project Cost $66,158 ,
.-
t ‘.I
<’
/
Pursuant to Section 5 of the City-County Agreement for the construction and
maintenance of the traffic signal, City approval to award the construction
contract is requested.
scheduled for July 21, 1981. Therefore, receipt of City approval prior to
July 20, 1981 will be greatly appreciated.
Contract award by the Board of Supervisors is
.* Mr. Evans - 2- July 9, 1981
Proportionate sharing of project costs is indicated in the following
tabulation:
Estimated Actual Construction Cost
Less Developer Deposit
Construction Cost to be Shared
$52,858.00
45,000.00
$ 7,858.00
Consultant Design Cost $ 2,800.00
County Labor and Overhead:
Preliminary Engineering
Construction Inspection $ 7,500.00 $ 3,000.00
Total Project Cost to be Shared $21,158.00
City Share of Project Cost at 33-1/3 percent
County Share of Project Cost at 66-213 percent $ 7,045.61 $14,112.39
Invoices which reflect cost sharing as indicated above will be forwarded
at an early date.
Additional information relative to subjects covered herein may be obtained
from Rob Robinson of this department, telephone 565-3904.
Very truly yours,
R. J. MASSMAN, Director Department of Public Works B. F. Walsh:
RJM:HGR: sm Principal Civ'if mxne:neeT
At tach en t
.
k
G .. a 0 LL
v) n
Q c - z * 00. w f
4
E w I- -
1
3
2
c; *
4
f
c
r
E
I
I(
11
1:
1:
14
1E
1E
17
1E
14
2c
21
' 22
23
24
25
26
27
28
RESOLUTION NO. 6613
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSSAD,
CALIFORNIA, AUTHORIZING THE TRANSFER OF FUNDS FOR THE CON-
STRUCTION OF TRAFFIC SIGNALS AT LEVANTE AND EL CAMINO REAL
BE IT RESOLVED by the City Council of the City of Carlsbad as follows:
1. The transfer of Seven Thousand Forty Five Dollars ($7,045) from the
Contingency Reserve, Account 1-40. 1-139-2450, to the El Camino Real/Levante
Signal Account, No. 1-170-3123, is hereby authorized and approved.
2. The Department of Finance Fund Transfer No. 2 on file in said depart-
ment and incorporated by reference herein is approved.
PASSED, APPROVED AND ADOPTED by the City Council of the City of Carlsbad
at a regular meeting held the 21st day of Jdy , 1981, by the fol-
lowing vote, to wit:
AYES :
NOES: None
Council Kenhers Packard, Casler , Anear, Ms and Kulchin
ABSENT: NOW
&dJizL:d/&G/
RONALD C. PACKARD, MAYOR
ATTEST:
4 A 2. R,& -
ALETHA L. RAUTENKRANZ, CITY CLERK
(SEAL)
,
1200 ELM AVENUE C Af-I LS D A D , C A I- I F 0 R F! I A 9 ZOO0
July 23, 1-981
R. F. VJalsh
Departitlent of Public Works
Building 2
5555 Overland Avenue
San Diego, CA 92123
. County of San Diego
Enclosed for your records, please find a copy of the
f o 1 1 owiii g Re s 6 Xu t ion 6 6 1 --.----_I_ 3 , adopted by the
Carlsbad City Counci.1 on July 21, 1981
Siiicerely ,
V City Clerk
LR: adm
Enclosures ( 1 )
..