Subject: REQUEST TO REVISE SCHOOL FEES FOR SAN DIEGUITO
HIGH SCHOOL DISTRICT
Statement of the Matter
The San Dieguito Union High School District has recertified over-
crowding in its attendance areas and is requesting that school fees
collected from developers, pursuant to SB 201 and Chapter 21.55 of
the Municipal Code, be increased 9.33%, The fee increase is
summarized as follows:
SDUHSD
Single or multifamily
3 or more bedrooms
Single or multifamily
2 bedrooms
Multifamily
1 bedroom
Present Fee
$1,579
682
256
Proposed Fee
$1,726
746
279
The present fee was established in September 1980. The Municipal
Code allows the Council to adjust the fees from time to time by
Resolution.
Fiscal Impact
No direct fiscal impact on the City.
Exhibits
1. Letter from Superintendent of San Diequito School District
dated July 31, 1981.
2. Resolution No. _
Recommendation
Adopt Resolution No.
Dieguito District.
increasing school fees for the San
APPROVED
.San.
625 North Vulcan Avenue
Leucadia, California 92024
714/753-6491 Union High School District
July 31, 1981
Carlsbad City Council
c/o Mr. Robert Aleshire, City Manager
1200 Elm Street
Carlsbad, CA 92008
Dear Members of the City Council:
Re: Carlsbad City Ordinance Chapter 2155
Dedication of Land and Fees_ for School Facilities
The following letter is in response to Section 21.55.260 (Fee Fund Records and
Reports) of the above-named ordinance. The San Dieguito Union High School
District maintains a separate account for all fees paid under this ordinance,
and had receipts of $168,412.75 during 1980-81. A total of $168,412.75 was
expended for temporary classrooms in the attendance area which serves Carlsbad
residents.
The Board of Trustees took action at its regular meeting on July 16, 1981, to
identify all attendance areas in the San Dieguito Union High School District
as overcrowded for the 1981-82 school year. The Board also revised its policy
on the availability of facilities, modifying the developer fee to take into
consideration the increased costs of providing temporary classrooms. The few
fee schedule is as follows:
3 bedrooms - $1,726
2 bedrooms - $ 746
1 bedroom - $ 279
On behalf of the Board of Trustees, I respectfully request that the City of
Carlsbad approve the attached Resolution of Overcrowding along with the revised
fee schedule for providing temporary classrooms. Additional information is
available upon request.
Sincerely,
0 AjJ^AflUwx Q. fS
Mr. William A. Berrier, Superintendent
REP/ejm
Attachments
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 6649
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AMENDING RESOLUTION NO. 5998
REVISING THE AMOUNT OF FEES TO BE REQUIRED AS A
CONDITION OF APPROVAL FOR RESIDENTIAL DEVELOPMENT
WITHIN CERTAIN AREAS OF THE SAN DIEGUITO UNION
HIGH SCHOOL DISTRICT.
WHEREAS, pursuant to Chapter 4.7, Division 1, Title 7 of the
California Government Code, the City Council of the City of Carls-
bad, California has adopted a School Facilities Dedication and Fee
Ordinance (Carlsbad Municipal Code Chapter 21.55); and
WHEREAS, Section 21.55.150 of the Carlsbad Municipal Code
provides that the standards for the amount of fees to be required
pursuant to such ordinance shall be determined by the City Council
and set by resolution. The City Council's determination is to be
made after consideration of recommendations from the governing board
of the affected school district; and
WHEREAS, the City Council established standards for the amount
of fees to be required pursuant to Chapter 21.55 in Resolution
No. 6010; and
WHEREAS, the City Council is in receipt of recommendations
in regard to revised amount of fees from the San Dieguito Union
High School District. Their recommendation is attached hereto
as Exhibit A, and is made a part hereof; and
WHEREAS, the City Council fully considered the matter at
the regular meeting of August 18, 1981 at which time the City
!ouncil determined to concur in the revised standards as recom-
mended by the Board of the San Dieguito Union High School District;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
ity of Carlsbad as follows:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
A. That the above recitations are true and correct.
B. That the standard for the amount of fees to be required
as a condition of approval for residential developments within that
portion of the City of Carlsbad, which is also within the boundaries
of the San Dieguito Union High School District, shall be as con-
tained in Exhibit A.
C. This determination is based upon the City Council's con-
currence in the recommendations made by the Governing Board of
the San Diequito Union High School District, including the facts
supporting such recommendations as contained in Exhibit A.
D. Unless the decision making body especially determines to
Ithe contrary, the City Council hereby determines that the develop-
ment of fifty units or less:
1. All such developments shall be required to pay fees
in accordance with the schedule in Exhibit A.
2. The City Council has reviewed that portion of the
General Plan which applies to the San Dieguito Union
High School District and finds that it provides for
the location of public schools.
3. That the fees to be paid shall be used for the purpose
of providing interim school facilities.
4. That the fees to be paid for each unit bear a reasonable
relationship to the burdens placed on the School District
by such unit and that the fees will be used to mitigate
that burden.
5. That the school facilities to be funded by the fees
are consistent with the City's General Plan.
E. The standards adopted by this resolution do not at this
time require the dedication of land. The San Dieguito Union High
School District is developing standards regarding such dedications.
When the District is prepared to make their recommendation in that
regard, the City Council intends to amend this resolution to
-2-
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
include provisions for requiring the dedication of land as they
ietermine to be in the public interests,
F. Effective Date The fee schedule approved by this Resolution
hall become effective on October l, 1981.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City
Council of the City of Carlsbad, California, held on the 18th
flay of August , 1981, by the following vote, to wit:
AYES: Council Members Packard, Casler, Anear, Lewis
NOES: None
ABSENT: Council Mariber Kulchin
RONALD C. PACKARD, Mayor
ATTEST:
^^.kLETHA L. RAUTENKRANZ, City Clerkj
(SEAL)
—3 —
RESOLUTION RE: CONDITIC OF OVERCROWDING
IN SCHOOL ATTENDANCE AREAb
Exhib?* A to Resolution
On motion of MemberThompson
Howell
the following resolution is adopted:
seconded by Member
WHEREAS, for some time past there has been a continuing and substantial increase
in population within the boundaries of the San Diequito Union High School District
to the extent that the school facilities of this district have become overcrowded; and
WHEREAS, a very significant proportion of the increase in population in this
district results from construction of residential units in new housing developments
within the district; and
WHEREAS, in the absence of assistance in the form of financial contributions or
dedications of land from the developers of such new residential developments this
district would not have financial resources adequate to provide proper educational
facilities for all the children residing in this district; and
WHEREAS, Chapter 4.7 (commencing with Section 65970; added by Stats. 1977,
Chap. 955), Division 1, Title 7 to the Government Code making provision for financial
or other assistance by developers to school districts if the governing board of a
school district has made a finding that conditions of overcrowding exist in one or
more attendance areas of the district including the specific data specified in
Government Code Section 65971; NOW, THEREFORE
.IT IS RESOLVED AND DETERMINED that, pursuant to Government Code Section 65971,
this governing board makes the following findings:
(1) Conditions of overcrowding exist in the following attendance areas of the
San Pie g u i t o Uinion High School District which will impair the normal functioning of
educational programs in those areas:
San Dieguito High School - Grades 9-12
Torrey Pines High School - Grades 9-12
Oak Crest Junior High School - Grades 7-8
Earl Warren Junior High School - Grades 7-8
Sunset (continuation) High School - Grades 9-12
(2) Reasons for the conditions of overcrowding in the above-mentioned attendance
areas include the following:
San Dieguito High School
Torrey Pines High School
Oak Crest Junior High School
Earl Warren Junior High School
Sunset (continuation) High School
PROJECTED
ENROLLMENT
2001
1745
861
869
150
CURRENT CAPACITY
PERMANENT AND PORTABLE
1889
1726
939
891
•153
In addition to the students presently enrolled, the County or the responsible city
has approved numerous developments in each of the above named attendance areas that have
potential for further impacting District schools. The'students currently enrolled,
combined with those anticipated from new developments already approved, has resulted
in an overcrowded condition at each of the schools listed above.
(3) All reasonable methods of mitigating conditions of overcrowding have been
evaluated and no feasible method for reducing such conditions exists. Mitigation
measures considered by the_govern1ng board of this district to reduce the overcrowded
conditions include the fo' wing:
a) The District has entered into agreements with developers who have
contributed financial assistance toward the cost of providing temporary use buildings.
Other temporary buildings have been financed out of the District's general fund so
that each site contains a mix of temporary and permanent facilities.
b) District voters approved a bond measure that provided the first phase of
a new high school in 1974 that is seriously overcrowded in spite of the addition of
seventeen (17) portable classrooms at that site since the fall of 1975.
c) Student busing and boundary realignments are not feasible alternatives
at the high school level since both of the District's two comprehensive high schools
are overcrowded. These alternatives have been implemented at the junior high level;
and even so, those campuses are projected to exceed capacity prior to the completion
of developments that have been approved by the appropriate governmental body.
~d) Such alternatives as year-round operation and double sessions have been
examined by committees of parents and staff, but have been rejected due to what is
considered to be a negative impact on the instructional program.
e) The District has no "surplus" real property or "low priority school
facilities"; therefore, this is not a feasible alternative for increasing school
capacity.
f) A Long Range Comprehensive Master Plan was adopted in June 1981 that
identified the facilities required to keep pace with District growth. One new junior
high school was called for plus additional permanent facilities on each of the District's
four existing campuses. The District has received a Phase I planning grant for a junior
high school from the State Allocation Board, but completion of the project will only
partially meet the District's master planning needs.
(4) The conditions of overcrowding in this district and the explosive population
growth projected for this area can only be accomodated by the construction of new
permanent facilities on existing sites and/or the development of additional sites.
The use of additional temporary use buildings/relocatable structures to accommodate
future growth on developed District sites is extremely limited. Support by developers
in the form of financial contributions or dedications of land is necessary in order
to try to keep abreast of population growth and even with such assistance, any signifi-
cant reduction in the conditions of overcrowding will be difficult until sufficient
funds can be generated to provide additional permanent facilities.
, BE IT FURTHER RESOLVED AND ORDERED that the Secretary of this Board deliver
certified copies of this resolution to the city councils.and/or the Board of Super-
visors of all cities and County within whose boundaries the school district lies
together with copies of this District's policy on the subject of developers',
subdividers1, and builders' contributions to mitigate impact on school facilities to
Indicate the type and scale of assistance considered appropriate to meet the needs
of this district.
PASSED AND ADOPTED by the Governing Board of the San Dieguito Union High School
District of San Diego County, California, this 16th day~of~JuTy ,
1981
-2-
(yjijj P. vVyyvi/'7)/^u^'\A_Q
, ^ v
mue D-
Members of the Governing Board of the
SAN DIEGUITO UNION HIGH SCHOOL DISTRICT
Exhibit A~o Resolution
NEW CONSTRUCTION "7100
3110
Availability of Facilities . ;
It is the goal of the San Dieguito Union High School District Board of Trustees to
provide the best possible learning environment for all of the students who live
within the boundaries of the San Dieguito Union High School District. In the absence
of a method to finance school construction through bond issues, the District will seek
alternative solutions to the school housing problems on an interim basis. The
District will utilize temporary classrooms along with other alternatives to the maximum
extent feasible in order to avoid the requirements to operate on double sessions.
The administration and Board of Trustees will explore every legally available avenue
to secure funds and/or financial assistance to provide the space needed to maintain
a quality educational program.
Because a high quality educational program benefits not only students and the community
but also benefits land developers and builders by facilitating the sale of their homes
it shall be the policy of the Board to include property developers and builders
within the class of persons from whom financial and other contributions will be vigor-
ously solicited.
It will be the policy of the Board of Trustees, within the legal limits of its
discretion, to extend cooperation to developers and builders who assist the District
in the task of providing interim measures to maintain the high quality of the educa-
tional program and such cooperation shall be in the same measure as the assistance
provided by the developer.
The Superintendent is authorized to prepare administrative regulations that will (a)
provide guidelines for determining the availability of school facilities to meet the
needs of the projected enrollment and (b) identify the level of developer support
required to mitigate conditions of overcrowding in District schools. Among the
factors to be considered are:
1. The availability of school facilities to accommodate the projected enrollment.
2. The anticipated impact of proposed development on school enrollment.
3. The timing and certainty of the developer's building plans.
4. .The type of school facility needed when conditions of overcrowding exist.
5. The provisions of local building ordinances with regard to residential
development.
Policy Adopted: December 1, 1977 (effective 12/2/77) 1/1
Revised: September 28, 1978
October 25, 1979
NEVJ CONSTRUCTION - _ ATTACHMENT A
7100 <
3100
SAN DIEGUITO UNION HIGH SCHOOL DISTRICT
STUDENT HOUSING CAPACITY - FALL 1981
*• 9-12 High Schools - Regular Schedule . ;
The capacity of a senior high school plant is calculated on a space utilization
factor of approximately 85% of the teaching stations at .30 student each. The
ability to fully utilize available instructional space depends on such factors
as properly balanced classes and a class size average close to the maximum.
' !• San Dieguito currently has 76 teaching stations including six physical
education classes.
76 teaching stations:
3 special ed. day class @ 10 each =30
. 2 special ed. resource teachers @ 24 each = 48
71 x 30 * 2130 x 85% = 1811
1811 + 78 = 1889 .
2. Torrey Pines has 69 teaching stations including six physical education
classes (including lecture hall and I.A. room)
69 teaching stations:
1 special ed. day class - capacity 10
2 special ed. resource teachers - capacity 24 each = 48
1 trailer capacity- capacity 10
65 x 30 = 1950 x 85% = 1658
1658 + 68 = 1726
3. Sunset (Continuation) High School provides a highly individualized program
that is currently housed in stx~T6) teaching stations.
.6 x 30 x 85% =153 • .
II. 7-8 Junior Highs - Regular Schedule
The capacity of a junior high plant is normally calculated on a utilization
factor of 90% with 28 students per teaching station.
t
1.. .Earl Warren now has 38 teaching stations including physical education.
38 teaching stations
1 special ed. day class - capacity 10
2 special ed. resource teachers - capacity 24 each = 48
• 35 x 28 = 980 x 90% = 882
882 + 58 = 940
2- Oak Crest now has 40 teaching stations including physical education.
40 teaching stations
1 special ed. day class - capacity 10
2 special ed. resource teachers - capacity 24 each = 48
37 x 28 = 1036 x 90% = 932
932 + 58 = 990
07/16/81 . 1/2
NEW CONSTRUCTION • ~ ATTACHMENT A
7100 <=—3100
III. Exceeding Capacity - It is possible to exceed projected capacity at both the
high school or junior high level by such procedures as:
A. Schedule modification - extending the school day to permit more
students to take advantage of specialized facilities such as shops
and laboratories. • •
B. Facility modification - utilization of space not specifically
designed for instructional purposes, i.e., faculty lounges, storage
areas, etc.
While both procedures have been utilized to increase plant capacity, they do
not provide an optimum learning environment for students.
07/16/81 2/2
NEW CONSTRUCTION ATTACHMENT B
7100 <£—
3100
SAN DIEGUITO UNION HIGH SCHOOL DISTRICT
. SUGGESTED DEVELOPER FINANCIAL AIDE FORMULA
I. ESTIMATED CONSTRUCTION COSTS OF PERMANENT FACILITIES/SAN DIEGUITO HIGH SCHOOL DISTR:
The most current State aid formula has been applied to the actual buildings
in phase I and to those planned for construction during phase II at Torrey
Pines High School. An estimate has been made for providing a complete facility
for approximately 2,000 students including site acquisition and development,
' furnishings, and fees. Similar criteria was developed for 7-8 junior highs
developed around the requirements of an existing campus in the San Dieguito
Union High School District.
The estimated per pupil cost of providing permanent facilities in October
1979 was (a) high school - $11,060 and (b) junior high school - $7,310.
These figures will be adjusted periodically to reflect changes in the cost
of providing new permanent school facilities. Modifications will be based
on the Index of Construction costs as reported in the Engineering News
Record.
October 1979
ENR Index of Construction
Costs 3,192.60
II. ESTIMATED STUDENTS PER DWELLING UNIT
DWELLING TYPE Grades 7-8 Grades 9-12 Grades 7-12
Single or Multi-Family, 3 or more
bedrooms or equivalent rooms
Single or Multi-Family Homes, 2
bedrooms or equivalent rooms
Hultf-Femlly Homes, 1 bedroom or
equivalent room
.12
.05
.02
.25
.11
.04
.37
.16
.06
III. COST PER DWELLING UNIT (Including Land)
DWELLING TYPE
Site Acquisition Pupil Site Acquisition Pupil
Plus Construction Generation Total Plus Construction Generation Total
7-8 Factor 7-8 ' 9-12 Factor 9-12.
Single or Multi-Family,
3 or more bedrooms or
equivalent rooms $7,731
Single or Multi-Family,
2 bedrooms or equivalentrooms 7.731
Mi'" '-Family Homes. 1
bedroom or equivalent
" room 7,731
.12
.05
.02
$928
387
155
$11,060
11.060
11.060
.25
.11
.04
$2.765
1,217
442
1. 1977 (effective U/2/77)1/2
NEW CONSTRUCTION ATTACHMENT B7100<—
3100
IV. COST PER DWELLING UNIT (Excluding Land)
DWELLING TYPE
Construction7-8
Pupil
Generation Total
Factor 7-8
Construction
9-12
Pupil
Generation
Factor
Total
9-12
Single or Muni-Family,
3 or more bedrooms or
equivalent rooms $7,005
Single or Multi-Family,
2 bedrooms or equivalent
rooms 7,005
Haiti-Family Homes, 1
bedroom or equivalent
room 7,005
.12
.05
.02
$841
350
140
$10,198
10,198
10,198
.25 $2.550 $3.391
.11 1,122 1,472
.04 408
Policy Adopted; December 1, 1977 (effective 12/2/77)
KevTsUcT; November 29, 1979
2/2
NEW CONSTRUCTION - - ATTACHMENT C
7100 <
3110
1. ESTIMATED COST OF PORTABLE FACILITIES
(Base Date 8/1780}
The cost of providing a portable classroom facility on District property is
estimated based on the following factors:
Cost of building including carpet, air condition-
ing, delivery, installation. (Basis for computa-
tion $45.80 per sq. ft. X 900 sq. ft.) - - $ 41,220
Grading and Site Preparation
Fees, Architect and Others
Concrete Walkways and Ramps (1640 X $2.25 sq. ft.)
Utilities - Electrical
- Water
- Gas
- Sewer
Toilet facilities - one 456 sq. ft. building per
10 classrooms
Furniture
6,200
9,600
3,690
3,630
1,270
1,270
2,140
4,380
3,250
SUBTOTALS 76,650
INTEREST (5 YEARS) 30,374
' SUBTOTAL $
Building Removal
Site Restoration
Cost Per Student
(30 Students X 85% Utilization Factor)
Adjusted Cost
ENR (Engineering News Record) Construction
Index 6/26/80 = 3,256.60
Index 6/25/81 = 3,560.67
3,560.67 - 3,256.60 v 1nn ft— * - ^ 256 60 - = 9
Cost Adjusted
$4,268 x 1.0933 = $4,666
TOTAL COST $
$
107,024
800
1-,000
108,824
4,003
$ 4,268
.increase
3 Br. 4666
2 Br. 4666
1 br. 4666
Pupil
Generation
Factor
7-8
.12
.05
'.02
Cost
560
233
93
Pupil
Generation
Factor
9-12
.25
.11
.04
Cost
1166
513
186
Pupil
Generation
Factor
7-12
.37
.16
.06
Total
7-12
1726
746
279
NEW CONSTRUCTION ATTACHMENT D
7100 < •
3110
EXPLANATION OF MAJOR COMPONENTS IN PROPOSED DEVELOPERS' SCHEDULE
Cost of building:
Grading:
Architect Fees, etc,:
Cement Walkways:
Utilities:
Toilet Facilities:
Furniture:
Interest:
Building Removal:
Site Restoration:
A standard classroom is 900 square feet; the unit cost is based on $45.80
per square foot.
Preparation of a site is required to put the building in place. The school
district is usually responsible to prepare the site ready for temporary
foundations.
Each building requires architectural service; other fees are required to the
State Department of Education, the State architect, etc. for plan
conformance. Engineering services are required for site work and
utilities. A building inspector is required during construction.
A sidewalk surrounding the entire building has been district standard for
recent portables. Sidewalks also .connect with existing walkways.
Cost can only be an estimate since each location is different. Some
campuses will require more, some less, than the estimated amounts due to
the location of existing available lines.
As needed, these would be incorporated on a campus, but are not needed
for each building. The estimated amount shown would provide adequate
funds to provide these as they are required.
Includes teacher and student desks, bulletin boards, file cabinets,
blackboards, bookshelves, audio visual screens, etc., to make the room
ready for instruction.
Interest is included since the supplier would be submitting his bid on an
amount per year for a five-year period.
Costs incurred when the portable building is removed for other use.
Costs incurred to restore the site when a building is removed.
Date Amended:November 20, 1980 I/I
KEW CONSTRUCTION ~' • - ' 7100/AR-l
Ava i 1abi11ty of Faci 1ities
I. Facility Capacity
The following factors v/ill be considered in determining the availability of
facilities to meet the needs of the projected student population:
A. Projected Enrollment
The administration will project the enrollment for each campus for the
following school year by the beginning of the second semester. The pro-
jections will take into consideration such factors as:
1. Enrollment in the feeder elementary districts.
2. Current enrollment at the secondary level.
3. Projected enrollees as a result of new residential units planned for
each attendance area.
B. Current Capacity
The capacity of each campus is determined by the number of students who
may be served by the existing facilities. The following factors will
be taken into consideration in determining the capacity of a given campu
1. Number of teaching stations in permanent facilities.
2. Number of teaching stations in temporary facilities.
3. The staffing pattern and level of educational program offered at the
school site.
C. Maximum Capacity
Maximum capacity is deemed to be the greatest number of students who ca
• be provided a quality educational program and school environment on a
conventional time schedule. The administration will monitor plant capa
annually and make recommendations to the Board with regard to maximum s
enrollment consistent with a proper learning environment.
II. School Availability
Facilities will be determined to be available at" a particular school site if
of the following circumstances exist:
A. Current capacity will accommodate the projected enrollment.
B. Plant capacity is modified to accommodate the projected enrollment
a procedure acceptable to the Board of Trustees.
If the projected enrollment for the school is greater than the current cnpac
but docs not exceed the maximum considered acceptable by the Board of Trustr
to maintain a proper looming cnvironiv.rnt, interim steps arc possible with
developer or other assistance to incnv.sc plant capacity.
Administrative Regulation Issued: Docwubor 1, 1977 (effective 12/2/77) 1/2
231
2'j . 1979
NEW CONSTRUCTION 7100/AR-l <•••
3110/AR-l
III. Cooperation with Governmental Agency Responsible for Residential Development
The administration is to evaluate the impact of each proposed subdivision,
rezone, or special use permit, to determine the impact that will occur on the
District's ability to provide adequate school services and facilities for area
students.
A. Sufficient Capacity - If it can be determined that the capacity of the
particular school is sufficient to accommodate the projected enrollment,
a letter of availability .will be provided to the appropriate governmental
agency.
IV. Increasing Enrollment Capacity
• The administration shall explore with developers and others, interim measures
to mitigate projected overcrowded conditions in District schools. Developers
shall be encouraged to assist the school district to accommodate students pro-
jected from new developments through such efforts as the donation of land for
school sites or through financial contributions for facilities.•
Plant capacity will be considered adequate when the developer has entered into
a secured agreement with the District to provide assistance acceptable to the
Board of Trustees. When such conditions exist, the administration shall provide
a letter of availability to the appropriate governmental agency.
V. Hpnitorjng System for Developer Contributions
Any monies that accrue to the District as a result of agreements with developers
shall be placed in a special reserve fund for use in mitigating overcrowded
conditions in District schools. A report shall be filed with the appropriate
. governmental agency that will account for the funds on an annual basis.
^Administrative Ronulnt.ion Issued: Oi^combor 1, 1977 (effective 12/2/77) 2/2
stVl: SepUv.ibor 23, 1973
.JV October 2!i, 10/9
1200 ELM AVENUE flS.Mii.J^FI TELEPHONE:
CARLSBAD, CALIFORNIA 92008 • 1<3^\ K t™4) 438-5535
Office of the City Clerk
Citp of Cartefmfc
August 20, 1981
William A. Berrier, Superintendent
San Dieguito Union High School District
625 N. Vulcan Avenue
Leucadia, CA 92024
Re: Amount of School Fees
The Carlsbad City Council, at its meeting of
August 18, 1981, adopted Resolution No. 6649,
revising the amount of fees to be required as a
condition of approval for residential development
within certain areas of the San Dieguito Union
High School District.
Enclosed for your records and information is a
copy of the above referenced resolution.
If you have any questions regarding this matter,
please do not hesitate to contact this office.
ALETHA L. RAUTENKRANZ
City Clerk
ALRrkrs
Enclosure