HomeMy WebLinkAbout1983-03-15; City Council; 7317; Right-of-Way for Carlsbad Blvd Bridge0‘ w -> 0 a e e 4
46#1ZIZL2-- TITLe AUI’HORITY To
UTG.
DEPT. ENG
3-15-83 CEXl’IFY FUG”-OF-W FOR CNXSBADBDULFNARD BRIDGE
f
a 4 0 2 3 0 0
0 E
< DEPT.HD. Rah(-
CITY Ma+ * CITY Am VM
Adapt Resolution No. 7/64 authorizing the City Engineer to certify Right- Of-Way for the Carlsbad Boulevard Bridge Project.
ITEM EXPLANATICN:
In order to receive the allocation of Federal mnies for the Carlsbad Boulevard Bridge
project, it is necessary for an individual to be authorized by the governing body by Council Fesolution to certify that all Rights-Of-Way are clear.
As no Right-of-way is to be aoquired for this project, this amDLlnts to a fomlity; hcwever, it is required by Federal F&cJulations.
FISCAL IMPPCT:
NOIE, except that this will permit the city to be in a position to receive the
HBRR and FAU Funding required for this project.
1. Right-of-way Certificatian
2. Resolution NO. 7[1pqauthorizing the city mgineer to certify Right-of-way
R i ght-of-Way Certification Format B
LOCAL AGENCY NAME
February 25, 1983 11-SD-0-Cbd
Date Identi fi cati on Number
RIGHT-OF-WAY CERTIFICATION FAU/HBRR
Federal Program
Carlsbad Boulevard Bridge
Street, Road, or Project Name
Cannon Road to Tamarack Avenue
Job Limits ..,-
Right-of-way acquisition was not required for the construction of
this project since all work is being done as set forth below:
1. STATUS OF RIGHT-OF-WAY ACQUISITION
All Construction is within existing Right-of-way. All right-of-way was acquired prior to July 1, 1972.
2. STATUS OF AFFECTED RAILROAD FACILITIES - Not Affected
3. DESIGNATED MATERIAL SITES - Not Applicable
4. DESIGNATED DISPOSAL AREAS. - Public Dump Sites
EXHIBIT 1 a
.. 64 h.,
5. UTILITIES
A. Status of Relocation
C ornpany Type Faci 1 i ty
. EXHIBIT 14-2e 1980 -2
R el ocat i on Type
B. High and Low Risk
(1) /7 This will be a State administered project and the high and low risk underground facilities meet
Cal trans requirements for minimum cl earance.
or
(2) Ilir?f This will be a locally administered project and I
certify that (Local Agency) has been informed in writing of Caltrans high and low risk underground facilities policy. assumes no liability for compliance or
noncompl i ance with said pol icy.
I am aware that the State
6. SCHEDULE FOR REMOVAL OF IMPROVEMENTS AND OBSTRUCTIONS - To be
7. UNAUTHORIZED ENCROACHMENTS - None ~-
performed within contract.
8. COMPLIANCE WITH FEDERAL AND STATE REQUIREMENTS REGARDING THE
ACQUISITION OF REAL PROPERTY
The acquisition of right-of-way was not required.
9. COMPLIANCE WITH RELOCATION ADVISORY ASSISTANCE AND PAYMENTS
PROVISIONS OF FEDERAL AND STATE LAW
The project did not require the displacement of any persons or busi ness
I HEREBY CERTIFY the right-of-way on this project as conforming to
Statement No. ( ) of Paragraph 5c of FHPM 6-4-2-1,
AGENCY
BY City Engineer Date
1
2
3
4
5
6
7
8
9
..
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
/-
A RESOLUTION OF' THE CITY COUNCIL OF "E CITY OF
CARLSBAD, CALIFORNIA, AUISIOFUZING THE CITY ENGINEER
'IO (XFU'IFY FUGH'FOF-WIUI FOR THE CARISBAD BO-
BRIXF, PRQSECI'.
~
The City Council of the City of Carlsbad, California, does hereby resolve
3s follaws:
That the City Engineer of the City of Carlsbad is hereby authorized and
Erected to execute any Right-of-way Certification required for the Carlsbad
3ouleva.d Bridge Project.
PASSED, AppIiovED AND at a regular reeting of the City Council o
%e City of Carlsbad held on the 15th day of March , 1983, by the
Eollowing vote, to wit:
AYES: COUndl Mer&e.rs Casler, Iwis, Kulchin, Chick and Prescott
NOES:
AEsm:
ITTEST:
I MhRY H. WLER, Mayor