Loading...
HomeMy WebLinkAbout1983-04-05; City Council; 7335; Carlsbad Bl Beach Parking LotWQ. DM ENG PIMJECT LVD ADVEXTISE P.WJECT FOR BILE 4-5-83 CARISBAD BOULEVAW BEACH PARYIYING LQT ECON- STRUCTION PROJECT, AF'DROVE FUND T&'ISFER F3R ~~ I I Adopt Resolution No. RECOMMENDED ACTION the Carlsbad Bouleva &A#.. Parklng Lot Reconstruction Project; aFptmin3 fund authorizing City Staff to proceed with work on transfer for the project; appruzing plans ad specifications, and authorizing the City Clerk to Pdvertise for Bids for Project Nlnrber 3145. 'Ihe January storms damaged the Parking Lot on the west side of Carlsbad ~ulward south of Tamarack Avenue. DiaMge caused by those storms is eligible for reirrbursement fran the Federal Fmergency Management Agency (F.E.M.A.) on a 759, Federal/25% City CoSt split. The 1650-foot lemth of paved parking ancl an additional 250 feet of unpaved parking south of that is owned by the City. These areas will be KemXStNcted by this project. 'Ihe current schedule for this project is as foll0r;s: ndvertise for' Bids April 5 Wn Bids Award Contract Notice to Proceed April 25 May3 May 16 ' Notice of Canpletion June 21 Ihe contract requires work to k canplete by May 27. FISCAL IMPACT Ihe Eiyi.ner's Estimate is $17,700. This includes Design, Construction, Mministration, an3 Inspzction. npnxoximtely 75% of that munt is expected to be reirrbtmzd by the F.E.M.A. in the next three to four months. The money needed can be transferred frcm the Contingency Reserve Account No. 01-19-50-2470 to the Carlsbad Boulevard Beach Parking Lot Acmt No. 01-18-10-3145. Ife transfer of the needed $17,700 will leave $710,445 in the Contingency Reserve Acmt . .~ 2. Contruction cost estimate smry 1. Vicinity Map 3. Resolution No. Carlsbad mieva * Beac Parking Lot Reconstruction Project, al;proviq plans ad specifications, apprariq fund transfer, ad autbriziq the City Clerk to advertise for bids. authorizing City staff to proceed with work on I . ." 1200 ELM AVEFiUE CAHLSUAD. CALtFORNlA 92008-1989 I CONSTRUCTION COST ESTIMATE SURPMARY Project Title CARLSBAD BLVD. BEACH PARKING RECONSTRUCTION @ate WRCH 11, 1983 1 I W&f%y CARLSBAD BLVD, BETWEEN THE JETTIES 0 Conceptual . 0 Preliminary &Final Projest No. Checked By Estimated By 3145 ROBERT J. WOJCIK - - Construction Cost Estimate Summary i ! HE CITY CLERK TO ADVERTISE reconstruct the ecifications for the furnishing of all equipment, transportation, and other e on file in the Engineering reference herein: NOW, THEREFORE, BE City of Carlsbad as follows: ed to proceed with work on this project. 3. The plans and specif approved. hereby approved. the Carlsbad Boulevard Beach Parking Lot, in accorda plans and specifications hereinabove referred to. 1 2 3 4 .5 6 ,. 7 ,a 9 10 *11 12 13 . 14 15 16 17 .18 19 20 21 22 23 24 25 26 27 28 .- A PASSED, APPROVED AND ADOPTED by the City Council Of the City ifornia, at a regular meeting held the - day , 1983, by the following vote, to wit: AYES: . .' NOES: ABSENT: .I MARY H. CASLER, MAYOR ATTEST: ALETHA L. RAUTENKRANZ, ITY LERK (SEAL) i . PLAN A: GR .. - .. CARLSBhD BI VD, BFACH PARKING ALTERNATIVES AND COST BREAKEOVN .. ADE BEACH TO HEIGHT OF PARKING LOT, CLEAN OFF THE LOT, AND .. . LET PEOPLE PARK AS THEY WILL, .. CJTY s SHARE i STATE I s SHARF CLEAN OFF LOT $220 $380 :-GRADE BEACH -0- SO0 ENGINEERING,.' INSPECTION AND CONTINGENCIES 875 125 - - I ' 'TOTAL bI.095 $1305 -. .,. TOTAL COST $2400 ' ' TIME NEEDED 1'F DONE BY PRIVATE CONTRACTOR IS 385 WEEKS FOR BIDS, AWARD, CONTRACT ADMINISTRATION, AND WORK. TIME NEEDED IF DONE BY CITY CREWS IS WEEK FOR WORK,' .. I I '> i i SAME AS P~AN A WITH ADDITION OF RAILROAD TIES AS WHEEL STOPS. II I1 ! ! . . . . . , . . . . i ! CITY'S SHARE -5's SH~.RE CLEAN OFF LOT $220 $38C GRADE BEACH -0- 800 RAILROAD.TIES 1740 2580 ENGINEERING, INSPECTION . ,605 395 TOTAL $2565 $4155 .. .. . . AND CONTINGENCIES - - TOTAL COST $6720 TIME NEEDED IF DONE BY PRIVATE CONTRACTOR IS 8.0 WEEKS FOR ADVERTISEMENT, AWARD, CONTRACT ADMINISTRATION, AND WORK, TIME NEEDED IF DONE BY CITY CREWS is 1.'0 WEEK FCR WORK, .. ! . .4 PIAN I: SAME AS PUN A. WITH ADDITION OF CONCRETE WHEEL STOPS. I' 'I CLEAN OFF LOT GRADE BEKH CONCRETE WHEEL STOPS ENGINEERING, INSPECTION AND CONTINGENCIES TOTAL TOTAL COST CITY'S SHARE STATF'S SHAE $220 $380 -0- 800 1430 2170 2% 3 $2400 $3700 $6100 TIME NEEDED FOR PRIVATE CONTRACTOR IS '8,0 WEEKS FOR ADVERTISEMENT, AWARD, CONTRACT ADMINISTRATION, AND WORK, TIME NEEDED BY CITY CREWS IS LO WEEK FOR WORK, . 3 h elAN: ELIMIN IATE EXISTING A,C, BERM BETWEEN BIKE LANES AND PARKING LOT; GRADE BEACH TO HEIGHT OF PARKING LOT; CLEAN OFF THE LOTI AMI LET PEOPLE PARK AS THEY WILL, CITY'S SHAFE STATF'S SHARE CLEAN OFF LOT $220 $380 GRADE BEACH -0- 800 A.C. BERM REMOVAL 1.860 3210 ENGINEERING, INSPECTION ,, AND CONTINGENCIES &LlJ M TOTAL $2720 $4850 TCTAL COST $7570 TIME NEEDED FOR PRIVATE CONTRACTOR IS 8.0 WEEKS FOR ADVERTISEHENTI AWARD, CONTRACT ADMINISTRATIONJ AND WORK, TIME NEEDED BY CITY CREWS IS 1.0 WEEK FOR WORK, . .. . PI'AN E: SAME AS PLAN D WITH ADDITION OF RAILROAD TIES AS WHEEL STOPS. nn . .. .. . . .. .. . .. .. BATE'S SHARE CLEAN OFF LOT $220 $380 ERADE BEACH -0- 800 .. A.C, BERM REMOVAL 1860 3210 PAILROAD TIES . i740 2550 ENGINEERING, INSPECTION AND CONTINGENCIES m 1;IQ TOTAL $41.90 $7700 TOTAL COST TI.ME NEEDED FOR PRIVATE CONTRACTOR IS AWARD, CONTRACT ADMINISTRATION, AND WORK, ., TIME NEEDED BY CITY CREWS Is l;O WEEK $11,890 8,o WEEKS FOR ADVERTISEMENT, FOR WORK. . .. . 5 ,. . v) OW z- aI- p-. N 2 . .. :i i j ! i 1 .~ .. I-2 J- 00 v)o ov I- WUY V .W ZW -W Wl- YZ " I- 't;; I- -a m ao v, cc av ?& n - .n LnYY UY CVWW d=z UIWW Y, 00 mrl " .* . v) YY oww ow w WI Y, mo " .. 5wa .. 5 va oev >t >-I- u a- t.,~ b n V v) W i . . .. .. 2. .. .. . . .. . -. .. , ... .. V I ? , ... _. i i" s '? i 4 .. > i . BAS I c COSTS : (NO WHEEL STOPS, CLEAN AND AND GRADE, PLUS ENGINEERING COSTS AND CONTINGENCIES) ADDITIVES: WHEEL STOPS: RAILROAD TIES ' CONCRETE REMOVE A, C. BERM n CONTFACTOR $4300 ' $3600 $3600 $3200 $5070 $4400 RECOMFIEND : AUTHORIZE CITY TO CLEAN AND GRADE PARKING LOT AND INSTALL CONCRETE WHEEL STOPS. TOTAL 'COST: m STATE COST (62%): $3343 CITY COST (35%) : $2B2 , 8 75% REIMBURSE- MENT CITY COST : - lIEcl CLEAN AND GRADE USIC COST BRFAKDOWN CONTWCTOR $1400 WHEEL STOPS: .RAILROAD TIES CONCRETE. ~ ' ' . . A,C, BERI~ REMOVAL ENGINEERING COSTS AND CONTINGENCIES .. , ... COST SPLIT: STATE 62% ., CITY 38% ..'A% ~F:E.M,'A,'. REIMBURSEMENT $4320 $3690 $5070 $1000 €IIY $1200 $3800 $3200 $4400 $1000