RECOMMENDED ACTION:
That Council consider adopting Resolution No. 7a// in order to clarify Council intentions relative to future improvement of
TAMARACK AVENUE between Adams and Skyline.
ITEM EXPLANATION:
At Council meeting April 19, 1983 a motion was adopted to prepare a resolution declaring intention to designate Tamarack as a 60'
collector street between Adams and Skyline. The attached resolu- tion accomplishes that purpose.
If the resolution is adopted, a public hearing will be scheduled for Planning Commission and Council consideration. The action contemplated will require amendment to the Circulation Element of the General Plan.
Supporting staff reports will be presented at the public hearing.
FISCAL IMPACT:
Administrative costs are nominal to prepare the matter for public hearing. substantial savings will be realized due to the lower cost of a
60' collector street compared to an 84' secondary arterial.
If the Circulation Element is revised as indicated,
EXHIBITS:
1. Resolution No. 72rt 2. April 20, 1983 memo from the Mayor.
3. April 19, 1983 memo from the City Engineer.
4. April 1, 1983 memo from the City Manager.
I
.a ,'
1200 ELM AVENUE
CARLSBAD, CALIFORNIA 92008
Office of the Mayor
n
TELEPHONE: (714) 438-5561
April 20, 1983
TO THE CIRCULATION COMMITTEE
of
1,
2,
3.
4.
I have requested an agenda bill for the City Council meeting May 3 which would do three things:
State the Counci14s intention to leave Tamarack at 60'
right-of-way with 48' pavement width between Adams and Skyline.
Request the Circulation Committee to give due consideration
to this proposal.
Direct the City Engineer to complete constru ction plans
for the 1984 budgeted projects in conformance with this resolution.
Set the matter for public hearings before the Planning Commission at the earliest possible date to designate
this section of Tamarack a collector street and prepare an amendment to the CiEculation Element of the General Plan.
EXHIBIT 2
APRIL 19, 1983
TO : MAYOR MARY CASLER
FROM: City Engineer
YOUR NOTE ASKING:
a. Who will pay for improvements on Tamarack; and
b. why the delay from Septem*ber to June on setting up the circulation committee.
Concerning the first item, the CIP, project 83-18, appropriated $347,681 of P.F.F. money to design and construct the improvements
on Tamarack consisting of a Q8-foot street in a 60-foot right of way from Adams to Highland.
This does not take into account the obligations of certain pro-
perty owners to finance a portion of the improvements. Those obligated are:
Vera Devaney and Janet Nelson August0 and Margaret Gorgueiro
Harry Haubert
Ruth Allen
Jack Estes ..... "*... -
Although the agreements signed in late 1980 and early 1981 set out estimated amounts, the exact figure has not been calculated as of this moment.
Another facet of this project concerns excess city lands created
by establishing a 60-foot right of way, Since the right of way
varies from 68 to 72 feet and the project is aligned on the north
right of way lines, excess land of from 8 to 12 feet will occur on the south side which in turn will revert to the abutting property owner, if vacated.
In response to item b, the best answer is that the appointment of a committee was under consideration for a long time. The subject was first introduced at Council on November 16, 1982 and the final
appointment was made on January 4, 1983. A written evaluation of the Willdan Report was made by Richard Allen in October 1982,
about a month after its receipt, which then served as a basis of intra-staff discussion.
ROY KACXLEY
RLK:mmt
c: City Manager Assistant City Manager/Developmental Services
EXHIBIT 3
..
..
APRIL 1, 1983
TO: CITY COUNCIL
FROM: City Manager ..
0
.. .TAMARACK AVEF
This memo is to clarify the status of Tamarack in regard to widening: - 2..
HISTORY:
: ,1965 -
..
.. . ,. .. ..: , . ..
..
1975 -
1976 -
1981 -
1981 -
1983 -
r
City Circulation Plan shows: Tamarack from L Carlsbad Boulevard to 1-5 as major street - 102'
right-of-way, Tamarack from 1-5 to Highland as a major collector - 84' right-of-way, 64' pave-
ment and as a residential collector - 60-68' right-of-way, 48' pavement from Highland to
El Camino Real.
Circulation Element shows: Tamarack from Carlsbad Boulevard to 1-5 as major - 102' street. Tamarack
from 1-5 to Elm as secondary - 84' road, 64' pave-
merit a
Council accepted recommendations of consultant to reduce right-of-way between Carlsbad Boulevard and Highland from 84' to 80'.
.- - ...
Council directed City Engineer to design Tamarack from Carlsbad Boulevard to Highland as 80' right-
of-way.
WILDAN study recommended all of Tamarack as secondary - 84' right-of-way. This reduces width of street between Carlsbad Boulevard and 1-5 from
102' to 84'.
Design-was completed in August 1982.
Council appointed Circulation Committee to review
Circulation Plan Element and recommend changes.
',
' EXHIBIT 4
.. .
I'
..
I TAMARACK
'Page 2
1983 e
AVENUE
PROJECTS :
There are cufrently three projects on Tamarack: a..
. 3) Tract 76-15 - subdivider is contracting to build 52'
pavement in 84' right-of-way between Palisades and Skyline, Tamarack is complete between El Camino Real
and Palisades as 60' pavement in 84' right-of-way, .. - . .-.
FRANK ALESHIRE ..
FA: de
cc: City Engineer
.,
..
* .
1) CIP project 3108A appropriates $140,000 to widen pavement
to 48' in existing 60'. right-of-way between Sunnyhill and -
Skyline.
CIP project 3108B appropriates $347,681 to widen pavement to 48' in existing 60' right-of-way between Adams and Highland.
.. .
2)
3
NOTE: The CIP projects listed above are on HOLD until the .- Circulation Committee finishes its work and Council takes final action. If the decision is to build 48'
pavement in existing 60' right-of-way, the Circulation Elementwillneed to be changed.
.-
!
C.
7
, ,’ A . ..
1
I
z
4
C
E
‘i
’€
s
IC
11
12
12
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO . 7211
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, DECLARING ITS IN-
TENTION THAT TAMARACK AVENUE FROM ADAMS TO
SKYLINE BE DEVELOPED AS A 48-FOOT PAVEMENT
WITHIN EXISTING 60-FOOT RIGHT-OF-WAY.
WHEREAS, TAMARACK AVENUE is designated a Secondary Arterial
(64 ft, of pavement within 84 ft. right-of-way) easterly of 1-5
on the Carlsbad Circulation Element; and
WHEREAS, residential subdivisions have been allowed to
develop along Tamarack with 48 ft. pavement within a 60-foot
right-of-way; and
WHEREAS, the 1984 Capital Improvement Program includes two
projects on Tamarack for construction; and
WHEREAS, a Circulation Committee is now studying the entire
city street system prior to recommending changes to the City
Council; and
WEIEPiEAS, a citizen committee has been formed to oppose the
widening of Tamarack to its general planned width; and
WHEREAS, the City Council deems it imperative that action
be taken now to deal with traffic concerns, and to protect
property values of residents along Tamarack, and to preserve the
residential character of the neighborhood and to eliminate the
uncertainty concerning the intentions of the City Council.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
3ity of Carlsbad that:
1. It is the intention of the City Council to designate
ramarack Avenue as a collector street with a 60-foot right-of-way
snd 48-foot pavement between Skyline and Adams.
.,l
"2
4
5
6
7
a
9
10
-3.1
. 12
13
14
15
16
57
18
19
20
21
22
23
24
25
26
.27
28
2. The Circulation Committee is directed to include this
proposal in its deliberations.
3, The City Engineer is directed to complete construction
plans for the 1984 budgeted projects in conformance with this
resolution.
4, The Planning Commission is directed to initiate public
hearings to <revise the Circulation Element in accordance with
this resolution. c
PASSED, APPROVED AND ADOPTED at a regular meeting of the
City Council of the City of Carlsbad held the 3rd day of W ,
1983, by the following vote, to wit:
AYES: CounCfi MelXIkrs Cash, IEwiS and Kulchin
NOES: Council r- chick and matt
ABSENT: Ncme
ATTEST :
..
YLcMJeL WIRY H. CSLER, Mayor
{ &A ALETHA L. RAU ENKRANZ,
3