Loading...
HomeMy WebLinkAbout1984-03-20; City Council; 7601-1; Carlsbad BL emergency maintenancen w > 0 [1= e a. ct z 0 F 0 a d .. 0 z 3 0 0 \B# 7601 3-20-84 IIITG. IEPT. U/M TITLE EMERGENCY MAINTENANCE - WEST SIDE OF CARLSBAD BOULEVARD BETWEEN WALNUT AND ACACIA RECOMMENDED ACTION: Approve Resolution No'. 7537 authorizing the transfer of funds from the contingency reserve to the street repair fund in the amount of $42,391.41 to cover costs which exceeded the original estimate. STATEMENT OF THE MATTER: The original cost of the bluff restoration project was estimated to be $64,500. The actual cost to do the work was $106,891.41 or $42,391.41 over the original estimate. over and above the original project was approved or performed. All work was approved prior to performance and no additional work FISCAL IMPACT: Funds are available in the contingency reserve (Fund 01-19-50-2499) in the amount of $261,623. $219,232. This action will reduce the contingency reserve to EXHIBITS: 1. Memorandum from U/M Director to City Manager of March 9, 1984. 2. Resolution No. 7537- March 9, 1984 TO: CITY MANAGER FROM: Director, Utilities & Maintenance COST OVERRUN; BLUFF RESTORATION The Council approved an agreement with Bear Excavating at its meeting of January 3, 1984 to perform emergency work based on time and materials schedules. The specific project approved at that time was for bluff re- storation at Acacia and at Walnut plus some minor storm drain work between these two points. existing conditions, was made for about $60,000 and funds in the amount of $64,500 were transferred from contingency reserves to cover this work. An estimate, based only on visual observation of The work required was much greater than originally estimated and the final billing is in the amount of $106,891.41 or $42,391.41 over original estimates. No work was performed without approval and all work and materials billed was performed. fashion. The original estimate, based on field inspection, was admittedly too low. matter. The work was done in a workmanlike manner and in a timely Attached is a cover letter from Bear Excavating concerning the It is recommended, therefore, that the additional funds be transferred from the contingency reserve in order for full payment to be made. RWG: jlc attachment 2 Serving San Diego County 2018 Palsero Ave. - Escondido, CA 92025 - (619) 743-2229 License # 384909 February 24, 1984 Mr. Roger Greer City of Carlsbad Dear Roger Enclosed herein is my billing for the work performed on the Carlsbad Blvd. job P.O.# 011398. Acknowledging that this exceeds the estimate that I gave you before starting work, without any drawings from which to prepare an estimate, I would like to give you an explanation of the overrun. First, it was not possible to just replace the material that had ttblown outft as the sides were vertical and it was necessary to lay them back to 11/2 to 1. This considerably increaed the amount of fill to be purchased and placed. Next, when we installed the pipe drain and began placing the concrete to hold the installation form, it became appar- Serving San Diego County 2018 Palsero Ave. - Escondido, CA 92025 - (619) 743-2229 License # 384909 ent that a greatly increased amount of concrete would be required to assure a proper job. Consequently, it is estim- ated that atleast four times the amount of concrete originally estimated was required. When it came time to place the rip rap, it was soon apparent that adequate pro- tection could only be assured if the cut-off trench was deepened and careful- ly filled. Then, the rip rap was car- ried up to a higher elevation than had been estimated to provide adequate pro- t ec t ion. It is acknowledged that the amount of the bill exceeds the estimate given before work started but it is believed that no effort or money was wasted to give a satisfactory job. Thankyou. 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 20 - A RE RESOLUTION NO. 7537 UTION OF THE CITY COUNCIL OF THE CITY CARLSBAD AUTHORIZING THE TRANSFER OF FUNDS FROM THE CONTINGENCY RESERVE TO THE STREET MAINTENANCE FUND WHEREAS, the City Council authorized work to be done to restore and repair the beach bluffs at Acacia and at Walnut Street; and WHEREAS, the cost of these repairs was $106,891.41 which was $42,391.41 above the original estimate; and WHEREAS funds are available in Fund 01-19-50-2499, the Contingency Reserve ; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad as follows: 1. The transfer of $42,391.41 from Fund 01-19-50-2499 to Fund 01-51-10-2410, Street Repairs, is authorized. PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council held on the 20th day of March , 1984, by the following vote, to wit: AYES : Council Members Casler, Lewis, Kulchin and Chick NOES : None ABSENT: Council Member Prescott ABSTAIN : MARY H. CASdR, Mayor ATTEST: ALETHA L. RAUTENKRANZ, City Clerk (SEAL) 3