TITLE: APPROVING PLANS & SPECIFICATIONS FOR PHASE I OF CARLSBAD BOULEVARD IMPROVEMENTS
AND DECLARING THE INTENTION TO CONSTRUCT PHASE I1 - CONTRACT NO. 3098
DEPT. HD.L
CITY MGR.-
CITY ATTYm
RECOMMENDED ACTION:
Adopt Resolution No. approving plans and specifications, and authorizing the City Clerk to Advertise for Bids for the construction of Carlsbad Boulevard Bridge and Street Improvements from Tamarack Avenue to .25 mile south.
Adopt Resolution No. 7
Road, and authorizing the city mgineer to continue the action to obtain the necessary agreements and permits. ITEM EXPLANATION:
Council, at its June 5 meeting, determined that improvment of Carlsbad Boulevard from Tamarack Avenue to Cannon Road and construction of Agua Hedionda Bridge should be separated into two phases: Phase I: A. Construct improvements on Carlsbad Boulevard from Tamarack
Phase 11: Construct the remaining improvments on Carlsbad Boulevard from
Council has indicated that more study has to be done for controlling of erosion on
the south of the Bridge before Phase I1 starts.
declaring the intention to construct remaining
improvements on Carls a a oulevard from .25 mile south of Tamarack Avenue to Cannon
Avenue to .25 mile south.
B. Construct Agua Hedionda Bridge.
.25 mile south of Tamarack Avenue to Cannon Road.
CalTrans has agreed on the project being phased into two parts, if Council passes a
resolution stating that Phase I1 will be constructed within a reasonable time after
the beach erosion project has been evaluated.
FISCAL IMPACT:
The Engineer's Estimate for the construction (Phase I) is $2.7 million. The inspection and administration costs are estimated at $208,000. amount of $2,908,000 were appropriated in the 1984-85 Capital Improvement Budget and will be available as follows:
Total funds in the
1. Federal Aid Urban Funds (FAU) $ 139,000
2. Highway Bridge Replacement and Rehabilitation Fund (HBRR) 2,118,000 3. San Diego Gas & Electric (Developer Contribution) 450,000
TOTAL $2,908,000
4. City of Carlsbad (Gas Tax Fund) 201,000
EXH I B I TS :
1. Location Map
2. Resolution No. 57~~7 approving plans and specifications, and authorizing the
City Clerk to A ver ise for Bids for the construction of Carlsbad Boulevard Bridge and Street Improvements from Tamarack Avenue to .25 mile south.
declaring the intention to construct remaining
improvements Boulevard from .25 mile south of Tamarack Avenue to 3. Resolution No.
Cannon Road, and authorizing the City Engineer to continue the action to obtain
the necessary agreemnts and permits.
R +'
LOCATION MAP
2.
t.
1
2
3
4
5
6
7
8
9
10
11
12
12
14
15
1C
17
1€
1s
2c
21
22
2:
24
2E
26
27
2€
RESOLUTION NO. 7769
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS; AUTHORIZING THE CITY CLERK TO INVITE BIDS, FOR THE CONSTRUCTION OF CARLSBAD BOULEVARD BRIDGE AND IMPROVEMENT OF CARLSBAD BOULEVARD FROM TAMARACK AVENUE TO .25 MILE SOUTH - CONTRACT NO. 3098.
WHEREAS, the City Council of the City of Carlsbad has determined it is
iecessary and in the public interest to reconstruct the Carlsbad Boulevard
lridge and Carlsbad Boulevard from Tamarack Avenue to .25 mile south; and
WHEREAS, plans and specifications for the furnishing of all labor, ,
iaterial, tools, equipment, transportation, and other expenses necessary or
incidental for said project, Contract No. 3098, have been prepared and are on
‘ile in the Engineering Department of the City of Carlsbad and are incorporated
by reference herei n ;
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Carlsbad
1s follows:
1. The above recitations are true and correct.
2. The plans and specifications as presented are hereby approved.
3. The City Clerk of the City of Carlsbad is hereby authorized and
jirected to proceed to publish, in accordance with law, Notice to Contractors
inviting bids for the reconstruction of the Carlsbad Boulevard Bridge and
improve Carlsbad Boulevard from Tamarack Avenue to .25 mile south in accordance
vith the plans and specifications hereinabove referred to.
Ill
‘I1
Ill
a
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
20
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council of
he City of Carlsbad held the 2nd day of October , 1984, by the
ollowing vote, to wit:
AYES: Council *rs Casler, mis, Chick and Prescott
NOES: None
ABSENT: Council Menber Kulchin
MARY H. GFSLER, Mayor Y-
rTTEST:
,SEAL)
-.
P
*.
1
2
3
4
5
6
7
a
9
10
11
12
13
14
15
16
17
1f
1s
2c
21
22
22
24
25
26
27
2f
RESOLUTION NO. 7770
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, DECLARING ITS INTENT TO RECONSTRUCT CARLSBAD BOULEVARD TO FOUR LANES AS SOON AS A SUITABLE SHORE
NO. 3098.
PROTECTION SYSTEM CAN BE INCLUDED IN THE PROJECT - CONTRACT
WHEREAS, the City Council of the City of Carlsbad, California, has
etermined it is necessary and in the public interest to reconstruct the
arlsbad Boulevard Bridge and Carlsbad Boulevard from Tamarack Avenue to Cannon
oad; and
WHEREAS, reconstruction of the bridge must go forward or the City will lose
he funds for its reconstruction; and
WHEREAS, recent storms have shown the area where Carlsbad Boulevard is to
e widened to be subject to storm damage; and
WHEREAS, it is the City's intent to participate in experimental shore
rotection systems in conjunction with State agencies as part of the roadway
roject; and
WHEREAS, upon the determination of a suitable storm damage shore protection
ystem, the roadway project will proceed; and
WHEREAS, it is the City's intent to address the environmental issues raised
n the Federal Environmental Assessment Report and to meet Federal Highway
'tandards;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad
IS follows:
1. The above recitations are true and correct.
2. The City will proceed with the reconstruction of the Carlsbad
loulevard Bridge and roadway project from Tamarack Avenue to .25 miles south of
'amarack Avenue as Phase I of this project.
3. The City will construct Carlsbad Boulevard from .25 miles south of
-amarack Avenue to Cannon Road as Phase I1 of this project as soon as a suitable
-.
1
2
3
4
5
6
7
0
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
..-
shore protection system can be incorporated into the project.
4. The City Engineer is authorized to continue the action to obtain
the necessary agreements and permits.
PASSED, APPROVED AND ADOPTED at a regular meeting of the City Council
of the City of Carlsbad held the 2nd day of October , 1984, by
the following vote, to wit:
-
AYES:
NOES:
Council Pkmkrs Casler, Lewis, ai& and Prescott
ABSENT: ~uncil lkrtbsr KdChh
ATTEST:
RANZ, City Clerk 1
(SEAL)
6
F