HomeMy WebLinkAbout1984-12-18; City Council; 7999; AN APPEAL OF A PLANNING COMMISSION DECISION DENYING A SITE DEVELOPMENT PLANAN APPEAL OF A PLANNING COMMISSION
$8 'IN= TU= DECISION DENYING A s1rp-g DEVELOPMENT
MTG. 12/18/84 PLAN; LOCATED ON THE EAST SIDE OF EL CAMINO
REAL, NORTH OF THE CABLEVISION BUILDING.
SDP 84-5 - CARLSBAD GATEWAY CENTER '' c, DEPT. PLN rla
DEPT,
CITY A
CITY I\r E $43
0 .4
-4 8
WG
cc,
c,c kE 0
$8 CIU
q c kh 2G
kc, 3; -n
0 rlk rda
dE 0- .g 2 a,
"8
c2
OOu
da w -4
m $8 8c
(d .$ arn arn q
$El8
840 * fp:
828
rl q -ri .
-=r c3 I 03 4 I c\1 rl 2 0 5 4
1 0 z 3 00
RECOMMENDED ACTION:
It is recommended that the City Council UPHOLD the Planning
Cornmission's decision to DENY this appeal and to direct the ( Attorney to prepare documents DENYING SDP 84-5.
ITEM EXPLANATION
This item is an appeal of a Planning Commission decision to ( a site development plan for a mixed-use industrial/office co
on a 16.5 acre site located as described above. The attache
staff report describes the project in detail.
The Planning Commission denied the project based on one unresolved issue. The applicant is proposing a right turn i
out driveway access onto El Camino Real. This driveway does
meet the city's intersection spacing stanldards.
The Planning Commission indicated they could not support a driveway onto El Camino Real for a number of reasons. First property would have adequate access from Palmer Avenue which
adjacent to the property on the east side. Eventually, Palm Avenue will connect to the north to College Avenue through t
O'Hara property providing two ways of access to this propert
Second, the Planning Commission believed a driveway at this
location was not safe from a traffic point of view. Also, t
acceleration lanes that would be needed for this driveway wc overlap the deceleration lane that is being provided for a I turn into the O'Hara project to the north.
3ased on these findings, the Planning Commission is recommer denial of this project.
ENVIRONMENTAL REVIEW
If the City Council approves this project, the Council woulc have to approve a negative declaration. A copy of the negal declaration has been attached to the staff report.
FISCAL IMPACT
If the project is approved, the applicant would be required provide all needed public facilities to serve the project.
Also, the applicant has agreed to pay a public facilities f
offset the cost of providing other public services to the project.
EXHIBITS
1. Location Map
2. PC Resolution No. 2364 3. Staff Report, dated November 14, 1984 w/attachments
4. Staff Report, dated October 10, 1984 w/attachments
L
f \ I ROCATION MAP
OMAR TECH.
BECKMAN INST.
RESEARCH ----I-
BUSINESS PARK
CARLSAD GATEWAY CENTER L SDP
I I
1
2
3
4-
5
6
7
8
9
10
I1
12
13
14
15
16
17
18
1911
0 @
PLANNING COMMISSION RESOLUTION NO. 2364
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, DENYING A SITE
CONSTRUCTION OF A MIXED-USE INDUSTRIAL OFFICE
COMPLEX 16.5 ACRES OF PROPERTY GENERALLY
LOCATED ON THE EAST SIDE OF EL CAMINO REAL,
NORTH OF THE CABLEVISION BUILDING.
APPLICANT: CARLSBAD GATEWAY CENTER
CASE NO: SDP 84-5
DEVELOPMENT PLAN NO. 84-5, TO ALLOW
WHEREAS, a verified application has been filed wi
City of Carlsbad and referred to the Planning Commission; a
WHEREAS, said verified application constitutes a r
as provided by Title 21 of the Carlsbad Municipal Code; and
WHEREAS, pursuant to the provisions of the Municic
the Planning Commission did, on the 14th day of November, 1
, consider said request on property described as:
A portion of Parcels 1 and 2, in the City of Carls
County of San Diego, State of California as shown 10060 of Parcel Maps filed in the Office of the Cc Recorder of San Diego County, May 23, 1980;
WHEREAS, at said hearing, upon hearing and considc
testimony and arguments, if any, of all persons desiring tc
heard, said Commission considered all factors relating to !
21
22
23
24
25
26
27
28
NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plan I
Commission of the City of Carlsbad as follows:
(A) That the foregoing recitations are true and correct.
(B) That based on the evidence presented at the public he
the Commission DENIES SDP 84-5, based on the followir findings: ! ////
////
////
1 I
1
2
3
4
5
6
7
a
9
10
11
12
I.3
14
15
16
17
e
Findings
1) The project is inconsistent with the circulation eleme
the general plan in that the proposed direct access on
Camino Real violates City standards and will result ir
conflicts.
PASSED, APPROVED AND ADOPTED at a regular meeting
Planning Commission of the City of Carlsbad, California, he
the 14th day of November, 1984, by the following vote, to \
Chairman Rombotis, Commissioners Marcus,
Schlehuber, L'Heureux and McFadden. AYES:
NOES : Commissioners Farrow and Smith.
ABSENT : None.
ABSTAIN: None.
I
~
1 \
fLhHAEL JL\HJjizMzER
ATTEST :
/\ i&'&&$.J& . 'A 4 \d
LAND USE PLANNING MANAGER
20
21
22
23
24
25
26
27
28
I
I I
i
I I I
PC RES0 NO. 2364 -2-
a 0
Discussion
Of the identified issues, the only one necessitating a
substantial redesign of the project is the deletion of direct E;
Camino Real access. The developer has indicated a reluctance tc comply with this directive, as he feels such access is absolutely necessary for the viability gf the project,
With respect to issue 2, the developer has met with "downstreai
property owners in an effort to achieve a drainage sche
satisfactory to all. It appears that this has been accomplishe
Exhibit "Z", attached, delineates this drainage plan. Proper
owner signatures, indicating their concurrence, are a1
attached . Engineering staff concludes that this plan
acceptable if the entire drainage system is enclosed in ar
underground storm drain. There is concern that the systen
proposed may cause extensive erosion as runoff descends thf
natural slope to Aqua Hedionda Creek.
The project architecture, as proposed, will not appear bulky o
unattractive from the Sunny Creek residential area. Structure facing this direction consist of single-story offices. Nc loading doors or other unsiyhtly features would be visible.
The developer has indicated that he will not oppose an]
practical landscape conditions or noise-generating use restrictions the Commission may wish to place on the project.
In summary, staff concludes that the developer has not complj
with the El Camino Real access restriction identified by t Commission as a problem with the project. As a result, st: recommends denial.
Attachments
1. Planning Commission Resolution No. 2364
2. Loctation Flap 3. Site Plan
4. Exhibit "Z", dated November 9, 1984, with property own€
agreements.
PJK:ad I 1/7/a 4
-2-
- 2# G! .r VI Fa, or ilrl SCJ rt : If ,I 1-11 . f na 1 Zk F 8' t L & i- m- wa L z z ,E i-3 1 rL- i a+ j wo L nLc a
no it I OK vr m-, A, I til i,s,,tr It,! fr f hfl "iflit'[
&iL %:
5522 8":; =:::: %&u-- aEdzg !CZzZ! 0: i c >,fz:! o:": : 5: n ".
n n <
2
U
" n X
7 -...
,-
'. \
\\ +' E>(WW': 2
pok 9, l4$+
I
e
1% -1 [J r' ''-"~i\_illf 0
5 .I >, !cy -'I p, ; I_ \/l$i]LL$ 44 #..q 1 1 'P iL .( .-. ** 1 8 i
CONSULTING CIVIL ENGINEERS AND LAND SURVEYOR U November 5,1984
Mrs. Dorothy Ebright
Carlsbad, CA 92008
Mr. Robert Deflorm
2421 Dunstan
Oceanside, CA 92054
Mr. Ralph Wrisley
690 Elm Avenue Carlsbad, CA 92008
Dear Affected Property Owners:
SUBJECT:
5855 Sunny Creek Road
DRAINAGE FROM GATEWAY CENTER (DAVIS DEVELOPMENTS) ONTO YOUR RESPECTIVE PROPERTIES; OUR JOB NO. 84136
At our Tuesday, October 30 meeting in Carlsbad we discussed at length the
different drainage alternatives available to carry runoff from the Gateway
Center development (and from properties to the south) northerly across your properties to Agua Hedionda Creek. The specific concerns expressed by you downstream owners were: 1) your concern about surface runoff being discharged uncontrolled over the north facing slopes; and 2) possible site erosion due to concentration of flows onto unprotected and undeveloped property, causing erosion and subsequent siltation downstream.
I believe we mutually decided upon our modified Alternative lB, which carries the unretarded lOOyear developed peak runoff from the sites to the south (including all the flows from the Gateway Center site) into an underground storm
drain approximately 350 feet northerly across the Deeorm site to the northerly
DeLorm property line, runs another 5 120 feet northerly underground across the
Wrisley site, discharges into a natural rock swale extending down the Wrisley
slope to the common Wrisley/Ebright property line some + 80 feet easterly of
their west property line, is again picked up in an underground storm drain
extending northerly approximately 140 feet to discharge into Agua Hedionda
Creek.
We also agreed that this system would be sized to pick up the developed flows from the %tppeP portions of the Deeorm and Wrisley properties and that a small berm and ditch would be built along the top of the north facing slopes on the
DeLorm property to intercept any sheet flow which has in the past discharged over the slope. The
affected downstream property owners will bear no costs for these improvements. Enclosed is a plan showing this proposed construction.
Corporate Office 17782 Sky Park Blvd. Inine, California 92714 7141281.2222
inland Empire Office 0 1630 E. Francis St., Ste. B Ontario, California 91761 7141947-044
* San Oiego County Office 0 5375 Avenida Encinas, Ste. C Carlsbad, California 92008 6191431
0
i e
I
IC
.F
0
*\;J. i .
Affected Property Owners
November 3, 1984
Page 2
Our consensus was that this would remain a private drain, with each downstream
property owner having the right to relocate it across their properties as long as
it did not adversely affect the integrity of the drainage system. We, as engineers for Davis Developments, will prepare all the necessary plans and documents for the construction of this facility and will submit them to each of you for your final review and approval (after our project has been approved by the Planning Commission.) In the meantime, we need to show the City that we have resolved the drainage discharge to the satisfaction of those affected by it.
If you are in agreement with our proposed solution (again subject to your final approval of our plans) and agree to accept the concentrated discharge onto your property in the manner delineated above and on the enclosed plan, please sign a
copy of this letter and send it to Fred Walters - before November LO, 1984.
If you have any questions, please contact me or Terry Lutz of our office.
Our Job No. 84 136
' *a*
rr ls wpm=& w &f. @e M = WSS 0d-M PkWSfWJ krCL &re* CNaraH AN0 a5sp -Luv- 0 '7t, hrndJTM0 w G&+gl~
q;.Jg&&$
Ric ard R. Schmid
Corporate Off ice j lb
. Enclosures: Copy of Plan
Copy of letter to be returned
Addressed envelope to Fred Walters cc: Ms. June Applegate Mr. Don Schucard
Mr. Fred Walters
Mr. Walter Brown
TO THE CITY OF CARLSBAD:
I am the legal owner of Assessors Parcel No. in the City of Carlsbad northeasterly of El Camino Real, and agree to accept the discharge o concentrated drainage runoff from the Gateway Center in the manner describe
to me in the above letter from Williamson and Schmid, subject to my fina approval of their plans.
207- 040- 14
SIGNED m&rd&L- ffdm
Robert Deldorm
SIGNED - Dorothy Ebright
Ralph Wrisley SIGNED
0
t ' i71
C . ., ..., J d I-
0 \/lj';1 i ! 7, 1 ; c.1' J - \: - ' --q- -+#!\y ' [I ,-\ 1 ?j 7 1 \{ i d ,Id ? 1 4.. c-
CONSULTING CIVIL ENGINEERS AND LAND SURVEYOR *E November 5, 1984
Mrs. Dorothy Ebright 5855 Sunny Creek Road
Carlsbad, CA 92008
Mr. Robert DeLorm
2421 Dunstan
Oceanside, CA 92054
Mr. Ralph Wrisley 690 Elm Avenue
Carlsbad, CA 92008
Dear Affected Property Owners:
SUBJECT: DRAINAGE FROM GATEWAY CENTER (DAVIS DEVELOPMENTS) ONTO YOUR RESPECTIVE PROPERTIES; OUR JOB NO. 84136
At our Tuesday, October 30 meeting in Carlsbad we discussed at length the
different drainage alternatives available to carry runoff from the Gateway
Center development (and from properties to the south) northerly across your properties to Agua Hedionda Creek. The specific concerns expressed by you
downstream owners were: I) your concern about surface runoff being discharged uncontrolled over the north facing slopes; and 2) possible site erosion due ta
erosion and subsequent siltation downstream.
I believe we mutually decided upon our modified Alternative 18, which Carrie:
the unretarded lOOyear developed peak runoff from the sites to the soutk
(including all the flows from the Gateway Center site) into an underground storm
drain apprGmately 350 feet northerly across the DeLorm site to the northerlj
DeLorm property line, runs' another t 120 feet northerly underground across the
Wrisley site, discharges into a natural rock swale extending down the Wrisle)
slope to the common Wrisley/Ebright property line some 2 80 feet easterly o their west property line, is again picked up in an underground storm drair extending northerly approximately 140 feet to discharge into Agua Hediond: Creek.
We also agreed that this system would be sized to pick up the developed flow
from the '*uppertt portions of the DeLorm and Wrisley properties and that a smal berm and ditch would be built along the top of the north facing slopes on thc
DeLorm property to intercept any sheet flow which has in the past discharge1 over the slope. Enclosed is a plan showing this proposed construction. Thc
concentration of flows onto unprotected and undeveloped property, causing
affected downstream property owners will bear no costs for these improvements
Corporate Offlce 17782 Sky Park Blvd. Imine, California 92714 71412812222
Inland Empire Office 1630 E. Francis St., Ste. B Ontario, Californta 91761 7141947-04
San Diego County Office 5375 Avenida Encinas, Ste. C Carlsbad, Californta 92008 619143
-
0 .- .. I ' .- .I -:! ; 0 'A X-'- ' . ,'
Affected Propcrty Owners Our Job No. 84136 November 5,1984 Page 2
' .B
Our consensus was that this would remain a private drain, with each downstream
property owner having the right to relocate it across their properties as long as it did not adversely affect the integrity of the drainage system. We, as engineers for Davis Developments, will prepare all the necessary plans and documents for the construction of this facility and will submit them to each of you for your final review and approval (after our project has been approved by
the Planning Commission.) In the meantime, we need to show the City that we have resolved the drainage discharge to the satisfaction of those affected by it. If you are in agreement with our proposed solution (again subject to your final
approval of our plans) and agree to accept the concentrated discharge onto your property in the manner delineated above and on the enclosed plan, please sign a copy of this letter and send it to Fred Walters before November 10, 1984.
If you have any questions, please contact me or Terry Lutz of our office.
Corporate Off ice jlb
Enclosures: Copy of Plan
Copy of letter to be returned
Addressed envelope to Fred Walters cc: Ms. June Applegate
Mr. Don Schucard Mr. Fred Walters
Mr. Walter Brown
TO THE CITY OF CARLSBAD:
I am the legal owner of Assessors Parcel No.Lwlin the City of Carlsbad,
northeasterly of El Camino Real, and agree to accept the discharge of concentrated drainage runoff from the Gateway Center in the manner described
approval of their plans. to me in the above letter from Williamson and Schmid, subject to my final
SIGNED n
Robert DeKorm
SIGNED
SIGNED
Ralph Wrisley
@
; .\ r '4 _- e
\3 f .', 32 1 - 1, --- \, a1 !-{A$';#- 1 1-
\$;:L: i J ,,,q 14 , "; " x..-. "
'J f- d*d , 'J ,%.. i. - 4 3
CONSULTING CIVIL ENGINEERS AND LAND SURVEYOF R November 5? 1984
Mrs. Dorothy Ebright
5855 Sunny Creek Road Carlsbad, CA 92008
Mr. Robert DeLorm
2421 Dunstan Oceanside, CA 92054
Mr. Ralph Wrisley
690 Elm Avenue
Carlsbad, CA 92008
Dear Affected Property Owners:
SUBJECT: DRAINAGE FROM GATEWAY CENTER (DAVIS DEVELOPMENTS) ONTO YOUR RESPECTIVE PROPERTIES; OUR JOB NO. 84136
At our Tuesday, October 30 meeting in Carlsbad we discussed at length the
different drainage alternatives available to carry runoff from the Gateway
Center development (and from properties to the south) northerly across your
properties to Agua Hedionda Creek. The specific concerns expressed by you
downstream owners were: 1) your concern about surface runoff being discharged
uncontrolled over the north facing slopes; and 2) possible site erosion due to
concentration of flows onto unprotected and undeveloped property, causing erosion and subsequent siltation downstream.
I believe we mutually decided upon our modified Alternative IB, which carries the unretarded lmear developed peak runoff from the sites to the south (including a the flows from the Gateway Center site) into an underground storm drain approximately 350 feet northerly across the DeLorm site to the northerly DeLorm property line, runs another + 120 feet northerly underground across the Wrisley site, discharges into a natural rock swale extending down the Wrisley slope to the common Wrisley/Ebright property line some + 80 feet easterly of their west property line, is again picked up in an underground storm drain extending northerly approximately 140 feet to discharge into Agua Hedionda Creek.
We also agreed that this system would be sized to pick up the developed flows
from the Ituppert* portions of the DeLorm and Wrisley properties and that a small berm and ditch would be built along the top of the north facing slopes on the DeLorm property to intercept any sheet flow which has in the past discharged over the slope. The
affected downstream property owners will bear no costs for these improvements.
Enclosed is a plan showing this proposed construction.
Corporate Office 17782 Sky Park Blvd. Itvine, California 92714 7141281.2222
Inland Empire Office 1630 E. Francis St., Ste. B Ontario, California 91761 71419474447
San Diego County Office 5375 Avenida Encinas, Ste. C Carlsbad, California 92008 6191438-
e
,I 1 \ -<
'd
' 1'1. I 0
I
Affected Property Owners
Out Job No. 841 36
November 5,1984 Page 2
Our consensus was that this would remain a private drain, with each downstrear property owner having the right to relocate it across their properties as long a
it did not adversely affect the integrity of the drainage system. We, a engineers for Davis Developments, will prepare all the necessary plans an documents for the construction of this facility and will submit them to each c
you for your final review and approval (after our project has been approved b
the Planning Commission.) In the meantime, we need to show the City that w have resolved the drainage discharge to the satisfaction of those affected by i If you are in agreement with our proposed solution (again subject to your fin; approval of our plans) and agree to accept the concentrated discharge onto yoc property in the manner delineated above and on the enclosed plan, please sign copy of this letter and send it to Fred Walters before November 10, 1984,,
If you have any questions, please contact me or Terry Lutt of our office. b$JF&kd[
Ric ard R, Schmid
Corporate Office
j Ib Enclosures: Copy of Plan Copy of letter to be returned Addressed envelope to Fred Walters cc: Ms. June Applegate Mr. Don Schucard
Mr. Fred Walters
Mr. Walter Brown
TO THE CITY OF CARLSBAD:
I am the legal owner of Assessors Parcel No. in the City of Carlsba
northeasterly of El Camino Real, and agree to accept the discharge I
concentrated drainage runoff from the Gateway Center in the manner describt
to me in the above letter from Williamson and Schmid, subject to my fin approval of their plans.
SIGNED
Robert DeLorm
SIGNED .~-
SIGNED
RaIpV Wrisley u
a
a Y 24, 1984
J r-- r-.- -- STAFF REPORT f-
\ L.d , ',
DATE : October 10, 1984
TO : Planning Commission
FROM: Land Use Planning Office
SUBJECT: SDP 84-5 - CARLSBAD GATEWAY CENTER - Request for
approval of a site development plan to allow
construction of a mixed-use industrial/office complex
on a 16.5 acre site on the east side of El Camino Rea
north of the Cablevision building.
I. RECOMMENDATION
It is recommended that the Planning Commission APPROVE the
Negative Declaration issued by the Land Use Planning Manager i
ADOPT Resolution No. 2364 APPROVING SDP 84-5 based on the
mndings and subject to the conditions contained therein.
11. PROJECT DESCRIPTION
The proposed project involves the development of a previously
graded 16.5 acre site into a mixed-use industrial/office complex. The site is located on the east side of El Camino Rt (between El Camino Real and Palmer Way), north of the Cablevision building.
The site slopes moderately down to the north. Surrounding
property to the north is vacant. The recently constructed
Palomar Tech Industrial Park exists across Palmer Way, to the east. The Faraday Business Park Industrial buildings are undc construction to the south, and Koll's Carlsbad Research Cente
located across El Camino Real to the west.
The site fronts on two public roadways, El Camino Real to the
west and Palmer Way to the east. frontage road for El Camino Real and will eventually provide link between Faraday Avenue and College Boulevard.
The project proposes one 2-story, 50,000 square foot office
building, one l-story 38,000 square foot limited commercial
building, and seven l-story multi-tenant industrial buildings
111. ANALY S IS
Planninq Issues
1) Is the proposed project consistent with the M-Q zone
Palmer Way functions as a
standards? Is it compatible with surrounding existing ar future uses?
e W
2) Does the project meet the "El Camino Real Corridor"
standards?
3) Is the project's circulation adequate and safe?
4) Are some limited commercial uses appropriate for the site?
Discussion
The subject property is zoned M-Q (industrial-qualified
overlay). Due to the extremely lenient requirements of the M-zone, the City has avoided utilizing this zone as much as
possible over the past several years. It contains no setback
other design criteria, or performance standards. The subject
Q-Overlay zoning does, however, require Planning Commission
review of the site plan.
As shown on Exhibits "A" and "B", the project incorporates an attractive entry statement (with landscape median and enriched
paving) for the El Camino Real access. The two-story office building along this frontage is set back from the roadway and will appear unique and attractive.
On-site parking spaces provided are well in excess of the numt
required by code. While the developer feels that this number
spaces is important to the success of the project, this aspect
results in a project that is generally dominated by asphalt
parking lots. Pedestrian circulation and overall aesthetics i
severely compromised due to this factor.
Since the property has frontage on El Camino Real, its
The project design meets these standards except for the setbac
requirement for parking areas, In the southwest corner of the
site, parking spaces encroach about 7 feet into the required 2
foot (completely landscaped) parking setback from El Camino RE
Through the modification of several on-site regular size space to compact size spaces, this area of the project can be
redesigned to comply with the standard. Approximately 17 spac must be eliminated, however, adjacent to a deceleration lane
along the El Camino Real frontage, to comply with this setbacl
requirement. The City Engineer has indicated that acceleratic
and deceleration lanes are necessary for the safety of motoris
travelling El Camino Real and has included a condition requiri their construction (as shown on Exhibit "Y"). These lanes woi
push the right-of-way line (and 25-foot landscape setback) in1
the project up to 12 feet and result in the elimination of
approximately 17 parking spaces. The developer opposes the
conditions requiring the lanes and the elimination of parking,
-2-
site is one of the few M-zoned properties remaining in the Cit
development is subject to the El Camino Real Corridor Standard
0 0
El Camino Real is a prime arterial in the City's circulation
system. As such, access to it is severely restricted. Acces:
encouraged along frontage roads such as Palmer Way. The City Engineer has indicated that his office could support a right-
in/right-out access to El Camino Real on this site on the
condition that acceleration and deceleration lanes are providc and that the two Palmer Way accesses are designed as wide,
attractive entry alternatives. Staff feels that, as conditio1
the resulting plan makes an adequate attempt at maximizing thc two Palmer Way entries and minimizins the El Camino Real entr!
while keeping the El Camino Real streetscape attractive and si Overall, on-site circulation is functional and adequate.
The attached resolution includes a condition that the developc
improve Palmer Way "to full-width industrial street standards from its existing northerly terminus to the northerly line of project". The developer disputes the need for this length of
roadway, and proposes to improve the roadway only up to the
northerly entrance to the subject project, and to bond for thc
remainder (to the northerly property line),, He feels the not1
portion will remain unused and will result in a maintenance
problem. Staff prefers its construction up-front because of
difficulty in calling the bond once the project is complete,
the fact that it is anticipated to be only a short time until link to College Boulevard is completed.
As shown on Exhibit "A", the developer is proposing that the
large 34,000 square foot building along El Camino Real (Build
€3) be permitted to consider limited commercial uses. Staff concerns about the visual impact of a commercial building, excessive traffic attracted to the site by commercial uses, a
the compatibility of such uses, may be alleviated by the adop
of a very restrictive list of allowable uses. Although the s is zoned M-Q, many issues allowed in the M-zone would not be
compatible and could be detrimental to the existing and futur
uses in this area. Staff could support the commercial uses listed on attached Exhibit "X" . Such user-types exclude norm
retail uses and allow only commercial businesses that would c
directly to persons or businesses in the surrounding planned
industrial area. Conditional uses could also be allowed as
provided in this exhibit. It is recommended that this exhibi
adopted as part of the approving resolution.
Staff concludes that this project meets the standards of the
zone, is of lesser quality design but aenerally compatible wi surrounding properties and, as conditioned, meets City requirements.
IV. ENVIRONMENTAL REVIEW
The Land Use Planning Manager has determined that this projec
will not have an adverse impact on the environment and, therefore, issued a Negative Declaration on September 18, 198
-3-
0 a
Attachments
1. Planning Commission Resolution No. 2364
2. Variance report from City Engineer 3. Exhibit "X", dated October 10, 1984 4. Exhibit "Y'' , dated October 10, 1984
5. Location Map
6. Background Data Sheet
7. Disclosure Form
8. Environmental Document
9. Letter from SANDAG, dated August 27, 1984
10. Exhibit "A", dated August 24, 1984, and "B" - "G", dated
July 24, 1984.
PJK: ad
9/25/84
-4-
1
2
3
4
6 51
7'
8
9
10
11
12
0 0
PLANNING COMMISSION RESOLUTION NO. 2364
A RESOLUTION OF THE PLANNING COMMISSION OF THE
CITY OF CARLSBAD, CALIFORNIA, APPROVING A SITE DEVELOPMENT PLAN NO. 84-5, TO ALLOW
CONSTRUCTION OF A MIXED-USE INDUSTRIAL/OFFICE COMPLEX ON 16.5 ACRES OF PROPERTY GENERALLY
LOCATED ON THE EAST SIDE OF EL CAMINO REAL,
NORTH OF THE CABLEVISION BUILDING.
CASE NO: SDP 84-5 APPLICANT! CARLSBAD GATEWAY CENTER
WHEREAS, a verified application has been filed k
)City of Carlsbad and referred to the Planning Commission;
WHEREAS, said verified application constitutes a
as provided by Title 21 of the Carlsbad Municipal Code; ar
WHEREAS, pursuant to the provisions of the Municj
the Planning Commission did, on the 10th day of October, '
131 consider said request on property described as:
l5
16
17 1
18
19
County of San Diego, State of California as show1
10060 of Parcel Maps filed in the Office of the (
Recorder of San Diego County, May 23, 1980.;
WHEREAS, at said hearing, upon hearing and consic
I j
testimony and arguments, if any, of all persons desiring
heard, said Commission considered all factors relating to
23
24
(A) That the foregoing recitations are true and correct.
(B) That based on the evidence presented at the public hc
the Commission APPROVES SDP 84-5, based on the folloi
25
26
27
28
22'Commission of the City of Carlsbad as follows:
'i
I////
////
////
findings and subject to the following conditions:
'I
I
1
2
3
4
6 91
7
8
9
10
11
12
l3
0 m
Findings:
1) The project is consistent with all City public facilil
icies and ordinances since:
a) The Planning Commission has, by inclusion of an
appropriate condition to this project, insured thi final map will not be approved unless the City COI finds that sewer service is available to serve thc
project. In addition, the Planning Commission ha
condition that a note shall be placed on the fina
that building permits may not be issued for the p unless the City Engineer determines that sewer se
available, and building cannot occur within the p
unless sewer service remains available, and the P Commission is satisfied that the requirements of
public facilities element of the qeneral plan hav met insofar as they apply to sewer service for th
project.
b) All necessary public improvements have been provi will be required as conditions of approval.
c) The applicant has agreed and is required by the j of an appropriate condition to pay a public facil fee. Performance of that contract and payment of 1;
161
17
2) The project is consistent with M-Q zone standards anc
compatible with surrounding existing and future uses
area.
241 The project is located within the Palomar Airport In
area and has been found to be consistent with the pr 6,
28 dated August 24, 1984 and "B" - "G", dated July 24, incorporated by reference and on file in the Land U:
Office. Development shall occur substantially as sk
otherwise noted in these conditions.
I I
PC RESO NO. 2364 -2-
1
2
3
4
5
6
7
a
9
10
11
12
e e
2) This project is approved upon the express condition t
building permits shall not be approved unless the Cit Council finds as of the time of such approval that se
service is available to serve the project.
3) This project is approved upon the express condition t building permits will not be issued for development o
subject property unless the City Engineer determines
sewer facilities are available at the time of applica
such sewer permits and will continue to be available time of occupancy.
4) This project is approved upon the express condition t applicant shall pay a public facilities fee as requir
City Council Policy No. 17, dated April 2, 1982, on f the City Clerk and incorporated herein by reference,
according to the agreement executed by the applicant
payment of said fee, a copy of that agreement, dated
1984, is on file with the City Clerk and incorporated by reference. If said fee is not paid as promised, t
application will not be consistent with the General P approval for this project shall be void.
sections of the Zoning Ordinance and all other applic
~ 5) Approval of this request shall not excuse compliance
14
15
16
l?
18
16) Water shall be provided to this project pursuant to t
' Service agreement between the City of Carlsbad and th
Real Water District, dated May 25, 1983.
I Land Use Planning Conditions:
7) The applicant shall prepare a reproducible mylar of t site plan incorporating the conditions contained here
site plan shall be submitted to and approved by the I I
23 1
I I
amounts of water, and shall include drought tolerant in their place. In addition, this plan shall incorpc landscape standards identified for this area in the I
PC RES0 NO. 2364 -3-
1
2
3
4
5
11) All landscaped areas shall be maintained in a health:
thriving condition, free from weeds, trash, and debr
12) A uniform sign program for this development shall be to the Land Use Planning Manager for his review and
prior to occupancy of any building. As part of said no free standing signs shall be allowed along El Cam
13) Trash receptacle areas shall be enclosed by a six-fo
6,
masonry wall with gates pursuant to City standards. of said receptacles shall be approved by the Land Us
15 I
16
17
adjacent to the deceleration lane. All other setbac be maintained as shown on this exhibit.
16) Uses allowed in "Building B" shall be restricted to
and conditional uses identified in Exhibit "X", date
21
22
23
I 1 Engineering Conditions:
I 18) The developer shall agree to participate in the forn and shall participate in an assessment or other dist
25
26
27
28
sewer facilities serving the AH27 Basin as shown on ' "Interceptor and Trunk Sewer System Master Map," dat i 1984, which is on file in the Office of the City Enc
Other areas as the City Engineer may determine nece: 1 desirable may be included in any such district. '
~
////
////
PC RES0 NO. 2364 -4-
1
2
3
4
5
6
7
8
9
10
11
12
13
e e
19) Pretreatment of the sanitary sewer discharge from thi
may be required. In addition to the requirements for connection permit the developer shall conform to the
requirements of Chapter 13.16 of the Carlsbad Municip
The developer shall apply for an industrial waste dis
No Certificates of Occupancy for the project will be before the industrial waste discharge permit applicat
requirements have been met, all applicable fees paid
permit issued.
20) The developer shall obtain a grading permit prior to
commencement of any clearing or grading of the site.
permit concurrently with the building permit for this
21) The grading for this project is defined as "controlle
ing" by Section 11.06.170(a) of the Carlsbad Municipa
Grading shall be performed under t.he observation of 2 engineer whose responsibility it shall be to coordine
inspection and testing to insure compliance of the wc the approved grading plan, submit required reports tc
Engineer and verify compliance with Chapter 11.06 of
Carlsbad Municipal Code.
22) Upon completion of grading, the developer shall insui 1 "as-graded" geologic plan shall be submitted to the (
I Engineer. The plan shall clearly show all the geoloc 14
15
16
17
exposed by the grading operation, all geologic correc
measures as actually constructed and must be based or tour map which represents both the pre and post site
This plan shall be signed by both the soils engineei
engineering qeologist. The plan shall be prepared 01 or similar drafting film and shall become a permanenl
I
28 i PC RESO NO. 2364 -5-
1
2
3
4
5
6
7
8'
9
10
11
0 @
27) The developer shall exercise special care during the
construction phase of this project to prevent any off-
siltation. The developer shall provide erosion contrc measures and shall construct temporary desiltation/det basins of type, size and location as approved by the (
Engineer. The basins and erosion control measures shi
shown and specified on the grading plan and shall be
constructed to the satisfaction of the City Enqineer
the start of any other qrading operations. Prior to
removal of any basins or facilities so constructed thl served shall be protected by additional drainaqe faci
slope erosion control measures and other methods requ
approved by the City Engineer. The developer shall m
the temporary basins and erosion control measures for
of time satisfactory to the City Engineer and shall g
deposit and bonding in amounts and types suitable to
Enqineer.
their maintenance and satisfactory performance throuq
28) Additional drainage easements and drainage structures
I provided or installed as may be required by the Count
Department of Sanitation and Flood Control or the Cit neer.
13,, l2 i 29) The developer shall pay the current local drainage ax
prior to approval of the final map or shall construct
15
16
17
City of Carlsbad Standards as required by the City Er
30) The owner of the subject property shall execute a ho:
harmless agreement regarding drainage across the adj; property prior to approval of building permits.
31) The drainage system shall be designed to ensure that
21 I detention basin capacities necessary to accomplish t 1 results. Alternate methods of meeting this conditio are satisfactory to the City Engineer may be used. 22 ' solution that includes creation of a backwater in th
upstream, off-site, storm drain will be allowed. TI- developer shall qrant an easement to the City allowi
25
26
the owner of the project. j ' 32) Land for all public streets and easements shown on t
28
brances. 1 PC RES0 NO. 2364 -6-
1
1
2
3
4
5
6
7
8
9
10
11
12 '
13
14
15
0 0
33) The developer shall record an easement securing the rii
unrestricted access for the property adjacent to the southerly line of the project that fronts on El Camino
The form and content of the easement deed shall be to
satisfaction of the City Engineer and shall be recordel
issuance of a building permit. The access easement sh
no less than 24 feet wide and shall include access fro
Palmer Way and El Camino Real via the right in/out dri
permitted by this project.
certified copy provided to the City Engineer prior to
34) Improvements listed in this section shall be installed
agreed to be installed by secured agreement by the dev
before the issuance of any building permit. The devel
shall obtain approval of the plans from the City Engir pay all associated fees and performance guarantees pri
issuance of any building permit. The developer shall said improvements to the satisfacti.on of the City Engi
prior to issuance of a Certificate of Occupancy or occ of any portion of the project for any purpose. The
a) Palmer Way to full width industrial street standai its existing northerly terminus to the northerly
the project. This includes securing the riqht-of.
this street.
b) A temporary turn-around, barricade and warning sic the northerly temporary terminus of Palmer way. '
temporary turn-around shall be as per City Standa
drawing GS-5 except that the street width and bull
I improvements are:
16
I? '1
I
shall be as for an industrial street.
c) Sanitary sewer from the existing manhole (which 1, approximately 155 feet easterly of the intersectic Palmer Way and Impala Drive) thence to the inters1 i
21' facilities required by these conditions.
d) Sanitary sewer pump station sized to meet the
24
25
26
27
28
fronatage The median required by this sub-item I I I installed at such time as the City Engineer direc
f) Additional street lights on El Camino Real
g) Street liqhts on Palmer Way
h) All public improvements shown on the site plan i) Remove and replace the sidewalk adjacent to the ( inlet located approximately 235 feet northerly ol
southwesterly corner of the project. It is antic
that approximately 50 square feet of sidewalk mu:
replaced.
j) Removal and replacement of all public facilities during the course of constructing this project
i
I 1
j ~
PC RES0 NO. 2364 -7-
J
1
2
3
4
5'
6
7
81
9
10
11
12
13
14
15
16
0 0
k) Acceleration and deceleration lanes for the drive\ Camino Real. The lanes shall be no less than 100 long, the acceleration taper shall be no less thar
feet long and the deceleration taper shall be no 50 feet long, Except for taper lanes, the lanes :
35) Approval of this project (SDP 84-5) is granted subjeci
City Waiver of "Access Right Relinquishment", that was
on the project by Parcel Map No. 10060. (Said relinqr surrendered access rights to Carlsbad Boulevard alonq project frontage). This condition shall in no way bii City to waive the, "Access Right Relinquishment", or prepare and record any document to that end. No built permit for this project shall be issued until the waiy
procedure is complete and a quitclaim deed to effect
recorded. If the City chooses not to waive the, "Acc~
Right Relinquishment", this approval will no longer b
The developer shall comply with all the rules, regula
design requirements of the respective sewer and water reqarding services to the project.
no less than 12 feet wide.
136)
37) The design of all private streets and drainage system
be approved by the City Engineer prior to approval of
I final map. The structural section of all private str
shall conform to City of Carlsbad Standards based on tests. All private streets and drainage systems shal
inspected by the city, and the standard improvement F and inspection fees shall be paid prior to approval c
~ building permits.
17
18
38) All private driveways shall be kept clear of parked v
' Away Zone" pursuant to Section 17.04.040, Carlsbad Mu
at all times, and shall have posted "NO Parking/Fire
23
24
25
26
27
certificate:
"DECLARATION OF RESPONSIBLE CHARGE"
I hereby declare that I am the Engineer of Work for
project, that I have exercised responsible charge OVI design of the project as defined in Section 6703 of
Business and Professions Code, and that the design i
consistent with current standards.
1
2
3
4
5
61
7
8
9
10
11
12
13
0 e
I understand that the check of project drawings and
specifications by the City of Carlsbad is confined tc only and does not relieve me, as Engineer of Work, of responsibilities for project design.
(Name, Address and Telephone of Engineering firm)
Firm:
Address:
City, St.:
Telephone:
BY Date: - (Name of Engineer)
R.C.E. NO. #
40) The developer shall provide the City with a reproduc
copy of the site plan as approved by the Planning COI
The site plan shall reflect the conditions of approv4
the City. The map copy shall be submitted to the Cii
Engineer prior to improvement plan submittal.
41) Prior to recordation of any final map for this develc
the owner shall give written consent to the annexatic
15
16
17
existing City of Carlsbad Street Lighting and Landsc,
District No. 1.
Fire Conditions: 1
21
22
23
25
24
i 44) The applicant shall submit two (2) copies of a site
I on site roads and drives subject to the approval of
1 45) An all weather access road shall be maintained throu
' 46) All required fire hydrants, water mains and appurten
showing locations of existing and proposed fire hydr
I Marshal.
construction. I
28 PC RES0 NO. 2364 -9- i
I
1
2
3
4
5
6
7
8(
9
10
l1
l2
13
15
16,
14
0 0
48) All fire alarm systems, fire hydrants, extinguishing automatic sprinklers, and other systems pertinent to
prior to construction.
project shall be submitted to the Fire Department for
PASSED, APPROVED AND ADOPTED at a regular meeting
Planning Commission of the City of Carlsbad, California, l-
the 10th day of October, 1984, by the followinq vote, to F
AYES:
NOES :
ABSENT:
ABSTAIN:
~
JERRY ROMBOTIS, Chairman I I CARLSBAD PLANNING COMMIS;
1 ATTEST:
1
MICHAEL J. HOLZMILLER
I
(I LAND USE PLANNING MANAGER
17
18 i
23
24
25
26
27
28
I I
~ i
'I I
I
PC RES0 NO. 2364 -1 0-
0
September 20, 1984
TO: PLANNING COMMISSION
FROM: City Engineer
CARLSBAD GATEWAY CENTER, SDP 84-5 REQUEST FOR
STANDARD VARIANCE
The Developer of this project has requested a variance from Ci Design Standards. In accordance with Section 18 of the Street Design Criteria of the City Standards, the Planning Commission
shall have the authority as an administrative act to grant var to the City Standards provided the following findings can be mi
1. That there are extraordinary or unusual circumstances or conditions applicable to the situation of surrounding property necessitating a variance of the Standards.
2. That the granting of such variance will not cause sub-
stantial drainage problems.
with existing or future traffic and parking demands or pedestrian or bicycle use.
to the public welfare or injurious to the property or improvements in the vicinity in which the variance is granted.
5. That the granting of such variance will not adversely affect the comprehsneive general plan.
City staff has reviewed the variance request and is making the recommendation that follows in this memorandum.
1. Location; El Camino Real along the Project
3. That the granting of such variance will not conflict
4. That the granting of such variance will not be detriment;
frontage.
El Camino Real in contravention of City of Carlsbad Street Design Cril Access to be as shown on the site r
Request: Allow access to the project from
Reason: The Developer feels that the five findings for approvals can be made that the driveways are necessary fc the economic viability of the projt
Staff Recommendation: Approve
0
Page two
September 20, 1984
TO : FROM: City Engineer
PLAN N I NG COMM I S S IO N
CARLSBAD GATEWAY CENTER, SDP 84-5 REQUEST FOR
STANDARD VARIANCE
Explanation
1. Extraordinary circumstances at the location are occasioned by the anticipated heavy right turn movement from the south which is destined for the complex during the morning hours when people are going to work,
accommodate such movement directly into the complex via a
deceleration lane and angled right turn, than to mix it wit
left turns and through movements at a nearby major inter-
section. The same holds true for evening home-bound traffi
leaving the complex and going north. Obviously, there must
never be consideration given for left turn access or egress
at the location.
2. No drainage problems.
3. It will better accommodate future traffic, enhance the
It would be better to
ability to park expeditiously, and have no effect on pedestrians or bicycles.
on property in the vicinity.
4. Not detrimental to the public welfare nor have any effect
on the comprehensive general plan.
/ w J JL-
Marty Bouman Traffic Engineer
WB : MB : n j c
e e
EXHIBIT "KII
October 10, 1984
Uses permitted in "Building B" of CARLSBAD GATEWAY CENTER:
(1) All uses permitted by Section 21.34.020 in P-M zone (See
(2) Business systems store
(3) Computer store
(4) Office furniture store
(5) Office supplies, equipment store
attachment)
Conditional Uses - Uses permitted upon the granting of a
conditional use permit:
1) Eating and drinking establishments
2) Day care centers
3) Health and athletic clubs
DECELERATION LANE
SIDEWALK /PA R K W AY ( 1 0')
1
'LOCATION MAP
\\
BECKMAN INST.
CARLSBAD
RESEARCH
FARADAY
BUSINESS PARK
1 CARLSAD GATEWAY CENTER SDp 1
0 *
J3ACKGFOUND DATA SHEET
CASE NO: SDP 84-5
APPLICANT: CARLSW GATEWAY CE"ER
REQUEST AND LOCATION: Construction of mixed-use industrial/office complex
LM;AL DESCRIPTION: A portion of Par. 1 & 2, in City of CA, Cty.of SD, State California as shown at Page 10060 of Par.Maps filed in the office
of Cty Recorder of SD County, May 23, 1980 APN: 209-040-34
Acres 16.5 Prcpsed No. of Lotsflnits N/A
GENERAL PLAN AND ZONING
Land Use Designation PI
Density Allowed N/A Density Proposed N/A
Existing Zone M-Q Proposed Zone no change
Surrounding Zoning and Land Use:
Zoning Land Use
Site M-Q Vacant
North M-Q Vacant
South M-Q SFE
East M-Q Industrial
West C-M Industrial
PUBLIC FACILITIES
School District Carlsbad Water Carlsbad Sewer Carlsbad EDU's
Public Facilities Fee Agreement, dated July 19, 1984
ENvIR0"TAL IMPACT ASSES-T
- X Negative Declaration, issued September 18, 1984
E.I.R. Certified, dated -
Other,
wed- t further infomti s required, YOU Will be SO
CA/CLS $fib CPI~~ e-
APPLXCRNT: f?.fJefi kUwnn= N~~ (individual, partnership, joint venture, corpration, sy
28/0 </l-/NO DCc ]?IO&* fUITe tb3, J"nu
Business Address
619 296- 6307
Telephone Number
AGENT : o& JC*UCAi?b
Name
2020 C4wqo DCC em Jkl Jum 3-/2
c P Business Address
(54 27PL7/&
Telephone Number 7.Laz &U^/rRy LLU.
E.ENBE2S: f? Fern WAC- s La TOCCA, Cn. 920
EIme *(individual ,etnerJ joint
ventwe, corpora tion, syndication)
Home Address
SP 4 e&& &M..r/No bEc & , r,L17* d 20% ArE50, G.
Btlsiness Ad&css
6t9 Z4k43o7 9.J- y- vg/ E;
7c-7 l//# L/90 JdU,
bM* P. JAJ,s //eIhJPoR2 &/4Vr c
/yo0 dl BmmC- suj7'rf 2WA' M-PUffi
L 7/f 7p- 2@6d 7y t/ L73- 5-33
Tele2hone Nmhr Telephone Xumber
liifp Rome Addre&
3isiness Address
Tt1epnor.e N-er Telephone Xunber
-
(Attach more sheets if necessary)
I/We declzze ucder penalty of perjury that the inforreation contaiced in tl
closure is tme and correct and that it will remain true and correct and I
relied upon as being true and correct until enended.
CAMCS~AD G&F~H~
App 1 ica n t /
BY
1200 ELM AVENI SERVICES CARLSBAD, CALIFORNIA
(610) 438-5501
0 0
1 DEVELOPMENTAL
LAND USE PLANNING OFFICE
Up of Carls’bab
NEGATIVE DECLARATION
PRDJECT ADDRESSWION:
Cablevision building.
East side of El Camino Real, north of
PFOJECT DESCRIPTION: previously graded 16.5 acre site.
The City of Carlsbad has conducted an environmental review of the
above described project pursuant to the Guidelines for Implementation
of the California Environmental Quality Act and the Environmental Protection Ordinance of the City of Carlsbad.
review, a Negative Declaration (declaration that the project will not
have a significant impact on the environment) is hereby issued for the
subject project.
Land Use Planning Office.
A copy of the Negative Declaration with supportive documents is on file in the Lardf Use Planniiq Office, City Hall, 1200 Eh Avenuer
Carlsbad, CA. 92008, Ccmmnts frm the public are invited. Please submit ocmments in writirq to the Land Use Planning Office within ten
( 10) days of date of issuance.
Multi-use industrial/office ccanplex on
As a result of said
Justification for this action is on file in tie
DATED: September 18, 1984
CASE NO: SDP 84-5 Land Use Planning Manager
APPLICANT: Carlsbad Gateway Center
PUBLISH DATE: Septgnber 22, 1984
ND-4
5/8 1
.
0 0
Safl Diego
ASSOCIATIOX OF
GOT;ER;Z'>IESTS
Suite 524 Security Pacific Plaza
San Diego, California 92101
1619) 236-5300
1200 Third Avenue
August 27, 1984
Mr. Paul J. Klukas
Land Use Planning Office
1200 Elm Avenue
Carlsbad, CA 92088
SUBJECT: Carlsbad Gateway Center
Dear Mr. Klukas:
The proposed Carlsbad Gateway Center is located within the airport influence
area for Palomar Airport. However, the site is not within the noise contours or impact zones for the airport. Based on the location of the site in relationship to the noise contours and impact zone, the plans for the proposed industrial center
are consistent with the provision of the Palomar Airport Comprehensive Land TJse
Plan.
The SANDAG Board has not reviewed the staff analysis related to the proposed
development and Palomar Airport CLUP. If you have any questions regarding this matter, please contact me at 236-5372.
Sincerely, b"R J2-7-
JACK KOERER
Special Project Director
JK/rw
MEMBER AGENCIES Cities of Carlsbad, Chula Vista, Coronado, Del Mar, El Calon, Escondido, Imperial Beach, La Mesa, Lemon Grove Nat
Poway, San Dieqo, San Marcos, Santee and Vista ADVISORY, LIAISON MEM6ERS Calli Dept of TransportatloniU S Dept of Defense and T
e 0
CARLSRAD CITY COUNCIL APPEAL
RE: Carlsbad Gateway Center
SDP-84-5
DATE: December 18, 1984
SPEAKER'S AGENDA
INTRODUCTION : Kenneth H. Lounsbery
Vice President & General Counsel, LUSARDI CONSTRUCTION CO, 4 minutes
BACKGROUND/ Bernie Fipp ACCESS: President, Southern Division KOLL COMPANY 3 minutes
PLOT PLAN/ Don Schucard DESIGN: SCHUCARD ASSOCIATES 3 minutes
CONCLUSION: Kenneth H. Lounsbery 5 minutes
RESPONSE & CLARIFICATION: Engineering: Richard Schmid WILLIAMSON & SCHMID
Traffic :
Herman KIMMEL 81
ASSOCIATES 5 minutes
% A+
f* r 0 0
-a LUSARDI CONSTRUCTION CO.
KENNETH H LOUNSBERY
Vice President General Course1
7 _ecer.her 5, 1984
Planning C ormission
City of Carlsbad
1200 Elm Avenue Carlsbad, California 92008
Attention ; PJr . 'Rill Hofmzn
Re: Carlsbad Gateway Center (Davis Developments)
Cear P4embers of the Commission:
This is written on behalf of the applicant seeking approval of the above-d-escribed project .
On PJovember 21, 1984, ~n appeal was filed on behalf of Dax4s
Developments. The appeal pertains to a denial by the Plannicg
Commission sf an application for plan approval pursuant to a Q-overlay
ind.ustria1 project.
On November 27, 8 request was filed on behalf of the applicant
seeking a rehearing by the Commission of the ori@;inal application. The
applicant also requested that the above-mentioned apped be delaved
pending the Commission's actioln, if any, on the yehearing.
8n behalf of the applicant, we have had 2n opportunity to review
the application for rehearkg with the City Attorney's office. We have
also discussed the matter Xwitk members of the Flannirrg Departr>er,t; staif.
The applicant has now determined thet 'It would be most expediticus to
abandon the request for rehearing afic! pursue the appeal.
Please cofisider this as the withdrawal by Davis Developments of the
Plovember 27 request for rehearing of the subject application. Further ,
we respectfully request that the appeal to City Csunzil, filed November
21, be processed in due course.
Thank you for your consideratior,.
KHL : ss
cc : \Htp @lerk
Xembers of City Cmr-ci!
1570 Linda Vista Drive San Marcos, California 92069 (61 9) 744-31 33
State License No 207287
-~___-__ ____ --~-~. -== - -~-= ~~ - ~- -=-~= ~ -~ ~~~~~ ~
___ __- - 7 - ~~
94 CMf
-=_- --.- ~ ~___._
DM 3ATE 11-26 19
1 Mr. Lounsberry brought the check for the appeal,
He indicated that they were still trying to pursue
1; the matter through the Planning Commission, and that 1 they had filed the appeal so that if the PC does
" not then the matter can go to council. (apparently !I he and Dan Hentschke had talked previously re this ' course of action for the matter) As he indicated to i me Dan had indicated that the matter could be handled
1' as he requested in their letter of November 21, 1984.
I told him that apparently no one had informed you of this and that was why there had been some confusion and
!I
I
that you were merely trying to find out about it. I
K,
F R 3 k; THiS SHEET
I
=- __~. ~-_ ------= = =- - -~~ ___
5TbhDnhD IhItY IIFP-. nE/O FDSM i'-7L,-~ * 4F? SERVICE pE
CITY OF CARL 3AD
1200 ELM AVENUE CARLSBAD, CALIFORNIA 92008
438-5551
DATE RECEIVED FROM
I
TOTAL
IJ <,l
&A 'A
* c;tl"e,hd -. e a -.
-$ T7!F 3EVELCPR"ENTS
2810 Camino del Zie Scuth Suite 202
Szn Diego, California 92108
(619) 296-6307
November 21, 1984
city Clerk
City of Carlsbad
1200 Elm Avenue Carlsbad, California 92008
Re: Carlsbad Gateway (Davis Developmects)
Dear City Clerk:
This is to lodge 8 notice of appeal.
On \Vednesday, PTovember 14 , 1984, the Carlsbad Planning
Said Commission took action with respect to the above-described project.
action was to deny the requested approval of a project plan,
By the terms of this letter, the applicant herewith files an appeal of
said denial and requests that, in due course, such request be forwarded
to the City Council for review.
It is to be acknowledged, hcwever, that, bv sepzrate communication,
the applicant is requesting that the Planning Commission rescind its action
to deny and rehear the application. This notice is filed to perfect the
applicant's appellate remedy in the event that said request is denied or,
upon rehearing, the earlier derial is confirmed.
Yours very truly,
DAVIS DEVEJ,OPMENTS
'($e&;{$$
FRED WALTEES
[By: Kenneth F! . Lounsbery!
744 1- %i 33 FW : KNL : ss
w
LUSARDI CONSTRUCTION CO.
KENNETH H LOUNSEERY
Vice President. General Counsel
Irovernher 27, 1984
Planning Commission CITY OF CARLSRAD
1200 Elm Avenue
Carlsbad , California 92008
Re: Carlsbad Gateway Center (Davis Developments) SDP 84-5
Rlembers of the Commission :
This office represents the applicant, Davis Developments.
Appeal to Council
On November 21, 1984, the applicant herein filed an appeal of the
contained in SDP 84-5.
Commissionts denial (decided November 14, 1984), of applicant's request
The applicant has requested, however, that action upon said appeal
be withheld until a determination by the Planning Commission pursuant to
the request set forth below. Said appeal was merely filed as a necessity
dictated by the rules of appeal. Such filing was required to preserve the
right of appeal dependent upon the action of the Planning Commission pursuant to the applicant's request for rehearing.
Rehearing by Commission
procedural rules adopted by the Commission, the applicant hereby
requests that the Commission:
As permitted by the terms of the Carlsbad Municipal Code and the
a. Rescind its November 14, 1985 action to deny SDP 84-5, and
b. Rehear said matter.
This request is based upon the belief that not all relevant facts were reviewed or available for review, by the Commission during the October
10 or November 14 hearings. Thus, the Commission's decision was made in reliance upon an incomplete factual basis. - If rehearing is granted, the applicant will present to the Commission
factual information which was not presented or discussed at the hearings of October 10 or November 14.
1570 Llnda Vista Drive San Marcos. California 92069 (61 9) 744-31 33
State License No 207287
J W w
I L
Planning Cornmis sion
Novernbei. 27, 1984 Page 2
The requested land use approval was not, and is not, required to be
a noticed public hearing. Therefore, the Commission is free to calendar
the request for rehearing and, upon deciding to rescind its denial and
rehear the matter, immediately consider the merits of SDP 84-5 anew.
The applicant's request will have no prejudicial effect upon the City
staff or property owners in the area who may have an interest in the
project. The staff has thoroughly studied the application; it has
prepared two reports for the Commission totaling 35 pages, including
attachments. Further, prior to rehearing, the staff will have been fully
advised of the new factual information to be provided by applicant to the
Commission. Finally, the applicant will, voluntarily, contact each party
of record who appeared to address the subject request at the October 10 and November 14 hearings. Said persons shall be advised of the date,
time and place of the consideration by the Planning Commission of the
rehearing.
The applicant requests that the Commission consider and approve the
application as set forth above. &&b{
ENN T 11. LOUN BE
Vice sident , Gener Counsel
KHL: ss
cc: City Clerk
City Attorney's Office (Dan Hentschke)
D avis Develop men t s Koll Co. Helix Engineering
1
II) (b . LUSARDl CONSTRUCTION CO.
KENNETH H LOUNSBERY
Vice President, General Counsel
P.4aysr Yary Caskr
Members ~f City Cou~cil
CITY OF CAR,LSSAD
12@0 Elm Avenue
Carlsbad, Celifornia 92008
Re: CarBsbad Gateway Center (Appeal Erom Planning
Commission decision) ; Courcil PTeeting of Peeember IS ~ 1954 ~
Dear Mayor anC Plembers of the Council:
This office represents the owner of the above-described. prcject ?
Davis Developments.
The attached statevent is offered iv. surqmrt of the aanlieant's
appeal from a decision of the Carlsba6 Planning Commission. The facts
and issues invo?-ved in the mztter are exolained in the statement. rPre
wouId appreciate your review of the statement.
position.
Please feel free to contact the undersigned if we gight clarify OW
YQUYs V2Y:r truly,
-
A_- -
YENXETH FT. T,CI!T-:SSE?Y
KFL: ss
Enclosure
cc: City Clerk
City Attorney
Planning Bepartmer_t 3avis DeTreiopaePts
Kcll CC.
1570 Linda Vista Drive 0 San Marcos, California 92069 0 (619) 744-3133
State License NO 207287
m 0
?:TP,TFP./IENT JN SUPPORT OF APPEAl, -
Date: December 12, 1984
Project: SDP 84-5 Carlsbad Gateway Center
- Re:
Review Date: Council Meeting of December 18, 1984
Appeal of Planning Commission denial of November 14, 1984
Jmclowner: KO11 Co, (Seller)
Applicant: Davis Developments (Buyer)
Critical Issue: Right of Access
SUBJECT PROPERTY AND PROJECT
The 16.5 acre site in question is located on the east side frontage of
El Camino Real, west of the future extension of Palmer Way and
immediately north of the existing Cablevision building. The land slopes
downward moderately to the north; property to the north is vacant.
Koll's Carlsbad Research Center is located across El (Camino Real to the
west. A vicinity map is attached, marked Exhibit A.
The property is zoned M-Q (industrial with a qualified overlay).
This is one of the few sites remaining in the City that carries the lenient
M-Q zoning. The only reason the project was before the Commission for
review was the Q-overlay requirement for site plan review. Such review
does not require a noticed public hearing.
The project involves the development of a mixed-use industrial/office
complex. It includes one 2-story, 50,000 sq. ft. office building, one
1-story 38,000 sq. ft. limited commercial building, and seven 1-story,
multi- tenant industrial buildings .
BACKGROUND
Staff Recommendation :
On September 28, the City staff furnished the applicant with a draft
. of the its recommendation. It was for APPROVAL of the project. A
meeting was held on October 2 and conditions were discussed.
e
It was acknowledged that access to the project from El Camino Real
In this regard the staff and was (and continues to be) a critical issue.
applicant were in agreement. The staff report read, in pertinent part:
"El Camino Real is a prime arterial in the City's circulation
system. As such, access to it is severely restricted. Access
is encouraged along frontage roads such as Palmer Way. The
City Engineer has indicated that his office could support a
right-inIright-out access to El Camino Real on this site on the
condition that acceleration and deceleration lanes are provided,
and that the two Palmer Way accesses are designed as wide, attractive entry alternatives. Staff feels that, as conditioned,
the resulting plan makes an adequate attempt at maximizing the
two Palmer Way entries and minimizing the El Camino Real entry, while keeping the El Camino Real streetscape attractive
and safe. Overall, on-site circulation is functional and
adequate. ''
It is interesting to note the reasons offered by the City's traffic
engineer which support the staff's original recommendation. In a memo
dated September 20, 1984, the staff detailed the benefits which resulted
from allowing limited access to El Camino Real. A copy of the report is
attached, marked Exhibit B .
While there were minor disagreements as to other issues, the staff
The matter was referred to and report remained unchanged as to access.
heard by the Planning Commission on October 10, 1984.
First Planning Commission Meeting:
At the meeting of October 10, the Planning Commission was critical
of the staff's position with respect to access onto El Camino Real. The
Commission cited the City's policy that purports to limit such access to
points not less than 2,600 feet from any major intersection. There were,
however, other influences upon the Commission at the October 10 meeting.
Although the Commission's review of the subject site plan did not
entail a public hearing and notices therefor were not required, two
' representative groups were present and were heard as initial critics of
the project. They were:
-2 -
m W
o Residents of the Sunny Creek area who registered aesthetic concerns
which were the result of their unfamiliarity with the project.
o Mike O'Hara (Del Mar Financial), a developer of property situated to
the north on the proposed extension of Palmer Way, who urged the
Commission to require that this applicant be responsible for
extending Palmer Way. The argument was an attempt to shift the
burden of cost for certain off-site improvements required by O'Hara
onto the Carlsbad Gateway Center.
As a result of these initial concerns, and in order to resolve the
access problem, the Commission continued its consideration of the project
to the meeting of November 14,
Second Commission Meeting:
Prior to the November 14 Commission meeting, the applicant met with
the residents of Sunny Creek and O'Hara. Upon being more fully
informed of the project, the Sunny Creek representatives were satisfied
that the project was acceptable. The position taken by O'Hara continued
to be opportunistic, but in modified form.
Unfortunately, however, the reaction to the first Commission meeting
caused the staff to reverse its position with respect to access onto El
Camino Real. It acknowledged in its second staff report that all other
concerns had been satisfactorily addressed, but that the access issue
could no longer be resolved as originally agreed. The staff concluded
that, because the developer had presented a plan which provided access
onto El Camino Real, the request for site plan approval should be denied.
The November 14 hearing was a serpentine affair highlighted by
reversals and contradictions.
o The Sunny Creek residents appeared and spoke in favor of the
project.
o O'Hara took a modified position, but continued to press for
completion by Davis Developments of a road that would serve the
O'Hara project.
-3 -
Q e
o The staff agreed that all other development problems had been
resolved, but offered the access problem as the basis for a reversal
in its position.
The discussion by Commissioners included a brief reference to a 1980
parcel map placed on the property. The map clearly defines a right of
access to El Camino Real. Thus, the question was raised as to whether
the City had the legal right to deny the property owner access to El
Camino Real. A copy of the map was available at the hearing-, but no
conclusion was reached as to the owner's legal right to access.
The Commission, by a 4/3 vote, denied the requested plan approval.
It is important, however, to note that one Commissioner (Schlehuber)
made it very clear, on the record, that he was casting his vote "without
prejudice." Further, he indicated that, if it were determined that the
applicant had a legal right to access to El Camino Real, he would reverse
his position, thereby creating a 4/3 vote in favor of the requested plan
approval.
CRITICAL ISSUE: ACCESS
Access ; Legal Issue :
Following the second Commission meeting, the applicant's
representative discussed the access question, as a legal issue, with the
City Attorney's office. There is no doubt as to the existence of an
easement, defined on Parcel Map #lOOSO, which affords access to El
Camino Real. There is no clear agreement, however, as to the
permanence of such easement and its effect upon the subject decision.
The applicant takes the position that the right of access is vested
and, given the circumstances of this application, cannot be denied as a
matter of law. The City Attorney's office is not yet prepared to opine
that said access is a vested right. Such uncertainties might be resolved
by a trier-of-fact, but there is a simpler, more practical, solution.
,
-4-
m w
3
Access; Practical Issue :
A practical solution is found in a form of substantial compliance with
the City's policy of limited access onto El Camino Real.
The policy would require minimum distances of 2,600 feet between
access points along El Camino Real. Departures from the policy have
been evident in Carlsbad both before and after its inception. There are
two ways of viewing such departures; one - the policy has only been
honored in the breach, or, two - it has been applied with a sense of
reason in order to bring traffic circulation closer to conformance to the
desired goal of the policy. This project can be cited as an example of
the latter interpretation.
Current Access. As El Camino Real runs through Carlsbad, there
are many points of access to the arterial which do not conform to the
policy. For example, between Palomar Airport Road and the northerly
boundary of this project there are no fewer than five existing access
points. Thus, in nothing more than the area in question, there are five
departures from the City's policy. This is not to suggest that compliance
should, therefore, be excused. Instead, the policy should be applied
reasonably to improve circulation by moving toward conformance.
Proposed Access. The applicant's proposal for access would actually
bring the existing condition into closer conformity to the intent of the
policy. Consider the following points:
o The applicant will reduce the number of existing access points by
A merger of access rights with those of the adjoining property one.
owner immediately to the south has been proposed.
o Acceleration and deceleration lanes are proposed along the El Camino
Real frontage, virtually eliminating the traveled portion of El Camino
Real as a point of ingress and egress.
o The applicant has agreed to construct a median strip in the center
of El Camino Real, thereby prohibiting left turn movements into or
out of the project.
o For proper through-circulation, two access points will also be
provided at Palmer Way.
-5-
0 w
The applicant's proposal for access will constitute an improvement in
the traffic-flow capability of El Camino Real. At least one traffic expert
has detailed the reasons for such a conclusion in the attached report,
marked Exhibit C. Approval of the site plan would actually improve
The applicant's proposed solution to access
problems takes on increased merit when compared to the alternatives that
are implied by the revised staff position.
o Under current conditions, access to Palmer Waly would not eliminate
the need for similar access to El Camino Real. Palmer Way is a
cul-de-sac street and, according to City regulations, cannot serve as
a sole access point for this project. Thus, access to El Camino Real
would continue to be required and the number of access points on
the restricted thoroughfare would not be reduced.
o In recognition of the above-described flaw, the staff, in its second
access conditions along El Camino Real.
Impractical Alternatives.
Consider these difficulties:
report, suggested that, if El Carnino Real access were to be
eliminated, Palmer Way would have to be constructed as a
through-street . This would impose a requirement upon the applicant
of extending Palmer Way for nearly one-third of a mile to an
eventual joinder with College Ave. to the north. No one, least of all
the Planning Commissioners, had ever envisioned such a
requirement. The extremity of such a burden becomes even more
obvious when compared to the logic and fairness of the access
solution on El Camino Real. Considering the variety of past access
decisions along El Camino Real, it would be virtually unprecedented
to apply the City's policy so rigidly as to produce an unfair result.
CONCLUSION
The reasons and logic underlying the original recommendation by the
staff are compelling. We request that the Council follow the staff's first . recommended course of action and approve the applicant's site plan, with
the proposed access, as requested.
-6 -
L CARLSAD GATEWAY CENTER SDP 84
w
\
rn \.
September 20, 1984
TO: PLANNING COMMISSION
FROM: City Engineer
-
CARLSBAD GATEWAY CENTER, SDP 84-5 REQUEST FOR
STANDARD VARIANCE
The Developer of this project has requested a variance from City Design Standards. In accordance with Section 18 of the Street Design Criteria of the City Standards, the Planning Commission shall have the authority as an administrative act to grant varianc
to the City Standards provided the following findings can be met:
1. That there are extraordinary or unusual circumstances
or conditions applicable to the situation of surrounding property necessitating a variance of the Standards.
That the granting of such variance will not cause sub- stantial drainage problems.
with existing or future traffic and parking demands or pedestrian or bicycle use.
to the public welfare or injurious to the property or improvements in the vicinity in which the variance is
granted.
5. That the granting of such variance will not adversely
2.
3. That the granting of such variance will not conflict
4. That the granting of such variance will not be detrimental
affect the comprehsneive general plan.
City staff has reviewed the variance request and is making the recommendation that follows in this memorandum.
1. Location: El Camino Real along the Project frontage.
Request: . Allow access to the project from El Camino Real in contravention of City of Carlsbad Street Design Criteri Access to be as shown on the site plar
, Reason: The Developer feels that the five findings for approvals can be made an(
that the driveways are necessary for the economic viability of the project
Staff Reconiinendation: Approve
EXHIBIT B
0
(- : 0 \
Page two September 20, 1984
TO: PLANNING COMMISSION
FROM: City Engineer
CARLSBAD GATEWAY CHTER, SOP 84-5 REQUEST FOR
STANDARD VARIANCE
Explanation
1. Extraordinary circumstances at the location are occasioned
. by the anticipated heavy right turn movement from the south
which is destined for the complex during the morning hours
when people are going to work. It would be better to
accommodate such movement directly into the complex via a
deceleration lane and angled right turn, than to mix it with
left turns and through movements at a nearby major inter-
section. The same holds true for evening home-bound traffic
leaving the complex and going north. Obviously, there mGst
never be consideration given for left turn access or egress
at the location.
2. No drainage problems.
3. It will better accommodate future traffic, enhance the
ability to park expeditiously, and have no effect on
pedestrians or bicycles.
4. Not detrimental to the public welfare nor have any effect
on property in the vicinity.
5. No eff on the comprehensive general plan.
Marty Bouman
Traffic Engineer
WB :MB: n jc ..
1) W
# \- rRAFFIC ENGINEERIN&- ermsnn CONSULTANTS
immel and Associates, Inc.
3300 IRVINE AVENUE. SUITE 180. NEWP T B A CA 92660
(714) mxgw 8!2-\8y6
(91
November 15, 1984 ac-2 r&
Davis Developments
2810 Camino Del Rio South
Suite 202
San Diego, Ca. 92108
Attention Mr. Fred Walters
Access, Carlsbad Gateway Center
El Camino Real City of Carlsbad
Dear Mr. Walters:
In response to your request, we have analyzed the traffic impacts
of access to the Carlsbad Gateway Center.
INTRODUCTION
In the process of development of the Carlsbad Gateway Center, it
has Seen proposed to develop a street paralleling El Camino Real,
between Faraday Street and College Boulevard, to provide access
to the project. The primary purpsse for the new street (Faliner
Avenue) would be to eliminate the need for access along El Camino
Real. Access limitation is purported to be necessary to provide
traffic progression along El Camino Real, without side friction,
for optimum minimum distances of 2,600 feet between access to
El Camino Real.
N'! EXHIBIT C
W a I; \
!'age 2
'Nov. 15 1984
r Davis D&velopment&^"
ANALYSIS
There have been many variations regarding access limitation.
The requirements vary from one-quarter nile spacing of arterial
or collector street with no intervening access, no residential
driveways on arterial highways, no limitation of access to service
stations to one driveway of each adjacent street. These restrict-
ions, plus many others, have been tried in order to promote traffi
safety and progression along through streets, especially those
with very high volumes of traffic.
Restricting access to minimum distances of 2,600 feet along a
street could provide an acceptable vehicle speed of 40 niles per
hour, depending on the traffic signal timing at the intervening
intersections. However, this same progression can be achieved
even when some driveways and minor streets are intersecting the
major street. Even with traffic signal spacing at 2,600 feet,
traffic tends to move in groups. The intervals between these
groups will allow safe access to the street without interference
with the flow of through traffic.
There are problems created by limiting access over long distances
These could be:
. Traffic volumes on the intersecting streets would be much
higher than if there were intervening intersections to
accommodate or syphon off a portion of the demand.
. Because the approved intersecting street's volumes are
higher and it is desired to maintain progression along
the main street, more green time at signalized intersect-
ions, than can be made 'available, is required.
- In order to gain access to properties on the opposite sid
of the street, a greater number of U-turns and left turns
will be introduced at the limited number of accesses.
P i -’:
I’ayc 3
‘Nov, 15, 1384 ‘Davis Development ‘
. The 2,600 foot access spacing will increase the traffic
volumes on circulation streets and will increase the length
of vehicle trips.
. Groups of vehicles tend to stretch out over longer sections
between traffic signals. This tendency requires longer
green intervals on the main street traffic signals, in
order to maintain progression. This then leads to inordin-
ately long traffic signal cycles.
. The longer the traffic signal cycle length, the slower the
progression speeds along the main street. At 40 miles per
hour, a 90 second cycle length is normally required. At
35 miles per hour, a cycle length of 100 seconds is nbrmal.
. Pedestrian crossings can be a problem. The intersection of
a street is a legal crosswalk with or without painted indi-
cations. If it is desired to provide a crossing point
between intersections, it would be necessary to provide
painted crossing(s) in order to control random, promiscuou:
crossings by pedestrians. These mid-block crosswalks are
extremely hazardous.
. The reduction of side friction along a street will tend to
lead drivers to increase their speed between intersections
In the case of access to the project, the proposed entrance on
El Camino Real would be provided with acceleration and decelerati
lanes. This would be accomplished by setting back the curbs to
allow vehicles entering to pull out of the through traffic lane,
in order to decelerate for a turn into the entry, without restric
through traffic speeds, and to enter the street, accelerating to
s’treet speed prior to merging into the through lanes.
Northbound traffic, entering the project site, would not interfer
with through travel that will use the deceleration lane provided.
w t. r : rn . Page 4
'Nov. 15, 1984 (, *Davis Developments
Southbound traffic, entering the site, would make a left or U-turn
at Faraday Street and a left turn at Palmer Avenue. Northbound
traffic leaving the site could use the exit onto El Camino Real,
without interference with through traffic by virtue of the
acceleration lane, or turn right on Palmer Avenue to Faraday
Street, right to El Camino Real and right on El Camino Real.
Southbound traffic would leave in the same direction on Palmer
Avenue and Faraday Street, turning left onto El Camino Real.
On the basis of this accessability, it would not be necessary to
extend Palmer Avenue northerly of the project site, unless propert
to the north finds a need for the access. Such access to the
north would be of no benefit to the proposed project, either with
or without access to El Camino Real.
CONCLUSIONS
Allowing properly designed and spaced access to El Camino Real
at distances less than 2,600 feet would not be detrimental to
through traffic .
Good traffic progression can be maintained with controlled access
permitted along the major street at less than 2,600 feet.
Access limitation can create problems on intersecting streets,
due to higher cross street volumes, excess U-turns, left turns,
and increased circulating vehicles.
Longer traffic signal cycles and increased green time intervals
may be required to accommodate traffic at widely spaced inter-
se,ctions, or peak hour queues (back-ups) will result.
Problems with pedestrian crossing can be created with the 2,600
foot spacing of access points.
,w ‘ :
Page 5 m .’Nov. 15, 1984 t.
‘I D2Oi”s Deve lopme n t s‘ ’
Drivers will travel at higher speeds if all side friction is
eliminated, thus defeating the progressive system.
Reasonable access to the project site can be gained without exten-
sion of another street northerly.
If you have questions or comments concerning our analysis, please
contact us.
Sincerely yours,
HERMAN KIMMEL & ASSOC., INC. ’
&&eE. Herman \immel,