HomeMy WebLinkAbout1985-05-07; City Council; 8169; Capital projects division reorganizationCIT- IF CARLSBAD - AGENDi-3ILL
67 iB# fi'
MTG, 5/7/85
CM IEPT.
REORGANIZATION OF
AND AMENDING THE CLASSIFICATION
TITLE: CAPITAL PROJECTS DIVISION
AND MANAGEMENT SALARY PLAN
DEPT. HD.*
CITY ArrY
CITY MOR.&
RECOMMENDED ACTION:
The City Council approve the reorganization of the Capital
Projects Division as the Municipal Projects Division by
adopting Resolution No. ro 13 which includes the
establishment of the classification description of
Administrative Assistant II/Contract Administrator.
ITEM EXPLANATION
Reorganization of the Capital Projects Division would include
retaining the following positions currently in the 1984-85
budget:
1. One Principal Engineer
2. One Associate Civil Engineer
3. One Engineering Technician I1
4. One Engineering Technician I
5. One Construction Inspector
In addition the following personnel would be authorized:
6. One Associate Civil Engineer - to replace the position
7. One Administrative Assistant II/Contract Administrator
8. One Construction Inspector - to relieve overload on
9. One Secretary I - to handle clerical workload of this
transferred to the Developmental Services Desk.
- explanation to follow.
current inspector.
division.
The Personnel Department in concurrence with the Engineering
Department has prepared a classification description and
appropriate salary for the Administrative Assistant/Contract
Administrator. The salary range recommended for this
management position is $869 - $1038 biweekly. This new
position would handle all the administrative and coordinating
functions of design and construction activities.
The increase in staff, along with the reorganization plan, will
give the Municipal Projects Division the necessary manpower to
complete the balance of the 1984-85 Capital Projects in process
and all the 1985-86 CIP projects during the appropriate fiscal
year.
Page 2 of Agenda Bill
An important feature of the program is the concept of utilizing
a "turnkey outside engineeringt1 firm for the design of all
capital improvement projects. Such a firm would be placed
under contract for one year and, based on pre-established cost
estimates and charge rates, would perform all the design work
to be started during that year. It is felt that such ,a method
would be more efficient and productive than the current
cumbersome method of selecting a different design engineer for
every project, large or small.
FISCAL IMPACT
The current 1984-85 Capital Projects division has a total
budget of $217,441.00 with $150,000.00 to be charged to Capital
Projects and $67,441.00 charged to the General Fund.
The proposed Municipal Projects division would have a total
budget in FY 85-86 of $364,000.00 with $300,000.00 to be
charged to Capital Projects and $64,000.00 charged to the
General Fund. This is equivalent to a reduction of 14% in the
General Fund overhead rate.
Implementation for the current 84-85 fiscal year can be
accomplished with no increase in budgeted funds.
EXHIBIT
1.
2.
3.
4.
5.
Resolution No. approving the reorganization of the
Capital Projects division and establishing the
classification of Contract Administrator at the appropriate
salary range.
Organization chart for Municipal Projects division.
Job description for Administrative Assistant II/Contract
Administrator.
Reorganization goals and justification.
Summary Status FY 84-85 Capital Projects.
c
1
2
3
4
5
6
7
e
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 8013
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING THE REORGANIZATION OF THE CAPITAL
PROJECTS DIVISION AND AMENDING THE CLASSIFICATION PLAN OF
THE CITY TO INCLUDE THE CLASSIFICATION OF ADMINISTRATIVE
ASSISTANT II/CONTRACT ADMINISTRATOR
WHEREAS, the City Manager recommends and the City Council
concurs that the reorganization of the Capital Projects Division
is in the best interest of the city; and,
WHEREAS, The City Manager recommends and the City Council
concurs that the classification of Administrative Assistant
II/Contract Administrator should be included in the City's
classification and salary plan;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the City Council authorizes the reorganization of
the Capital Projects Division as submitted in Exhibit 2, attached
hereto, and made a part hereof.
3. That the City Council authorizes and directs the City
Manager to add the classification of Administrative Assistant
II/Contract Administrator as described in Exhibit 3, attached
hereto, and made a part hereof.
4. That the City Council authorize and direct the City
Manager to add the title of Administrative Assistant II/Contract
Administrator to the management salary plan with a FY 84-85 range of
$22,594.00 to $27,000.00.
///
///
///
3
c
3
4
5
6
7
8
9
11
12
14
15
17
1€
15
2c
21
22
24
2E
27
PASSED, APPROVED, AND ADOPTED at a regular meeting of the
Carlsbad City Council held on the 14th day of MY 9
1985 by the following vote, to wit:
AYES :
NOES: None
ABSENT: None
Council Members Casler, Lewis, Kulckin, Chick and Pettine
J.
MARY H. FASLER, Mayor
ATTEST:
(SEAL)
-.
DEFINITION
ASSISTANT I1 ONTRACT ADMINISTRATOR
In conjunction with a Principal Civil Engineer, perform highly responsible
administrative work related to and involving the construction and completion
of City public works projects, and related work as needed.
EXAMPLES OF DUTIES
Administer and participate in a varied program of work involving the design,
approval, and completion of City public works projects.
Supervise and coordinate the activities of the design architects, engineers,
construction supervisors, construction inspectors, and contractors, and others
as assigned, involved in contract compliance and construction work.
Submit and obtain successful legislation of bid documents, specifications,
contracts, and notices inviting bids to the City Manager and City Council.
In conjunction with the PEE, meet with and assist engineers, architects,
and contractors involved in the construction of city facilities with the resolution
of problems and/or disagreements involving City public works projects.
Review completion reports and certify progress payments as recommended
by the Construction Supervisor or PCE.
Review project status reports involving construction progress and expendi-
tures and be attailable at all times to inform the City Manager or City Council
of the pertinent information.
QUALIFICATIONS
Knowledge of:
Fundamentals of Contract Administration, accounting principles, and business
administration, and/or public works.
Prpwples of negotiation and scheduling, along with some basic knowledga
' 8 erlClfneering and/or architectural principles.
Ability to:
Plan, supervise, and participate in a construction program. Establish and
supervise effective procedures for contract compliance. Maintain and reconcile
relationships with those involved in the completion of the projects.
Effectively supervise, train, and evaluate assigned staff.
i ./
/-
J
EXPERIENCE AND EDUCATION -
Any combination equivalent to experience that could likely provide the
required knowledge and abilities is qualifying. A typical way to obtain the
required knowledge and abilities would be:
Experience:
Five years experience leading to a broad knowledge of contract adminis-
tration, construction coordination, and supervision of public or private construc-
tion projects.
EDUCATION:
Equivalent to Bachelors Degree in Public Works, General Business, or Accoun-
ting or related degree. Masters degree in Public Works, Accounting, or General
Business preferable, but not mandatory.
7
EXHIBIT 4
JUSTIFICAKION FOR REORqANIZATION
GOALS:
1. Complete an average of $10 million in Capital Projects
each fiscal year.
2. Get every project under contract (whether under design,
construction or completed) within the fiscal year.
3. Actively process assessment districts and do special
projects as they are needed.
BACKGROUND:
From 1979 to 1981 the Capital Projects Division had a full
time staff of 7 and completed an average of $2.7 million in
projects each year. In 1982, staff dropped to 6, and in
1983 to 5; project completions averaged $1.3 million.
The goal for the 1984 fiscal year is to complete $5.2
million worth of projects with a staff of 5.
Currently two Associate Civil Engineers handle design and
contract administration. One way to double the output (from
$5 to $10 million) would be to hire two more Associates; a
better way is to identify the work functions. Associates
have a wide variety of tasks -- they keep files on projects,
make progress payments to consultants and contractors,
review change orders, perform inspections when the inspector
is unavailable and many other tasks.
PROPOSED REVISION:
It is proposed to take most of the non-engineering tasks
from the Associates and assign them to a Contract
Administrator, Secretary I and an additional Construction
Inspector. Based on analysis of time required to do
projects (obtained from time cards), the proposed staff of 9
will be able to get the job done.
Of the $18.5 million in projects in the current C.I.P.,
$10.5 million are being done by the Capital Projects
Division. This project level of $10 million is anticipated
to continue during the next five years and almost certainly
much longer.
EXHIBIT 4
JUSTIFICATION FOR REORGANIZAT1,ON
(continued)
This year's goal of $5.2 million in completed projects is
short of the total due to lack of sufficient staff to work
on all the projects simultaneously. Clearly more effort is
needed to reach the desired goal of completing $10 million
in projects every year.
Estimates of the staff hours to complete projects have been
compiled from time cards and may be expressed as a per-
centage of the project construction cost. For staff to
administer the design (actual design done by consulting
firm) and construction and perform inspection requires about
4% of construction costs for staff time and expenses. For
$10 million worth of projects to be done in one year, an
expenditure of approximately $400,000.00 is required for
staff time and expenses. The current division budget is
$217,000.00 or half what is needed. The proposed budget of
$364,000.00 accurately reflects the level of effort
required.
Even with augmented staff, it seems clear that output cannot
be doubled without maximizing the efficiency of the design
process. The present process of selecting a design
consultant and awarding a project contract is cumbersome and
time consuming. For almost every project, staff must issue
a Request for Qualifications (RFQ) and a Request for
Proposal (RFP). Then a selection must be made from as many
as ten proposals received, a price negotiated, and a
contract awarded by City Council following prior approval by
several City departments, It is an awkward and clumsy
process.
The "turnkeyy1 process which is proposed would select a
single qualified engineering firm to design all projects for
one year. The contract could be extended at the end of the
year or a different firm selected. With the prospect of $10
million in projects to be designed, a single firm could gear
up for such a concentrated effort and produce an output that
would far exceed what could otherwise be done, recognizing
the City's staff and space limitations. Of course, such a
process will require careful advance project cost estimates,
the setting of a maximum or "upset" figure for each design
project, and a monitoring system to ensure that design
production is timely and within budget.
It is proposed that the rigorous and time consuming chore of
plan checking by City staff be eliminated. The selected
design firm would be required to guarantee its work, backed
by certification of a Registered Professional Engineer, Hold
Harmless Agreements, and Errors and Omissions Insurance.
ENGINEERING DEPARTMENT CAPITAL PROJECTS DIVISION
CAPITAL PROJECTS
STATUS IN BRIEF
MAY 1, 1985
__y
I CURRENT STATUS I I ENGINEERING DEPARTMENT
I May 1, 1985
I I
I
PERCENT BUDGETED PERCENT
PROJECT ACTIVITY NUMBER BY PROJECTS COST BY COST
I Preliminary 5 13 $ 665,000 6
19 i I Design 15 37 1,996,060
I Advertise
I Construct ion
1 3
5 13
2,908,000 2a I
2,833,450 27 I
I Completed 10 26 1,840,330 la I - 8 187,530 - 2 I I ENGINEERING DEPT. TOTALS 39 100% $1 0,430,370 100% I
3 - I Scheduled
I FORECAST FOR 1984-85 FISCAL YEAR
I ALL CAPITAL PROJECTS
I October 1, 1984
I
I
I
BUDGETED PERCENT
PROJECT ACTIVITY NUMBER COST BY COST
I Completed 20 $ 5,183,780 2a I I Under Construction 5 a,a63,443+ 50 I I In Design 7 1,449,060 a I I On Hold 2 157,530 1 I 1 Deleted 1 14,000 0 I - 13 I I By Other Departments - I TOTALS: 47 $1 7,968,376 100% I
12 2,300,563
I I
RHA
CAPITAL PROJECTS
SUHARY STATUS OF ALL PROJECTS
FISCAL YEAR 1984 - 1985
Uay 1, 1985
El Canino Real N/O PAR
CamaJCollege As;essnent Dist.
Rancho Smta Fe Rd. Asses. Dist.
El Canino Real Si@ Comect
Park Drive Assessnerrt District
Rancho hta Fe realiqment
3166
31&*
3 190
31
31 ai
- w
ESIrn:
31 35
3140
3142
31 44
31%
316W
31 72
31 77
3178
3179
3180
318W
318W
3189
3704
IWERTISE:
M98
Entezarj
Barnan
Allen
Allen
Bwrran
Wojcik
Carlsbad Boulevard Bridge
JanesDr. Assess. Est.
bliday Park Parking
Faraday Avenue
Jefferson Path
bian Road Asessmnt District Library Parking Lot
Elm Averue Siqals - Elm mi ECR
Si@ Mod: ECR & Chestnut
Siqal: EJJ? & Kelly
South College Assessnent Dist.
La Costa AvemR Intersection
Depot Parking Lot
Tamarack - Adans to Hicjlld
si@ Mod: Carlsbad & Grad
Entezarj
Wojcik
Gttezarj
Gttezarj
AllMl
Allen Entezarj
Allen
Allen
Bwnan
Bounan
Bwrsan
Entezarj
Entezarj
Allen
--
XELSTRUCTI[E(:
3079
3085
31 59
3168
3169
Poinsettia Lane Bridge Central Business Storm Drain Police Firing Raqe
CarlWoinsettia Intersectior
Carlsbad Blvd. Stonn Drain
i
Entezarj
Allen
Allen
Gttezarj
Allen
* Desiq by Consult& u-&r cartrat.
+H New Project - Not in original C.I.P.
JERCENT
INLETE
5
100
M
1U
50
--
9o
50
90
9ow
sI1y,
I@
9ow
10
9ow
5[y,
ICW
103
E*
15 1W
0
85
50
90
0
95
-
SMWLED
XMXETICN CF
XWJSlRUCTIaV
07/86
12/86 lBD
02/85
11/85
--
12/85
11/85
1 2/85
11/85
05/86
11/85
1 2/85
12/85
1 2/85
05/85
05/85
08/85
1 2/85
12/85
04/85
12/85
06/85
05/85
05/85
08/85
04/85
~
STATUS
jchedule will be moved up
kd to accpire W
)ebt Limit Hearirg 06/04/85
'etitiors sent to mrs
1cpipm-t beirg tested
31d kt
3etailed desiq cnderway
%rking wd street inprov.
'inal Plan Check required j3m.lltant selected
-id plan check required
ksm by develcper khed depends on develcper
Wlic Heariq 06/85
hait. cent. Bus. Ston Dm.
Pagelof2 a-N
II
..
ENGItERIK; WARWNT CPPITAL PROJECTS DIVISICN
CAPITAL VTS
SUEIARY STATUS OF ALL PROJOCTS
FISCAL YEAR 1984 - 1985
May 1, 1985
“€R ‘PmJOCT I I XEPLETED: I
3109
31 41
3143
3146
3149
3160
3165
3185
3186
371 5
;MDuED:
3161
3164
31 75
3Y om:
3176
3183
3720
3722
31 39
3173
3174
31 25
31 33
31 26
3182
3721
ArmyNavy Crassiq Siqd
Alga Rod Widening
Traffic Siqal: Yarm & PAR
Traffic Siqal: CVR & ECR
Alga/Alicmte Traffic Siqal
City Hall Modulars
Beach Bluff Protection Stdy
Raised Pavement Markers
Streetsxp!: State & Grad
TmaCk-mill to Skyline
Cynthia Lane
Hrnlock cUl&Sac
Artificial Seaweed
Valley/euena Vista Sewer
Lift Station wades
bvelt Street Sidewalk
Washiqton Street
Fuerte Park
Calavera Park
chase/pine Field Rmation
Fire Station: Poinsettia Lane
Fire Station: Calavera Hills
Palm Joint Outfall
Vista/carls&d Tru-k Sewer
Soys & Girls Clh Remvatbn Alley: Jefferson & l-krdinq
-
FTKECT
M9NACER
kbjcik
Entezari
Wojcik
Entezari
Entezari
Entezari
Entezari
Allen
Bwnan
kbjcik
Ulen
Entezari
Allen
Uh Uh Uh Uh
PM
PM
PM
FIRE
FIRE
-
ERC€NT
DPLETE
100
100
100
100
100
100
100
100
100
la3
Ial
5(rc
0
7Y
75 w
90
0
0
SmMara~ 25 1 p.
1 0/84
11/84
Ow84
08/84 10/w
12/84 11/84
11/84
09/84
CNW
CNm auW
05/85
10/85
06/85
12/85
08/86 05/85
06/85
06/85
12/85
12/85
06/84 ELETED
12/84
Completed 02/19/85
Completed 02/85
Ccnpleted 02/19/85
Canpleted 08/21/84
Conpleted 08/21/84
Ccnpletd 02/85
Ccnpleted 01/85
Ccnpleted 11/84
Canpleted 11/84
Canpleted 11/05/84
Awaitirq adjacent &velaper
Perdiq talk with SXE
Canpleted
hi9
Need RW
big?
Construction (grdiq)
Preliminary
Corstruction
hig? only
kip only - start 11/84
C-t. - Awarded 09/27/84
Preliminary
I\bt a City Project
Proj. drcpped - HIDdenid
* Desiq by Cwsultant uder contract. Page2of2
la, &w