HomeMy WebLinkAbout1985-06-11; City Council; 8206; Hunt Properties/Eastern Batiquitos LagoonOil. OF CARLSBAD — AGENDA BILL
AB#_
MTG 6/11/85
DEPT._
TITLE: HUNT PROPERTIES/EASTERN BATIQUITOS
LAGOON: A PROPOSED AMENDMENT TO THE
CARLSBAD LOCAL COASTAL PROGRAM (LCP)
RECOMMENDED ACTION:
1. Establish a six-week review period to begin June 11, 1985
and end at a July 23, 1985 public hearing, during which interested
parties may review the proposed LCP amendment.
2. Direct staff to prepare a notice of the availability of the
LCP amendment document pursuant to Title 14, section 13515 of the
California Administrative Code.
ITEM EXPLANATION;
The area covered by the proposed LCP amendment includes a portion
of the Hunt Properties on the north shore of Batiquitos Lagoon, Green
Valley and the lagoon. Also included are public and private holdings
in the rest of the eastern lagoon (see Exhibit 2). The entire area
was annexed to the City of Carlsbad in February 1985. Because the
property was not, until recently, within the City's jurisdiction, the
responsibility for LCP preparation rested with the County of San
Diego. The annexation has removed the property from County land use
jurisdiction. The annexation also effectively removed the property
from the County's LCP and thus a hole has been created in the LCP
policies for the area. In creating this hole the Coastal Commission
has acknowledged the need for the City to submit a replacement LCP
segment as an amendment to the larger Carlsbad LCP document.
The documents attached to this agenda bill are land use policies
and implementing zoning ordinances which constitute an LCP amendment
for the? subject properties. The organization for this LCP amendment
was configured to "fit" the Carlsbad (Mello I and II area) LCP format.
The proposed amendment establishes the general conditions that will
aPPly to development in the Coastal Zone. The proposed LCP amendment
establishes the Developable Agriculture Zone over both the north shore
and Green Valley and provides for the enhancement of the lagoon, based
on a plan being prepared by the Coastal Conservancy. In addition, the
proposed amendment allots for the property to be developed under a
master plan consistent with the Carlsbad. General Plan.
The process for the Hunt'LCP amendment will be the same as the
Carlsbad (Mello I and II) and Sammis LCP process now under way. The
State Administrative Code requires the City to open a six-week review
period for all interested parties of the LCP amendment proposal. The
Coastal Commission has supplied the City with a' list of interested
_ parties which the City has used during all previous amendment review
O periods. After the six-v/eek review Council would hold a public hear-
tr ing on the proposed amendment. Following the hearing Council would
consider adopting a resolution approving the LCP amendment, indicating
its intent to implement the LCP if approved by the Coastal Commission,
O
3
OO
PAGE 2 OF AB #
The Hunt LCP amendment is expected to follow the City's
current LCP efforts by about three months. Both the Carlsbad
and the Sammis Properties LCPs are scheduled for Coastal Com-
mission consideration at the July 23-26, 1985 meeting to be
held in San Diego.
EXHIBITS;
1. Hunt Properties amendment to the Carlsbad Local Coastal
Program.
2. Location map.
R/AG 5/85
HUNT PROPERTIES/EASTERN BATIQUITOS
LAGOON LCP AMENDMENT
Exhibit 2
HUNT PROPERTIES
Proposed Amendment to the
Carlsbad Local Coastal Program
June 18, 1985
Exhibit 1
ATTACHMENT C
HUNT PROPERTIES LAND USE
This attachment amends the Carlsbad Local Coastal Program
by including and addressing the Hunt Properties within the
City of Carlsbad's coastal zone - outside the Mello I and II
areas. The subject geographical area is east of Interstate 5
and generally includes the north shore of the Batiquitos Lagoon,
Batiquitos Lagoon and Green Valley. The area was, prior to
annexation into the City of Carlsbad in 1984, part of the San
Dieguito LCP.
A. Land Use Categories
Sub-areas:
1. Batiquitos Lagoon north shore area (outside Batiquitos
Lagoon wetland) - this area is designated Developable
Agriculture Land (DAg). If the property is developed
under the DAg conversion provisions set forth in the
zoning section of this attachment, a maximum residen-
tial density of 2.8 dwelling units per acre may be
achieved. Development standards shall be those of the
R-l zone with qualified "Q" overlay.
2. Batiquitos Lagoon - the lagoon wetland area is desig-
nated Open Space (0-S). Any restoration enhancement
and preservation of the lagoon shall be consistent with
the Batiquitos Lagoon Enhancement Plan. (See Environ-
mentally Sensitive Habitats section.)
3. Green Valley (south of existing La Costa Avenue and
west of El Camino Real) - the riparian corridor which
traverses the property from south to north shall be
designated Open Space (0-S). The precise boundaries
of the corridor shall be established through future
mandatory environmental review prior to any develop-
ment on site.
The area outside the identified riparian area is desig-
nated Developable Agricultural Land (DAg). If the
property is developed under the DAg conversion pro-
visions set forth in the zoning section of this
attachment, a maximum residential denisty of 2.8
dwelling units per acre may be achieved. Development
standards shall be those of the R-l zone with "Q"
overlay. ' /-
4. The above subparcels may be combined, planned and pro-
cessed under a single master plan and specific plan
consistent with those uses permitted by the Carlsbad
General Plan. ''••••>
-1-
B. Developable Agricultural Lands
1. Areas designated Developable Agricultural Lands may
be converted to non-agricultural uses if the City
finds at the time of proposed conversion that con-
tinued or renewed agriculture is infeasible.
2. As a condition of approval of any conversion of
agricultural land located within this area to urban
uses, the applicant shall be required to pay a coas-
tal resource enhancement fee of $6,500 per acre con-
verted to urban uses to 'be administered by a joint
Coastal Conservancy/City of Carlsbad trust. If a
future enhancement study of Batiquitos La/goon deter-
mines that a greater per-acre coastal resource
enhancement fee is necessary to implement 'the plan,
then the per-acre fee may be increased by vote of the
Carlsbad City Council as necessary, but not to exceed
$10,000 per acre of non-prime agricultural land con-
verted to urban uses.
3. The City of Carlsbad in consultation with the State
Coastal Conservancy shall create a Batiquitos Lagoon
Trust. Consistent with California Public Resources
Code Section 30171.5 all coastal resource enhancement
fees collected pursuant to subdivision (b) shall be
administered by the trust. Separate accounting of
fund collection, management and disbursement shall
be carried out by the City.
a. Priority for the Expenditure Funds -
The following are the categories and priorities
in order of expenditure of funds:
i. Restoration of natural resources and
wildlife habitat in Batiquitos Lagoon.
ii. Development of an interpretive center
at Buena Vista Lagoon.
iii. Restoration of beaches managed for
public use in the coastal zone in
the City of Carlsbad.
iv. Any other project or activity benefiting
natural resources in the coastal zone in
the City of Carlsbad that is provided
for in the local coastal program of the
City of Carlsbad.
b. The priorities in 3a. above are established by
Public Resources Code Section 30171.5. If those
priorities are determined to be illegal, funds may
be expended according to the priorities established
in the Mello I and II LCP.
-2-
Land Uses Established by Master Plan
Land use categories provided in section A. including all
provisions (including mitigation fee) of the Developable
Agricultural Lands category may be replaced with alter-
native land uses through the provisions of a Master Plan.
These uses must be represented as permitted by the Carlsbad
General Plan.
The highest priority of resource protection for these pro-
perties is the Batiquitos Lagoon wetland. It is recognized
that other resources exist within the possible Master Plan
area. The Master Plan mechanism provides a methodology for
permitting land uses reflective of the necessary hierarchy
of various resource values.
Section 30007.5 of the Coastal Act states:
"The Legislature further finds and recognizes
that conflicts may occur between one or more
policies of the division. The Legislature,
therefore, declares that in carrying out the
provisions of this division such conflicts be
resolved in a manner which on balance is the
most protective of significant coastal resour-
ces. In this context, the Legislature declares
that broader policies which, for example, serve
to concentrate development in close proximity
to urban and employment centers may be more
protective, overall, than specific wildlife
habitat and other similar resource policies."
1. If a Master Plan for all land use areas is pursued,
the substitution of uses for those designated in
Section A., and the elimination of an agricultural
conversion mitigation fee shall be allowed only
through the following findings:
a. The Master Plan provides overriding bene-
fits to the resources of the lagoon area.
b. The Master Plan provides significant pro-
tection and enhancement of the sensitive
habitats in and around the wetland above
and beyond the existing land use control's
current requirements.
2. In considering a Master Plan for the combined sub-
areas, possible trade offs for increased resource
protection could be reflected through the following
techniques: r \ - •-:
a. Increased development density on areas not
of high resource value to provide protec- < -••<••,''>
tion for more sensitive habitats and ; .: ;'
visually important open space areas. - :
-3-
7
b. Conversion of marginal agricultural
lands to accommodate clustered or
buffered development allowing the
permanent preservation protection and
enhancement of high priority biological
areas.
c. Development of marginal and/or disturbed
riparian and/or wetland areas to provide
additional enhanced or restored riparian or
wetland habitats in more stable, control-
led or buffered areas.
d. Increased development density or intensity
to provide sufficient project revenues
for provision of innovative wetland res-
toration, enhancement and maintenance
techniques.
D. Grading and Erosion Control
The identification of Batiquitos Lagoon as the primary
coastal resource within the subject area warrants strin-
gent controls on upstream development activities. Down-
stream impacts of possible erosion and sedimentation,
due to development must be limited to insignificant levels.
In addition, many slope areas contain sensitive vegetation
and support a variety of wildlife species. Slope areas
also pose possible geologic hazards and require close
development review. In light of the above conclusions,
the following criteria are established:
1. Grading of slopes in excess of 25% is prohibited.
To allow exceptions to the disturbance restric-
tion the Carlsbad City Council must make findings
of fact regarding slope disturbance as a part of
the issuance of a coastal permit.
All of the following are mandatory findings for
all exceptions:
a. A soils investigation conducted by a
licensed soils engineer has determined
the subject slope area to be stable and
grading and development impacts miti-
gatable for at least 75 years, or life
of structure.
b. Grading of the slope is essential to the
development intent and design.
c. Slope disturbance will not result in
substantial damage or alteration to major
wildlife habitat or native vegetation areas.
-4-
d. If the area proposed to be disturbed is
predominated by steep slopes and is in
excess of 10 acres, no more than one
third of the total steep slope area
shall be subject to major grade changes.
e. If the area proposed to be disturbed is
predominated by steep slopes and is less
than 10 acres, complete grading may be
allowed only if no interruption of sig-
nificant wildlife cor,r,idors occurs.
f. Because north-facing slopes are generally
more prone to stability problems and 'in
many cases contain more extensive natural
vegetation, no grading or removal of veg'e-
tation from these areas will be permitted
unless all environmental impacts have been
mitigated. Overriding circumstances are
not considered adequate mitigation.
2. Drainage and runoff shall be controlled so as not to
exceed at any time the rate associated with property
in its present state, and appropriate measures shall
be taken on and/or off site to prevent siltation of
lagoons and other environmentally sensitive areas.
3. Grading activity shall be prohibited during the rainy
season from October 1st to April 1st of any year.
A. All graded areas shall be hydroseeded prior to
October 1st with either temporary or permanent land-
scape materials. Landscaping shall be maintained and
replanted if not established by December 1st.
5. Grading plans shall indicate staking or fencing of
open space areas during construction and shall speci-
fically prohibit running or parking earthmoving equip-
ment, stockpiling of earthwork material, or other
disturbances within the open space areas.
6. Any necessary temporary or permanent erosion control
devices, such as the desilting basin, shall be dev-
eloped and installed prior to any on- or off-site
grading activities, or, concurrent with grading,
provided all devices are installed and operating
prior to October 1st, and installation is assured
through bonding or other acceptable means.
7. The developer must provide for the long term main-
tenance of drainage improvements and erosion control
devices. ,,
-5-
7
E. Landscaping
In order to guard against introduction of any species
which are inherently noxious to or incompatible with
the adjacent lagoon habitat, drought tolerant plants
and native vegetation shall be used in areas of close
proximity to the wetland to the maximum extent feasible.
Landscaping adjacent to structures should provide an
effective screen of urban development.
F. Environmentally Sensitive Habi'tats
The environmentally sensitive habitats (wetlands and
25%+ slopes) shall be preserved as open space. These
sensitive areas shall be protected from any significant
disruption. Furthermore, development on the bluff tops
shall be set back from the bluff edges to prevent possi-
ble impacts on adjacent environmentally sensitive habitats.
Any restoration, enhancement and preservation of Batiquitos
Lagoon shall be consistent with a Batiquitos Lagoon Enhance-
ment Plan. When completed by the California Coastal Conser-
vancy and adopted by the City of Carlsbad and certified by
the California Coastal Commission, the Batiquitos Lagoon
Enhancement Plan will become an attachment to the Carlsbad
Local Coastal Program.
The provisions called for in F. will be implemented through
the approvals granted for development.
G. Scenic and Visual Qualities •
The scenic and visual qualities of the subject areas are of
great value to the region. Again, the focal point for these
qualities is Batiquitos Lagoon. The viewshed to the lagoon
and from the lagoon shoreline are important resources. Many
of the requirements previously established by this element
address visual quality components, such as:
— blufftop setbacks
— preservation of slope areas
— preservation of lagoon and riparian habitats
— enhancement of the lagoon environments
— controlled grading ;
In addition to these provisions, the following shall be pro-
vided to further address the important scenic and visual
character of the area:
1. La Costa Avenue shall be established as a scenic
corridor pursuant to the City of Carlsbad General
Plan Scenic Highways Element.
-6-
2. If a public roadway is established along a
part or the entire lagoon north shore, scenic
corridor status shall be established for that
area.
3. Existing mature, healthy vegetation, such as
eucalyptus stands, shall be preserved where
possible.
4. Off-site signing along public roadways shall
be prohibited.
5. If a master plan is pursued for the property,
the provisions of the City of Carlsbad Scenic
Preservation Overlay Zone should be utilized
where appropriate.
6. View points shall be established along the north
and south shore areas, to provide varied visual
access to the lagoon, across the lagoon and from
the lagoon to upland areas.
7. View points should offer a mix of accessibility for
pedestrian, bicycle and motor vehicles.
8. If a master plan is pursued, consideration may be
given to combined public visual access and visi-
tor-serving uses, if the use is provided compatibly
with adjacent or nearby coastal resources.
H. Public Access
The primary coastal resource in the area is Batiquitos
Lagoon. The balance of public access and ecological pro-
tection requires careful consideration. With this under-
standing the following goals are established:
1. Continuous bicycle and/or pedestrian access should
be provided along the-lagoon south shore and along
El Camino Real.
2. Controlled pedestrian access to the lagoon for
wetland viewing should be provided along the south
lagoon shore at a minimum of three points.
3. Lagoon overlook areas for pedestrian and bicycle
access should be provided along El Camino Real at
a minimum of three points.
4. Continuous motor vehicle, bicycle and pedestrian
access in close visual proximity to the north
lagoon shoreline should be established.
-7-
5. Controlled pedestrian access to the lagoon for
wetland viewing should be provided along the
north lagoon shoreline at a minimum of three
points.
6. All direct access points adjacent to the wetland
shall be reviewed and approved by the California
Department of Fish and Game prior to establishment.
7. All accessways for public use shall be established
by irrevocable offers of .dedication to appropriate
public agencies as a condition of development.
I. Visitor-Serving Uses
If a master plan is pursued for the property, visitor-
serving uses in close proximity, to the wetland may be
considered under the following provisions:
1. Disturbance of marginal and/or disturbed
riparian and/or wetland areas are offset by
provision of enhanced or restored riparian
or wetland areas in more stable, controlled
or buffered areas. Those areas disturbed
shall be replaced at a one-to-one area ratio.
2. Visitor-serving uses must be consistent with
the Carlsbad General Plan.
3. Inclusion of the uses can be shown to provide
sufficient additional project revenue to allow
otherwise unavailable lagoon restoration,
enhancement and maintenance techniques.
J. State Lands Commission Review
Prior to issuance of the coastal development permit, permittee
shall obtain a written determination from the State Lands
Commission that: ;
1. No State Lands are involved in the development, or
2. State Lands are involved in the development and
all permits required by the State Lands Commi-
ssion have been obtained, or
3. State Lands may be involved in the development,
but pending a final determination an agreement
has been made with the State Lands Commission
for the project to proceed without prejudice to
that determination.
-8-
ATTACHMENT 8
HUNT PROPERTIES ZONING
Addition to the Planned Community Zone - the following new
section shall be added to Ch. 21.38 of the Carlsbad Municipal
Code:
Additional Standards - Hunt Properties, sub-areas; Batiquitos
Lagoon North Shore, Batiquitos Lagoon, Green Valley.
1. Permits Required. No development, including trat not
limited to land divisions, as defined in Sect-ion
21.04.108 of this code shall occur without a Coastal
Development Permit having first been issued pursuant
to Chapter 21.65 of this Code. A master plan or a
planned development permit processed according to
Section 21. .060 shall be considered a coastal
permit if also processed in compliance with Chapter
21.65.
2. Maximum Density of Development.
A. If all identified sub-areas are not combined
and processed under one master plan, the maxi-
mum density of development shall be as provided
in A-l, 2 and 3 of Attachment C of the Land Use
section of the Carlsbad Local Coastal Program,
upon payment of an agricultural conversion miti-
gation fee pursuant to the provisions of the
Developable Agricultural Zone (DAg), i.e.
Batiquitos Lagoon North Shore: residential 2.8
dwelling units per acre maximum; Batiquitos
Lagoon: open space; Green Valley: riparian
corridor - O.S, remainder residential 2.8
dwelling units per acre maximum. These den-
sities shall be implemented under the standards
of the following zones:
Batiquitos Lagoon North Shore: R-1-"Q"
Batiquitos Lagoon: O.S.
Green Valley: R-1-"Q", O.S.
B. If the identified sub-areas are combined and pro-
cessed under one master plan the master plan process
shall establish specific land use locations and
attainable densities consistent with the applicable
General Plan categories. No agricultural conversion
mitigation fee shall be required, however:
Under the combined master plan approach, criteria
set forth in the Carlsbad Local Coastal Program
Land Use section, Attachment C, item C-la. and b.
must be found. They are:
-1-
13
a. The master plan provides overriding
benefits to the resources of the lagoon
area.
b. The master plan provides significant pro-
tection and enhancement of sensitive
habitats in and around the wetland above
and beyond the existing land use control's
current requirements.
i
Also, the combined maser plan process shall
review and consider the techniques outlined
in the Carlsbad Local Coastal Program'" -Land
Use section, Attachment C, item C-2a, b, c,
and d.
3. Erosion, Drainage, Sedimentation. Subject to the modifi-
cations, additions, or exceptions expressed below, as a
part of the permit application, the applicant shall sub-
mit an erosion, sedimentation and drainage plan prepared •'
by a qualified professional, including the requirements of
the Model Erosion Control Ordinance reprinted in the Appen-
dix to the June 1980 Carlsbad Master Drainage Plan, the
requirements of the Master Drainage Plan, and the additional
requirements specifically enumerated herein. For purposes
of this zone, the June 1980 Master Drainage Plan and its
appendices are herein incorporated by this reference and
are part of this zone. The general provisions, standards
content of plans and implementation contained therein are
in addition to the provisions below. Approved development
shall include the following conditions, in addition to the
requirement specified above:
A. A soils map in the scale of 1" = 100 feet, showing
both the erodibility of soils and the type and
location of soils, using the SCS Land Use Capa-
bility Classification System and standards of
erodibility developed by SCS. The soils map
shall be certified by a soils engineer as true
and accurate.
B. Drainage and runoff shall be controlled so as not
to exceed at any time the rate associated with
property in its present state, and appropriate
measures shall be taken on and/or off-site to
prevent siltation of lagoons and other environ-
mentally sensitive areas.
C. The appropriate measures shall be installed prior
to on-site grading. ,
D. All bluff slopes shall be placed in open space
easements as a condition of development approval. •••••<
-2-
Grading of slopes in excess of 25% is prohibi-
ted. Exceptions to this provision require
findings of fact by the Carlsbad City Council
as set forth in the Carlsbad Local Coastal Pro-
gram Land Use section, Attachment C, item
D-la. to f.
Mitigation measures tailored to project impacts
and consistent with the control of cumulative
development shall be implemented prior to dev-
elopment in accordance with the following addi-
tional criteria:
>
a. Submittal of a runoff control plan designed
by a licensed engineer qualified in hydrology
and hydraulics, which would assure no increase
in peak runoff rate from the developed site
over the greatest discharge expected from the
existing undeveloped site as a result of a
10-year frequency storm. Runoff control
shall be accomplished by a variety of measures
including, but not limited to, on-site catch-
ment basins, detention basins, siltation
traps and energy dissipators and shall not be
concentrated in one area or a few locations.
b. Detailed maintenance arrangements and various
alternatives for providing the ongoing repair
and maintenance of any approved drainage and
erosion control facilities. If the off-site
or on-site improvements are not to be accepted
or maintained by a public agency, detailed
maintenance agreements shall be secured prior
to issuance of a permit.
c. All permanent runoff and erosion control
devices shall be developed and installed prior
to or concurrent with any on-site grading
activities.
d. All grading activities shall be prohibited
within the period from November 1st to March
31st of each year.
e. All areas disturbed by grading, but not com-
pleted during the construction period, including
graded pads, shall be planted and stabilized
prior to November 1st with temporary or perm-
anent (in the case of finished slopes) erosion
control measures and native vegetation. The
use of temporary erosion control measures, such
as berms, interceptor ditches, sandbagging, fil-
tered inlets, debris basins and silt traps, shall
-3-
be utilized in conjunction with plantings
to minimize soil loss from the construction
site. Said planting shall be accomplished
under the supervision of a licensed land-
scape architect and shall consist of seeding,
mulching, fertilization and irrigation ade-
quate to provide 90 percent coverage within
90 days. Planting shall be repeated, if the
required level of coverage is not established.
This requirement shall apply to all disturbed
soils, including stockpiles.
f. Grading plans shall indicate staking or fencing
of open space areas during construction.' and
shall specifically prohibit running or parking
of earthmoving equipment, stockpiling o'f earth-
work materials, or other disturbances within
open space areas.
A. Landscaping. In order to guard against the introduction
of any species which are inherently noxious to, or incom- •'
patible with the adjacent lagoon habitat, the master plan
shall indicate that drought tolerant and native vegetation
shall be used in areas of close proximity to the wetland
to the greatest extent feasible. Prior to development, a
detailed landscape plan must be submitted and approved by
the City. Said landscape plan shall be reviewed by the
Department of Fish and Game for compatibility of landscape
materials with adjacent environmentally sensitive habitat
species.
5. Environmentally Sensitive Habitats. The environmentally
sensitive habitats located on both wetlands and 25%+
slopes shall be preserved as open space. These sensitive
areas shall be protected from any significant disruption.
Furthermore, development on the bluff tops shall be set
back from the bluff edges to prevent possible impacts on
adjacent environmentally sensitive habitats.
Detailed topographic maps shall be prepared by qualified
professionals including biologists, hydrologists and engi-
neers in sufficient detail to locate the boundary of
lagoon or wetland and upland areas. The scale shall not
be less than 1" = 100 feet with a contour interval of 5
feet, and shall include an overlay delineating the loca-
tion of the development. The lagoon and wetland areas
shall be delineated according to the requirements of
Section 30121 of the Coastal Act and the LCP Mapping
regulations, subject to the review and approval,of the
Department of Fish and Game.
6. Scenic and Visual Qualities. The scenic and visual quali-
ties of the subject areas are of great value to the region.
Specific criteria shall be included in the maister plan to
-4-
reflect the requirements of the Carlsbad Local
Coastal Program Land Use section, Attachment C, item
G-l to 8.
7. Public Access. The primary coastal resource in the
area is Batiquitos Lagoon. The balance of public
access and ecological protection requires careful con-
sideration. The master plan shall reflect the goals
established in the Carlsbad Local Coastal Program Land
Use section, Attachment C, item H-l to 7.
8. Visitor-Serving Uses. Through the comprehensive planning
of the master plan process, visitor-serving uses, in close
proximity to the wetland, may be considered under the pro-
visions of the Carlsbad Local Coastal Program Land Use
section, Attachment C, item 1-1, 2 and 3.
9. State Lands Commission Review. Prior to issuance of the
coastal development permit, permittee shall obtain a writ-
ten determination from the State Lands Commission that:
A. No State Lands are involved in the development, or
B. State Lands are involved in the development and
all permits required by the State Lands Commis-
sion have been obtained, or
C. State Lands may be involved in the development,
but pending a final determination an agreement
has been made with the State Lands Commission
for the project to proceed without prejudice to
that determination.
-5-