q4 GG3 CII OF CARLSBAD - AGENL,. BILL
TITLE:
REqUEST FOR ADDITIONAL PERSONNEL
IN THE ENGINEERING DEPARTMENT
RECOMMENDED ACTION:
By motion, adopt Resolution No. FJqr
new positions, appropriating funds and dTrecting the City Manager to recommend changes in Engineering Fees.
authorizing the hiring of seven
ITEM EXPLANATION --
This item is a request to add additional personnel to bring Engineering
staffing up to an adequate level to keep pace with the demands on the
department.
It is increasingly difficult for the Engineering Department to keep pace with
the level of work being submitted to the City in the Current Development
Division and to achieve the level of construction of public facilities desired
by the City Council.
understaffed.
Every division within the Engineering Department is
The attached memorandum to the City Manager explains in detail the current
situation and the potential consequences of this situation.
FISCAL IMPACT
The estimated cost of funding this request is --LA- $161 650 - in salary and fringe
benefits for the balance of FY 85-86.
salaries and benefits.
The annual fiscal impact is $293,300 in
Exhibit A to the Resolution explains these costs.
These additional costs will be covered by fee increases which will be brought
back to the City Council prior to filling any positions.
EXH IBI TS
1. Memoran9m and attachments to the City Manager from the City Engineer
dated November 19, 1985.
2. Proposed Engineering Department Organization Chart.
3. City Council Resolution No. ---- F.?(/f =~ __---- .
MANAGER'S NOTE:
The staff report from the Engineering Department requests
twelve additional positions. Rather than approve all twelve
positions, the City Engineer and I have decided that seven
will be sufficient at this time. After the personnel have
been hired and we are able to evaluate the effectiveness of
the new organization, additional positions can be considered
if necessary.
I
.-
ADDITIONAL ENGINEERING STAFF
ADDITIONAL POSITIONS:
1 001-820-3120-1100 $ 29,700.00 Assistant City Engineer
Associate Civil Engineer 1 001-820-3120-1100 $ 23,950.00
Sr. Construction Inspector 1 001-820-3120-1100 $ 19,600.00
$ 73,400.00
TO TAL 7 $1 46,650.00
Construction Inspector - 4 001-820-3120-1100 I
PRO-RATED IMPACT FY 85-86 (6 Months)
PLUS: Equipment
TOTAL IMPACT FY 85-86
$1 46,650.00
$ 15,000.00
$161,650.00
I
i 1 L2-J 1
I
-- ,L, I
November 19, 1985
TO: CITY MANAGER
FROM: City Engineer
NEED FOR ADDITIONAL PERSONNEL AND REORGANIZATION OF THE
ENGINEERING DEPARTHENT
RECOMMENDATION
Reorganize the structure of the Engineering Department.
Authorize the hiring of ten new positions. Increase the plan
checking and inspection fees by approximately 70% to cover
engineering costs.
BACKGROUND
It is increasingly difficult for the Engineering Department to
keep pace with the level of work being submitted to the City and
achieve the level of public facilities desired by the City
Council.
Every division within the Engineering Department is understaffed.
There is generally not time to spend analyzing problems to
develop a solution with a reasonable degree of confidence, no
time to train employees--new staff members are expected to take
over a portion of the workload without adequate orientation and
training, and there is no time for proper administration.
The entire engineering staff is working at full capacity, and the
ever-growing workload and overcrowded conditions have created a
constant high-stress environment. Relief in the way of
additional staff and additional space is vital to productivity,
efficiency and quality.
The department worked together to prepare this report; staff
interviews and surveys were used to produce the data. Our
Engineering Department has a high quality staff of people who want to perform at the level of excellence which they are
capable. Under the present conditions, top performance is
difficult.
Engineering Staffing Report
November 19, 1985
Page 2
CURRENT SITUATION
Current >Develo,pment:
In 1984, the number of approved housing units nearly doubled from
the previous year (see Exhibit A). This indicates an increase in
development, thus an increase in the workload of development-
related departments.
The Engineering Department processes new development plans in its
Current Development Division. The City's development process
begins in the Planning Department when a developer submits a Land
Use Planning Application (see Exhibit B for review process).
This application requests review for items which can range from a
simple zone change to a major project involving a tract map, an
EIR, a General Plan amendment, a master plan and a zone change.
Each application is sent first through "Preliminary Review" in
the Engineering Department. Preliminary Review takes about three
months and usually involves three rounds through the department.
Preliminary Review takes plans as far as the Planning Commission.
Following Planning Commission and City Council approval, plans
must go through Final Review. Final Review encompasses review of
the final map, improvement plans and grading plans. This process
takes approximately six (6) months.
With each plan passing through Engineering up to three times for
Preliminary Review and four times for final review, it is
understandable that as development in the City increases, the
workload in Engineering rises accordingly. As a result of the
heavy workload, routine matters are neglected, processing is
slowed, and plans are not receiving as thorough a review as
desirable the first or second time checked (often resulting in
the necessity of an extra plan check to address all the
conditions).
Exhibit C shows the current service level provided by the Current
Development staff compared to the level of work demanded by the
task at hand. This chart shows a need for 8.4 engineering
positions in Current Development. The workload is currently
being handled by three associate civil engineers and an assistant
civil engineer under the supervision of the Principal Civil
Engineer. We are requesting two (2) additional engineering
positions.
7
Engineering Staffing Report
November 19, 1985
Page 3
Municipal Projects Division:
The Municipal Projects Division is responsible for contract
administration for design and construction of all the "City"
projects, such as the Safety & Service Center, Carlsbad Boulevard
Widening and Stagecoach Park.
The Capital Improvement Program is well underway and the number
of projects under construction has increased from $1.4 million in FY 82-83 to $10.8 million this year (see Exhibit D). There are
currently 34 active Capital Improvement projects. The current
engineering staff consists of a Principal Civil Engineer and two
associate engineers. Since August, 1985, a consultant associate
engineer has been hired to assist with the workload. An
Assistant City Engineer position was recently approved for this
division, but the position is not yet filled. Working at maximum
capacity, the current staff does not have the time to devote to
projects to ensure maximum quality. Time for planning ahead and
managing resources is almost non-existent.
The attached staffing analysis (Exhibit D, page 2) shows the
staffing needs based on percentage of time charged to projects.
This analysis shows a need for five (5) associate positions in
Municipal Projects. We currently have positions for two
associates and a principal civil engineer. We are requesting one
additional associate engineer position.
InsDection:
The lack of construction inspectors could have the most serious
consequences for the City. Engineering construction inspection
is the City's control over how well the City is built. (See
Exhibit E, Engineering Constuction Inspection Responsibilities).
Engineering inspectors are responsible for inspecting all
development in the City. Subdivision or project (including
municipal projects) inspection includes inspecting the grading,
all underground utilities such as storm drains, sewer, water
lines, and public utilities, and above ground inspection of curb
and gutters, pavement, sidewalks and streetlights.
Engineering inspectors inspect all private trenches, such as
installation of underground utilities in existing right of ways.
They also investigate complaints and keep an eye out for routine
maintenance needs, such as potholes.
Engineering Staffing Report
November 19, 1985
Page 4
As an engineering rule of thumb, there should be one inspector
for every $3.5 million of current development projects and one
inspector for every $5 million of municipal projects annually. Last year, inspections fees were collected on $18.9 million,
indicating a need for 5.4 inspectors in current development
alone. A CIP budget of $15.6 million in new projects (not
to mention the projects currently underway) calls for 3.1
inspectors in municipal projects. We are requesting five
additional inspectors.
The City currently has a total of four approved inspector
positions on a permanent basis, two of whom began work in
September. Three additional inspectors and an inspection
supervisor have been hired under contract to increase our
inspection services.
According to our current construction supervisor, inspectors
should inspect their assigned projects at least once a day and a
common standard of figuring time allowance is to plan for one
hour per day per project. The City currently has 84 development
projects underway, of which 62 are active, divided between three
inspectors.* Obviously, one hour per inspection per day per
project cannot be scheduled without causing tremendous
slowdowns.
In addition, calls come in daily for permit inspections which
must be scheduled around the regular project inspection. In
September, 21 calls for permit inspection were received. Between
October 1st and October 23rd, 43 permit inspection calls were
received.
It is vital that the City provide adequate inspection services.
Most of the work inspected by inspectors gets covered up in the
construction process. Problems arising from cursory inspection
often won't show up for years. A full staffing level of
inspectors must be a top priority for a growing city to avoid
serious problems in the future.
* Carlsbad's fourth permanent inspector is assigned right-of-way
permits - a full time job. One of the three consultant
inspectors is handling grading inspections and the other two are assigned to PVC pipe inspections and to the cleanup of the
pipeline project at El Camino Real.
Engineering Staffing Report
November 19, 1985
Page 5
Adm,inistrati,ve & Clerical
The administrative and clerical workload has increased
concurrently with the workload of the engineers. Increased
development in the City has made telephone answering a job for
two full time people. A Clerk/Typist has been assigned to the
Current Development section to provide direct clerical support to
the Principal Civil Engineer. Although this measure provided
some relief to that division, it has necessitated the hiring of a
temporary employee to fill the vacated spot. Many routine
administrative matters in the Current Development division are
receiving minimal attention due to lack of staff (see Exhibit
F).
The Secretary I1 assigned to the City Engineer has been
supervising four clerical people directly. In addition to the
normal workload of the Secretary I1 position, she is responsible
for the continual hiring and training of all clerical help--a
time consuming process.
At a time when there is no available spare time, the continual
need to hire and train temporary personnel adds to the stress in
the department. The addition of a clerical position will help relieve the twofold workload increase from both staff and
developers.
RECOMMENDED CHANGES
Attached is an organization chart showing the recommended
reorganization and additions to the departments.
The Current Development Division would add eight people to the
staff: an Assistant City Engineer, two Associate Civil Engineers,
a Senior Public Works Inspector, three Construction Inspectors,
and a Secretary I.
An Assistant City Engineer is needed to supervise current
development. The nature of current development requires a number
of meetings with developers, a time consuming but necessary part
of the job. The City Engineer needs assistance so he can devote
more time to overall planning and management of the Engineering
Department.
Of the two requested associate civil engineers, one would be
assigned to preliminary review and the other would specialize in
review of sanitation and flood control items, a final review
process. A Secretary I would be assigned to this division.
Engineering Staffing Report
November 19, 1985
Page 6
Municipal Projects would add two people: an Associate Civil
Engineer to assist with project management and a Senior Public
Works Inspector. (See Exhibit D--chart showing minimum staffing
levels based on project costs.)
FISCAL IMPACT
Annual fiscal impact for salaries and benefits: $329,950
Balance of Fiscal Year 1985-1986 $1 80,000
(See Exhibit G: Fiscal Impact Summary)
City Engineer
EXHIBITS:
A. Number of Units Approved 1975-1984
B. Current Development--Review Process
C. Current Development--Service Level VS. Demand Level
D. Capital Projects FY 82-86 & Staffing Analysis
E. Engineering Construction Inspection Responsibilities
F. Clerical Summary
G. Fiscal Summary
u m z 1 '7
MEMO EXHIBIT A
1 I 1 I 1 I
-
EXHIBIT B
->
CURRENT DEVELOPUENT REVIEW PROCESS*
PLANNING mr. ROUTES -> ENGINEERING STAFF
TO ENGINEERING wr. REVIEWS PRELIM. DESIGN
I
nl
-1
01 GI
El
DEVELOPER SUBMITS
C OMPLE TE APP IC A T I ON
PLANNING COMMISSION
MEETING
I
ENGINEERING STAFF IREVIEWS AND PREPARES
CONDITIONS OF APPROVAL
I I I I
<- APPLICANT RE-SUBMITS
"REV I SED TEN TAT IVE
DES I GN
-> DEVELOPER SUBMITS -> ENGINEERING STAFF
FINAL MAP, IMPROVEMENT REVIEW AND RETURN FOR
PLANS, GRADING PLAN CORRECTIONS
!I
I * 1-h IO I2 I
13 I* IS
I CITY COUNCIL MEETING
-> CITY COUNCIL
APPROVES FINAL MAP
I I
I
XI
$=I
I CITY ENGINEER SIGNS
-1 MENT PLANS AND FINAL
g MAP
-1 GRADING AND IMPROVE-
FINAL SIGNATURES -> CONSTRUCTION ACTIVITY
OBTAINED, CITY CLERK BEGINS
SENDS FOR RECORDATION
<-
Begin
<-
I I I
* This flow chart uses an "ideal" plan with approvals every step of the way.
Such a situation is rare.
13
L
CURRENT DEVELOPMENT
EXHIBIT C
Service Level vs. Demand Level
Service Level Demand Level
Actual hours worked Hours demanded by task
(Der week) (Der week) .r --
PRELIMINARY REVIEW
(includes Principal Civil Engineer)
Development Review:
Presubmittal
Assistance
Project Application
Review
Plan Check:
Code Enforcement
Standards Enforcement
Design Support
Documentation Check
Field Review
Plan Approval
Meetings, Agenda Bill
Preparation, Misc.
Misc. Management Tasks
TOTAL PRELIMINARY REVIEW:
FINAL REVIEW
Plan Check:
Code Enforcement
Standards Enforcement
Design Support
Documentation Check
Development Consitions
Check
Utility Coordination
Field Review
Fee Determination
Plan Approval
Meetings, Agenda Bill
Preparation, Misc.
TOTAL FINAL REVIEW
4 hours
60
4
12
4
6
5
15
15
125 hours worked
4
23
18
5
4
3
2
1
20
80 hours worked
8 hours
76
8
20
6
8
10
15
24
175 hours needed
3
61
31
8
7
7
1
5
35
158 hours needed -
STAFF MEMBERS NEEDED = Demand Level Hours/40 hrs per week
Preliminary Review:
Final Review: 4.0 staff members needed (158 hrs/40 hrs)
TOTAL: 8.4 Enqineering Positions Needed in Current Development
4.4 staff members needed (175 hrs/40 hrs)
EXHIBIT D PAGE I CIF 2
CAPITAL PROJECTS
COMPLETED OR UNDER CONSTRUCTION
BY €NGINEERING EPARTMENT
MUNICIPAL PROJECTS OWISION
29
08 d
LL7 0 6 ua
0 *5
2
I
0
FY 82-83 FY 83-84 FY 84-85 FY 85-86 (FORECAST)
LEGEND
PROJECTS I COMPLETED
PROJECTS UNDER
CONSTRUCTION
..
8-14-85
R.H. A
I 37-
x.
MUNICIPAL PROJECTS DIVISION
EXHIBIT D PAGE 2 OF 2
Staff time in Municipal Projects is charged to projects as a standard percentaae of the construction cost. These percentages are used in preparing budgets for proposed projects. The percentages vary depending on the total cost of the project (see sample below).
The next chart shows actual charge. made to projects for design
total staff charges are divided by the salary cost of staff to develop the total staffing needs for this division.
. administration, conatruction administration and inspection. The
PERCENTAGE OF STAFF TIME CHARGED TO PROJECTS
Estimated Construction Coat: $50,000 $500,000 $10,000,000+
1 Charge for:
Design Administration 3.01 1 .OI 0.51
Construction Administration 4.01 2.01 0.81
Inspection 3.01 1 .51 0.81
TOTAL 1 for Staff administration L inspection
10.01 4.5) 2.11
~ ~~~ ~~
S AWN1 CHARGED TO PROJECT
STAFF TIHE STAFF TIHE STAFF TIM
DESIGN AWIN. CONST. IOIIIN. INSPECTION PROJECT NM CONSTRUCTION COST CHARCEO CHARGED CHARGE0
El Cuino Real Camon Road A. 0. Junss Drive A. D. Holiday Park Faraday Avenue Tmarmck Avenue Jeffereon Path Appian Road A. D. Library Parking Lot Elm Avemm A. 0. Eln/ECR Signal Carlsbad/GrMd Signal Chestnut/ECR Signal College A. 0. Park Drive A. D. Depot Parking Lot Car1sb.d Blvd. Bridp
Cynthia Lam A. D.
safety CWItoC
fiacal raar 1985-86:
Carlabad Blvd. Storm Drain Safety Center Stagecoach Park Grading Calavora Perk Grading Calavera EDC Ls CoetdECR Inter. Rancho Santa Fe A. 0. Palonnr Airport Road A. 0. Park Drive A. D. Carlabad Blvd. Wldening La Costa Prelim Carlebad Blvd. hawall ECR/Kelly Signal JeCferaon/Lae florea Signrl Jefferson/Lapon Signal
fiacal Year 1984-85 Carryover
TOTALS:
S 650,000.00
s 500,000.00 s 250,000.00 s 450,000.00
s 40,000.00 s 90,000.00 s 1,500,000.00 s 80,000.00
S 340.000.00 S 95,000.00
S 50.000.00 S 64,000.00
S 60,000.00 s 20,000.00 s 2,MO,ow.00 s 1,000,000.00 s 120,000.00
S 270,000.00 s 2,550.000.00 s 500,000.00 s 500,000.00 s 1,000,000.00 s 22u,000.00
S 70,000.00 S 650,000.00 S 50,000.00 s z,mo,ow.oo s 60,000.00 S 50,000.00 S 50,000.00
Sl8,679,000.00
s 5,200.00 s 10,000.00
S 2,500.00
S 1,900.00
s 5,000.00
s 10,000.00 S 3,000.00
S 3,000.00 f 2,400.00
s 4,050.00 S 2.550.00
s 8,000.00
s 10,000.00 s 1,400.00
s 2,000.00 S 14,500.00
s 1,000.00
S 3,100.00 S 5,000.00
S 94,800.00
S 9,750.00 S 6,500.00
S 10,000.00 S 7,500.00 S 5,000.00 S 3,750.00 S 9,000.00 S 6,750.00 S 6,800.00 S 5,100.00
S 1.600.00 S 1.200.00 s l;8oo.o0 s 1;350.00 s 15,000.00 s 12,ow.oo S 1.600.00 S 1.200.00 s 2;ooo.oo s 1;500.00 S 2,560.00 S 1,920.00
$ 1,800.00 $ 1.500.00 s 40.000.00
S 600.00 S 500.00 S 6,250.00 S 5,000.00 S 6.000.00 S 6.000.00 S 3,600.00 S 1;OOO.OO
s 6,750.00 s s.om.00 S 5.100.00 S 5.100.00 s 5;000.00 s 12,500.00 s 10,000.00 s 15.000.00 s 10.000.00 S 5;500.00 S 4;400.00
$ 2.100.00 S 1,750.00 S 13.000.00 S 9,750.00
S 14,500.00
S 1,500.00 S 1,250.00 $ 1.5W.00 1,250.00
s 1,800.00 s 1,500.00
S207,610.00 $115,170.00
08s - e6 STAFF NEEDS eAsm ON SALARY COST PER PROJECT
STAFF WORK rim TOTAL as1 ASSOCIATE C.E. % INSPECTDR X
Design Administration s 94.800.00 s 94.800.00 Contract Adminiatration S207.600.00 $166,088.00 S 41,522.00 In-tion TOTALS:
Aasociate Civil Engineer Salary COST: 348.OOO.00 amually Direct Sslary. mc. Pera. etc. Inspector Salary COST: 137,000.00 annually Direct Salary, inc. Pera, etc.
INSPECTION WORK COST $156 692 00 ASSOC. CE WORK COST 5260 888 00 -7' 3g$ = 3.1 ASSOC. CE cosr = 5.4
_.
EXHIBIT E
ENGINEERING CONSTRUCTION INSPECTION RESPONSI BI L IT1 ES
TO: ALL CONSTRUCTION INSPECTORS
FROM: Construction Inspector Coordinator
PROJECT RESPONSIBILITIES
RIGHT-OF-WAY INSPECTOR:
Will be responsible for permits issued to all utility companies, water sewer, T.V. cable, and any other miscellaneous right-of-way permits that may be assigned, INCLUDING REQUIRED TRAFFIC CONTROL.
GRADING INSPECTOR:
Will be responsible for clearing and grubbing, grading (regardless of quantity), and Final Fine Grade; sending Final Fine Grade releases to the Building department for move-ins or releases as needed for utility turn-ons, erosion control, and INCLUDING REQUIRED TRAFFIC CONTROL.
CONSTRUCTION INSPECTORS :
Will be responsible for all public works improvements, stom drains, sewers, utility permits where applicable, curb and gutter, sidewalks, catch basins, concrete drains of any material as called for on plans, all asphalt paving and tract finals such as water valve covers raised to grade, sewer manhole covers raised to grade, street signs installed per City requirements, street lights installed per City requirements, and to work with and secure all releases of other City departments involved, INCLUDING REQUIRED TRAFFIC CONTROL, and including improve- ments not called for on plans but required by City Council in public rights-of-way or dedicated easements.
Construct ion Inspector Coordinator
DS:dm
EXHIBIT F
Page 1 of 3
SUMMARY OF REMARKS FROM CLERICAL STAFF
Attached is a function description for the clerical services in
the Engineering Department. A staff survey showed that a minimum
of 72 hours per day total is needed to provide proper clerical
administration, support, and records management. There are
currently 40 staff hours per day available (8 hours X 5 permanent
staff members). This leaves a balance of 32 hours per day which
shows a need for 4 additional clerical staff persons (32/8hrs)
Each of the clerical staff members wrote statements about the
current situation. Some of these remarks are quoted below:
!!The Engineering staff has increased from 16 to 31 during the
last year--our clerical staff has not changed in number. The
change has been from temporary to per.manent in two positions. We
still have the same number of clerical serving twice the number
of department personnel. . . . Records management requires 2
hrs/day day for proper control and updating. This cannot be
accomplished with present staff and workload. . . , I should
spend 3 hrs/day on supervision and training; I probably spend one
hour maximum with numerous interruptions."
Secretary I1 , City Engineer
ITA minimum of five to six hours daily should be spent on
maintaining the files and keeping them in current chronological
order. At this time, the filing is done on a daily basis
basically to keep up with paper work flow only. No major
reconstruction of the filing system or the files can be done as
there isn't enough time."
Clerk/Typist, Current Development
IrI feel that it will be necessary to hire a clerk/typist to
handle the filing and telephone calls. The word processing work
(agenda bills, contracts) requires a great deal of time which is
constantly interrupted by telephone calls. It is difficult to
get away from my desk to complete tasks such as filing, xeroxing,
and pick-up and delivery of mail."
Secretary I, Municipal Projects
"We need additional staff to handle phones to allow me time for
proper records management. In the absence of clerical to back
me up on the telephones, my entire work day is spent on the
telephone--all other work is left unaccomplished. . . . I serve
as back-up for the Secretary I1 if she is on leave. On days
when I serve as her back-up, a temporary must be hired to
replace me (currently there is already a temporary serving as my
back-up.)
Departmental Clerk/Typist
"If I am absent, the relief word processing operator must be
replaced by temporary personnel. Otherwise, both jobs back up."
Word Processing Operator
1.
2.
3.
4.
-- EXHIBIT F
PAGE 2 OF 3
ADMINISTRATIVE/CLERICAL/RECORDS DIVISION
Records Management
a.
b.
C.
d.
e.
Catalog Maintenance:
1) Paper files.
2) Computer file (DP 61 WP)
3) Project plans (originals)
4) Maps (originals)
Records Monitoring
Summary reports generation (management tool)
Tickler files - agreements, bonds and personal
Complaint files
Accountin9 -
a. Purchase handling
b. Fee studies
c. Project balances
d. Finance coordination
e. Budget verification
Communications
a.
b.
C.
d.
e.
f.
g-
h.
i.
j.
Telephones
Word processing
Office mail
Radio response
Information dispersal
Ring file
Counter contact
Tape recording/transcribers
Visitations
Typing
Resource Management
a. Time keeping
b. Conference room scheduling
c. Appointment scheduling
d. Computer scheduling
e. Office supplies
f. Vehicle scheduling
- EXHIBIT F -
PAGE 3 OF 3
ADMINISTRATIVE/CLERICRL/RECORDS (continued)
4. Resource Management (continued)
g. Equipment management
h. Task assignments:
1) Special projects
2) Complaints
i. Task monitoring
j. Budget preparation/monitoring
5. Employee Relations
a. Job training
b. Education incentive
c. Performance awards
d. Supervisory evaluation
e. Dispute handling
f . Discipline
6. Miscellaneous Management
a. Decision making
b. Procedures manuals
c. Code/Standards enforcement
-2-
EXHIBIT G
Page 1 of 3
SALARY 32% FRINGE
TOTAL -- COST (EACH) POSIT ION NUMBER - (EACH) ---
ADDITIONAL POSITIONS:
Assistant City Engineer
Associate Civil Engineer
Sr. Construction Inspector
Construction Inspector
Secretary I
TOTAL
LESS: Municipal Projects
NET TOTAL
TOTAL ANNUAL IMPACT
1 $ 45,000.00
3" $ 36,300.00
2" $ 29,700.00
3 $ 27,775.00 - 1 $ 19,400.00
10
- 2" -
$ 14,400.00 $ 59,400.00
$ 11,600.00 $143,700.00
$ 9,500.00 $ 78,400.00
$ 8,900.00 $109,950.00
$ 6,200.00 $ 25,600.00
$417,050.00
-I- I--- - - - 1 I
- 87,100000 -
8 $329,950.00
PRO-RATED IMPACT FY 85-86 (6 Months)
PLUS: Equipment
TOTAL IMPACT FY 85-86
$329,950.00
$1 65,000.00
$ 15,000.00
$1 80,000.00
* Municipal Projects Division personnel do not impact annual budget.
1 Associate Civil Engineer
1 Sr. Construction Inspector
. EXHIBIT G Page 2 of 3
\D W I m 02 mz
N U 4 m ul \D
N 3 9 U ul
P- N 9 m 0 N
iff
4 m 0.
N U 3
U m 0 V
h
m rl m m
U u al Fi d
P
3
mm UP- P-3
.I. mP- \DN Nrl
m al d Fi
rl m v)
U U al t4 .d n
h 3w -0 U m b.*
or. om
uw G am 6U LIm Fio mu a ala Pm :c zs PO .. ~m
m
m
N P-
m
m
3
m P- m
U N N
r.
00
m
m
m
3
m 3 m
U \D P-
O 2
m rD m
I
m ul U
m P-
O m m
m \D rl
PI 0
N N m
d
h 0 2
m ul m v
0 0
0
d
m
m
4 P- m
U N
I
m N 0
\D 0 rl
I
0 NI OII
rD
m m
a0 mu
sw Fiw
om $2
.. em
h 0 0
0 m rl
m
V
U tl 2
zl rl al
n
w 0
m \ d
w 0
CM
02 dd um mm urn 00 do Ht4 4h
rD
m m P-
m 0
N 9
m 0 P-
N N m
P- N U
m m U
m U \o
N
rl
d
m
I 0
- r. N U
m * m
w
I
h PI N U
W U
m
v
I
I I
00 lrl m
m
m 3
3
m
0 P-
N N m
I
m U 0
N m 4
3
I
0 NI 01
ul \o N
I
m
0 0
0 m
0.
3
iff
I
I
0 0
0 a0
0,
3
iff
I
0 0 4
3
4 m
I
I
0 0 U
rl
rl m
I
I I
\ou mu Ial mFi m *d
w IO
mw
mP- 0 vw
ma 3
um
rla am Gal 0s .d Fi
a om a
a GV 010 m .d h 0 ut4 a $4 m 0 ad Fi am P, 4m
xc
4 4:
.. 0- 34
m m P-
\o N m
4
iff
m 0 P-
N N * m
I
m
9 U 0 rn
4 iff
I
-
I
\D 03
In m m H
I
m U m 0 V
M
IC W
W W m 4
EXHIBIT G Page 3 of 3
W vi m
13 ?
d H
m
0 IC
N N m H
I
m U W
N m .-(
4 H
I
0 Itl
Q\ N m
0:
I
I
0 VI 0: m N m
I
U W 02
0 U N
I
I
V W
0 U N
“0,
I
N I-
W W
N i)
4
0.
m E
N N m H
I
m W
m W I-
4
‘J,
H
I
,
a3
MANAGER'S NOTE:
The staff report from the Engineering Department requests twelve additional positions. Rather than approve all twelve positions, the City Engineer and I have decided that seven will be sufficient at this time. After the
personnel have been hired and we are able to evaluate the effectiveness of the new organization, additional positions can be considered if necessary.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 8348 - - --
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AUTHORIZING SEVEN ADDITIONAL
POSITIONS IN THE ENGINEERING DEPARTMENT,
APPROPRIATING FUNDS, AND DIRECTING THE CITY
MANAGER TO RECOMMEND CHANGES - -- IN ENGINEERING FEES
WHEREAS, the City Manager recommends and the City Council concurs
that the addition of seven positions to the Engineering Department is in the
best interest of the city; and
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Carlsbad, California, as follows:
1. That the above recitations are true and correct.
2. That the City Council, authorizes the reargmization of the
Engineering Department.
3. That the City Council authorizes the addition of seven positions
in the Engineering Department as shown in Exhibit A attached hereto and made a
part hereof.
4. Funds in the amount of $161,650 are hereby appropriated from the
General Fund Unappropriated Fund balance and transferred to the accounts shown
in Exhibit A.
5. That the City Manager is hereby directed to return to the City
Council with revised Engineering Fees prior to filling any position herein
approved.
///
///
///
///
///
///
a
'.
1
2
3
4
5
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad
City Council held on the 2lstday of January , 1985 by the following vote,
to wit:
AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine
NOES: None
ABSENT: None
MARY H. kASLER, Mayor
ATTEST :
ALETHA L. RAUTENKRANZ, City Clerk]
(SEAL 1
3