HomeMy WebLinkAbout1986-04-15; City Council; 8119-22; Amend Contract Carlsbad Safety and Service Center 3006-3E ElectricalCIT~OF CARLSBAD — AGEND~BILL
ABa^r//?-4*^:*
MTG. 4/1S/RA
DEPT. rM
TITLE:
AMEND ELECTRICAL CONTRACT FOR
CARLSBAD SAFETY AND SERVICE CENTER
DEPT. HP. kjfc-
r.]Tf ATTY Vy^]
^7>>CITY MGR-^-jfe/^
Q
Q_
8
RECOMMENDED ACTION:
By motion, adopt Resolution No. £$~®Q amending Contract No. 3006-3E
for Catton/McCutcheon to allow for additional expenditures necessary for
the construction of the Carlsbad Safety and Service Center in the amount of
$22,454.00.
ITEM EXPLANATION;
The additional cost for Contract 3006-3E, Change Order No. 3 ($16,480.00),
is for the additional costs to provide data conduit system and outlets, for
the Police/Fire administration building, that is required for operation of
the CAD system. Work to be done is part of the CAD system and will be paid
for out of the CAD C.I.P. budget.
The additional cost for Contract 3006-3E, Change Order No. 5 ($5,976.00),
is for the receptacle additions/modifications to accomodate the final
furniture layouts and connection of open plan furniture systems as
developed by the interior designer for the Police/Fire building and the
connected labor to do the work.
The above changes have been reviewed and approved by the architect,
construction manager and City staff. We will issue the change orders upon
approval of the City Council. These two changes are critical to the timely
completion of the project.
FISCAL IMPACT
The added cost of these change orders has been included in the current
budget for Phase I of the Safety Center. Funds are available in Account
No. 140-820-1810-3006 and Account No. 140-820-1810-3195.
BUDGET 5CORECARD
Funds expended or encumbered: $ 8,900,626
(Includes contracts awarded, architect fees,
construction manager, and miscellaneous
municipal expenses to date)
Outstanding Bid Packages, Change Orders and
Miscellaneous Expense $ 1,140,000
(No. 8 Furniture, Fixtures and Equipment)
(No. 9 Landscaping and Miscellaneous Municipal
Expense)
Contingency $ 209,374
TOTAL - PHASE 1 $ 10.250.000
Page 2 of Agenda Bill No. 8500
EXHIBITS
1. Resolution No. amending Contract No. 3006-3E for
Catton/McCutcheon to allow for additional expenditures necessary for
the construction of the Carlsbad Safety and Service Center in the
amount of $22,454.00.
2. Catton/McCutcheon Change Order No. 3.
3. Catton/McCutcheon Change Order No. 5.
1
AND SERVICE CENTER.
4
10
11
13
14
18
22
27
28
RESOLUTION NO. 8snn
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING AN AMENDMENT TO
CONTRACT NO. 3006-1E FOR THE CARLSBAD SAFETY
WHEREAS, an additional expenditure of $22,454.00 is required for the
accomodation of changes to the Carlsbad Safety and Service Center; and
WHEREAS, the City Council has previously approved the contract for the
installation of electrical systems which did not include the added costs as
enumerated above; and
WHEREAS, the architect, construction manager, and City staff have
concluded that the additional expenses are necessary; and
WHEREAS, funds are available within the current budget in Account No.
140-820-1810-3006;
NOW, THEREFORE, BE IT RESOLVED by the City Council of City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That Change Order No. 3 in the amount of $16,478.00 and Change Order
No. 5 in the amount of $5,976.00 for Catton/ McCutcheon are hereby approved.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City
Council held on the ISthday of April , 1986 by the following vote, to wit:
AYES: Council Members Casler, Lewis, and Chick
NOES: None
ABSENT: Council Members Kulchin and
24
J @&. {-•*-
ATTEST. MARY H. GASLER, Mayor
25
26
ALETHA L. RAUTENKRANZ, City Clerk
(SEAL)
IT 2_
CITY OF CARLSBAD (CE#24)
PUBLIC WORKS PROJECT CHANGE ORDER
CHANGE ORDER NO.
CONTRACT NO; 3006-3E
DATE 2/5/86
.PURCHASE ORDER NO.' 14491 BUDGET
CONTRACTOR'S NAME
PROJECT NAME AND NO.
/Mori.|.)-rhfaon Electrical Contractors, Inc.
Public Safety and Service Center
ACTION
Additional cost to provide data conduit system
and outlets per requirements of the electrical
engineer dated 11/26/85, and noted as Delta 2
revisions on Sheets E-l, E-10, E-ll, E-12.
Conduit required for operation of CAD system
as approved by City Council.
Total Add:$16,478.00
CONTRACT AMOUNT TO DATE THROUGH C.O. NO.
AMOUNT THIS CHANGE ORDER NO.
REVISED CONTRACT AMOUNT
AP PROVED:ROLL CONSTRUCTION CO.
CONSTRUCTION MANAGER<ufo
Date
APPROVAL:
Field Engineer Date
Department Head Date
$683,381.00
$ 16,478.00
$699,859.00
RUHNAU, MCGAVIN, RUHNAU
ARC
G.A. Catton President
DATE February 10, 1986
LICENSED BONDED INSURED
Catton
ELECTRICAL CONSTRUCTION, Inc.
741 W. FOURTH AVENUE
ESCONDIDO, CA 92025-4038
(619)741-8317
31 1986
KOLL CONST.- C
January 30, 1986
Koll Construction
2237 Faraday Suite C
Carlsbad, CA 92008
Attn: Steve Mahoney
Steve:
Re: Carlsbad Safety Center
Sub: Our Change Order #3-4798
We are in reciept of your revised prints dated September 16,
1985 with an attached explaination of the changes. This at-
tached explaination is dated November 26, 1985, from Randall
Lamb .
Because of the complexity of these changes, we are handling
it in two change orders.
Attached is the breakdown and price for the work described
under "#5 data system" only.
MATERIAL
4-S box w/bkt.
4-S 1-gang ring
Ivory Plates
3/4" EMT
3/4" EMt connectors
3/4" EMT couplings
3/4" EMT straps
1" EMT
1" EMT connectors
1" EMT couplings
1" EMT straps
li" EMT
connectors
couplings
straps
I ftH11"J- 4
H"
EMT
EMT
EMT
EMT
EMT
EMT
EMT
Pull line
connector
couplings
straps
QUANTITY
39
39
39
1060
62
106
106
1090
50
109
109
120
4
12
12
170
4
17
17
2440
COST
$ 117.68
26.31
48.32
372.17
27.59
55.01
19.93
577.26
37.25
96.46
33.79
89.11
5.05
17.86
4.85
144.38
7.36
36.58
10.76
45.00
Page 2
MATERIAL QUANTITY COST
12x12x6 pull can 4 $ 54.20
18x18x6 pull can 1 24.60
Core floor 19 285.00
2$" EMT 60 148.34
2i" EMT connectors 2 19.34
2^" EMT couplings 6 74.77
2i" EMT straps 6 6.70
3/8" all thread 8' 5.60
3/8" anchors 28 18.36
2,418.75
Material $ 2,418.75
Tax 145.12
2,563.87
Material Overhead & Profit 384.58
Labor 345 @ $32.68 11,274.60
Labor Overhead & Profit 2,254.95
16,478.00
In the explainations under S.B. "in lieu of providing a home-
run directly to the radio equipment 115". The home runs have
already been installed in the slabs, both upstairs and down.
We can not give a credit for those home runs. Also we found
additional data outlets in rooms 110 and 224 that were not in
the explainations.
Because of the block walls already being up, we plan to run the
conduit exposed down the wall of room 149 and through the wall
to room 139.
Due to fluctuating prices, if this change order is not approved
within 30 days it becomes subject to our review.
R. P. McCutcheon
E.M.G.P.
(CE #38)
CITY OF CARLSBAD
PUBLIC WORKS PROJECT CHANGE ORDER
CHANGE ORDER NO.DATE March 18, 1986
CONTRACT NO: 3006-3E 140-820
PURCHASE ORDER NO. 14491 BUDGET NO.isio-3006
CONTRACTOR'S NAME Catton/McCutcheon Electrical Contractors, Inc.
PROJECT NAME AND NO. Carlsbad Public Safety and Service Center
ACTION: Revise contract documents to include revised plans E-7, E-8, E-9,
E-10 and E-12 with Delta 3 changes dated 1/28/86.
1. Additional cost for receptacle additions/modifications to
accommodate furniture layouts and connection of open plan
furniture systems as developed by interior designer $5,976.00
CONTRACT AMOUNT TO DATE THROUGH C.O. NO.
AMOUNT THIS CHANGE ORDER NO.
REVISED CONTRACT AMOUNT
ROLL CONSTRUCTION CO,
.CONSTRUCTION MANAGER
APPROVED
APPROVAL:
Field Engineer
Department Head
Date
Date
$701,788.72
$ 5,976.00
$707,764.72
RUHNAU, MCGAVIN, RUHNAU
ARCHITECT
CONTRACTOR: Catton/McCutcheon Elec. Contr.
^2f*tf€.
DATE
7
LICENSED BONDED
Catton I J\/(cCu.tc^£.on
ELECTRICAL CONSTRUCTION, Inc.
741 W. FOURTH AVENUE
ESCONDIDO. CA 92025-4038
(619)741-8317
RECEIVED
MAR 11 1986
KOLL CONST. - C
INSURED
February 18, 1986
Koll Company
2237 Faraday
Carlsbad, Ca 92008
Attn: Steve Mahoney Re: Carlsbad P.S.C.
Sub: Our Change Order # 11-4798
Steve;
This is our change order for the work described in the revised
sheets E-7, E-8, E-9, E-sO, E-12. There was no letter describ-
ing the changes made and not all of the changes were clouded.
I can only hope I've found all of them.
MATERIAL
i" EMT
" " connectors
" " couplings
" straps
3/4" EMT
" " connectors
" " couplings
straps
1"EMT
connectors
" " couplings
" straps
Pull rope
J-box
Plaster rings
Weather-proof plates
Plate straps
Duplex receptacles
#12 THHN
i" Flex
2" Flex connectors
Telephone plates
Furnature J-box hookup
Core floor
Relocate box and conduit already
installed.
R&R clocks already installed
QUANTITY
180
10
17
18
400
20
39
40
330
6
33
33
430
7
7
34
34
<27>
2630
80
12
3
34
4
6
3
COST
.00
.00
768
LABOR
8.10
1.20
4.25
.00
22.00
2.86
11.70
.00
23.10
.90
13.26
.00
2.00
2.45
1.19
3.46
.00
<5.40>
18.41
3.20
1.32
.30
10.20
2.00
2.00
3.00
131.32
page 2
Material 768.39
Tax 46.10
814.49
Material Overhead & Profit 122.17
Labor 131 M/H @ 31.68 4,150.08
Labor Overhead & Profit 830.01
5,916.75
Bond & Liability Insurance 59.25
TOTAL $ 5,976.00
We have not included any cost or credit from Powers, for the clock
that changed from single face to dual face. It will be included
under your request for a new lay out.
Several short conduit runs to the perimeter walls had to be aband-
onded to comply with the new wiring diagram.
We have not included any tails for the furniture hook-ups. We
expect the furniture to come with them.
Thank you,
R.P. McCutcheon
E.M.G.P.