HomeMy WebLinkAbout1986-04-22; City Council; 8119-23; Award Contract Carlsbad Safety and Service Center 3006-7F Access FlooringCir~OF CARLSBAD - AGEND "BILL ARtt F"//9~i?& MTG 4/22/86 DEPT. CM TITLE: AWARD OF CONTRACT FOR ACCESS FLOORING DPPT. HD. <*A P|TY ATTYV/^J HITY MGR.<^^- QLU oo:o.a. O o o oo RECOMMENDED ACTION: NoBy motion, adopt Resolution price and awarding Contract No. Carlsbad Safety and Service Center. accepting the negotiated 3006-7F Access Flooring for the ITEM EXPLANATION On March 18, 1986 the City Council authorized the negotiation of the contract for access flooring in the dispatch center at the Safety Center. Koll was given this authority because no bids were received for this item in Bid Package No. 7. As of April 8, 1986 the Koll Co. has received proposals from three vendors as follows: Tate Access Floors Hackett Environmental Systems Vincent Wentz Floors $14,493.00 $15,996.00 $17,500.00 The Koll Company recommends the award to Tate Access Floors for $14,693.00 which represents a savings from estimate of $6,955.00. References have been verified on the recommended bidder. Construction manager's estimate for this item was $21,648.00. FISCAL IMPACT Funds are available in Account No. 320-820-1810-3006. EXHIBITS Resolution No. awarding Contract Safety and No Service Center o accepting the negotiated price and 006-7F Access Flooring for the Carlsbad Koll Co. letter and vendor proposals 1 RESOLUTION NO. 8510 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING THE BID AND 3 AUTHORIZING THE EXECUTION OF CONTRACT 3006-7F ACCESS FLOORING FOR THE CONSTRUCTION OF THE 4 CARLSBAD SAFETY AND SERVICE CENTER. 5 6 WHEREAS, negotiated bids have been received by the City of 7 Carlsbad for the construction of access flooring at the 8 Carlsbad Safety and Service Center; and 9 WHEREAS, the bid received is for a total of $14,693.00; 10 and 11 WHEREAS, the Construction Manager has recommended the 12 acceptance of the bid; and 13 WHEREAS, the funds are available in Account No. 320-820- 14 1810-3006; 15 NOW, THEREFORE, BE IT RESOLVED by the City Council of the 16 City of Carlsbad, California, as follows: 17 1. That the above recitations are true and correct. 18 2. That the negotiated bid recommended by the Koll Co. 19 in the amount of $14,693.00 for the access flooring at the 20 Carlsbad Safety and Service Center Bid Package No. 7 contract 21 number 3006-7F is hereby accepted and the Mayor and City Clerk 22 are authorized to execute contracts thereafter. 23 /// 24 /// 25 /// 26 /// 27 /// 28 /// 1 PASSED, APPROVED AND ADOPTED at a regular meeting of the 2 Carlsbad City Council held on the 22nd day of April 3 1986 by the following vote, to wit: 4 AYES: Council Members Casler, Lewis, Kulchin, Chick and Pettine 5 NOES: None 6 ABSENT: None 7 8 9 MARY H/CASLER, Mayor 10 ATTEST: 11 12 ALETHA L. RAUTENKRANZ, City Clerk 13 (SEAL) 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 E>«( BIT 2 KOLL 7330 Engineer Road San Diego California 92111-1464 Roll Construction Company (619) 292-5550 April 7, 1986 Mr. Mike Brooks City of Carlsbad 1200 Elm Ave. Carlsbad, CA 92008 Re: Carlsbad Safety Center KCC Job #3225 Flagpole and access flooring awards Dear Mike: Approval by the City Council to negotiate certain contract sections within Bid Package #7 was granted on March 18,1986 Resolution #8440. The breakdown for flagpoles, and access j flooring system costs are as follows, with appropriate AO written confirmations attached: ft Flagpoles•' The Flag Factory $3,000.86 Southern California Flagpole $3,857.00 Rayco Building Specialties $4,505.00 U.S. Flag and Pole $4,893.09 We recommend award to The Flag Factory for the amount specified, which represents a budget savings of $3,000.00. Since this work is less than $5,000.00, it seems appropriate within public bid constraints, to issue a Purchase Order direct without contract/bond requirements. Access Flooring Tate Access Floors $14,693.00 0 x Hackett Environmental Systems $15,996.00 cr Vincent Wentz Floors $17,500.00 £+2. Mr. Mike Brooks Carlsbad Safety Center 4/7/86 Page Two We recommend award to Tate Access Floors for the amount specified which represents a budget savings of $6,955.00. Actual hard surface and carpet samples have been approved by Designtech, and we've also confirmed with the computer contractor the acceptability of the Tate system. It should be pointed out that once console, equipment, and wiring requirements are known, additional funds will be required for flooring cutouts. At $18.00 a piece for vinyl trimmed holes, $500.00 would most likely be adequate. We understand that an agenda bill will be prepared for City Council approval of the Access flooring award. Please let me know if additional information is required or if there are any problems with this recommendation. Sincerely, K0LL COSTRUCTION COMPANY Steve Mahoney Project Manager SM/ml cc: Bill Miller Gene Hussey File ^\) RECEIVED • MAR 2 1 1986 Access Floors K°LL CONST. - c 16742 Burke Lane Huntington Beach, California 92647 (714)848-4«t£rcn 1° f 1986 Koll Construction Company 2237 Faraday Avenue Suite 101C Carlsbad, CA 92008 Attention: Mr. Steve Mahoney Reference: Carlsbad Public Safety and Service Center ACCESS FLOOR PROPOSAL We are pleased to provide our following proposal covering the installation of access floor systems in accordance with Architect's Plans and Specifications and as hereafter described with material manufactured by Tate Access Floors, Inc., of Jessup, Maryland. One of the two access floor systems is to be installed in a new Dispatch Center of maximum inside dimensions of 32'-0" long x 32'-0" wide, or 1,024 material square feet; the adjoining access floor system will be installed in a new Radio/Computer Equipment Room measuring a maximum 24'-0" wide, or 288 material square feet; both systems are predicated on a finished floor height of 12" as measured from slab to top of panel. The access floor will consist of our Tate 824 CRS computer grade all steel panels. Surface covering for panels in the Dispatch Center will be factory-laminated Geneva 3 carpet. Panels in the Equipment Room will be surfaced with 1/8" thick high pressure laminate (HPL). The access flooring supported by our Tate MOD 915 bolted stringer system including all required field and perimeter pedestal assemblies and 4'-0" galvanized steel stringers designed for mechanical fastening. Accessories to be furnished include the following: 1. An allowance of twenty-one (21) four-way diagonal seismic bracing assemblies. 2. An allowance of 20 square yards of rolled Tate Geneva 3 carpet for installation by others. 3. One (1) each double-suction and claw-type panel lifting device. 4. Spare material as follows: a. Five (5) HPL-surfaced panels b. Five (5) carpeted panels. A Tate Industries Company ATTN: MR. STEVE MAHONEY 3/18/86 RE: CARLSBAD PUBLIC SAFETY & SERVICE CENTER PAGE (2) c. Five (5) pedestal assemblies. d. Five (5) stringers with factory-applied gaskets. Your cost for the above access floor installation as de- scribed is $14,693.00 net including all required material, labor, freight and sales tax. Terms of payment are standard net 30 days from completion. Delivery; Please allow approximately 7-8 weeks lead time for material requisition and scheduling after our receipt of your purchase authorization. Option; If vinyl-trimmed cable cutouts are required, please add $18.00 net each. Exlcusions; 1. This proposal assumes that, prior to our commencement, of work, the Owner will arrange to have the subfloor thoroughly cleaned, damp mopped and sealed against dusting with a "clear seal" type liquid sealant. 2. Additionally, while we will leave our installation in a firstclass condition, any subsequent cleaning of the access floor surface or underfloor areas must be the responsibility of the Owner. In any case, a thorough final cleaning of the access floor components and sub- floor areas by a janitorial service, immediately prior to equipment move-in, is recommended practice. 3. Protection of the finished access floor is properly the responsibility of the Owner. 4. Although our Tate access floor systems will be electrically- continuous, any connection of our floor systems to a ground must be the responsibility of others. Thank you for this opportunity to provide our proposal. We hope that we may be permitted to work with you on this project. Tate/>ccess/Fzoors^ Inc. DC So. Ca Regional Manager DH/emg 7 HACKETT ENVIRONMENTAL SYSTEMS, INC. £ C E I V £ APR 03 1986 KOLL CONST. - C 8544 Commerce Avenue (619) 566-8140 San Diego, California 92121 License No. 450208 April 2, 1986 Mr. Steve Mahoney The Koll Co. 2237 Faraday Avenue, Suite 101C Carlsbad, CA 92008 Re: Carlsbad Public Safety & Service Center Bid Item #7F Spec. Section 10270 - Access Flooring Mr. Mahoney: We are pleased to submit this revised bid for the access flooring at the above referenced project. Furnished and installed as per plans, bid book and specifications, tax included, for the sum of FIFTEEN THOUSAND NINE HUNDRED NINETY SIX AND NO/100 DOLLARS ($15,996.00) including bonds. Our bid is based upon using the "Severn" Model 50 all steel panel as manufactured by Donn Corp and upon the seismic requirements of the 1985 edition of the Uniform Building Code, Tables 23-A and 23-J. If you have any questions, please call me. Yours truly, STT ENVIRONMENTAL SYSTEMS Jeff K. Bowman Estimator JKB/sr California State Contractors License No. 450208 Uincent (A/enlz oors THE KOLL CO. CARPETS LINOLEUM TILE DRAPERIES 1303 E. EDINGER • SANTA ANA, CALIFORNIA 92705-4467 • PHONE (714) 835-1936 S.C.L. #259925 March 27, 1986 E C E \ V E i APR 01 1986 KOLL CONST. - CKoll Construction 7330 Engineer Road San Diego, Ca. 92111 Re; Carlsbad Safety Center/Steve Mahoney Dear Steve, We propose to furnish and install the following: Liskey Mark 30-10 access flooring with the following: Conforms to V.B.C. 1985 code for zone k with a safety factor of 1.5 for an essential facility. Bolted Rigid Grid 12" FFH Conductone 28 oz. monolithic carpet covered panels, Room 109. Matching carpet tiles for Room 111 (furnish only). 1/8" high pressure plastic laminate covered panels, Room 115. Pedestals bolted to slab with two l£" x •£» Tapcons. Spare Parts: 5 panels with HPC, 5 panels with carpet, 5 pedestals, 5 stringers, 10 stringer gaskets, 1 double cup lifter and 1 carpet lifter. Total Alternate: (Deduct $500.00 to eliminate Tapcons.) Thank You, $17,500.00