Loading...
HomeMy WebLinkAbout1986-05-20; City Council; 8632; REQUEST FOR APPROVAL OF A 36 LOT | 35 UNIT TENTATIVE TRACT MAP AND LA COSTA DEVELOPMENT PERMIT FOR NEIGHBORHOOD SE-10 OF THE LA COSTA MASTER PLAN. CT 85-21 |LCDP 85-3 - PARK VIEW EASTuo 4 *rl c1 $4 .rl ucd a ala) SA HU \o co 0 I c\I I m .. z g b A a 5 0 0 a This project was originally heard by the Planning Commission ( January 8, 1986. Although it was a good project and complied with all applicable development criteria, staff recommended tl it be continued until the La Costa Traffic Study was completec The Planning Cornmission concurred with staff's recommendation, However, the applicant ' s representative indicated that they wc prefer a denial for purposes of being able to appeal to City Council for approval, thereby circumventing the approximate 9( day continuance necessitated by the completion of the La Cost2 Traffic Study. In accordance with this request the project wi denied by the Planning Commission. At the City Council meetir of February 4, 1986, the applicant's appeal was considered, ar the project was returned to Planning Commission for a further report, subsequent to the completion of the La Costa Traffic Study. This study was approved by the City Council on April 2 1986. Based on the results of the study, and recent discussion by Ci Council, a condition was added requiring the payment of a traf impact fee. The Planning Commission approved this project by unanimous vote of 6-0. @ e 1 .i Page 2 of Agenda Bill No. 8632 It should be noted that approval does not allow this projec. be built at this time. A community facilities management program for the area in which the project is located must bc prepared before the project can move forward. ENVIRONMENTAL REVIEW The Planning Director has determined that this project will cause any significant environmental impacts because potentie impacts have been mitigated and, therefore, has issued a Ne! Declaration, dated November 27, 1985. The Planning Commissi recommended approval of the Negative Declaration on April 2: 1986. A copy of the environmental document is on file in tk Planning Department. FISCAL IMPACT The increased need for city capital facilities resulting fro development will be offset by the payment of the public faci fee. Any capital facilities related directly to this develo will be constructed and paid for by the developer. Increased operating expenses related to this development wil offset to some extent from increased tax or fee revenue gene by the development. No detailed economic impact analysis of development has been conducted at this time so predictions c portion of operating expenses covered by additional operatin revenue created as a result of this project cannot be made. PUBLIC FACILITY ADEQUACY STATUS EXHIBITS 1. Location Map 2. Vicinity Map 3. Planning Commission Resolution No. 2552 4. Staff Report dated April 23, 1986 w/attachrnents 5. Memorandum from Planning Director dated May 7, 1986 SANTA FE KNOWLES 73 single family units PARK .. VIEW EAST . CT 85- EXISTING S.F. EXISTING S.F. TAGE COAC I f 1 2 3 4 5 6 7 a 9 10 11 12 13 14 15 16 17 18 19 2o 21 22 23 24 25 26 27 28 e 0 PLANNING COMMISSION RESOLUTION NO. 2552 A RESOLUTION OF THE PLANNING COMMISSION OF THE CI' CARLSBAD, CALIFORNIA, APPROVING a 36 LOT TENTATIV MAP AND 35 UNIT LA COSTA DEVELOPMENT PERMIT ON PRI GENERALLY LOCATED ON THE WEST SIDE OF MISION ESTAi APPROXIMATELY 280 FEET SOUTH OF LA COSTA AVENUE. APPLICANT: PARK VIEW EAST CASE NO: CT 85-21/LCDP 85-3 WHEREAS, a verified application for certain propel wit: Parcel 4 of Parcel nap No. 13524, City of Carlsbac County of San Diego, State of California, has been filed with the City of Carlsbad, and referred to 1 Planning Commission; and WHEREAS, said verified application constitutes a 1 as provided by Title 21 of the Carlsbad Municipal Code; anc WHEREAS, the Planning Commission did, on the 23rd April, 1986, hold a duly noticed public hearing as prescrik by law, to consider said request; and WHEREAS, at said public hearing, upon hearing and considering all testimony and arguments, if any, of all per desiring to be heard, said Commission considered all factor relating to the Tentative Tract Map and Condominium Permit; NOW, THEREFORE, BE IT HEREBY RESOLVED by the Plann I I Commission as follows: A) That the foregoing recitations are true and correct. 8) That based on the evidence presented at the public hear the Commission hereby APPROVES CT-85-21/LCDP 85-3, bas the following findings and subject to the following conditions: //// //// 7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 0 Findings: 1) The project is consistent with the City's General Plai the proposed density of 4.4 du's/acre is within the dq range Of 4-8 du's/acre specified for the site as indic on the Land Use Element of the General Plan. The site is physically suitable for the type and dens: the development since the site is adequate in size anc to accommodate residential development at the density posed. icies and ordinances since: a) The Planning Commission has, by inclusion of an - 2) 3) The project is consistent with all City public facilit appropriate condition to this project, ensured tha final map will not be approved unless the City Cou finds that sewer service is available to serve the project. In addition, the Planning Commission has condition that a note shall be placed on the final that building permits may not be issued for the pr unless the City Engineer determines that sewer ser available, and building cannot occur within the prl unless sewer service remains available, and the PL Commission is satisfied that the requirements of t: Public Facilities Element of the General Plan have met insofar as they apply to sewer service for thi project. School fees will be paid to ensure the availabilitj school facilities in the San Dieguito School Distr: Also an existing school agreement between the La Cc Land Company and the Encinitas School District will ensure adequacy of elementary school facilities. The dedication of park land or the payment of park- lieu fees pursuant to the La Costa Parks Agreement required as a condition of approval. All necessary public improvements have been provide will be required as conditions of approval. e) The applicant has agreed and is required by the inc of an appropriate condition to pay a public facilit fee. Performance of that contract and payment of t will enable this body to find that public facilitie be available concurrent with need as required by th General Plan. b) c) I d) f) Assurances have been given that adequate sewer for project will be provided by the Leucadia Water Dist //// PC RES0 NO. 2552 -2- 1 .I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 e 4) The proposed project is consistent with the developmer standards and regulations of the La Costa Waster Plan, City's Planned Development Ordinance and also compliec the Design Guidelines Manual. 5) The proposed project is compatible with the surroundir future land uses since surrounding properties are desi for residential development and open space on the Gene Plan. 6) This project will not cause any significant environmer impacts and a Negative Declaration has been issued by Planning Director on November 27, 1985 and approved by Planning Commission on April 23, 1986. 7) This project requires the construction of the improvem facilities listed in the conditions of approval or the payment of fees in lieu of construction, This project creates a direct need for the improvements or faciliti the reasons stated in the staff report. If the improvl or facilities are not provided, the project will creat unmitigated burden on existing improvements and facili Further, the improvements and facilities are necessary provide safe, adequate and appropriate service to futul residents of the project consistent with City goals, p< and plans. Conditions: 1) Approval is granted for CT 85-21/LCDP 85-3, as shown 01 Exhibits "A" - "G", dated December 6, 1985, incorporate reference and on file in the Planning Department. Development shall occur substantially as shown unless otherwise noted in these conditions. This project is approved upon the express condition tha final map shall not be approved unless the City Council as of the time of such approval that sewer service is available to serve the subdivision. 2) 3) This project is approved upon the express condition tha applicant shall pay a public facilities fee as required City Council Policy No. 17, dated April 2, 1982, on fil the City Clerk and incorporated herein by reference, an according to the agreement executed by the applicant fo payment of said fee, a copy of that agreement, dated Ju 1985, is on file with the City Clerk and incorporated h by reference. If said fee is not paid as promised, thir application will not be consistent with the General Plai approval for this project shall be void. 4) The applicant shall dedicate land to be located in Stagc Coach Park pursuant to the existing parks agreement bet\ Daon and the City of carlsbad, PC RES0 NO. 2552 -3- 1 i I. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 6 e Prior to the issuance of a grading permit, the applicz coordinate design and construction regarding drainage walkway improvements with the Stage Coach Park develop plan. 6) The applicant shall provide school fees to the San Die School District to mitigate conditions of overcrowding of the building permit application. These fees shall on the fee schedule in effect at the time of building application. Also, the applicant shall comply with thl requirements of the existing school agreement between Costa Land Company and the Encinitas School District. Approval of this request shall not excuse compliance w sections of the Zoning Ordinance, the La Costa Master ' and all other applicable City ordinances in effect at * building permit issuance. 8) Water shall be provided by the Olivenhain Municipal Wal District . 9) The applicant shall prepare a 24"~36" reproducible myl: the final site plan incorporating the conditions conta: herein. Said site plan shall be submitted to and apprc the Planning Director prior to the issuance of buildin5 permits. 10) The applicant shall establish a homeowner '9 associatior corresponding covenants, conditions and restrictions. CCstR's shall be submitted to and approved by the Plannj Director prior to final map approval. 11) The applicant shall prepare a detailed landscape and ir tion plan which shall be submitted to and approved by t Planning Director prior to the issuance of grading or 1: permits, whichever occurs first. Planning Director prior to the recordation of the final 5, 7) 12) A 500' scale map of the subdivision shall be submitted 2o 21 22 23 24 25 26 27 28 Said map shall show all lots and streets within and adj to the project. 13) All landscaped areas shall be maintained in a healthy a thriving condition, free from weeds, trash, and debris. 14) Any signs proposed for this development shall be design1 conformance with the City's Sign Ordinance and shall re( I review and approval of the Planning Director prior to installation of such signs. 15) All roof appurtenances, including air conditioners, sha architecturally integrated and concealed from view and sound buffered from adjacent properties and streets, pui to Building Department Policy No. 80-6, to the satisfact the Planning and Building Directors. PC RES0 NO. 2552 -4- 1 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 0 0 16) The applicant shall submit a street name list consist€ the City's street name policy subject to the Planning Director's approval prior to final map approval. 17) The project shall provide bus stop facilities at locat subject to the satisfaction of the North County Transi trict. Said facilities shall at a minimum include a t free from advertising, and a pole for the bus stop sig bench and pole shall be designed in a manner so as to detract from the basic architectural theme of the proj said design shall be subject to the approval of the P1 Director and North County Transit District. in the sales office at all times, and/or suitable alte to the satisfaction of the Planning Director. public shall include but not be limited to trails, futr existing schools, parks, and streets. 20) Building identification and/or addresses shall be placc all new and existing buildings so as to be plainly vis from the street or access road; color of identificatioi addresses shall contrast to their background color. 21) Prior to occupancy of any units, the applicant shall c(: a directory sign at the entrance to the project. The ( of this sign shall be approved by the Planning Directoi 22) If any condition for construction of any public improvc or facilities, or the payment of any fees in lieu then imposed by this approval or imposed by law on this pro: challenged, this approval shall be suspended as provid< Government Code Section 65913.5. If any such conditio1 determined to be invalid this approval shall be invalid the City Council determines that the project without tk 18) The developer shall display a current Zoning and Land 19) All sales maps that are distributed or made available I 2o 21 22 23 24 25 26 27 28 condition complies with all requirements of law. 123) The final map shall include an open space maintenance e to the Homeowner's Association for maintenance of 2.5:l or greater along the rear of lots 1-14. The aforementj slopes shall be maintained by the Homeowner's Associati 24) Prior to the issuance of any building permits, the appl shall submit detailed cross sections of the pedestrian for approval by the Planning Director. 25) The applicant shall be required to create adequate buff areas between the residential units and Mision Estancia east, to the satisfaction of the Planning Director. PC RES0 NO. 2552 -5- 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e 0 26) Prior to the issuance of building permits, the appiica shall be required to submit to the satisfaction of the Planning Director, a noise analysis for all units fror- on Mision Estancia. 27) CC&R's shall contain a provision prohibiting the parki storage of recreational vehicles onsite. In addition, applicant shall participate in the design, funding, an location of a permanent RV storage facility in the La area. 28) Prior to final map approval, a traffic study shall be prepared to determine the extent of impacts that this will have on major streets in the La Costa area, inclu Costa Avenue from El Camino Real to Interstate 5. The shall determine a solution to these impacts and the ap shall agree to perform or to participate in the solutii determined by the City Council. No units shall be occ in this subdivision until traffic impacts have been mitigated to the satisfaction of the City Council. Th studies which are now being conducted by the City may 1 to satisfy this condition if they are completed prior * applicant requesting approval of a final map. Engineering Conditions: 29) The developer shall obtain a grading permit prior to tl commencement of any clearing or grading of the site. 30) The grading for this project is defined as "controlled ing" by Section 11.06,170(a) of the Carlsbad Municipal Grading shall be performed under the observation of a ( engineer whose responsibility it shall be to coordinate inspection and testing to ensure compliance of the work the approved grading plan, submit required reports to t Carlsbad Municipal Code. Engineer and verify compliance with Chapter 11.06 of th 31) No grading shall occur outside the limits of the subdiv unless a letter of permission is obtained from the owne the affected properties. 32) All slopes within this project shall be no steeper than 33) Prior to hauling dirt or construction materials to any proposed construction site within this project the deve shall submit to and receive approval from the City Engil for the proposed haul route. The developer shall compl. all conditions and requirements the City Engineer may i with regards to the hauling operation. //// -6- 66'f;ESO NO. 2552 1 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 4b e 34) The developer shall exercise special care during the construction phase of this project to prevent any offe siltation. The developer shall provide erosion contrc measures and shall construct temporary desiltation/det basins of type, size and location as approved by the C Engineer. The basins and erosion control measures sha shown and specified on the grading plan and shall be constructed to the satisfaction of the City Engineer E the start of any other grading operations. Prior to t removal of any basins or facilities so constructed the served shall be protected by additional drainage facil slope erosion control measures and other methods requi approved by the City Engineer, The developer shall ma the temporary basins and erosion control measures for of time satisfactory to the City Engineer and shall gu< their maintenance and satisfactory performance through deposit and bonding in amounts and types suitable to t' Engineer. No grading permits will be issued for this project pric final map recordation. 36) Additional drainage easements and drainage structures I provided or installed as may be required by the County Department of Sanitation and Flood Control or the City neer, 35) 37) The developer shall pay the current local drainage aree prior to approval of the final map for this project or construct drainage systems in conformance with the Mast the City Engineer. Drainage Plan and City of Carlsbad Standards as require 38) The proposed storm drain system from Mision Estancia, i specifically not approved. The developer shall bore un Mision Estancia at Via Calendo and connect to the upper of this system. The lower reach shall be plugged and I abandoned. Specific alignment of this storm drain shal 20 21 22 23 24 25 26 27 28 in Street "A", "C" and "D" or as approved by the City Engineer. harmless agreement regarding drainage across the adjace property prior to approval of the final map for this pr 40) The developer shall make an offer of dedication to the for all public streets and easements required by these conditions or shown on the tentative map. All land so ( shall be granted to the City free and clear of all lien: encumbrances and without cost to the City. Streets thal already public are not required to be rededicated. 39) The owner of the subject property shall execute a hold 41) Direct access rights for all lots abutting Mision PC RES0 NO. 2552 -7- Estancia shall be waived on the final map. 1 f 1 2 3 4 !5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 e 0 42) Street "A" shall be 36 feet wide from curb to curb. Streets"B", "C" and "D" shall be 26 feet wide from cur to curb. All streets shall have (five foot) wide side along both sides of the streets. There shall be a min distance of two feet behind face of curb before slope encroachment. The horizontal and vertical alignment o proposed streets shall comply with minimum standards f de-sac streets (except widths as mentioned above), The developer shall design and construct a guardrail a 43) the west side of Mision Estancia adjacent to this proj This guardrail shall be sufficient in size to deflect vehicle travelling 40 mph. away from homes below. 44) Plans, specifications, and supporting documents for a1 improvements shall be prepared to the satisfaction of Engineer. Prior to approval of the final map, the Subc shall install, or agree to install and secure with app security as provided by law, improvements shown on the tentative map and the following improvements to City St to the satisfaction of the City Engineer: A) The guardrail mentioned previously. B) All streets shown on the tentative map to serve th: subdivision. serve this subdivision. subdivision (4-5 ton class). C) AH sewer! water, stormdrain, and public utilities D) Rip-rap slope protection along the rear of this 45) Improvements listed above shall be constructed within 1 months of final map approval and/or improvement plan ap whichever occurs first. 46) Unless a standards variance has been issued, no varianc City Standards is authorized by virtue of approval of t tentative map. 47) The developer shall construct private street accesses tc public streets in such a way as to clearly designate th, private streets are not a portion of the public street The developer shall place a plaque-type sign with the 11 "PRIVATE STREET BEYOND THIS POINT", at the access point private streets from public streets. The script on the shown above shall be capital letters of a size and conti such as to be readable for a normally sighted person at distance of 20 feet. The provisions of this condition I be met to the satisfaction of the City Engineer prior tc issuance of a Certificate of Occupancy for any portion c project. 48) The developer shall install street lights along all pub1 private street frontages in conformance with City of Car Standards. PC RES0 NO. 2552 -8- f 1 2 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 I? 18 19 e 0 49) The developer shall install street trees at the equivc 40-foot intervals along all public street frontages ir Conformance with City Of Carlsbad Standards. The tree be of a variety selected from the approved Street Tre6 50) The developer shall install sidewalks along all public frontages in conformance with City of Carlsbad Standar to occupancy of any buildings. 51) The developer shall install a wheelchair ramp at the E street corner abutting the subdivision in conformance City of Carlsbad Standards prior to occupancy of any b ings . 52) The developer shall comply with all the rules, regulat design requirements of the respective sewer and water regarding services to the project. 53) This subdivision shall be constructed entirely in one 54) 'The design of all private streets and drainage systems be approved by the City Engineer prior to approval of ! final map for this project. The structural section of private streets shall conform to City of Carlsbad Stanc based on R-value tests. All private streets and drain2 systems shall be inspected by the City, and the standai improvement plan check and inspection fees shall be pa: to approval of the final map for this project. 55) All private streets and drainage systems shall be maint by the homeowner's association in perpetuity. This res sibility shall be clearly stated in the CC&R's. 56) The Subdivider shall provide separate sewer, water, gas electric services with meters to each of the units. 57) All plans, specifications, and supporting documents for imprOVementS Of this project shall be signed and sealed Engineer in responsible charge of the work. Each sheet 2o 21 22 23 25 26 27 24 28 be signed and sealed, except that bound documents may bl signed and sealed on their first page. Additionally, t first sheet of each set of plans shall have the followi certificate: I "DECLARATION OF RESPONSIBLE CHARGE" I hereby declare that I am the Engineer of Work for thi! project, that I have exercised responsible charge over ' design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with current standards. I //// -9- PC RES0 NO. 2552 I 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 e 0 I understand that the check of project drawings and specifications by the City of Carlsbad is confined to only and does not relieve me, as Engineer of Work, of responsibilities for project design. (Name, Address and Telephone of Engineering firm) Firm: Address: City, St.: Telephone: BY Date: (Name of Engineer) R.C.E. NO. # Prior to recordation of any final map for this developr approval of any grading or building permits for this pi the owner shall give written consent to the annexation area shown within the boundaries of the tentative map 1 existing City of Carlsbad Street Lighting and Landscapi District No. 1. 59) Approval of this tentative tract map shall expire twent 58) months from the date of City Council approval unless a map is recorded. An extension may be requested by the applicant. Said extension shall be approved or denied discretion of the City Council. In approving an extens the city Council may impose new conditions and may revi, existing conditions. 60) The City Council has determined that in order to accommc the traffic on Rancho Santa Fe Road, the developer of pj in this area must be responsible for the improvement of Santa Fe Road from La Costa Avenue to the existing Melrc ! 20 21 22 23 24 25 26 27 28 Drive intersection. Prior to final map approval the de\ shall submit a proposal satisfactory to the City Council such improvements. The proposal shall be based on indel traffic analysis accomplished to the satisfaction of the Engineer. The proposal shall include a time schedule an financing plan for the improvements which may include an assessment district, developer financing, or some altern acceptable to the City Council. The construction and improvements must be assured either by confirmation of t assessment district secured subdivision improvement agre or otherwise guaranteed to the satisfaction of the City Council prior to final map approval. //// //// -1 0- PC RES0 NO. 2552 > 1 1 2 3 4 5 6 7 8 9 10 11 12 3.3 14 15 16 3.7 18 19 20 21 22 23 24 25 26 27 28 a 0 61) Before and as a condition of obtaining a final map, Oi development permit or site plan approval under Title 2 Carlsbad Municipal Code, the subdivider shall enter ir contract with the City whereby the subdivider covenant behalf of the subdivider and subdivider's successors j interest to the following: a) Not opposing and consenting to the formation of a and major thoroughfare district for the southern E the City. b) Payment of the bridge and mayor thoroughfare fee f area of the district in which this development is located. c) Payment of the traffic impact fee established purs Chapter 18.42 of the Carlsbad Municipal Code. 62) Building permits for this project shall not be issued the applicant, as a condition of the building permit cc with the provisions of City Council and Ordinance No. ! any subsequent ordinance or establishing a development management system, or public facilities financing or pk programs as referenced in Ordinance No, 9791, 63) If, at time of issuance of building permits for this pi a free right turn on Olivenhain Road at El Camino Real not exist, the developer shall provide for a minimum 30 long right turn lane at this intersection. This shall constructed prior to issuance of building permits. provide a view corridor at the western end of the main to the project. 64) The developer shall switch the recreation area with 1 Fire Department Conditions: 165) Additional public and/or onsite fire hydrants shall be provided if deemed necessary by the Fire Marshal. 66) The applicant shall submit two (2) copies of a site plai showing locations of existing and proposed fire hydrant1 onsite roads and drives to the Fire Marshal for approva 67) An all-weather access road shall be 'maintained through01 construction. 68) All required fire hydrants, water mains and appurtenance shall be operational prior to combustible building matei being located on the project site. All private streets shall be kept clear of parked vehicl at all times, and shall have posted "No Parking/Fire Lan Zone" pursuant to Section 17.04.040, Carlsbad Munic 69) eaag. PC RES0 NO. 2552 -11- * 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 0 70) Fire retardant roofs shall be required on all structui 71) Brush clearance shall be maintained according to the specifications contained in the City of Carlsbad Landa Guidelines Manual. All fire alarm systems, fire hydrants, extinguishing s automatic sprinklers, and other systems pertinent to t project shall be submitted to the Fire Department for prior to construction. 72) Parks and Recreation Department Conditions: 73) The sewer line shown entering the northeast portion of Stagecoach Park is specifically not a roved. Prior tc approval of improvement/grading ----EeT- plans and or final map this site, the applicant must receive approval from thc Director of Parks & Recreation for any encroachment of utilities and easements through Stagecoach Park, PASSED, APPROVED AND ADOPTED at a regular meeting c Planning Commission of the City of Carlsbad, California, he1 the 23rd day of April, 1986, by the following vote, to wit: AYES: Chairman Schlehuber, Commissioners: McBan NOES : None. ABSENT: Commissioner Smith. ABSTAIN : Marcus, McFadden, Holmes and Hall. 19 20 I.8 21 22 23 24 25 26 27 28 CLARENCE SCHLEHUBER, Chairm; CARLSBAD PLANNING COMMISSIOI ATTEST : I MICHAEL J. HOLZMILLER PLANNING DIRECTOR -1 2- PC RES0 NO, 2552 e 0 0 MEMORANDUM DATE : APRIL 23, 1986 TO: PLANNING COMMI SS I ON FROM: PLANNING DEPARTMENT SUBJECT: CT 85-21/LCDP 85-3 - PARK VIEW EAST - Request for a 36 lot/35 unit Tentative Tract Map and a La Costa Developr, Permit for Neighborhood SE-10 of the La Costa Master P1 located along the west side of Mision Estancia approximately 280 feet south of La Costa Avenue. RECOMMENDATION That the Planning Commission APPROVE the Negative Declaration, i ADOPT Planning Commission Resolution No. 2552, APPROVING CT 85- 21/LCDP 85-3 with the addition of traffic impact conditions as established by the City Council. DISCUSSION This project was heard at Planning Commission on January 8, 1986 Although CT 85-21/LCDP 85-3 complied with all of the relevant City standards and policies and was a good project, staff recommended that it be continued until the La Costa Traffic Stud: was completed and solutions to the circulation problems in the L, Costa area were identified. The Planning Commission concurred with staff that it was a good project with the exception of the 24-foot wide streets throughout, but that the project would have to be continued until the La Costa Traffic Study was completed. The applicant's spokesperson indicated that they would prefer a denial for purposes of being able to appeal to City Council for approval, thereby circumventing the approximate 90-day continuance necessitated for the purpose of completing the La Costa Traffic Study. In accordance, the Planning Commission recommended denial of CT 85-21/LCDP 85-3 based on the La Costa Traffic Study not being completed, even though the project was a good one. The Planning Commission also requested that the project be reviewed to determine whether the proposed 24-foot wide streets could be widened. At the City Council hearing of February 4, 1986, the applicant's appeal was granted, and the project was returned to Planning Commission for a further report, subsequent to the completion of the La Costa Traffic Study. In response to the Planninc~ Commission's concern over the proposed projects 24-foot wide streets, the applicant has redesigned the project to provide minimum 26-foot wide streets (see Exhibit "A"). This street width, in association with the 17 visitor bay parking spaces provided, satisfies the r e 0 development standards of the Planned Development Ordinance. Staff does not recommend widening the streets to 32 feet because, this would allow for onstreet parking, which staff feels would ultimately detract from the projects good design. In addition, widening the streets to 32 feet would also likely: ( ?) increase the number of retaining walls between dwelling units (2) result in the deletion of the majority of parking bays, and (3) reduce the area of the residential lots. Per this specify that Streets "B", "C" and "D" shall be 26 feet wide. La Costa Traffic Study An executive summary of the La Costa area traffic study is attached. The above referenced project was considered as a "committed" project by the study, meaning that the study assumed possible approval of this project. The study indicates that there will be failing intersections in La Costa at peak hours even after implementation of the recommended mitigation measures. These intersections include: - La Costa Avenue and El Camino Real - Alga Road and El Camino Real - Interstate 5 and La Costa Avenue change in street widths, Condition 43 has been revised to - La Costa Avenue and Rancho Santa Pe Road The traffic report will be reviewed by City Council on April 22, 1986. An oral summary of Council action will be given to the Commission at the April 23, 1986 Planning Colnmission meeting, In . addition, traffic impact conditions established by Council on April 22 will also be-presented to the Commission at that time. The staff recommendation for approval of this project remains the same as previously considered by the Planning Commission. The Planning Commission may wish to revise Resolution No. 2552 to reflect any additional traffic conditions suggested by Council, ATTACHMENTS 1. Planning Commission Resolution No, 2552 2. Planning Commission Resolution No. 2517 3, Staff Report dated, January 8, 1986 4. Exhibit "A" dated, April 11, 1986 5. La Costa Traffic Study, Executive Summary CDD: ad 4/8/86 -2- 1 2 3 4 5 6 7 a 9 10 11 .. . .I2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 0 PLANNING COMMISSION RESOLUTION NO. 2517 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF CARLSBAD, CALIFORNIA, DENYING A 36 LOT TENTATIVE TRACT MAP AND 35 UNIT LA COSTA DEVELOPMENT PERMIT ON PROPERTY GENERALLY LOCATED ON "EiE WEST SIDE OF MISION ESTANCIA APPROXIMATELY 280 FEET SOUTH OF LA COSTA AVENUE. APPLICANT: PARK VIEW EAST CASE NO: CT 85-21/LCDP 85-3 WHEREAS, a verified application for certain proper wit: Parcel 4 of Parcel Map No. 13524, City of Carlsbac County of San Diego, State of California, has been filed with the City of Carlsbad, and referred to t Planning Commission; and . . . . .WHEREAS ,'. said "veir'if ied dpp1fcation~'ilons~itutes' a z as provided by Title 21 of the Carlsbad Municipal Code; and WHEREAS, the Planning Commission did, on the 1 lth December, 1985, and on the 8th ,day of January, 1986, hold i noticed public hearing as prescribed by law, to consider si request; and WHEREAS, at said public hearing, upon hearing and I considering all testimony and arguments, if any, of all per desiring to be heard, said Commission considered all factor relating to the Tentative Tract Map and Condominium Permit; NOW, THEREFORE, BE IT HEREBY RESOLVED by the Planr Commission as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the public hear Commission hereby DENIES CT-85-21/LCDP 85-3, based on 1 following findings: //// ///I 1 2 3 4 5 6 7 8 9 10 11 . 12: 13 14 15 16 3.7 e.. 18 19 20 21 22 23 24 25 26 27 28 W * F ind ing s : 1) The proposed project will incrementally contribute to unresolved traffic problems in the La Costa area, particularly on La Costa Avenue. 2) The 24' wide private streets serving the project are 1 narrow to provide adequate parking and safe circulatic PASSED, APPROVED AND ADOPTED at a regular meeting Planning Commission of the City of Carlsbad, California, hc the 8th day of January, 1986, by the following vote, to wil AYES: Chairman Schlehuber, Commissioners: MCBi NOES : Commissioner McFadden. ABSENT : None. Marcus, Smith, Holmes and Hall. *. .. ABSTAIN: NQne. . . .. .. -. . '* . &xu-& CLARENCE SCHLEHUBER, Chaii CARLSBAD PLANNING COMMISS: ATTEST: .- 4%GQv&!!, MICHAEL J. HmZMILUR PLANNING DIRECTOR PC RES0 NO. 2517 -2- 0 %-/6 1 MEMORANDUM @ x4," DATE : JANUARY 8, 1986 TO: PLANNING COMMISSION FROM: PLANNING DEPARTMENT CT 85-21/LCDP 85-3 - PARK VIEW EAST At their December 11, 1985 meeting the Planning Commission hearc the above project, and returned it to staff for conditions of approval . Attachments 1. Staff Report dated December 11, 1985 2. Planning Commission Resolution No. 2517 3. Traffic Study dated November 7, 1985 APPLICATI. SUBMITTAL DATE: JULY 11, 1985 e \ E STAFF REPORT DATE: DECEMBER 11, 1985 TO : PLANNING COMMISSION FROM : PLANNING DEPARTMENT SUBJECT: CT 85-21/LCDP 85-3 - PARK VIEW EAST - Request for a 3 lot/35 unit Tentative Tract Map and La Costa Developm Permit for Neighborhood SE-10 of the La Costa Master Plan, located along the west side of Mision Estancia approximately 280 feet south of La Costa Avenue. I. RECOMMENDATION That the Planning Commission continue this item until an analysis of the problems and potential solutions to the circulation problems in the La Costa area have been completed. 11. PROJECT DESCRIPTION The applicant is requesting approval of a 36 lot/35 unit Tentative Tract Map and La Costa Development Permit for Neighborhood SE-10 of the La Costa Master Plan, located as described above. The proposed project will be located on a 7. acre site and have a density of 4.4 du/ac. This is in conformance with the General Plan and La Costa Master Plan designation for this site of RM, Residential Medium which is n 4-8 du/ac. The projects density is also well below the maximu allowable density of 9 du/ac provided by the La Costa Master Plan. The proposed project will consist of single-family detached homes on 3,190-7,800 square foot lots. The average lot size i 4,780 square feet. The residential units will range in size f 950 square feet to 1,400 square feet. Each of the units will have a two-car garage. The subject property consists of very gently rolling terrain, with a small westerly trending drainage located near the cente of the property. The site is composed of disturbed grassland is bounded on the west by a narrow band of riparian woodland, characterized by relatively small black willows. A portion of the site is, however, disturbed as a consequence of stockpilin dirt on the property associated with the construction of Misic Est anc i a. e e 1 The property to the south and west of of the site is vacant ai is part of Stage Coach Park. The property to the east is in i process of being developed with minimum 7,500 square foot sin( family residential lots (Santa Fe Knolls, CT 85-5). The property to the north is in the process of being graded for condominiums as part of CT 8417, La Costa Racquet Club. 111. ANALY S I S 1) Is the proposed project in conformance with the La Costa 2) Master Plan? Does the proposed project conform to the development standards of the Planned Development Ordinance? Does the project conform to the design criteria of the Planned Development Ordinance? 3) DISCUSSION The La Costa Master Plan designates the subject property as Neighborhood SE-IO. Neighborhood SE-10 is identified in the Master Plan as being a part of the La Costa Community Core. Because the subject-property is included as part of the Community Core, The Master Plan indicates that it should be processed under the La Costa Development Plan review process. This review process requires that a La Costa Development Plan processed similarly to a site development plan under the procedures set forth in Chapter 21.06 "Q" Qualified Developmei Overlay Zone. The La Costa Development Permit also requires that all projects must conform to general and specific development standards and regulations set forth in the La Cos1 Master Plan. The proposed project conforms with all of the general and specific development standards of the La Costa Master Plan. ' 35 dwelling units proposed is well below the maximum density allowed by the Master Plan of 100 dwelling units. The individual neighborhood development regulations for SE-10 indicate that development should; (1) utilize multiple dwellil unit development in two clusters, (2) provide access to adjacc Stage Coach Park and, (3 ) provide neighborhood entrance/exit from Mision Estancia. With regard to these development stand: and criteria, the project has been designed as discussed beloi 1) The project as proposed does not include multiple dwelling unit development, but instead proposes smal: lot single family detached product types. It is staff's opinion that the intention of this developmei standard of utilizing multiple unit development in ti clusters, was to ensure that the maximum number of dwelling units (100) could be accommodated on the sii while at the same time ensuring that the projects design was opened up and the onsite riparian corrido. -2- 0 0 preserved. Staff feels that with the proposed small lot single family detached product design, the above mentioned goals have been achieved. In addition, sin the number of actual dwelling units have been reduced from a maximum of 100 to 35, potential site design an traffic impacts have been reduced. The proposed sing family units will also be more compatible with the larger lot single family residences approved for the Santa Fe Knolls project to the east. 2) The proposed project has been designed to include a 2 foot wide park accessway between Lots 14 and 15 to St Coach Park. In addition, the applicant has agreed to incorprate a meandering, specially design-treated sidewalk along his property fronting on Mision Estanc thereby providing another identifiable access to Stag Coach Park. 3) The project has been designed to include its principa and only accessway along Mision Estancia. This accessway has been chosen so that it lines up with thc accessway to the already approved Santa Fe Knolls project located along the east side of Mision Estancia. The proposed project was also reviewed with regard to its conformance with the Planned Development Ordinance. In this case, the Planned Development Ordinance is used in association with the La Costa Development Plan Review process in order to provide more specific (restrictive) standards regarding parkinc setbacks and recreation requirements. As proposed, this projec meets or exceeds the development standards of the Planned Development Ordinance. All of the units will have a two-car garage with a minimum dimension of 400 square feet. This will provide the adequate space to fulfill the storage requirements as well as provide parking for two cars. Guest parking will bc available in parking bays distributed throughout the project ai will also be provided as driveway tandem parking, in that all garages will be setback 20 feet from the front property line. All of the dwelling units will front on minimum 24 foot wide private driveways and will be set back at least 20 feet from tl sidewalks. All of the units will have a minimum rearyard dimension of 15 feet. In addition, a common recreation center located in the center of the project and other smaller passive recreation recreation center will include a pool, spa and sundeck. spaces will be located throughout the project, The common -3- 0 DESIGN CRITERIA AS proposed, this project conforms with the design criteria ( the Planned Development Ordinance at the density proposed. 1 project has been laid out to incorporate much of the existin5 swail/riparian corridor located along the projects western boundary will be preserved. The overall design of the projec will ensure that many of the units have views of Stage Coach Park. Enriched pavement with thematic landscaping have been provided to breakup the appearance of the project streetscapc The main entrance will include heavy landscaping, enriched pavement, open spaces and a view of the common recreation arc The other smaller passive green spaces will help to create visual breaks throughout the project. decorative block wall will buffer units from traffic along Mision Estancia. For these reasons, staff feels that the project justifies the density proposed. TRAFFIC Staff has identified an increasing number of traffic concern: within the City and particularly within the La Costa area, 2 is currently undertaking a study to more clearly identify ant resolve them. The proposed project is not a major traffic contributor in itself but will incrementally contribute to tl traffic problems in the area. In accordance, the proposed project will be responsible for contributing a proportionate share towards the solution of identified problems. The propc project does comply with all of the relevant City standards i policies, however until the aforementioned traffic study is completed and the details of the appropriate solutions are identified, staff is unwilling to recommend approval and is providing three alternatives for the Planning Commission to consider in dealing with the proposed project relative to tri issues. These include: 1. A continuance of the project until the traffic study ha: been completed by staff. Approve the proposed project based upon the finding that the project will contribute only incrementally to the existing traffic problems and have staff return with documents. topography, In particular, the existing 75 foot wide drainac Landscaped slopes and 2. 3. Approve the project, with the inclusion of a condition requiring that the final map not be approved until the traffic study has been completed for the La Costa area i the applicant has agreed to perform or participate in a solution. (There are some concerns with this alternatir in that it may be difficult to make a finding for adequi public facilities. -4- 0 0 In conclusion, staff is recommending Alternative No. 1, continuance of the project until after the traffic study for t La Costa area has been completed. Staff's recommendation is t it would be more appropriate to delay a decision on this proje until the traffic study is completed, letting us know the exte of the existing problems and possible solutions. The study should be completed sometime in February. IV. ENVIRONMENTAL REV1 EW The Land Use Planning Manager has determined that this project will not have a significant effect on the environment and, therefore, has issued a Negative Declaration on November 27, 1985. ATTACHMENTS 1. Location Map 2. Vicinity/Existing Land Use Map 3. General Plan/Zoning Map 4. Background Data Sheet 5. Disclosure Form 6. Environmental Document 7. Exhibits "A" - "G", dated December 6, 1985 8. Traffic Volumes CDD : ad 11/18/85 -5- PC PLANNED COMUNITY u RESIDENTIAL MEDIUM 4.1-9 HBEStDENTIAL MEDIUM Low 1.c aRESiDENTtAL Low 0-1-5 t7 H RESIDENTIAL MEDIUM HIGH 9.1-15 NHlGH SCHOOL s- Q COMMERCIAL w 0 0 BAcRGRouND DATA SHEET CASE NO: CI' 85-21mDP 85-3 APPLICANT: Park View East REQUEST AND WATION: for a tentative tract map and La Costa Development Per along the west side of Mision Estancia approx. 280' south of La Costa Ave. LM;AL DESCFtIPTION: Parcel 4 of Parcel Map No. 13524, City of Carlsbad, Count of San Diego, State of California A€": 223-060-43 Acres 7.923 Proposed JYo. of Lotsfinits 36/35 GESEBAL PLAN AND ZONING Land Use Designation RM (4-8 Density Allowed (4-8 du/ac) &nsity Proposed 4.4 du/ac PC proposed Zone Existing Zone PC Surrounding Zoning and Land Use: Zoning Land Use Site PC Vacant North PC proposed condos(& Costa south PC Stage Coach Park East PC Proposed Single Family (Santa Fe Knolls) West PC Stage Coach Park San Dieguito Racquet Club) PUBLIC FACILITIES School District Encinitas Water Olivenhain Sewer Uucadia EDU's 35 Public Facilities Fee Agreement, dated ENVIRONMENTAL IMPACT ASSESSMENT X Negative Declaration, issued November 27, 1985 June 24, 1985 - E.I.R. Certified, dated - Other, - rriT;~L ~~,~ rr,LV*.YY-,4n y b=Vu auwrdcieu nas nern zrv e*.&, it IS determi ,hat further informatior@ required, YOU Will be SO ad*&- APPLICANT : OAod CaRh gkn€3& N~U (individual, partnership, joint venture, corpration, synd %‘(So UkT , ~WCsmD .to q-zooe RLj&cDA tkKr 6t4 1 931 -(Z2Y F Business Address 8 Teleph6no Number AGENT: Name (SWE.) Business &dress .. Telephone Number MEmmS: Era- - (individuaz, paxtnar , joint . Kame EMress venture, comoration, syndication) Business Address Telephone Nmber Telephone Sumber .?LIS Eonre Mdress 3;siness Aridrcss Tcie?’ncrr,s N&er Teleplhne SUnber (Attach more sheets if necessary) I/& dsc1zcs uzdez ,-e?.alty Of Perjury that the infornratio?l contaized in this closure is tre and correct and that it will remain true and correct and nay relied upon as 5tii-q truz and correct until anended. nAod 64PdUmbrJ Applicant BY e 0 DEVELOPMENTAL 1200 ELM SERVICES CARLSBAD, Ci (619) 431 LAND USE PLANNING OFfiCE city of darlstbab NM;ATIVE DEQ;ARATION PROJECT ADDWSS/IXATION: The project is located along the vest side of Mision Estancia approximately 280 feet south of La Costa Avenue. PR(MEcT DESCRIPTION: 35 single family lots and one recreation lot over 7.9 acres. project is defined as Neighborhood SE-10 of the La Costa Master Plan. The City of Carlsbad has conducted an environmental review of the above described project pursuant to the Guidelines for Implementation of the California Environmental Quality Act and the Environmental Protection Ordinance of the City of Carlsbad. review, a Negative Declaration (declaration that the project will not have a significant inpact on the environment) is hereby issued for the subject project. This project, CT 85-21/XDP 85-3, will include %is As a result of said Justification for this action is on file in the Planning Department. A copy of the Negative Declaration with supportive documents is on file in the Planning Department, City Hall, 1200 Elm Avenue, CarlsM, CA. 92008. Cmnts frm the public are invited. Please s-it comments in writing to the Planning kpartment within ten (10) days of date of issuance. ._I DATED: Ebvember 27, 1985 / 1 1 Ld l-3 c a/&C 7 bLh& a, MU9 'MICHAEL J. CASE NO: CT 85-21/LCDP 85-3 A?PLICANT: PARK VIFM EFST PUBLISH WTE: November 27, 1985 Landt Use Plzng Manager ND4 11/85 a TRAFFQC VOLU~ ** 14204 e.0 37000 8500 EXISTING TRAFFIC PARK VIEW E PROJECTED TRAFFIC CT 85-21 35 UNITS 360 TRIPS ** OTHER PROJECTS TRAFFIC **' EXISTING CAPASITY 0 0 W+& I. -( 0 TRAFFIC & TRANSPORTATION 1 j$$+u” Plriuqee 6ud AbbW November 7, 1985 Mr. Bill Hofman DAON Corporation 5150 Avenida Encinas Carlsbad, CA 92008 Dear Mr. Hobman: This letter sumnarizes our review of traffic factors related to the develof of the Park View East project in the City of Carlsbad. The study 3s based information provided by you, previous studies and infomation provided by t city. The site is located on the westerly side of Mision Estancia southerly of La Avenue in the City of Carlsbad. To the southwest of the site is the proposl Stagecoach Park development. The project contains 36 single family residen units with a density of 4.54 dwelling units per acre. All vehicular access from a street extending southwesterly from the intersection of Mision Estani and Sitio Lanero. EXISTING CIRCULATION CONDITIONS Both Mision Estancia and La Costa Avenue are currently under construction ec of Rancho Santa Fe Road. Rancho Santa Fe Road is currently a two lane facil however, the section from La Casta Avenue to Olivenhain Road is scheduied for improvement to ultimate standards in the next year. This improvement will i signalization of the Rancho Santa Fe Road/Mision Estancia intersection. PM peak hour traffic counts for existing conditions were available on Rancho Santa Fe Road at La Costa Avenue and on El Camino Real at Olivenhain Road ai La Costa Avenue. Intersection Capacity Utilization (ICU) analyses were compl for these intersections in order to quantify existing conditions. (The ICU methodology and relationship of ICU to Level of Service are contained in Appt A). Existing ICU analyses are contained in Appendix B and sumnarized in Tab1 .-- .. A 2651 EAST CHAPMAN AVENUE 0 SUITE llfi FIJI I FnTnN **I I=*pLtIA nnc*r 4 0 0 -2- I t Table 1 EXISTING PM PEAK HOUR ICU VALUES Park View East Los(2: - dl) - INTERSECTION El Camino Real & La Costa Avenue El Camino Real & Olivenhain Road E B 0.98 0.61 Rancho Santa Fe Road &l La Costa Avenue 0.44 A (1) Intersection Capacity Utilization . (2) Level of Service .. -2 0 e .* Review of Table 1 indicates acceptable conditions at two intersections and existing capacity deficiency of El Camino Real and La Costa Avenue, TRIP GENERATION In order to examine the traffic factors, it is necessary to estimate the nul of trips that would be generated. Trip generation rates for various land u have been established in previous studies including the City's Traffic Mode The rates utilized in this study are listed in Table 2. Applying these rat to the proposed development provides an estimate of trip generation. Table sumnarizes daily and PM peak hour trip generation estimates for the project and other development in the area, As indicated in Table 3, the project is estimated to generate 290 daily trip ends with 35 occurring during the PM peak hour. TRIP ASSIGNMENT Geographic trip distribution patterns for projects in this area have been established previously from examination of regional land use and circulation data, The trip distribution for this project was based upon these studies a Is illustrated on Figure 1. By applying these distribution percentages to t' estimated project trip generation, these trips were assigned to the road sys This assignment of daily trips is iJlustrated on Figure 1 and represents con ditions upon project completion. PM peak hour trips were assigned to intersc traffic movements in a similar manner and these assignments are contained in Appendix 8. ANALVS IS Project traffic has been examined at two future conditions. Conditions upon completion of the project have been simulated by combining existing, approved project and project traffic volumes. Ultimate or buildout conditions have a1 been examined through the City's Traffic Model projections. As described previously, existing ICU values were calculated and sumarized in Table 1. Project traffic and estimated traffic from approved, but not -4* * 0 0 Table 2 TRIP GENERATION RATES Park View East LAND USE DENSITY TRIP ENDS PER DWELLXNG 1 PM 0.8 0.2 - _(DU/ACL Daily PM Xn 10 Low Medium Density Residential (RLM) 0-4 Medium Density Residential (RM) 4-10 .0 0.8 0.2 0.6 0.2 8 Medium High Density Residential (RMH) 10-20 * e 0 z 0 I- =, 0 a LL I- LL - - m cn a Q a - 0’ 0 a2 z 3 J - a 0 W U tl 0 co z - I -5 , e* 0 I, constructed, projects were added to existing traffic to simulate condition! upon completion of the project. The other projects are listed in Table 3 along with their estimated trip generation. ICU values were calculated foi this condition with consideration for street improvements planned or requii as a part of the other projects development. These ICU analyses are contar in Appendix B and summarized in Table 4. Review of Table 4 indicates that the El Camino Real/La Costa Avenue interse would operate with an ICU value greater than 0.90 while the other two inter sections would have ICU values of less than 0.90. While the ICU value at t El Camino Real/La Costa Avenue intersection is above generally accepted lev the project does not change the ICU value, This is due to the minor volume traffic added to the intersection by this project. The calculations in App B indicate no impact or change in ICU value due to the project. For ultimate conditions, the City's Traffic Model was utilized. This model has estimates of daily and peak hour intersection volumes at buildout. For the RM Zoning of this property, the model assumed seven dwelling units per i which is 1.5 times greater than the actual proposed density of 4.54 dwellSng attributable to this site would be 1.5 times greater than the proposed proje The Traffic Model projected daily volumes of 4500 on Mision Estancia; 44,200 on Rancho Santa Fe Road; and 25,800 on la Costa Avenue. These volumes are a' within the daily capacfties of these roads wlth consideration of the accurac of the model. Intersection analyses are a better measure of the adequacy of the street system. Ultimate PM peak hour intersection volumes were obtained from the City and utilized to determine ICU values. These analyses are conk in Appendix C and sumrized in Table 5. Review of Table 5 indicates that three of the intersections will require designs that exceed the normal standards in order ta provide for projected traffic demands. This condition has been identified in previous studies and indicates the need for analysis of both the Traffic Model volumes and inter- section geometries, With the improvements utilized in this analysis, the ICU units per acre. ihis would also indicate that traffic volumes in the model ' , e 0. - t ,. Table 3 TRIP GENERATION Park View East AREA DWELLING LAND GENERATED TRIPS Project SElO Approved Projects sw1 sw2 sw3 126 sw4 SW16 Subtotals - PM In PM Out Daily - - 36 RM 290 30 5 85 RLM 850 70 15 345 RM 2 , 760 275 70 RMH 1,010 75 25 233 RM 1,860 185 ' 45 131 RM 1,050 105 25 - - - - 920 7,530 710 180 f -7- 1 e e ’ : Table 4 ICU SUMMARY AT PROJECT COMPLETION(^) . Park View East EXISTING PROJECT COMPI INTERSECTION C( El Carnino Real & La Costa Avenue 0.98 E 0.98 I El Camino Real & Olivenhain Road 0.61 B 0.86 I Rancho Santa Fe Road & La Costa Avenue 0.44 A 0.54 E - Icu(2) - LOS(~~ - ICUt2) - (1) PM Peak hour (2) Intersection Capacity Utilization (3) Level of Service -8- 0 e Table 5 ICU SUMMARY AT BUILD OUT(^) Park View East MODEL k MODEL IMPROVEF )a - ICU(E) - LOS(5 - INTERSECTION - El Camino Real l4 La Costa Avenue 1.50 F 1801 1.07 El Camino Real & Olivenhain Road Rancho Santa Fe Road L La Costa Avenue 1.26 F 0.85 Rancho Santa Fe Road & Mision Estancia F 1.92 0.73 C - (1) PM Peak Hour (2) Intersection Capacity Uti1 ization (3) Level of Service e 0 -9 . values have been significantly reduced. These improvements are generally additional left and right turn lanes and do not represent major improvemeni It is recomnended that the future intersection requirements be determined s that adequate right-of-way can be reserved. AS indicated previously, this project would generate: less traffic than ass\ in the Traffic Model, Due to the small magnitude of the project, it would affect the ICU values. This condition may occur in other existing or plann development which could have a cumulative reduction in travel demands. SUMMARY This study has reviewed traffic factors related to the proposed Park v'ew Ea development in the City of Carlsbad. Existing conditions were quantified t provide a basis for the study. Estimates were made of trips to be generate by the project and the ability of the street system to accomnodate these tr examined. Analyses were completed for conditions at project completion and General Plan buildout. It was found that the project would have no impact at project completion. While the project would generate less traffic than indicated by the City's Traffic Model, some improvements will be required tc accomnodate ultimate traffic volumes. Principal findings of the study are the following. 1. The project would generate an estimated 290 daily trip ends with 3: occurring during the PM peak hour. 2. While the project and other approved projects, traffic operations would be at acceptab'le levels or unchanged. 3, The proposed density is 1.5 times less than utilized in the Traffic Model resulting in reduced traffic volumes. 4. At ultimate or buildout, principal intersections will require irnproi ments above the normal standards. * * * * -1 3 0 e We trust that this study will be of assistance to you and the City of Carl If you have any questions or require additional information, please contaci us . Respectfully submitted , . WESTON PRINGLE & ASSOCIATES Ne& Weston S. Pringle, P.E. Regi stered Professional Engineer State of California Numbers C16828 & TR565 GISP: bas cc: Mr. Clyde Wickham Mr. Chris Decerbo Mr. Pat O'Day m 0 APPENDIX A . EXPLANAT I ON OF I NTERSECTION CAPACITY UTI LI ZATION LEVEL OF SERVICE AND ,, e 0 APPENDIX A EXPLANATION OF INTERSECTION CAPACITY UTILIZATION The capacity of a street is nearly always greater between intersections and at intersections. The reason for this is that the traffic flows continuousl, between intersections and only part of the time at intersections. To study intersection capacity, a technique known as Intersection Capacity Utilizatia fICU) has been developed. ICU analysis consists of (a) determinin the pro- portion of signal time needed to serve each conflicting movement; 9 b) Sumin! the times for the movements; and (c) comparing the total time required to thc time available. For example, if for north-south traffic the northbound traf. is 1,000 vehicles per hour, thesouthbound traffic is 800 vehicles per hour, i the capacity of either approach is 2,000 vehicles per hour of green, then the northbound traffic is critical and requires 1,000/2,000 or 50 percent of the signal time. If for the east-west traffic, 40 percent of the signal time is required, then it can be seen that the ICU is 50 plus 40, or 90 percent. Whc left-turn phases exist, they are incorporated into the analysis. As ICU's approach 100 percent, the quality of traffic service approaches Level of Seru (10s) E, as defined in the Highway Capacity Manual, Special Report 87, Highwa Research Board, 1965 . Level of Service is used to describe qual i ty of traffic flow. Levels of Serv A to C operate quite well. Level of Service D is typically the Level of Serv for which an urban street is designed, Level of Service E IS the maximum VOl a facility can accommodate and will result in possible stoppages of momentary duration. Level of Service F occurs when a facility is overloaded and is characterized by stop-and-go traffic with stoppages of long duration. A des- cription of the various levels of service appears on the following page. The ICU calculations assume that an intersection is signalized and that the signal is ideally timed. A1 though calculating ICU for an unsignal ized inter- section is not valid, the presumption is that a signal can be installed and tf calculation shows whether the geometrics are capable of accomnodating the ex- pected volumes. It is possible to have an ICU well below 1.0, yet have severe traffic congestion. This would occur because one or more movements is not getting enough time to satisfy its demand with excess time existing on other moves . Capacity is often defined in terms of roadway width. However, standard lanes have approximately the same capacity whether they are 11 foot or 14 foot lanes Our data indicates a typical lane, whether a through lane or left-turn lane ha! Highway Capacity Manual found capacity to be about 1500 vehicles per lane per hour of green for through lanes and 1200 vehicles per lane per hour of green for left-turn lanes. However, the capacity manual is based on pre-1965 data, and recent studies and observations show higher capacities in the southern California area. For this study a capacity of 1600 vehicles per lane has been assumed for through traffic, and 1600 vehicles per lane for turning lanes. a capacity of approximately 1600 vehicles per lane per hour of green time. Thr Level of Service A B c 0 E F Nmi nal Of I[ 0.00 Low volumes; high speeds; speed not restricted by other vehicles; all signal cycles clear with no vehicles waiting through more than one signal cycle. Operating speeds beginning to be affected by other traffic; between one and ten percent of the signal cycles have one or more vehicles which wait through more than one signal cycle during peak traffic periods. Operating speeds and maneuverability closely controlled by other traffic; between 11 and 30 percent of the signal cycles have one or more vehicles which wait through more than one signal cycle during peak traffic periods; recomnended ideal design standard. of the signal cycles have one or more vehicles which wait through more than one signal cycle during peak traffic periods; often used as design standard in urban areas. Capacity; the maximum traffic volumes an inter- section can accommodate; restricted speeds; 71 to 100 percent of the signal cycles have one or more v$licles which wait through more than one signal cycle during peak traffic periods. Long queues of traffic; unstable flow; stop- traffic speed can drop to zero; traffic volume will be less than the volume which occurs at Level of Service E. 0.61 0.71 Tolerable operating speeds; 31 to 70 percent 0.81 - 0.91 - Not me pages of long duration; traffic volume and 0 0 , APPENDIX B ICU ANALYSES PROJECT COMPLETION e 0 n h * -e-* U m * \u WmbOmwIDQO dQIQ0 dwmnc6 =: rc-o--wwv) orcq yD0Q)W Q, +& dddddddd 000 0000 +o am teg gg eatn WCuVmm ?",? 9tlDooLL 92 ?? 0. w 00 dd 00 000 dddcl 0.. a. ?& wo ** * c P *+ I * wm mw QQ tOIOO bvcUv)oI ?e dd d(u Lum 979 y???L Y* dd dd dd 000 mood e* * * 2 v, v)u t mm om WDQI eQDQ0 00mQD A n u\ -- 379 em0-u L 3 w w 00 00 00 000 do'dd P U E s QO s CLY z E- Ye 9 s E 9 t;;* p: k P, U 98 z -2 e is=- 0'3 s z * E d E ). U L U L acs 0. 72 2u.s r 3 Od Q:O v) 0 &> u v) v) *LC a- a# rn 2 3 Qc u4 Ov) 00 00 P P 5 \ IO 82 e0 mi0 6J- 0 Wd e PW~PhOOQOOWO wo rop~~lD$$gMx& Y d ts * 0 0 u X 0 ci !z s Y L 3 m w Y a 0 Q: w i V kn oo 00 00 ooo 3v) 3I5 L EYE E Em =I 00000000 000 n oa 00000000 000 .. eu WCUIPIDNIDWID -DIDID Q.u -(r)rcrtc*)--rc m-- w v) U r c w z v)I Y w, crks +., w =:cw - 5 v) WU 00 00 00 000 wx Oc3W a -0 -0 m- -mrc 4v) E mur xu rDw ww WID WWW cc 59: 0 -4 v)=u Q p?c w3- Y) nau 3tW on 0-u. mew wwz I -&I c 34 E2 u a0 $" -U v) CLW u- -0c 01 ZEZ &- u. %zs HZ rlNOdNOdW0HHH &kS,, 22E ne E3 oz -wHrcwrc--oq-ll-- rp cv, \3 X\S#W kt5 d; dl+ sz a+ctaha~+aa p&l ZZZv)v)v)UWWIS% v)w =mu-& 11 u n st OUdUO =&* v e ** * Q. +o OgDUO WOHN O\ +W w 0000 Q QI warn- N mNOgD= ...e dddd ** * OU OhbO OI r(QIknv) +\ Numr(N w rnwacoa 00.. w, 0000 8 dddd c4 * a w z c\ E U z OrDoDO kn r(Lc)ulrc o'do'd 0 dddc; *n 4 w s E -0 d a a- v) MU NWON (u (*)(UoIDa E- t;w O -3 L U 3 I X z w LJ * YC w P e L I- 4,- 0 CI - L = 0 wx Q) \ OA CTO P E r 2 51 2 &* g E E2 LnLn w s 2 c 0 L G* se 9 2 s 2 EZ CS E Gtx CI 0 =az -0 *w 0 z x 0 m zm 0) M u 0. L E5 w, VIY n!E 5w OCSW %* I- x> u w W VI= v) =) mww p: a* dv) =e0 0000 0 e I-UZ MU 0 -A -xu kz u CSU <uwV)(u un KU Crh 403- wu u- a0 + Qc nncu IU n ZXQ: =I-o Gscw OM 4 owu mcm cYv)WJv) ZdU lucl s;S 5 w X iLwMv)wuw&= s x J w * Y z w U v) 0 Y a zz ONQod mr(Cu0 =i2 -uHw 0 .. L3 w O -0 cz 0 0-1 3p: EL 0000 LZ (*)rtr((*) w w s E U Et"E -v) l-m OWZ v)r 0N~r(Cu0000~00 SF%" I-I-U auauo iLwu-4 =a* w w > edscuat-=a e ~ . 9 8 ** c e \u 3r\ WW rcv) rc-Worc hWv)* P 0. 0.. ..a. Op. +5 w- r P@m ow rcO”O~? --ov)m +a dd 00 00000 0000 c I c rum v)dW hWmm W&r( (*)WQY)rn a. ?tl r(c3 us 00 000 dddd * * a cz 0.0 z h.lriD aD.lrm* , 000 0000 9\f?9s- -u sz c( r( 0 E> dd * w w z u) 4 s s z v) s uI: t;w sz 5 4. 3 ‘ eaz an- E a0 < k 2!is d CI gE LL w 0- 3 s e, v) -a U L u e0 0 Od CL) n w- A I Ln 0 v) W =A r( #-0 w z *c 1 ( 4 t 4 4 I a 4 X wa (*)- el a e 4) i a #-= rtrt orcrc s 8 x” big se u r %E g z 4 z3“o +<r z d Y U ;LW OH 0 v) kt a* ‘E z 2 El Ge 3 e E zc 00 ( t 4 1 t 4 4 L 4 3 I t c( V ti 4 E E +J+Joo 888 Y y”g; 5h 23 wu =v) r ask! 5 => mu- I n yp i 0 --I f w sa az OLJ rt”O~WOrc”HrcW0 LE v)su I1 W3u .c s5 a E:: stu c C E% 0 Ev) MWZ \IC stz v)L ~~00~0~0~000 =.&tu ow;L ~ ii ii n k E5 SSGZS =a* 2 Lz E d tx~+e-~+a-~ g 9 w as W+ 00 00 00000 0. v)- 00 00 00000 2 on eU 1 1 P, z -u * n (DWWbDW E: 22 2% rcrcrcrc(r) Y ;L G QU u v) Q: w v) Q: a* v) U w # Y L mu %ZZ eu -ID Hrn XU c1 v)t OOW dv) =e0 v)v) -U ec v)a- T u- *OC a e ncz- o ZIP: c s P OWU CW ++U WV)W=>v) X-IW W &Zv)Wv)WWW&~ I \e 0 *I APPENDIX C ICU ANALYSES BUILDOUT 0 8 , INTERSECTION CAPACITY UTILIZATION ANALYSIS PARK VIEW EAST (PM Peak Hour) At General Plan Build-out INTERSECTION: EL CAMINO REAL / LA COSTA AVE MOVEMENT GEN PLAN PROPOSED GEN PLAN PROPOSED GP MODEL GP MODEL LANES LANES CAPACITY CAPACITY VOLUME V/C NL 1 1 1600 1600 108 0.07 NT 3 3 MOO 4800 2204 0.48 NR 0 1 1600 110 St 1 2 1600 3200 564 0.35 ST 3 3 4800 4800 1277 0.45 SR 0 FREE 878 EL 1 2 1600 3200 7 16 6.45 * ET 2 2 3200 3200 545 0.27 ER 0 FREE 331 WL 1 1 1600 1600 19 0.01 i 1 1600 246 KT WR 2 3200 3200 309 0.17 * NORTH/SOUTH CRITICAL SUMS = 0.83 EAST/WEST CRITICAL SUMS = 0.62 CLEARANCE = 0.05 ICU = 1.50, 10s - F N=NORTHBOUND ,St SOUTHBOUND ,€=EASTBOUND, W=WESTBOUND L=LEFT,T=THROUGH,R=RI6HT * DENOTES CRITICAL MOVEMENTS IPVEUPl a e q * I’ e INTERSECTION CAPACITY UTILIZATION ANALYSIS , PARK VIEW EAST (PM Peak Hour) At General Plan Build-aut INTERSECTION: EL CAMINO REAL / OLIVENHAIN RD . MOVEMENT GEN PLAN PROPOSED GEN PLAN PROPOSED GP MODEL GP MODEL LANES LANES CAPACITY CAPACITY VOLUME V/C NL 1 1 1600 1600 58 0.04 L NT 3 3 4800 4800 1942 0.57 * NR 0 FR€E 786 SL 1 2 1600 3200 512 0.32 ST 3 3 4800 4800 920 0.20 SR 0 0 60 EL 1 2 1600 3200 306 0.19 ET 2 3 3200 4800 802 0.26 * ER 0 0 20 WL 1 2.5 1600 4000 1154 0.72 * KT 3 2.5 4800 4000 631 0.17 WR 0 1 1600 200 NORTH/SOUTH CRITICAL SUMS = 0.89 EAST/WEST CRITICAL SUMS = 0.98 CLEARANCE - 0.05 ICU - 1.92 LOS = F NsNORTHBOUND , StSOUTHBOUND , E=EASTBOUND * W= WESTBOUND 9 L=LEFf,T=THROUGH,R=RIGHT DENOTES CRITICAL MOVEMENTS IPVEUPPC 1 0 e , dc # 1 Il INTERSECTION CAPACITY UTILIZATION ANALYSIS PARK VIEW EAST (PM Peak Hour) At General Plan Build-out INTERSECTION: RANCHO SANTA FE RD / MISION ESTANCIA MOVEMENT GEN PLAN GEN PLAN GP MODEL GP MODEL LANES CAPACITY VOLUME v/c NL 0 NT 3 4800 2488 0.55 * 0.00 * 1600 NR 0 SL 1 St 3 4800 1667 0.35 SR 0 EL 0 ET 0 ER 0 WL 1 1600 205 0.13 *. WT 0 WR 1 1600 36 0.02 174 NORTH/SOUTH CRITICAL SUMS - 0.55 EAST/WEST CRITICAL SUMS = 0.13 CLEARANCE = 0.05 ICU = 0.73 ' LOS = C N=NORTHBOUND,S~SOUTH8OUND~E=EASTBOUND~W=HESTBOUND LsLEFTsT=THROUGH,R=RIGHT * DENOTES CRITICAL MOVEMENTS IPVEUP4 e + EXECUTIVE SUMMARY 0 Carlsbad Traffic Impact Fee Study by Barton-Aschman Associates, Inc. April, 1986 Transportation system improvements are needed and will be need in the future based on development trends in the La Costa area the City of Carlsbad. Associates 1 Inc. to determine the necessary roadway requiremen to meet existing and future traffic demand, and to recommend a financing method to implement the improvements. The City retained,Barton-Aschman In sequence, the study determined appropriate area boundaries, identified short and long-range developments within the study area, calculated present and future levels of service on the transportation network, determined what improvements would be needed to correct deficiencies, estimated how much money would needed to fund the improvements, and finally, evaluated alternative funding mechanisms for raising the needed revenues, The geometrics of the existing roadway network were taken as t? starting point, with all needed improvements to be added to the existing street system. When so considered, .some 46 different construction projects were recommended. The projects were plat into two categories: (1) Those needed now or to satisfy already approved or committed projects, and (2) those additionally need in the future as development proceeds to General Plan buildout. --. 0 0 9 , The study determined that projects in the first category total $1 1.5 million, while those needed ultimately total an additior $22.5 million. Thus, the total Street improvement needs, to buildout of the General Plan, will cost $34 million. A dollar assessment per trip generated, to be called a Traffic Impact Fee, is the recommended financing mechanism. It provid the most direct tie between new traffic generated by area development and funds needed to improve roadways to accommodat new traffic demand. The amount of the fee can be calculated b dividing the number of future trips to be generated into the amount of money to be raised. As an example, the $34 million General Plan buildout could be divided by SANDAG's estimate of 141,242 future trips to be generated, and would result in a per daily trip fee of $240. In setting the per trip fee, the City has several.options: 1) The project list might be reduced depending on other fundin sources that might be available. 2) There could be a differentiation between residential trips and other trips such a5 commercial or industrial, due to th phenomenon of "double-counting". -_. 3) The project list might be reduced through the City's willingness to accept a level of service lower than "average" . 2 e 0 6 'b 4) The future needs (and future trips generated) might be reduced through a reduction Of allowable density in the General Plan. Because actual development may take place differently than assumed under the General Plan, the analysis of the Traffic Impact Fee should be frequently renewed, no less than once eve two years. Finally, this type of analysis could be expanded to determine appropriate roadway improvements and financing mechanisms for other areas in the City of Carlsbad. - .. - 3