HomeMy WebLinkAbout1986-08-19; City Council; 8738; Growth Management Program-Progress ReportGIF .OF CARLSBAD — AGEND SILL
AB# ^73 f
MTG 8/19/86
DEPT. PLN
TITLE: Growth Management Program
Progress Report
nFPT HO. 1^\MA
CITY ATTYVf'S
CITY MGR.^2^±
2Os
O
z
O
O
OO
RECOMMENDED ACTION:
Receive and File.
ITEM EXPLANATION:
The purpose of this item is to provide the City Council with a
brief update on the Growth Management Program. Staff will be
expanding on this information by making a presentation at the
Council meeting. Attached for your review is an updated Work
Schedule which indicates the current status of each specific
task to be accomplished.
Work Schedule Highlights
Staff is continuing to proceed on schedule with the
implementation of the Growth Management Program. During the
past few weeks several important tasks have been accomplished:
1. Initial meetings have been conducted with each of the
special districts.
2. The base data has been obtained to determine what future
facilities will be needed to adequately service the City,
assess the impacts of existing, pending and future
development, and will be used to measure compliance with
the adopted performance standards.
3. The automated computer system is being tested with actual
data and specific data bases are being established for
each of the Local Facilities Management Zones.
4. A first draft of the model format and/or guidelines for
the Local Facilities Management Zones has been prepared
and will be available for review and comments.
5. All of the information necessary to prepare the
descriptive maps has been obtained and the first maps
will be available for review in the next few days.
6. The process of identifying the financial options
available to accomplish funding for future public
facilities is underway as well as establishing cost
estimates for these improvements.
7. Work is in process to develop an informational overview
and summary of the Growth Management Plan which will be
presented to the Council in September.
Page 2 of Agenda Bill No.
These items are the highlights of the progress being made on the
Growth Management Program. During the presentation given by
staff, Fay Round - Automated Systems Consultant, and Paul Zucker
- Planning Consultant, the Council will be given a more detailed
report.
FISCAL IMPACT;
None
ATTACHMENTS;
1. Growth Management Program Work Schedule.
EH
03
«
I
01aa .-iO -H•H J3
£ O.
6 -H •Hj=Oi
IB
O O rHID -H
H .C
O O.
M.XaIBEH
•u eo o
cc oIB -H-H 4Ja IBt>
J^ 4)ki n§<!)MQi
IB i-l COM -H <J>a o <-a ca> a -n o i~
Ok U «-
01
SIBC•H
1
S1
Uft0 OH *0a i
M§01o
I
4->IB D^M C^4 -H
-H CO Oe No
g-S« a
?s•H r-lC (X
C
IB
IBV4 Oo ou i4
1i i
O 4J '«M 01
? §• RJH Q4 O•H 3 VIS in a
aIB
1
3m
at a.a §•S en
4-1 n
§ §
4J 4->•H a
| &
o MO 01sa> aM§u
C >iO 13
4
S 8.•H E=m -H
4J
U
ao•a <
IB
4-1C
0 a
Xt,
Z o.01 T3-•4
>i
01 4Ji»a01 klIH Ocu IM
Ifl IB -H 4-1
•i-l -H t) 'HtJ O C. S•M (15 4-1C Qi•H w
« S'I'Se ^H -H s OSr-l T3 > *>IB lj --I M
IB 0
e
•H14 -
01
£ -
4J<B
>Ois
0>cfcl -H O
<a01
Vj 1-1 -H 01 O -H
IB 0) VI 01 rH $a 4-1 4-1 3 m >,0> 4J tn B1 > 4-1VI 4) -H V 0> -H
04 ^H *O Vl »O U
"c c•H H OO €
o >-H » O
C Cu
O S
O)a4JIB
•8jj
<D1-4
I
•8 1
01p-Ha
4J01 4J0)4Jt Iy o
"S 'S
0)r-(a
4J01fu
14
Ox
4J
0)r-la
u
sDa
|
osS "^s"EH
§3 CO«
_
inN
00
EH *~
1
00CN
r-
CN
^
-
o
m
5 vo
IT.
4J•HrH•H
XI•rlnca0141
oi
pecific Task(n
na4JIfl4->
CO
§
|
1
X
I
1
XI§
4)
•H IH !c1-3 O O*publicy existt - bothrH B4J nc nJJ HI T310 M 10
etermineacilitiesitywide, byQ IH U
CM
s41
"ag5u
x
x
XXX
*
X
XXX
s
•rl
1-5
districtpublicrH10 4J•H 10U 4?4) *ity andacilitiesetermineU «H Q
0101
O0M
PU
BM
4)O rH(0 -H
O PU
essary tobuildoutt - bothU 4-1 B<P Ifl IflC Li
41 >i"SJO U S•H &
rH UrH
acilities wiervice theitywide, by«H 01 U
a
u•H
301
*
3•HU
1
>14J
O
M
§
*O
g
1
i
rH4110
U g•rl -rlS ID
existingng units•H>«H rH0 rH
rl 'O
4>
g T)etermine nand conunittea a
^
!
r-fa
Q
0
rH•H
£
CU
by zonedistrictC^rH
Ifl 10kl -HT3 oIS-
*i41 41•O•HS B>,-HJ-J
•H
O >»
X1
X
g
a
^o
g
v
•H rl X!^ O PU
acres byincludingywide by•H4J >1 O4) 14
^&01 4) 01
O O -H
etermine grand use cean densita H g
2
ISJJ4>
rHa
0u
O XI
<uM T]
0 -H^»
1^3 O 41
4) OC 4J N0 0
H -rl >l
V4 XI
uadrant, bypecial distuadrant andO" 01 O1
X
g
g
X1
g
^J
1
X1
8
I
1
1
1
s
^1
1
i
4)U Hg Ifl -H
•H rl £^ u o<mappingpublicto futureJS41 O O*> <8 C
•rl 4) -rl
4J -POl 01
-H -rl
0 M (U
repare desystems foacility -acilities(X 01 »w MH
010141B
rl
111
CH
01BO•rl
10
01•HB•H
1<
B rHc o ™O -H 4J•H 4J C01 4J 10 41tn «J 4J S10 rH CQ B
rl M C 3 VI41 41 -H O 41 41S 4J IB li ri >
41 « tl -H -rl OW S Q U Cu O
vo r^ co eft o «-'-'-'-•- CM M
EH
EM COcn
•-
inCM
CO
-
00Ol
a"
r-
o
CO
m
U
5 «
1-3 •-
cn
4J
•Hr-l•H
XI•r-tm
110
Specific TasksCO
4J(04Jin
1
X§
1
1
B.
§
|
XX
I
X
1
1
x
1
IdxX
e
tH•H£a.1 Parks1 Library1 Schools1 Density1 Enivornmental Constraints1 Open SpaceI Develop an automated system tooj PO ^* m vc o co
CS CM CM CM CM M CS
U)in<O
§H0.
C
H
Co
i? Qfc. O
maintain current growthmanagement information. Assuresystem compatibility with theCity's current computerhardware, and work concurrentlywith the Information SystemsDirector. Information formattedso it can be used for localplansX
X
<a<e
Is
1 Provide the City Council with aprogress report and review anysuggested modifications to theplan.30 day Progress ReportsJuly 22Aug 19Sept 23CM
|U
CXrH —0) 3 X.
« -g CO
•O £ MC 0 OCM in XH
Bs
X
1
a**
0)
•H S1-3 O
1 Schedule all meetings andobtain information on current0m
I(Ui-la
§u
Aa.facilities citywide and meetwith district and provideinformation necessary toproject specific facilitiesnecessary to service the Cityat buildout citywide and byquadrant
1
01Im0)
01
a18EH
o•HU-l
•Hus
CO
<a34JIBJJ
Cfl
iH iHB -H S -H-H.fi -H .e^3 fc ID Oi
Ll01"O•H
OLia.
LI m H n B0) 0 IB 0 -Htji IB O 0> O <B O0 -H LI oj M j2 IQ(B 13 IB IB B 18\ Li IB £ IB £ 0> IB Li>i 01 O JJ > 6 O•UOI3B 0) E -rl 0> rH••H Li 0> <B O IB rH 3 Ouojtn otnomcj
4J
•H
•HU18fu
O•H
r-l
•§
IX
• • 4*
>-f MQ) (U
1 I
. ,
"~ M
«- CMM m
rH
•H Xhi cu
01
M <001 Og1*
0^ Llx, IH a>, a> mJJ ID p•H Ll 18U U S3
0)
S"B-H
IB
a
,
rn
M
PO
i«
Si rH0 -rl
£ Pk
B
1 B MC IBO S >iJJ -C JJt! o wa n 1803 < £
„
BO•HJJ18i-H3OIH•H
U
t
<*
•4<
ro
0) 0)O O
O C5
B0)B
B IB
8 s
!4H Q« X
01 g B•HO IBC C LlU EH b
e
•H ••
S °>•rt 0)
< -HJJ• -H
• • JJ rH
0) - -H
.rl § S
h U Cu
• •m vr>
in vcm n
S §
Ll LlU O
01« g1
01 IB
JJn UHo) -g u-i> IB -Ha LI HQ 03 U
,,
Lln IBX L!L| J^
« J
. ,
p. 00
r^ oom ro
<U
a ^•H Ll
badarcosm £1-1Ll Ca ao w
„n
iH00
u
to\
<y\n
o
•H3 01Oi 18a jj•H 'H0 B
B'5IB Bca u
OS
rTEH
PiB ooCO
r-
in(N
00
1o
„
00
M
£
*
"
OM
m(N
h
on
•r4
rH
•H
.fl•H0CIm
HIOS
01X01IBEH
•3
VH
Os01
III34-1IB4-1w
X
rH0>IB
•C rHIO E -H•H -H £SI ITD 04
and thresholdeach publicimprovementes for adding01 onO -H 01
C 14 r4 > -r(id O O 5 4J
S I4J n -H
C rH
O -rl
U4 ffl OLi c IBJ) 73 >i -H «H
IB -rl 01 O
a c 'H o> I-HIO IB O -rt £>13 4J <B r4 3< « <4H 4J a
o
•004J01
a§u
X
-.IB
.C rHo e -H
S £ 04
hearing andity ManagementO -H
•r< U 01
rH IB 01
Q, rH IB
O C0 34J J Qu i
ng Q, 01fi O CO T3 OU tJ N
5
30)rHa
§u
r*^
X
B
XXX
1
1
1
Xg
X
XX
1
X
l-l01IB
•C rH
O 3•r( IS£ a,ng options tong to buildoutc facilitiesCity•H -H — I 41
e UH a >i
•rt fj
Si TJ01 H 01
•H "a, o
56 u
*o o o oH IB 14-1 U
CM
»n
Oua,
e
x
x
|
XX
X
d
x
g
|
X
Xq
Wg
|
|
|
|
xX
1
8
|
^
^
IB
X rH
£ 04
rH
gs
M nss
rH4J a,IBg^O 01"ii! ?
Q K)
a 4J1
0 -H
ai -H
m
n010>
Q
04
BHH
><
g
X1gX
X
1
X
x
1
1
x
X
XX
1
1
1
1
s
g
Xs
1
^
0)
U J=
U 04
support anderialsl\a
IS rHr4 IB
O•H
0,30 g
01 O> UH0) CQ -H
S
III01
Q
r<
04
e
M
X
'3 'aIS Q
u o c•H -H (B£ £ Q
TJ tJ 4J 01 rl V4 01£ c c c 01 o <U(B (B Q) IS XI *44 -fH
O> CP tTl 4J C rHc c IB in a ai -H•H -H C 1> 01 SOU L4 IS -rl rn 0) IBIB IS £ 4J (1) fc0) 0) -H 14 t4
J3 Si >, rH 4) CPC JJ 01 -H 4-> SIB -r* 01 U I4H H
rH rH frj IB )4 IBO Q. O-H Cn — 4-> O
•H -H O O> O OrHOI rHIBC rHto 01 J 01o >rl j3 Pti -H IS 1 Tl 01
3-rl 3 01 Or- Oh
O, > O.rH 01 O M I4J>, iso) J « a o 4J4J o o 01 C•H o O C T) 01
4JCJ 4Jr5r4 OIO «t!^O o a, Vj N jJ c 5)34J 34J IS CUO)CTi
'§§' '§§'§ §*,,— § li BOTJ O'OO MOm XIBIBO>B rj!Btt 04MHCS UQ,£
in vo r^ oo
1>4->0)rHa
%u
7
GUIDELINE FOR PREPARATION OP
LOCAL FACILITY MANAGEMENT PLANS
City of Carlsbad
Preliminary Draft
August 19, 1986
TABLE OP CONTENTS
PAGE
I. Growth Management Plan Background 1
II. Reasons for Guidelines 1
III. Overall Format 1
IV. Editorial Guidelines 2
V. Contents Overview 2
VI. Specific Outline 3
1. Title Page 4
2. Table of Contents 4
3. Introduction 4
4. Build-Out Assumptions 4
5. Phasing Assumptions 5
6. Facilities Having City-Wide Impact 6
7. Parks and Recreation 8
8. Circulation 10
9. Drainage 13
10. Fire 15
11. Open Space 17
12. Schools 19
13. Sewer Collection System 21
14. Water Distribution System 24
VII. Environmental Review 27
VIII. Plan Preparation Options 27
IX. Plan Processing 29
Table of Exhibits
(Note Exhibits to be added In final package)
1. Local Facility Management Zone Map
2. Methodology For Build-Out Projections
3. Facilities Having City-Wide Impact Analysis
4. City Circulation Element Map
I. GROWTH MANAGEMENT PLAN BACKGROUND
(to be inserted)
II. REASONS FOR GUIDELINES
These guidelines have been prepared to:
1. Develop a consistent format for each of the twenty-
five facility management zones which will facilitate
review by decision makers and the public alike and,
2. Provide clear directions to property owners, consul-
tants, and developers who may prepare management
plans, with the aim of reducing the costs or time
delays associated with the process.
3. Assume that the Local Facility Management Plan will be
consistent with and implement the City-Wide Facilities
and Improvement Plan.
in. OVERALL FORMAT
1. 8 1/2" by 11"
All documents to be 8V2IT by 11" with a vertical format,
Where larger maps or tables are needed, provide them
on 11" by 17" fold-out pages.
2. Print One Side Only
To facilitate review and notation of documents, please
print on one side of paper only.
3. Page Numbers
Page number the entire document sequentially, rather
than by section to facilitate easy review.
4. Exhibits, Figures and Tables
Label exhibits, figures and tables numerically or
alphabetically and include in the Table of Contents.
5. Appendixes
Any lengthy documentation, felt necessary such as
traffic studies, lengthy calculations, large maps,
etc., should be included in an appendix section, or
separate appendix document.
IV. EDITORIAL GUIDELINES
1. Adequate
Avoid using words like "adequate," instead, always
quantify in specific numerical terms.
2. Sources
When using or referring to secondary sources of data,
be specific, i.e., report names, dates, authors, page
numbers, etc.
3. Methodology
Be specific about the methodology used for analysis,
cite all secondary sources.
V. CONTENTS OVERVIEW
1. Entire Zone
The plan should cover the entire zone. Plans submitted
for only a portion of the zone will not be processed.
2. General Plan and Zoning
The Local Facility Management Plan shall be based upon
the general plan and zoning applicable within the
local zone at the time of approval.
3. City-Wide Facilities and Improvement Plan
The Local Facility Management Plan shall be consistent
with the City-Wide Facilities and Improvement Plan and
shall implement this plan within the specific zone.
Any proposals for deviation must be specifically docu-
mented and Justified along with recommendations for
amendment to the city-wide plan and an analysis of how
such amendments would impact the other twenty-four
zones.
4. Facilities Covered
The Local Facility Management Plan shall discuss eleven
separate facilities. Three of these shall be reviewed
on a city-wide basis, one on a district basis, and
seven shall be reviewed on a zone basis as follows:
City-Wide
1. City Administrative Facilities
2. Library
3. Wastewater Treatment Capacity
District Basis
4. Parks and Recreation
Zone Basis
5. Circulation
6. Drainage
7. Fire
8. Open Space
9. Schools
10. Sewer Collection Systems
11. Water Distribution System
VI. SPECIFIC OUTLINE
The Local Facility Management Plan should follow the out-
line and must include the contents listed below:
1. Title Page
Include zone number, name, address, and telephone
number of sponsor of zone plan, all consultants, and
date of preparation.
2. Table of Contents
The table of contents should be comprehensive and
Include a list of exhibits, figures, tables and appen-
dices .
3. Introduction
Include, here, a brief description of the zone and
background maps. Maps should include the following:
A. City-Wide Local Facility Management Zone Map (see
Exhibit ); please highlight the specific zone
under consideration with a graphic pattern.
B. Latest general plan map of the zone.
C. Latest city zoning map of the zone.
D. Map and table indicating the major (25 acres or
larger) property owners in the zone and acres of
property owned by each. For smaller holdings list
the number of owners and acres in aggregate. Also
list popularly known names of development projects
included in the zone. Where a specific project
has been filed with or approved by the City
include City's official reference number.
4. Build-Out Assumptions
A projection of the build-out for the zone shall be
provided including dwelling units, non-residential
land use acreage and environmentally-constrained land.
A land use map showing how dwelling units and acreage
projections were determined shall be provided. The
map shall also show the location of all constrained
lands including beaches, permanent bodies of water,
floodways, wetlands, riparian or woodland habitats,
major power transmission lines, major roadways,
railroad tracks, slopes with an inclination of 25 per-
cent to 40 percent and those greater than 40 percent,
open space areas previously designated on the City's
Land Use Map and other land upon which significant
environmental features are located as determined by
the environmental review process for the local faci-
lity management plan. Also include population projec-
tions based on 2.471 persons per household.
The build-out projection shall be checked and verified
by City staff using projections made by the City as
part of the preparation of the City-wide Facilities and
Improvements Plan (see Exhibit for the methodology
used by the City). Any deviation from these numbers
must be fully documented and justified and be
discussed with City staff prior to completing the
remainder of the plan as this is a critical step in
developing a plan for required public facilities.
Should the City Council's Referendum or the Citizen
Initiative be passed on the November ballot, addi-
tional instructions may be issued for this section.
5. Phasing Assumptions
The primary goal of the zone plan is to provide more
up front, longer term planning for public facilities.
The phasing analysis and schedules are for planning
and "early alert" purposes only and are not for speci-
fic policy adoption. It is recognized that when
development will actually take place relates to many
variables that change over time. Nevertheless, it is
necessary to prepare phasing assumptions in order to
analyze facility phasing, construction and financing
plans. The decision as to whether a specific project
may proceed will be made in relation to both the Zone
Plan and the actual project approval. In both cases
analysis will relate directly to assurances that the
Performance Standards can be met.
Both dwelling unit and non-residential land usage
should be projected on a year-by-year basis over a
twenty year time line. Development projected beyond
the 20 year period should be shown in one remainder
number. A table for the specific zone should be
included as part of the plan.
Specific facility phasing for each of the eleven
facilities should relate directly to these projec-
tions. When considered helpful, alternative phasing
schedules may be submitted. For example, such sched-
ules might document that facilities will be adequate
for variable rates of development within the specific
zone.
6. Facilities Having City-Wide Impact
Facilities for City Administration, Library and Waste-
water Treatment Capacity have been analyzed as part of
the City-Wide Facilities and Improvement Plan and are
monitored as part of the City's public facility manage-
ment systems, semi-annual monitoring report.
City standards for these three facilities are as
follows:
City Administration
1500 square feet/1000 population must be
scheduled for construction within a five
year time period.
Library
.8 square feet/person must be scheduled
for construction within a five year time
period.
Wastewater Treatment Capacity
Sewer plant capacity is adequate for at
least a five year period.
Current and future requirements for each of these
facilities along with the timing and funding schedule
for future improvements are included in attached
Exhibit . To the extent that the preparers of the
Local Facility Management Plan feel that these city-
wide facilities will be constructed on a timely and
adequate basis for appropriate development within the
local zone, no further analysis is required within the
local zone plan. Analysis should be included only if
recommendations are made to modify the city-wide
facility plan for these facilities including plans,
standards, phasing or funding. Additionally, any
wastewater treatment that is proposed to be handled at
other than the Encina Plant should be discussed in
detail in this section.
If the city-wide analysis is acceptable, include in
this section a statement indicating that the city-wide
plan has been reviewed for these three facilities and
indicate that it is acceptable for zone development.
7. Parks and Recreation
A. City Standards
The plan for parks should be designated to meet
the following standards:
Three acres of community or special use
park per 1,000 population within the
Park District, must be scheduled for con-
struction within a five year time period.
B. Inventory
The plan shall include:
i. A map of the Park District within which the
zone is located. If a zone lies in more
than one Park District, a map shall be shown
for each Park District.
ii. A map and list of all existing and proposed
community or special use parks within the
related Park District.
C. Phasing
A phasing schedule for the entire Park District
shall be included. The build-out projections used
for this schedule shall be the same as that pre-
pared by the City, or specific documentation and
justification for a different schedule shall be
included.
Time periods where the demand for facilities and
improvements may exceed this capacity shall be
indicated, and the plan shall either:
0 Provide a plan for eliminating the shortfall,
or
0 Indicate the intent to suspend development in
the zone for a period of time, until the
necessary facilities are constructed.
D. Financing Plan
The financing plan establishing proposed methods
to fund all needed facilities shall be included.
The plan shall specifically indicate:
i. Which facilities are proposed to be funded
and built as an integral requirement of the
development project. If reimbursement
features are anticipated, they should be so
indicated.
ii. Which facilities are proposed to be built by
the City as part of its normal capital
improvement program, and funded from park
fees or other revenue sources. The facili-
ties should either be shown on an approved
capital facilities program or it should be
indicated why it is reasonable to assume
that the facility will be included in a
future capital facilities program.
ill. Other funding sources, such as assessment
districts or grants shall be discussed in
detail along with rationale as to why this
source is considered workable and reason-
able .
8. Circulation
A. City Standard
The plan for the circulation system should be
designed to meet the following standard:
No road segment or Intersection in the
zone nor any road segment or intersec-
tion out of the zone which is impacted
by development in the zone shall be
projected to exceed a service level C*
during off-peak hours, nor service
level D* during peak hours. Impacted
means where 20% or more of the traffic
generated by the local facility manage-
ment zone will use the road segment or
intersection.
* service levels C and D are defined as follows: (to be Inserted)
10
B. Inventory
The plan shall include:
1. A map of the existing and proposed street
system categorizing streets by the City
Circulation Element criteria (see Exhibit )
All existing prime arterials, major arter-
ials, secondary arterials and collector
streets shall be shown. For the proposed
street system new collector streets that
will be built and entirely funded by the
developers as part of an individual develop-
ment need not be shown.
For ease of analysis it is suggested that
existing streets be shown with a solid line
and proposed streets with a dotted line.
Use a wider line width for the prime
arterial scaling down to a narrow line for
collector streets.
The map should normally include land outside
of the zone which is necessary to analyze
how the circulation system works for the
entire zone and also to indicate "impacted"
road segments or intersections.
ii. A table and/or map indicating existing
street capacities, traffic volumes and ser-
vice levels during off-peak and peak hours
for all road segments and intersections.
ill. A table and/or map indicating projected
street capacities, traffic volumes and level
of service during off-peak and peak hours
for all road segments and intersections at
build-out.
11
iv. A list of technical assumptions or method-
ology used in the analysis such as trip gen-
eration rates by land use, traffic modeling
systems used, etc. If City studies are used
for the analysis simply reference the City
studies.
C. Phasing
A phasing schedule shall project the timing for
provision of road improvements in relation to
existing and projected development and any cir-
culation deficiencies. Periods where standards
cannot be met shall be indicated and the plan
shall either:
i. Provide a plan for constructing improvements
to bring the facility to standard or,
ii. Indicate the intent to suspend development
in the zone for a period of time until the
necessary facilities are constructed.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed facilities shall be included. The
plan shall specifically indicate:
i. Which facilities are proposed to be funded
and built as an Integral requirement of the
development project. If reimbursement
features are anticipated they should be so
indicated.
12
11. Which facilities are proposed to be built by
the City OP State as part of their normal
capital improvement program and funded from
traffic fees, taxes or other revenue sources.
The facility should either be shown on an
approved capital facilities program or it
should be Indicated why it is reasonable to
assume that the facility will be Included on
a future capital improvement program.
ill. Any other funding sources such as assessment
districts shall be discussed in detail along
with rational as to why these sources are
considered workable and reasonable.
9. Drainage
A. City Standard
The plan for the drainage system should be designed
to meet the following standard:
Drainage facilities must be provided
for as required by the City prior to
any development.
Standards for improvements should meet or exceed
those shown in the City's Master Drainage Plan.
For areas not yet covered by the City's Master
Drainage Plan, facilities shall be designed using
standards and methodology as developed in the
City's Master Drainage Plan.
B. Inventory
The plan should include:
i. Map of natural drainage areas in relation to
topography.
13
ii. Map and listing of existing and proposed
facilities including:
Pipes
Desiltation basins
Retention basins
Open channels (earth OP concrete)
Headwalls
Clean Outs
ill. Include adjoining areas outside the zone
boundary when necessary. Because facilities
and improvements may overlap zone boundaries,
a discussion of the need for coordination
and a proposed coordination plan for facili-
ties extending from one zone to another
shall be included. It must be shown that
development in the zone will not create
problems in other zones.
iv. For any facility not shown in the City's
Master Drainage Plan or recommended changes
to the City's plan, list specific assump-
tions and calculations used in the analysis
such as expected flows (cfs) and capacities
for each facility.
C. Phasing
A phasing schedule shall project the timing for
provision of facilities in relation to projected
development activity. It should be shown that the
proposed phasing schedules will not create any on
site or downstream problems in relation to ero-
sion, flooding, or siltation.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed facilities shall be included. The
plan shall specifically indicate:
1. Which facilities are proposed to be funded
and build as an integral requirement of the
development project. If reimbursement
features are anticipated they should be so
indicated. Reimbursement might be from
another developer or as a credit against
fees .
ii. Which facilities are proposed to be built by
the City as part of its normal capital
improvements program and funded from drain-
age fees or other revenue sources. The
facility should either be shown on an
approved capital facilities program or it
should be indicated why it is reasonable to
assume that the facility will be included on
a future capital improvement program.
ill. Other funding sources such as assessment
districts or grants shall be discussed in
detail along with rationale as to why this
source is considered workable and reason-
able.
10. Fire
This section should be completed only for zones 2, 5,
6, 7, 8, 11, 12, 13, 14, 15, 16, 17, 18, 24, and 25.
All other zones currently meet the standard.
15
A. City Standard
The plan for fire service should be designed to
meet the following standard:
No more than 1,500 dwelling units
outside a five minute response time.
B. Inventory
The plan should include:
i. A map of existing and proposed fire stations
serving the zone. For each station show the
five minute response time.
ii. A table and/or map indicating the number of
existing and proposed dwelling units outside
the five minute response time.
C. Phasing
A phasing schedule shall project the timing for
construction of new fire stations in relation to
projected development activity outside of existing
five minute response time. Periods where more than
1,500 dwelling units are outside a five minute
response time shall be indicated, and the plan
shall either:
i. Provide a plan for constructing a new sta-
tion to eliminate the shortfall, or
ii. Indicate the intent to suspend development
in the zone for a period of time, until the
necessary fire stations are constructed.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed fire stations and station sites
16
shall be included. The plan shall specifically
indicate:
i. Which fire stations are proposed to be
funded and built as an integral requirement
of the development project. If reimbursement
features are anticipated they should be so
indicated.
ii. Which facilities are proposed to be built by
the City as part of its normal capital
improvements program and funded from taxes
or other revenue sources. The facility
should either be shown on an approved capi-
tal facilities program or it should be indi-
cated why it is reasonable to assume that
the facility will be included on a future
capital improvement program.
ill. Any other funding sources such as assessment
districts shall be discussed in detail along
with rational as to why these sources are
considered workable and reasonable.
11. Open Space
This section should be completed only for zones 11,
12, 13, 14, 15, 17, 18, 19, 20, 21, 22, 23 and 25.
All other zones currently meet the standard.
A. Standard
The plan for open space should be designed to meet
the following standard:
Fifteen percent of the total land area
in the zone exclusive of environmentally-
constrained non-developable land must be
set aside for permanent open space.
17
B. Inventory
The .plan should include:
i. A map and table (acres) showing all existing
land to be considered as open space. Such
areas might include pocket parks, homeowners
ball fields, environmental areas not included
in constrained lands, planned residential
development (PRD) common areas, golf courses,
etc. Specific definition as to what areas
qualify for this category are included in
Exhibit
ii. When known, a map and table indicating all
proposed future open spaces. If possible
relate these spaces to specific property
ownerships or developments. Where feasible,
the plan should inventory any sites within
the zone that are particularly suited to
open space use and that will enhance the
overall livability within the zone.
C. Phasing
The intent is that open space shall be provided at
the fifteen percent level at or before the time
that either residential or non-residential devel-
opment takes place (i.e., for every 100 acres of
residential or non-residential development in the
zone, 15 acres should be dedicated to permanent
open space).
A phasing schedule shall project the timing for
open space reservation in relation to projected
development activity. Periods where open space to
development area ratios may be less than the fif-
teen percent level should be indicated and the
plan shall either:
18
i. Provide a plan for eliminating the short-
fall or,
ii. Indicate the intent to suspend development
in the zone for a period of time until the
necessary facilities are constructed.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed open spaces shall be included.
The plan shall specifically indicate:
i. Which facilities are proposed to be funded
and built as an integral requirement of the
development project. If reimbursement
features are anticipated they should be
indicated.
ii. Which facilities are proposed to be built by
the City as part of its normal capital
improvements program. The facility should
either be shown on an approved capital
facilities program or it should be indicated
why it is reasonable to assume that the
facility will be Included on a future capi-
tal facilities program. It should be noted
that open space will normally be required as
part of the development. Any proposal to
include open space in the City's capital
improvements program will require extraor-
dinary justification.
12. Schools
A. City Standards
The plan for schools should be designed to meet
the following standard:
19
School capacity to meet projected enroll-
ment within the zone as determined by the
appropriate school district must be pro-
vided prior to projected occupancy.
B. Inventory
List the name of the service agency(s) for the
zone. If more than one agency serves the zone,
list each agency, and include a map showing each
agency's service area. Service agencies include
San Dieguito Union High School District, Encinitas
Union School District, San Marcos School District
and, Carlsbad School District.
The plan should include a map of existing and pro-
posed elementary, junior high and high schools
serving the zone. For each school show current
and projected enrollment and rated capacity.
Indicate assumptions used such as students per
household.
C. Phasing
A phasing schedule for the schools related to the
specific zone shall be included. The populations
projections used for this schedule shall be based
on the build-out projections prepared by the City,
or specific documentation and Justification for a
different schedule shall be included.
Time periods where the demand for schools may
exceed this capacity shall be indicated, and the
plan shall either:
1. Provide a plan for eliminating the short-
fall, or
20
ii. Indicate the intent to suspend development
in the zone for a period of time, until the
necessary schools are constructed.
D. Financing
Please discuss here an understanding of the school
districts funding plan, particularly in relation
to developer agreements for development approvals
within the zone.
13. Sewer Collection System
A. City Standard
The plan for the sewer collection system should be
designed to meet the following standard:
Trunk line capacity to meet demand as
determined by the appropriate sewer
district must be provided prior to
any development.
B. Inventory
List the name of the service agency(s) for the
zone. Service agencies include Leucadia, San
Marcos, and Carlsbad. If more than one agency
serves the zone, list each agency and include a
map showing areas served.
The plan should include:
i. Map of the natural drainage areas in rela-
tion to topography.
ii. Map and list of existing and proposed trunk
lines (normally 12 inches and larger), force
mains, and pump stations.
21
ill. Include adjoining areas outside the zone
boundary when necessary. Because facilities
and improvements may overlap zone boundaries,
a discussion of the need for coordination,
and a proposed coordination plan for facili-
ties extending from one zone to another
shall be included. It must be shown that
development in the zone will not reduce the
facilities or improvement capabilities, or
create shortages in other zones.
iv. List of technical assumptions used in analy-
sis such as:
0 Gallons per day for residential uses.
0 Gallons per acre per day for non-
residential uses.
0 Build-out assumptions by drainage area.
If figures are used that differ from those
provided by the city the reasons for change
and detailed methodology must be included.
v. For each facility indicate size, capacity in
cubic feet per second, current utilization
in cubic feet per second, projected build
out utilization in cubic feet per second,
cost estimates.
vi. A discussion of how the proposed system
relates to water reclamation plans within
the zone or other zones should be included.
If golf courses or large park and open
spaces are included, the plan shall include
a specific discussion of the reclamation
potential, and indicate if the facility will
agree to use reclaimed water, if available.
22
C. Phasing
A phasing schedule shall project the timing for
provision of facilities in relation to projected
development activity. Periods where the demand for
facility and improvements may exceed the capacity
shall be indicated, and the plan shall either:
i. Provide a plan for eliminating the short-
fall, or
ii. Indicate the intent to suspend development
in the zone for a period of time, until the
necessary facilities are constructed.
Any temporary pump stations required, due to
phasing of facilities shall be clearly iden-
tified. Future development proposals requir-
ing pump stations that are not identified in
the zone plan will not be approved without
amendments to the zone plan.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed facilities shall be included. The
plan shall specifically indicate:
i. Which facilities are proposed to be funded
and built as an integral requirement of the
development project. If reimbursement
features are anticipated, they should be so
indicated.
ii. Which facilities are proposed to be built by
the serving agency as part of their normal
capital improvements program, and funded
from hook up fees, taxes, or other revenue
23
sources. The facility should either be shown
in an improved capital facilities program,
or the serving agency should indicate that
the proposed funding method is reasonable,
and it can be anticipated that the facility
will be included in a future capital improve-
ments program.
iii. Other funding sources such as assessment
districts, or grants shall be discussed in
detail along with rational as to why this
source is considered workable and reason-
able.
iv. If temporary pump stations are proposed, a
financing plan covering the operations of
the pump stations during the temporary per-
iod shall be included. It will normally be
assumed that this operations will be funded
by the related development.
14. Water Distribution System
A. City Standard
The plan for the water distribution system should
be designed to meet the following standard:
Line capacity to meet demand as deter-
mined by the appropriate water district
must be provided prior to any development.
A minimum 10 average day storage capacity
as determined by the appropriate water
district, must be provided prior to any
development.
B. Inventory
List the name of the service agencies for the
zone. Service Agencies include Olivenhain
Municipal Water District, San Marcos Water
District, and Costa Real Municipal Water District.
If more than one agency serves the zone, list each
agency and include a map showing each area served.
The inventory should include:
i. Map and list of existing and proposed facil-
ities including major transmission lines,
storage facilities, water treatment and pump-
ing facilities, and local water resources.
ii. Include adjoining areas outside the zone
boundary when necessary. Because facility
improvements may overlap some boundaries, a
discussion of the need for coordination and
a proposed coordination plan for facilities
extending from one zone to another shall be
included. It must be shown that development
in the zone will not reduce the facilities
or improvement capabilities, or create short-
ages in other zones.
iii. List of technical assumptions used in analy-
sis such as:
0 Gallons per day for residential uses.
0 Gallons per acre per day for non-
residential uses.
0 All golf courses or proposed large open
spaces, or parks to be watered shall be
identified.
25
0 Fire flows.
iv. For each facility indicate size, capacity,
current utilization, projected build-out
utilization, cost estimates.
v. A discussion of how the proposed system
relates to water reclamation plans within
this zone or other zones should be included.
If golf courses or large parks and open
spaces are included, the plan shall include
a specific discussion of the reclamation
potential and indicate if the facility will
agree to use reclaimed water, if available.
C. Phasing
A phasing schedule shall project the timing for
provision of facilities in relation to projected
development activity. Periods where the demand for
facilities and improvements may exceed the capa-
city shall be indicated, and the plan shall
either :
1. Provide a plan for eliminating the short-
fall, or
ii. Indicate the intent to suspend development
in the zone for a period of time until the
necessary facilities are constructed.
D. Financing Plan
A financing plan establishing proposed methods to
fund all needed facilities shall be included. The
plan shall specifically indicate:
i. Which facilities are proposed to be funded
and built as an integral requirement of the
26
development project. If reimbursement
features are anticipated, they should be so
indicated.
ii. Which facilities are proposed to be built by
the serving agency as part of their normal
capital facilities improvement program, and
funded from hook-up fees, taxes or other
revenue sources. The facilities should
either be shown on an approved capital facil-
ities program or the serving agency should
indicate that the proposed funding method is
reasonable, and that it can be anticipated
that the facility will be included on a
future capital improvements program.
iii. Other funding sources such as assessment
districts or grants shall be discussed in
detail along with rational as to why this
source is considered workable and reason-
able.
VII. Environmental Review
A local Facilities Management Plan shall be considered a
project for the purposes of Title 19 of the City Code.
Environmental documents should be processed concurrently
with the plan.
(more to be added)
VIII. Plan Preparation Options
1. Single Owner Zones
A. Owner Prepares
The owner may prepare the plan at the owner's
expense.
27
B. City Prepares
The-City Council by resolution may direct the City
Manager to prepare the plan and assess the cost to
the owner within the zone after a hearing ten days
written notice of which is given to the property
owner.
2. Multi Owner Zones (All Owners in Agreement)
A. Owner Prepares
All owners may prepare a plan at the owner's
expense.
B. City Prepares
The City Council by resolution may direct the City
Manager to prepare the plan and assess the cost to
the owners within the zone after a hearing ten
days written notice of which is given to the pro-
perty owners.
3. Multi Owner Zones (All Owners do not Agree)
A. Owner Prepares
Any owner or group of cooperating owners within a
zone may petition the City Council to allow the
owner or group of owners to prepare the plan.
After a meeting from which ten days prior written
notice has been given to the property owners
within the zone, the City Council may permit the
owner or group of owners to prepare and submit the
plan. A limit based on the estimated cost of the
plan shall be determined at the time of the
hearing. The actual cost shall be determined when
the plan is adopted and shall be assessed pro rata
based on acreage and development potential to pro-
28
perty within the Facilities Management Zone. The
assessment shall be collected by the City at the
time any application for a development project
within the zone is submitted. The owner or owners
who prepare the plan shall be reimbursed for the
cost of the plan, less the owner or owners pro rata
share. No reimbursement shall be made unless the
plan is approved. Cost of preparation shall not
include interest.
B. City Prepares
The City Council may direct the City Manager to
prepare the Facilities Management plan after a
hearing ten days written notice of which is given
to the property owners. The cost of preparation
shall be advanced to the City by the requesting
owner or owners. A limit based on the estimated
cost of the plan shall be determined at the time
of the hearing. The actual cost shall be deter-
mined when the plan is adopted and shall be as-
sessed pro rata based on acreage and development
potential to property within the Facilities Man-
agement zone. The assessment shall be collected
by the City at the time any application for a
development project within the zone is submitted.
The owner or owners who requested the plan shall
be reimbursed for the cost of the plan, less the
owner or owners pro rata share. The cost of pre-
paration shall be advanced to the City by the
requesting owner or owners.
IX. Plan Processing
Facility Management Plans shall be reviewed according to
the following procedures:
29
1. A completed Facilities Management Plan complying with
the Carlsbad Municipal Code and accompanied by
necessary environmental documents and a processing fee
in an amount established by City Council Resolution,
may be submitted to the Planning Director for pro-
cessing. If the Planning Director determines that the
plan complies with the provision of Section 21.90.110
of the Carlsbad Municipal Code, the Director shall set
the Facilities Management Plan for public hearing
before the Planning Commission within 60 days of
receipt of a complete application.
2. The hearing shall be noticed according to the provi-
sions of Section 21.54.060(2) of the Carlsbad
Municipal Code. A staff report containing recommen-
dations on the plan shall be prepared and furnished to
the public, the applicant, and the Planning Commission
prior to the hearing.
3. The Planning Commission shall hear and consider the
application for a Facilities Management Plan and shall
by resolution prepare recommendations and findings for
the City Council. The action of the Commission shall
be filed with the City Clerk, a copy shall be mailed
to the owners within the facility zone.
4. When the Planning Commission action is filed with the
City Clerk, the Clerk shall set the matter for public
hearing before the City Council. The hearing shall be
noticed according to the provisions of Section
21.54.060(2) of the Carlsbad Municipal Code.
5. The City Council shall hear the matter, and after con-
sidering the findings and recommendations of the
Planning Commission, may approve, conditionally
approve or deny a Facilities Management Plan. The
City Council may include in the resolution adopting the
30
Facilities Management Plan any fees or facilities
improvement requirements which it deems necessary to
impose on development projects within the zone in
order to implement the City-wide Facilities and Impro-
vement plan and the Local Facilities Management Plan.
A Facilities Management Plan may be amended following
the same procedures for the original adoption. The
City Council may initiate an amendment to any of the
plans at any time if in its discretion it determines
that an amendment is necessary to insure adequate
facilities and improvements.
JHOO/City of Carlsbad/1-13
31
EXHIBIT
METHODOLOGY FOR BUILD-OUT PROJECTIONS
The process used to estimate the total number of dwelling units
in the City at ultimate build-out is relatively straightforward.
Using the City's General Plan map as a basis, all of the land
uses shown were entered into a computer by the San Diego Associa-
tion of Governments (SANDAG) using a process known as "digitiz-
ing." The computer converted this digitized information into
gross acres for each land use designation. Environmentally
constrained areas were also digitized and converted into acreage
figures in the same way. Constrained areas included slopes
greater than 25 percent; beaches, wetlands, floodways, other
water bodies, major roadways, railroad tracks, major power line
easements and raparian and woodland habitats. The primary sources
used in identifying these areas included previous environmental
impact reports prepared for projects throughout the City and a
citywide slope analysis map. To obtain net developable acres,
all of the 100 percent constrained acres and one-half of the
areas shown as 25-40 percent slopes were subtracted from the
gross acreage figure for each land use category. In this way, a
net developable acreage figure could be established for the
overall City, for each quadrant of the City, and for each of the
25 Growth Management Zones.
The net developable acreage figure was then multiplied by the
number of dwelling units allowed per acre using the City's "Con-
trol Yield" density ranges, which are listed below:
Residential Land Use Control Yield
RL 1.0
RLM 3.2
RM 6.0
RMH 11.5
RH 19.0
The Control Yield densities represent either the midpoint of the
City's adopted density ranges or actual experience using existing
developments within each land use category.
By applying the Control Yield densities to the net developable
acreage figures, an estimate of the total number of dwelling
units at full build-out can be derived. To carry the process one
step further, the per capita household size data provided by the
State Department of Finance can be used to estimate build-out
population. These data indicate that the City of Carlsbad had an
average household size of 2.471 persons on January 1, 1986, which
is considerably less than the nationwide average.
The same types of calculations were used to estimate the total
number of square feet of industrial and commercial land uses at
build-out. However, instead of residential density ranges, a set
of assumptions regarding site coverage for industrial and commer-
cial development was applied to the net developable acreage
figures.
The methodology described in the previous paragraphs was used to
provide a basis for determining the amount and types of public
facilities that will be needed to adequately serve the City at
build-out. However, it has a number of acknowledged short-
comings. For example, the digitizing process itself is not 100
percent accurate, and when applied to small geographical areas,
such as Management Zones, some inaccuracies can occur. A much
more accurate means of providing the same information would be
via a parcel-level Geobase system, however, such systems are very
complex and require a substantially longer time frame to imple-
ment. Therefore, concurrent with the development of the Growth
Management Program, the City has begun work on developing such a
Geobase system, which, at some point in time will supplant the
methodology described in the previous paragraphs.
Likewise, the dwelling unit estimates at build-out represent a
straight conversion of acres to units, with no regard to the
number of units already existing throughout the City. This may
result in Inequities within certain zones where development has
previously occurred under less constraining conditions or using
higher density ranges than those represented by the Control
Yield. In those cases, remaining development will have to occur
at densities lower than the Control Yield in order to achieve the
desired densities at full build-out. Of course, the opposite may
also occur where development within a certain Zone has taken
place at a density lower than the Control Yield figure. Despite
these recognized shortcomings, the approach and methodology used
within the Growth Management Program has been found to be quite
adequate for the purpose to which it was intended, namely long-
range facility planning. Therefore, until the parcel-level
Geobase system described earlier is implemented, this approach
will be used to provide the baseline estimates needed for both
mid-term and long-term facilities planning.
Other planning assumptions used in preparing the citywide projec-
tions included:
1. Pending applications to change the city's land use plan
from a residential to non-residential use.
2. Dwelling unit projections do not include any density
increases for special housing projects such as senior or
low Income projects.
3. Hotel, motel, health care, other housing units without
individual kitchen facilities which do not qualify as
dwelling units by the building code were not considered
as units for the purpose of dwelling unit calculations.
JHOO/City of Carlsbad/lH
i\ 4
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the Carlsbad City Council will hold a
public hearing on September 16, 1986 at 6:00 P.M. in the City Council Chambers,
1200 Elm Avenue to consider the following items pertaining to the
implementation of the Growth Management Ordinance:
1 ) Adoption of a Citywide Facilities and Improvements Plan;
2) Adoption of Guidelines for Preparation of Local Facility
Management Plan;
3) Minor revisions to previously adopted Public Facility Performance
Standards; and
4) Adoption of a Local Facility Management Plan processing fee.
A Negative Environmental Declaration was previously approved by the City
Council for the Growth Management Ordinance and a Notice of Prior Environmental
Compliance has been filed with respect to the implementation items being
considered at this time.
APPLICANT: CITY OF CARLSBAD
PUBLISH DATE: September 6, 1986
CARLSBAD CITY COUNCIL
B-4 ^eganAtepltaion Saturday, September 6,1986
NOTICE OF PUBLIC HEARING
NOTICE IS HEREBY GIVEN that the Carlsbad City Council will hold a public
hearing on September 16,1986 at 6:00 P.M. in the City Council Chambers, 1200
Elm Avenue to consider the following items pertaining to the implementation of the
Growth Management Ordinance:
1) Adoption of a City wide Facilities and Improvements Plan;
2) Adoption of Guidelines for Preparation of Local Facility Management Plan;
3) Minor revisions to previously adopted Public Facility Performance Standards; and
4) Adoption of a Local Facility Management Plan processing fee.
A Negative Environmental Declaration was previously approved by the City
Council for the Growth Management Ordinance and a Notice of Prior
Environmental Compliance has been filed with respect to the implementation
items being considered at this time.
APPLICANT: CITY OF CARLSBAD
Carlsbad City Council
PUBLISH: September 6,1986 Cjtj> o{