HomeMy WebLinkAbout1987-01-27; City Council; 8119-36; Notice of Completion Carlsbad Safety and Service Center 3006 projectsr OF CARLSBAD - AGENr BILL
ABflffVH-"^
MTG. 01/27/87
DEPT. CM
TITLE:
NOTICES OF COMPLETION FOR CONSTRUCTION
OF THE CARLSBAD SAFETY AND SERVICE CENTER
DFPT. HD.T^
CITYATTYV/y^
CITY MGR.<^~
RECOMMENDED ACTION:
Accept the contractual responsibilities of each contractor as being
complete. Direct the City Clerk to have the Notice of Completion recorded
and release the bonds 35 days after recordation.
ITEN EXPLANATION
Construction of the following portions of the Carlsbad Safety and Service
Center have been satisfactorily completed per the Construction Manager per
the letter attached:
IoC£CX.a
O
o
_J
o
oo
ORIGINAL
CONTRACT
CHANGE
ORDERS NO.TOTAL TYPE
3006-3A Reliable Elevators
3006-3B/
3D Kinney Air Condit.
3006-3C Orvin Engineering
3006-3E Catton/McCutcheon
3006-3F Lube Lift Equip.
3006-3G N/S Corporation
3006-4C Tecon Pacific
3006-4E Tulsa Steel Mfg.
3006-4F Estrada Hardware
3006-5A L. R. Hubbard
3006-5B/
7C Dittman Masonry
3006-5D/
71 Maloney Spec.
3006-6A Pacific Glass
3006-6B Construction Spec.
3006-6C/
6D E.F. Brady Co.
3006-6E Hess Roofing
3006-6F Calif. Sheet Metal
3006-6G Dittemore Bros.
3006-6H So. Cal. Overhead
3006-61 Air Link Inter.
3006-7A Bowser Cabinets
3006-7B McCandless Tile
3006-7D Simmons and Wood
3006-7E Vincent Wentz
3006-7F Tate Access Floods
3006-7G Advanced Wall Sys.
3006-7K Goodale Co.
3006-7M Sheward & Sons
$ 58,821 $10,171 2
$760,204 $44,139 10
$ 49,352 $ 3,462 5
$664,900 $71,878 13
$243,255 $ 3,070 2
$ 57,200
$438,500 $41,574 6
$ 69,992 Grading
$141,
$ 60,
$253,
$372,
$ 22,
$ 86,
$ 26,
850
560
821
421
758
250
175
18,644
$20,764
$ 9,094
$ 4,231
$ 4,927
3
3
3
2
2
$158,264
$132,530
$464,600
$140,358
$ 45,338
$ 14,767
$ 62,700
$ 13,092
$183,741
$125,418
$121,628
$ 86,732
$ 14,693
$ 33,709
$ 26,418
$ 6,872
$ 4,954 3
$23,246 11
$ 4,220 2
$10,605 5
$ 2,292 1
$ 2,069 1
$ 8,117 2
< 8,402> 1
$ 7,327 3
$ 288
$ 1,674
( 892) 1
$804,343
$ 52,814
$736,778
$246,325
$ 57,200
$480,074
$160,494
$ 81,324
$262,915
$376,652
$ 22,758
$ 91,/77
$ 26,175
$163,218
$132,530
$487,846
$144,578
$ 55,943
$ 17,059
$ 62,700
$ 15,161
$191,858
$117,016
$128,955
$ 86,732
$ 14,981
$ 35,383
$ 26,418
$ 5,980
HVAC
Fire Sprinklers
Electrical
Serv. Sta.
Equipment
Vehicle Wash
Precast
Concrete
Misc. Metal
Doors/Frames
Concrete
Masonry
Glass Block
Ceilings
Toilet
partitions
Glazing
Alum, canopies
Drywall
Roof
Sheet Metal
Insulation
Ceiling Doors
Pneumatic Tube
Cabinets
Tile
Painting
Carpets
Access floor
Folding
partitions
Lockers
Window
Coverings
NOTE: These completed contracts total $5,149,727. Funds are
available to pay less the 5% retention. A final recap
of Safety Center expenditures compared to budget will
be on Council agenda February 10, 1987.
Page 2 of Agenda Bill No.
The final project total for each contractor includes change orders handled
administratively in accordance with Administrative Order No. 7 to cover
necessary additional work.
FISCAL IMPACT
All contract amounts in total have been encumbered and those funds are
available to pay the retainage. The five (5%) percent retention will be
withheld until 35 days after the filing of the Notice of Completion.
EXHIBITS
1. Notices of Completion.
2. Letter from the Koll Co.
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Int erested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of grading at the Carlsbad Safety and Service
Center, on which Reliable Elevators was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ^sO^^^as^* £ 7 > 1987, accepted the
above described work as completed land ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on <&WV^»J>-<I>-M cQ^ > 1987 at Carlsbad, California.
CITY OP CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of HVAC at the Carlsbad Safety and Service
Center, on which Kinney Air Conditioning was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <^r»^x>u-a^M 3 ~f _ , 1987, accepted the
above described work as /completed/ and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
t rue and correct .
Executed on dsi^m^As-*) £ $^~ > 1987 at Carlsbad, California.
' CITY OF CARLSBAD
J.
ALETHA L. RAUTEftKRANZ
City Clerk
Ll
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of fire sprinklers at the Carlsbad Safety and
Service Center, on which Orvin Engineering was the Contractor,
was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <df^f^Afa^u^ £ 7 > 1987, accepted the
above described work as/compieted and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on <J^^^-«^L^I SL^ > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of electrical at the Carlsbad Safety and
Service Center, on which Catton/McCutcheon was the Contractor,
was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on C^g-y^^nx/i^ o? r7. _ » 1987, accepted the
above described work a s /com pie t e a and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct .
Executed on -dq^^j^gj^M £ ^ > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of service station equipment at the Carlsbad
Safety and Service Center, on which Lube Lift Equipment was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ••evv^oc^gu* 3. 7 _, 1987, accepted the_
above described work as/completed/ and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on r^^^L,^ 2. , 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of vehicle wash at the Carlsbad Safety and
Service Center, on which N/S Corporation was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on -^U-^UL^J^ . «? 7 > 1987, accepted the
above described work as ^completed/and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on '••J^fl^ tji f^Aj*\, 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of precast concrete at the Carlsbad Safety and
Service Center, on which Tecon Pacific was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <toL~*-*****~ 3 7 > 1987, accepted the
above described work as/fcompletedand ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on ^^^^cixx/u^ SI > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of miscellaneous metal at the Carlsbad Safety
and Service Center, on which Tulsa Steel Manufacturing was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on •*h&~f-*~t-4*s^\ a? *7 > 1987, accepted the
above described work as ^completed/ and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on , 1987 at Carlsbad, California.
CITY OF CARLSBAD
uutiutfa- K-
ETHA L. RAUTALETHA L. RAUTENK
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of doors and frames at the Carlsbad Safety and
Service Center, on which Estrada Hardware was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <dxv>^x>cu^ J *7 , 1987, accepted the
above described work as Completed/ andordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on <dff^ju^A^^\ £/ , 1987 at Carlsbad, California.
' ' CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of concrete masonry at the Carlsbad Safety and
Service Center, on which L. R. Hubbard was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <4ct^ti^A^ o2 7 > 1987, accepted the
above described work as^complet ejd and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on y^tix*/^ ,2. > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of glass block ceilings at the Carlsbad Safety
and Service Center, on which Dittman Masonry was the Contractor,
was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on xg-y^mxiA- £ *J , 1987, accepted the
above described work as ompleted and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of toilet partitions at the Carlsbad Safety
and Service Center, on which Maloney Specialties was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on yrt^ju^au^* 3 7 _ , 1987, accepted the
above described work a s/co m p 1 e t e/d and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on "^L^^JJ~^->^\
" '
> 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Int erested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of glazing at the Carlsbad Safety and Service
Center, on which Pacific Glass was the Contractor, was
complet ed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on dUvv-^xxiAA^ o? "7 __ » 1987, accepted the
above described work as ^completeq and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on <^ti^ju>~<^<^ c3 <T i 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of aluminum canopies at the Carlsbad Safety
and Service Center, on which Construction Specialties was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <x£^y^uX<5tA^1 £ ~? , 1987, accepted the
above described work as ^eompletepand ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on , 1987 at Carlsbad, California.
CITY OF CARLSBAD
3C.
ALETHA L. RAUTENKRANZ
City Clerk
.
It*
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of drywall at the Carlsbad Safety and Service
Center, on which E. F. Brady Co. was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ~g<tia-v-C'UrtA~ ___ £ 7 > 1987, accepted the___
above described work as .completed; and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on > 1987 at Carlsbad, California
CITY OF CARLSBAD
*.
ALETHA L. RAUTENKRANZ
City Clerk
~.
I
'
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of roofing at the Carlsbad Safety and Service
Center, on which Hess Roofing was the Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ^^o~n^A^>^^i S 7 > 1987, accepted the
above described work as Completed /and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on xL^^yCc o?^ _> 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of sheet metal at the Carlsbad Safety and
Service Center, on which California Sheet Metal was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINAOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on C^L^O^-A^LXOV ^ 2 ~? » 1987, accepted the
above described work as/complet edj and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on sa^oLxo^-i ol^/*' > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk /
n
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of insulation at the Carlsbad Safety and
Service Center, on which Dittemore Brothers was the Contractor,
was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on *zla^-*A-tt^~\ a? 7 > 1987, accepted the
above described work as ycomplet epand ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on , 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of ceiling doors at the Carlsbad Safety and
Service Center, on which Southern California Overhead Doors was
the Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <T%aw-«-<-<t/t> >? 7 _ > 1987, accepted the
above described work as Gromplete
Completion be filed.
_
and ordered that a Notice of
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
^-yOl<3-~-\
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of pneumatic tubes at the Carlsbad Safety and
Service Center, on which Air Link International was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on W^jj^y <^ ^ _ » 1987> accepted the
above described work as ompleted and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on 3~Q > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of cabinets at the Carlsbad Safety and Service
Center, on which Bowser Cabinets was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ^JOL^J^^^-^ d?"7 > 1987, accepted the
above described work as jcompleteq and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on , 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of tile at the Carlsbad Safety and Service
Center, on which McCandless Tile was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <3s^*J^*s^s\ J1 , 1987, accepted the
above described work as .completed/
Completion be filed.
and ordered that a Notice of
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on , 1987 at Carlsbad, California.
CITY OF CARLSBAD
ff(. ^aALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of painting at the Carlsbad Safety and Service
Center, on which Simmons and Wood was the Contractor, was
complet ed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <bjL^u^e>ji*A. £ "J _ , 1987, accepted the
above described work as ^completed and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on -^t n*t > iw* -3 S^ > 1987 at Carlsbad, California.
'CITY OF CARLSBAD
ALETHA L. RAIJTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of carpets at the Carlsbad Safety and Service
Center, on which Vincent Wentz was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on ^a--^*-*-^^^ _ «R ? > 1987, accepted the
above described work as Completedl and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on c^U^^L^ <2IT > 1987 at Carlsbad, California.
CITY OF CARLSBAD
&.ALETHA L. RALTTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of access flooring at the Carlsbad Safety and
Service Center, on which Tate Access Floors was the Contractor,
was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on -^t^^u^c^-i o? ^7 _ > 1987, accepted the
above described work a s ycotnpleteq an d ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on
'
> 1987 at Carlsbad, California
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Int erested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of folding partitions at the Carlsbad Safety
and Service Center, on which Advanced Wall Systems was the
Contractor, was completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <j jft^uu^a^-^. o? /7 > 1987, accepted the"above described work as ompleted" (arid ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on tf" > 1987 at Carlsbad, California.
CITY OF CARLSBAD
Z.
ALETHA L. RAUTENKRANZ
City Clerk
ja~^
T
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on January 13, 1987, the
project consisting of window coverings at the Carlsbad Safety and
Service Center, on which Sheward & Sons was the Contractor, was
completed.
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on <Ln^^ju^a^^^\ e2 7 > 1987, accepted the
above described work as /Completed and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on *&G^J^AA^ 3. IT > 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
NOTICE OF COMPLETION
To All Laborers and Material Men and to Every Other Person
Interested:
YOU WILL PLEASE TAKE NOTICE that on . January 13, 1987, the
project consisting of lockers at the Carlsbad Safety and Service
Center, on which Gpodale Co. was the Contractor, was completed.
»
CITY OF CARLSBAD
PROJECT COORDINATOR
VERIFICATION OF CITY CLERK
I, the undersigned, say:
I am the City Clerk of the City of Carlsbad; the City
Council of said City on -A^-^JuuaU^\ <3 7 > 1987, accepted the
above described work as /ompletep and ordered that a Notice of
Completion be filed.
I declare under penalty of perjury that the foregoing is
true and correct.
Executed on '\pfV»\-*-u<LA->A , 1987 at Carlsbad, California.
CITY OF CARLSBAD
ALETHA L. RAUTENKRANZ
City Clerk
?o
KOLL 7330 Engineer Road
San Diego
California 92111
Roll Construction Company (619) 292-5550
December 17, 1986
Mr. Mike Brooks
City of Carlsbad
2075 La Palmas
Carlsbad, CA 92008
Re: Carlsbad Safety Center
KCC Job #3225
Retention Release
Dear Mike:
The following contractors have completed their contractural
obligations with respect to the referenced project. Pending
final review by your architect and inspection department, we
would recommend acceptance by the City Council and filing of
Completion Notices.
Reliable Elevator #3A
Kinney Air Conditioning #3B/3D
Orvin Engineering #3C
Catton/McCutcheon Electric #3E
Lube Lift Equipment #3F
N/S Corporation #3G
Tecon Pacific #4C
Tulsa Steel Mfg. Company #4E
Estrada Hardware #4F
L.R. Hubbard #5A
Dittmann Masonry #5B and 7C
Specialties #5D and 71,
Pacific Glass #6A
Construction Specialties #6B
E.F. Brady, Company #6C/6D
Hess Roofing #6E
California Sheet Metal #6F
Dittemore Brothers, Inc. #6G
Southern California Overhead Door #6H
Air Link International #61
Bowser Cabinets #7A
McCandless Tile #7B
Simmons and Wood #7D
Mr. Mike Brooks
December 17, 1986
Page 2
Vincent Wentz Flooring #7E
. Tate Access Floors #7F
f';±t*«-Advanced Wall Systems, Inc. #7G
Goodale Company #7K
Sheward & Sons #7M
There are three (3) remaining contracts which need to be
completed. Should you have any questions, please call.
Respre"ohfully,
KOLL CONSTRUCTION COMPANY
Stevel Mahoney
Project Manager
SM/lp
Enclosure
cc: Gene Hussey
File
r